1. Cost Estimating
2. Cost Budgeting
4 3. Cost Control
Project Quality Management 1. Quality Planning 2. Perform QA
(3)
1. Quality Planning
2. Perform QA
5 3. Perform QC
Project Human Resource 1. HR Planning 2. Acquire Project Team
Management 3. Develop Project Team
(4) 1. HR Planning
2. Acquire Project Team
3. Develop Project Team
6 4. Manage Project team
Project Communications 1 Communications Planning 2 Information Distribution
Management 1 Communications Planning
(4) 2 Information Distribution
3 Performance Reporting
4 Manage Stakeholders
7
Project Risk Management
(6) 1 Risk Management Planning
1 Risk Management Planning 2 Risk Identification
2 Risk Identification 3 Qualitative Risk Analysis
3 Qualitative Risk Analysis 4 Quantitative Risk Analysis
4 Quantitative Risk Analysis 5 Risk Response Planning
5 Risk Response Planning
8 6 Risk Monitoring and Control
Project Procurement Management 3. Request seller responses
(6) 1. Plan, Purchase and Acquisitions 4. Select sellers
1. Plan, Purchase and Acquisitions 2. Plan Contracting
2. Plan Contracting
3. Request seller responses
4. Select sellers
5. Contract administration
6. Contract Closure
9
Vipul Vashisht
Prepared by vipul 08/25/2009 vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
Prepared by vipul 08/25/2009 vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
4. Scope verification,
5. Scope control
6. Schedule Control
3. Cost Control
3. Perform QC
3 Performance Reporting
4 Manage Stakeholders
PM Processes
Inputs
I. Project Management Knowledge Areas:
Project Integration Management
1. Develop the Project Charter
( INITIATING) 1. Contract
2. Project statement of work
3. Enterprise environmental factors
4. Organizational Project assets
7. Close Project
(CLOSING) 1. Project Management Plan
2. Requested Changes
3. Work Performance Information
4. Recommended Preventive Actions
5. Recommended Corrective Actions
6. Recommended Defect Repair
7. Deliverables
2. Scope definition
(PLANNING) 1. Organizational Process Assets
2. Project Charter
3. Preliminary Project Scope Statement
4. Project Scope Management Plan
5. Approved Change Requests
3. Create WBS
(PLANNING) 1. Organizational Process Assets
2. Preliminary Project Scope Statement
3. Project Scope Management Plan
4. Approved Change Requests
4. Scope verification
( MONITORING & CONTROL) 1. Project Scope Statement
2. WBS Dictionary
3. Project Scope Management Plan
4. Deliverables
5. Scope control
( MONITORING & CONTROL) 1. Project Scope Statement
2. Work Breakdown Structure
3. WBS Dictionary
4. Project Scope Management Plan
5. Performance Reports
6. Approved Change Requests
7. Work Performance Information
1. Activity Definition
( PLANNING) 1. Enterprise Environmental Factors
2. Organizational Process Assets
3. Project Scope Statement
4. Work Breakdown Structure
5. WBS Dictionary
6. Project Management Plan
2. Activity Sequencing
( PLANNING) 1. Project Scope Statement
2. Activity List
2. Activity Attributes
3. Milestone List
4. Approved Change Requests
5. Schedule Development
( PLANNING) 1. Organizational Process Assets
2. Project Scope Statement
3. Activity List
4. Activity Attributes
5. Project Schedule Network Diagram
6. Activity Resource Requirements
7. Resource Calendars
8. Activity Duration estimates
8. Project Management Plan
Risk Register
6. Schedule Control
( MONITORING & CONTROLLING) 1. Schedule Management Plan
2. Schedule Baseline
3. Performance Reports
4. Approved Change Requests
2. Cost Budgeting
( PLANNING) 1. Project Scope Statement
2. Work Breakdown Structure
3. WBS directory
4. Activity Cost Estimates
5. Activity Cost Estimate Supporting Detail
6. Project Schedule
7. Resource Calendars
8. Contract
9. Cost Management Plan
3. Cost Control
( MONITORING & CONTROLLING) 1. Cost Baseline
2. Project Funding Requirement
3. Performance Reports
4. Work Performance Information
5. Approved Changed Requests
6. Project Management Plan
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
1. Quality Planning
(PLANNING) 1. Enterprise Environmental Factors
2. Organizational Process Assets
3. Project Scope Statement
4. Project Management Plan
2. Perform QA
(EXECUTING) 1. Quality Management Plan
2. Quality Metrics
3. Process Improvement Plan
4. Work Performance Information
5. Approved Change Requests
6. Quality Control Measurements
7. Implemented Change Requests
8. Implemented Corrective Actions
9. Implemented Defect Repair
10. Implemented Preventive Actions
3. Perform QC
( MONITORING & CONTROLLING) 1. Quality Management Plan
2. Quality Metrics
3. Quality Checklists
4. Organizational Process assets
5. Work Performance Information
6. Approved Change Requests
7. Deliverables
2 Information Distribution
(EXECUTING) 1. Communication Management Plan
3 Performance Reporting
(MONITORING & CONTROLLING) 1. Work Performance Information
2. Performance Measurements
3. Forecasted Completion
4. Quality Control Measurements
5. Project Management Plan
- Performance Measurement Baseline
6. Approved Change Requests
7. Deliverables
4 Manage Stakeholders
(MONITORING & CONTROLLING) 1. Communication Management Plan
2. Organizational Process assets
2 Risk Identification
(PLANNING) 1. Organizational Process Assets
2. Project Scope Statement
3. Risk Management Plan
4. Risk Register
4. Select sellers
(EXECUTING) 1. Organizational Process Assets
2. Procurement Management Plan
3. Evaluation Criteria
4. Procurement Document Package
5. Proposals
6. Qualified Seller List
7. Project Management Plan
- Risk Register
- Risk related contractual agreements
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
5. Contract administration
( Monitoring & controlling) 1. Contract
2. Contract management Plan
3. Selected Sellers
4. Performance Reports
5. Approved Change Requests
6. Work Performance Information
6. Contract Closure
1. Procurement Management Plan
2. Contract Management Plan
3. Contract documentation
4. Contract closure procedure
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
1.
1 . Closed Contracts
1. Procurement audits 2. Organizational Process Assets
2. Records management system (updates)
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
Vipul Vashisht
vipulvashisht@gmail.com
- PMP, CSQA, CTFL, JCP, MCP
PM Processes
Inputs Tools & Techniques Output
I. Project Management Knowledge
Areas: Project Integration
Management
1. Develop the Project Charter
( INITIATING) 1. Contract 1. Project Selection Methods 1. Project Charter
2. Project statement of work 2. Project Management Methodology
3. Enterprise environmental 3. Project Management Information
factors System
4. Organizational Project assets 4. Expert Judgment
7. Close Project
(CLOSING) 1. Project Management Plan 1. Project Management Methodology 1. Administrative Closure Procedure
2. Requested Changes 2. Project Management Information 2. Contract Closure Procedure
3. Work Performance Information System 3. Final Product, service or result
4. Recommended Preventive 3. Expert Judgment 4. Organizational Process assets
Actions (updates)
5. Recommended Corrective
Actions
6. Recommended Defect Repair
7. Deliverables
PM Processes
Inputs Tools & Techniques Output
II . Project Management
Knowledge Areas: Project
Scope Management
1. Scope planning
(PLANNING) 1. Enterprise 1. Expert Judgment 1. Project Scope Management
Environmental Factors 2. Templates, Forms , Plan
2. Organizational Process Standards
Assets
3. Project Charter
4. Preliminary Project
Scope Statement
5. Project Management
Plan
2. Scope definition
(PLANNING) 1. Organizational Process 1. Product Analysis 1. Project Scope Statement
Assets 2. Alternatives Identification 2. Requested Changes
2. Project Charter 3. Expert Judgment 3. Project Scope Management
3. Preliminary Project 4. Stakeholders Analysis Plan (Updates)
Scope Statement
4. Project Scope
Management Plan
5. Approved Change
Requests
3. Create WBS
(PLANNING) 1. Organizational Process 1. Work Breakdown 1. Project Scope Statement
Assets Structure templates (Updates)
2. Preliminary Project 2. Decomposition 2. Work Breakdown Structure
Scope Statement 3. WBS Dictionary
3. Project Scope 4. Scope Baseline
Management Plan 5. Project Scope Management
4. Approved Change Plan (Updates)
Requests 6. Requested Changes
4. Scope verification
( MONITORING & 1. Project Scope 1. Inspection 1. Accepted Deliverables
CONTROL) Statement 2. Requested Changes
2. WBS Dictionary 3. Recommended Corrective
3. Project Scope Actions
Management Plan
4. Deliverables
5. Scope control
( MONITORING & 1. Project Scope 1. Change Control System 1. Project Scope Statement
CONTROL) Statement 2. Variance Analysis (Updates)
2. Work Breakdown 3. Replanning 2. Work Breakdown Structure
Structure 4. Configuration (Updates)
3. WBS Dictionary Management System 3. WBS Dictionary (Updates)
4. Project Scope 4. Scope Baseline (Updates)
Management Plan 5. Requested Changes
5. Performance Reports 6. Recommended Corrective
6. Approved Change Actions
Requests 7. Organizational Processes
7. Work Performance Assets (Updates)
Information 8. Project Management Plan
(Updates)
PM Processes
Inputs Tools & Techniques Output
III .Project Management
Knowledge Areas: Project Time
Management
1. Activity Definition
( PLANNING) 1. Enterprise 1. Decomposition 1. Activity List
Environmental Factors 2. Templates 2. Activity Attributes
2. Organizational Process 3. Rolling Wave Planning 3. Milestone List
Assets 4. Expert Judgment 4. Requested Changes
3. Project Scope Statement 5. Planning Component
4. Work Breakdown
Structure
5. WBS Dictionary
6. Project Management
Plan
2. Activity Sequencing
( PLANNING) 1. Project Scope Statement 1. Precedence Diagramming Method 1. Project Schedule
2. Activity List (PDM) Network
2. Activity Attributes 2. Arrow Diagramming Method (ADM) 2. Activity List (Updates)
3. Milestone List 3. Schedule Network Templates 3. Activity Attributes
4. Approved Change 4. Dependency Determination ( Updates)
Requests 5. Applying leads and lags 4. Requested Changes
6. Schedule Control
( MONITORING & 1. Schdule Management 1. Progress Reporting 1. Schedule model Data
CONTROLLLING) Plan 2. Schedule Change Control System (updates)
2. Schdule Baselinne 3. Performance Measurements 2. Schedule Baseline
3. Performance Reports 4. Project Management Software (updates)
4. Approved Change 5. Variance Analysis 3. Performance
Requests 6. Schdule Comparison bar charts Measurements
4. Requested Changes
5. Recommended
Corrective Actions
6. Organizational Process
Assets (Updates)
7. Activity List (Updates)
8. Activity Attributes
(Updates)
9. Project Management
Plan (Updates)
PM Processes
Inputs Tools & Techniques Output
IV. Project Management
Knowledge Areas: Project
Cost Management
1. Cost Estimating
( PLANNING) 1. Enterprise 1. Analogous Estimating 1. Activity Cost Estimates
Environmental Factors 2. Determine Resource Cost Rates 2. Activity Cost Estimate
2. Organizational 3. Bottom-up Estimating Supporting Detail
Process Assets 4. Parametric estimating 3. Requested Changes
3. Project Scope 5. Project Management Software 4. Cost Management Plan
Statement 6. Vendor Bid Analysis (updates)
4. Work Breakdown 7. Reserve Analysis
Structure 8. Cost Of Quality
5. WBS directory
6. Project Management
Plan
Schedule
Management Plan
Staffing Management
Plan
Risk Register
2. Cost Budgeting
( PLANNING) 1. Project Scope 1. Cost Aggregation 1. Cost Baseline
Statement 2. Reserve Analysis 2. Project Funding Requirement
2. Work Breakdown 3. Parametric estimating 3. Cost management Plan
Structure 4. Funding Limit Reconciliation (updates)
3. WBS directory 4. Requested Changes
4. Activity Cost
Estimates
5. Activity Cost
Estimate Supporting
Detail
6. Project Schedule
7. Resource Calendars
8. Contract
9. Cost Management
Plan
3. Cost Control
( MONITORING & 1. Cost Baseline 1. Cost Change Control System 1. Cost Estimate (updates)
CONTROLLING) 2. Project Funding 2. Performance Measurement 2. Cost Baseline (updates)
Requirement Analysis 3. Performance Measurements
3. Performance Reports 3. Forecasting 4. Forecasted Completion
4. Work Performance 4. Project Performance reviews 5. Requested Changes
Information 5. Project Management Software 6. Recommended Corrective
5. Approved Changed 6. Variance management Actions
Requests 7. Organizational Process assets
6. Project Management (updates)
Plan 8. Project Management Plan
(updates)
PM Processes
Inputs Tools & Techniques Output
V. Project Management
Knowledge Areas: Project
Quality Management
2. Perform QA
(EXECUTING) 1. Quality Management Plan 1. Quality Planning Tools & 1. Requested Changes
2. Quality Metrics Techniques 2. Recommended corrective
3. Process Improvement 2. Quality audits actions
Plan 3. Process Analysis 3. Organizational Process assets
4. Work Performance 4. Quality Control Tools and (updates)
Information Techniques 4. Project Management Plan
5. Approved Change (updates)
Requests
6. Quality Control
Measurements
7. Implemented Change
Requests
8. Implemented Corrective
Actions
9. Implemented Defect
Repair
10. Implemented Preventive
Actions
3. Perform QC
( MONITORING & 1. Quality Management Plan 1. Cause & Effect Diagram 1. Quality Control Measurements
CONTROLLING) 2. Quality Metrics 2. Control Charts 2. Validated Defect Repair
3. Quality Checklists 3. Flowcharting 3. Quality Baseline (Updates)
4. Organizational Process 4. Histogram 4. Recommended Corrective
assets 5. Pareto Chart Actions
5. Work Performance 6. Run Chart 5. Recommended Preventive
Information 7. Scatter Diagram Actions
6. Approved Change 8. Statistical Sampling 6. Requested Changes
Requests 9. Inspection 7. Recommended defect repair
7. Deliverables 10. Defect repair Review 8. Organizational Process assets
( Updates)
9. Validated Deliverables
10. Project Management Plan
( Updates)
PM Processes
Inputs Tools & Techniques
VI. project Management Knowledge
Areas: Project Human Resource
Management
1. HR Planning
(PLANNING) 1. Enterprise Environmental Factors 1. Organizational Charts and
2. Organizational Process Assets position descriptions
3. Project Management Plan 2. Networking
Activity Resource Requirements 3. Organizational Theory
1. Team Performance
Assessments
1. Requested Changes
2. Recommended corrective
actions
3. Recommended Preventive
actions
4. Organizational Process assets
(updates)
5. Project Management Plan
(updates)
PM Processes
Inputs Tools & Techniques
VII . Project Management Knowledge
Areas: Project Communications
Management
1 Communications Planning
(PLANNING) 1. Enterprise Environmental 1. Communication Reqts
Factors Analysis
2. Organizational Process 2. Communication technology
Assets
3. Project Scope Statement
4. Project Management Plan
Constraints
Assumptions
2 Information Distribution
(EXECUTING) 1. Communication 1. Communication Skills
Management Plan 2. Information Gathering and
Retrieval System
3. Information Distribution
Methods
4. Lessons Learned process
3 Performance Reporting
(MONITORING & CONTROLLING) 1. Work Performance 1. Information Presentation Tools
Information 2. Performance Information
2. Performance Gathering and Compilation
Measurements 3. Status Review Meetings
3. Forecasted Completion 4. Time Reporting Systems
4. Quality Control 5. Cost Reporting Systems
Measurements
5. Project Management Plan
- Performance
Measurement Baseline
6. Approved Change
Requests
7. Deliverables
4 Manage Stakeholders
(MONITORING & CONTROLLING) 1. Communication 1. Communication Methods
Management Plan 2. Issues Logs
2. Organizational Process
assets
Output
1. Communication Management
Plan
1. Performance reports
2. Forecasts
3. Requested Changes
4. Recommended Corrective
Changes
5. Organizational Process Assets
(updates)
1. Resolved Issues
2. Approved Change Requests
3. Approved Corrective Actions
4. Organizational Process Assets
(updates)
5. Project Management Plan
(updates)
PM Processes
Inputs Tools & Techniques Output
VIII. Project Management Knowledge
Areas: Project Risk Management
2 Risk Identification
(PLANNING) 1. Organizational Process 1. Documentation Reviews 1. Risk Register
Assets 2. Information Gathering
2. Project Scope Statement technique
3. Risk Management Plan 3. Checklist Analysis.
4. Risk Register 4. Assumption Analysis
5. Diagramming Techniques
PM Processes
Inputs Tools & Techniques Output
IX. Project Management
Knowledge Areas: Project
Procurement Management
1. Plan, Purchase and Acquisitions
(PLANNING) 1. Enterprise Environmental 1. Make-or-buy analysis 1. Procurement
Factors 2. Expert judgment Management Plan
2. Organizational Process Assets 3. Contract Types 2. Contract Statement of
3. Project Scope Statement Work
4. Work Breakdown Structure 3. Make or Buy
5. WBS Dictionary decisions
6. Project Management Plan 4. Requested Changes
- Risk register
- Risk related contractual
agreements
- Resource Requirements
- Project Schedule
- Activity Cost estimates
- Cost Baseline
2. Plan Contracting
(PLANNING) 1. Standard Forms 1.Procurement
1. Procurement Management Plan 2. Expert Judgment Documents
2. Contract Statement of Work 2. Evaluation Criteria
3. Make or Buy decisions 3. Contract Statement of
4. Project Management Plan Work ( Updates)
- Risk Register
- Risk related contractual
agreements
-Resource reqts
- Project Schedule
- Activity Cost Estimate
- Cost Baseline
3. Request seller responses
(EXECUTING) 1. Organizational Process Assets 1. Bidder Conferences 1. Qualified Seller List
2. Procurement Management Plan 2. Advertising 2. Procurement
3.Procurement Documents 3. Develop Qualified seller list Document Package
3. Proposals
4. Select sellers
(EXECUTING) 1. Organizational Process Assets 1. Weighting System 1. Selected Sellers
2. Procurement Management Plan 2. Independent Estimates 2. Contract
3. Evaluation Criteria 3. Screening System 3. Contract
4. Procurement Document Package 4. Contract Negotiation management Plan
5. Proposals 5. Seller Rating System 4. Resource Availability
6. Qualified Seller List 6. Expert Judgment 5. Procurement
7. Project Management Plan 7. Proposal evaluation Management Plan
- Risk Register techniques (updates)
- Risk related contractual 6. Requested Changes
agreements
5. Contract administration
( Monitoring & controlling) 1. Contract 1. Contract Change Control 1. Contract
2. Contract management Plan System Documentation
3. Selected Sellers 2. Buyer-Conducted 2. Requested changes
4. Performance Reports Performance Review 3. Recommended
5. Approved Change Requests 3. Inspections and Audits Corrective Actions
6. Work Performance Information 4. Performance reporting 4. Organizational
5. Payment System Process Assets
6. Claims administration (updates)
7. Records Management system 5. Project Management
8. Information Technology Plan (updates)
- Procurement
Management Plan
- Contract Management
Plan
Created By : Vipul Vashisht
- PMP, CSQA, CTFL, JCP, MCP
7. Close Project
(CLOSING)
Output