DETAILED ESTIMATE

Name Of Work : Construction of 6m span of Double vent slab culvert @ Seelamuthaiyapuram to Vandiyur Road Length Depth (m) width(m) (m) Sl.No Description of item Nos Unit Quantity Earth work excavationfor foundation of structures up to 3m depth as per drawing and technical specification clause 1140 including setting out,construction of shoring and bracing ,removal of stumps and other deleterious matter, dressing of sides and botto Abutment footing Pier Wing wall footing 1 1 1 2 1 4 10.90 10.90 5.00 3.30 3.30 2.60 Total 2.20 Cum 2.20 Cum 2.20 Cum Cum 158.27 79.13 114.40 351.80

Providing and laying concrete for plain/Reinforced concrete with 40 mm metal (cc 1:3:6) in open foundation complete as per drawings and MORD technical specification clauses 802,803,1202 &1203 Foundation up to Sill Level Abutment 1st footing 2nd footing 3 rd footing Pier 1st footing 2nd footing 3 rd footing WING WALL 1st footing 2nd footing 3 rd footing Approach slab both sides 1 2 5.00 6.80 Total 0.15 Cum 10.20 248.72 2 2 2 2 2 2 5.00 5.00 5.00 2.60 2.20 1.80 0.60 Cum 0.60 Cum 0.60 Cum 31.20 26.40 21.60 1 1 1 1 1 1 10.90 10.10 9.30 3.30 2.90 2.50 0.60 Cum 0.60 Cum 0.60 Cum 21.58 17.57 13.95 1 1 1 2 2 2 10.90 10.10 9.30 3.30 2.90 2.50 0.60 Cum 0.60 Cum 0.60 Cum 43.16 35.15 27.90

Providing and laying cement concrete with 40 mm metal (1:2:4) in superstructure as per drawing and MORD technical specificationclause clause 800,1250.4 &1205.5 Above Sill Level

Abutments Pier Wings

1 1 1

2 1 4

7.50 (2.5+.72)/2 7.50 (2.5+.72)/2 5.00 (1.4+.45)/2

2.00 Cum 2.00 Cum 3.00 Cum

48.30 24.15 55.50

Approach slab both sides

10.00 Total

6.80

0.20 Cum

27.20 155.15

Providing and laying reinforced cement concrete (1: 1.5 :3)in superstructure as per drawing and MORD technical specification clause 800,1250.4 &1205.5 Design mix m 25 for deck slab Design mix m 25 for deck slab Design mix m 25 for deck slab Deck slab Parapet wall - vertical pillar 1 4 2 4 7.50 0.20 6.80 0.20 0.48 cum 0.90 cum 48.96 0.58

Bed block for abutment Dirt wall for abutment

2 2

2 2

7.50 7.50

0.72 0.30 Total

0.25 cum 0.48 cum

5.40 4.32 59.26

Centering: Providing form work for centering, shuttering etc., for all RCC works including strutting up to 3.29m in all floors using mild steel sheets of size 90 x 60 cm of B G 10 stiffened with mild steel angles of size 25 x 25 x 3mm laid over silver oak Below Sil Level Abutment 1st footing 2nd footing 3 rd footing Pier 1st footing 2nd footing 3 rd footing Wing wall 1st footing 2nd footing 3 rd footing 2 2 2 2 2 2 5.00 5.00 5.00 Total 0.60 Cum 0.60 Cum 0.60 Cum 12.00 12.00 12.00 129.60 246.00 Total 375.60 1 1 1 2 (10.9+3.3) 2 (10.1+2.9) 2 (9.3+2.5) 0.60 Cum 0.60 Cum 0.60 Cum 17.04 15.60 14.16 1 1 1 2 (10.9+3.3) 2 (10.1+2.9) 2 (9.3+2.5) 0.60 Cum 0.60 Cum 0.60 Cum 17.04 15.60 14.16

Centering: Providing form work for centering, shuttering etc., for all RCC works including strutting up to 3.29m in all floors using mild steel sheets of size 90 x 60 cm of B G 10 stiffened with mild steel angles of size 25 x 25 x 3mm laid over silver oak Above Sil Level

Abutment Pier Wing wall

2 1 2

2 (7.5+1.6) 2 (7.5+1.6) 4 (5+.7)

2.00 Cum 2.00 Cum 3.00 Cum

72.80 36.40 136.80 246.00

Deck Slab Deck Slab Sides 1 2 2 2 7.50 6.80 6.00 0.48 90.00 13.06

vertical pillar

0.80

0.90 cum

11.52

Bedblock Abutment Dirt wall abutment 4 2 7.50 0.48 28.80 158.38 supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification clauses 1002,1010,&1202 For deck slab as per scheduled enclosed 4 2 7.50 0.25 15.00

2.50 MT Total

5.00 MT

5.00

providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and MORD technical specification Over abutment 1 2 7.50 0.48 Total sqm 7.20

Backfilling behaind abutment , wing wall and return wall complete as per drawing & MORD technical specification clause 1240.3.8 Rear side of abutment Wingwall Both sides Inbetween wing walls 2 4 2 2 2 2 3.15 2.10 5.00 1.05 1.05 6.90 Total 1.00 cum 1.20 cum 0.60 13.23 21.17 82.80 117.20

Plastering with cement mortar (1:3) 10mm thick 10 on masonary work in sub-structure as per MORD technical specification clause 613.4 &1204 over wings 4 2 5.00 0.45 Total Supplying and fixing in position best 11 qulity PVC Rain water pipe having ISI mark and providing leak proof joints inculding fixing to the wall with special PVC / MS clamps etc Wing wall Abutment 2 2 2 2 1.00 1.00 2.20 1.50 Total RM RM 8.80 6.00 14.80 sqm 18.00 18.00

ABSTRACT ESTIMATE
Name Of Work : Construction of 6m span of Double vent slab culvert @ Seelamuthaiyapuram to Vandiyur Road Sl.No Qty 1 2 Description of item 3 RATE 4 PER UNIT 5 AMOUNT 6

Earth work excavationfor foundation of structures up to 3m depth as per drawing and technical specification clause 1140 351.80 including setting out,construction of shoring and bracing ,removal of stumps and other deleterious matter, dressing of sides and botto

72.80

CUM

25 611

Providing and laying concrete for plain/Reinforced concrete (1:3:6) in open 248.72 foundation complete as per drawings and MORD technical specification clauses 802,803,1202 &1203 Providing and laying concrete for plain/Reinforced concrete (1:2:4) in open 155.15 foundation complete as per drawings and MORD technical specification clauses 802,803,1202 &1203 providing and laying reinforced cement concrete (1:1 1/2 :3) in superstructure as per drawing and MORD 59.26 technical specificationclause clause 800,1250.4 &1205.5 Design mix m 25 for deck slab Centering: Providing form work for centering, shuttering etc., for all RCC works including strutting up to 3.29m in all floors 375.60 using mild steel sheets of size 90 x 60 cm of B G 10 stiffened with mild steel angles of size 25 x 25 x 3mm laid over silver oak

2890.14

CUM

7 18 830

3372.15

CUM

5 23 189

4774.63

CUM

2 82 925

135.00

SQM

50 706

Centering: Providing form work for centering, shuttering etc., for all RCC works including strutting up to 3.29m in all floors 158.38 using mild steel sheets of size 90 x 60 cm of B G 10 stiffened with mild steel angles of size 25 x 25 x 3mm laid over silver oak

330.00

SQM

52 264

supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per 5.00 drawing and MORD technical specification clauses 1002,1010,&1202

65183.00

MT

3 25 915

providing and fixing 20mm thick 7.20 compressible fiber board in expansion joint complete as per drawing and MORD technical specification Backfilling behind abutment , wing wall and 117.20 return wall complete as per drawing & MORD technical specification clause 1240.3.8 plastering with cement mortar (1:4) 20mm thick,on masonary work in sub-structure 18.00 as per MORD technical specification clause 613.4 &1204 Supplying and fixing in position best qulity PVC Rain water pipe having ISI mark and 14.80 providing leak proof joints inculding fixing to the wall with special PVC / MS clamps etc

CUM

120.00

CUM

14 064

10

112.93

SQM

2 033

12

RM

4 000

13

463 20 00 000