Anda di halaman 1dari 117

ANNA UNIVERSITY TIRUNELVELI TIRUNELVELI 627 007

Laboratory Requirements for the UG / PG Programmes offered by the Colleges affiliated to the Anna University Tirunelveli for the Academic Year 2010-2011

B.E. / B.Tech. / (REGULATIONS 2008) M.E. / M.Tech. / M.B.A. / M.C.A. (REGULATIONS 2009) M.Sc. (REGULATIONS 2003)

Faculty of Civil Engineering B. E. Civil Engineering (R 2008) Semester 1


CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches)

Semester 2
GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3
CE38 -Survey Practical - I CE39 - Computer Aided Building Drawing

Semester 4
CE48 Hydraulic Engineering Laboratory CE49 Survey Practical - II

Faculty of Mechanical Engineering


B. E. Aeronautical Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches) Semester 3 ME37 Manufacturing Technology Lab - I ME38 Fluid Mechanics and Machinery Laboratory ME39 Electrical Engineering Laboratory Semester 4 ME48 Computer Aided Machine Drawing Laboratory ME49 Manufacturing Technology Lab - II

Faculty of Mechanical Engineering B.E. Automobile Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches)
ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3 AT 37 Automotive Components Laboratory ME38 - Fluid Mechanics and Machinery Lab AT39 Manufacturing Technology Laboratory Semester 4 ME47 - Strength of Materials Lab AT48 Engine Performance and Emission Testing Laboratory AT49 - Computer Aided Machine Drawing Laboratory AT411 Electronics and Micro-processors Laboratory

Faculty of Information and Communication Engineering B. E. Bio Medical Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EC29 Circuits and Devices Laboratory(Common for branches under I &C Faculty) Semester 3 BM38 Bio Chemistry and Human Physiology Lab BM39 Electronic Circuits Lab Semester 4 BM47 Integrated Circuits Lab BM 48 Pathology and Microbiology Lab

Faculty of Technology B.Tech. Bio Technology (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches) Semester 3 BT37 Bio Chemistry Lab BT38 Bio-organic Chemistry Lab BT39 Cell Biology Lab Semester 4 BT47 Microbiology Lab BT48 Instrumental Methods of Analysis Lab BT49 Chemical Engineering Lab

Faculty of Information and Communication Engineering B.E. Computer Science and Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EC29 Circuits and Devices Laboratory(Common for branches under I &C Faculty) Semester 3 CS37 Digital Laboratory CS 38 Data Structures Laboratory CS 39 Object Oriented Programming Laboratory

Semester 4 CS47 Operating Systems Laboratory CS48 Data Base Management Systems Lab CS49 Microprocessor Lab

Faculty of Electrical Engineering B.E. - Electrical and Electronics Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty)

Semester 3 EE37 - Electronic Devices and Circuits Laboratory EE38 Measurements & Instrumentation Laboratory EE39 - Data Structures and Algorithms Laboratory

Semester 4 EE47 Control Systems Laboratory EE48 Linear and Digital Integrated Circuits Laboratory EE49 - Electrical Machines Laboratory I

Faculty of Electrical Engineering B.E. - Electronics and Instrumentation Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty) Semester 3 EE 37 Electronic Devices and Circuits Laboratory EI38 Electrical Machines Laboratory EE39 Data Structures and Algorithms Laboratory

Semester 4 EI47 Transducers and Measurements Laboratory EE48 Linear and Digital Integrated Circuits Lab EI49 - Thermodynamics Laboratory

Faculty of Information and Communication Engineering B. E. - Electronics and Communication Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EC29 Circuits and Devices Laboratory(Common for branches under I &C Faculty) Semester 3 EC 37 Digital Electronics Lab EC38 Electronic Circuits Laboratory I EC39 Data structures and Object Oriented Programming Lab Semester 4 EC47 Electronics circuits II and simulation lab EC48 Linear Integrated Circuit Lab EC49 Electrical Engineering and Control System Lab

Faculty of Information and Communication Engineering B.Tech. Information Technology (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches EC29 Circuits and Devices Laboratory (Common for branches under I &C Faculty)

Semester 3 IT38 - Data Structures and Algorithm Laboratory CS37 Digital Laboratory CS39 Object Oriented Programming Laboratory

Semester 4 CS47 Operating Systems Lab CS48 Database Management Systems Lab CS49 Microprocessors Lab

Faculty of Electrical Engineering B.E. Instrumentation and Control Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) EE29- Electrical Circuits Laboratory (Common for branches under Electrical Faculty) Semester 3 EE37 - Electronic Devices and Circuits Laboratory EI38 - Electrical Machines Laboratory EE39 - Data Structures and Algorithms Laboratory

Semester 4 EI47 Transducer and Measurements Laboratory EE48 Linear and Digital Integrated Laboratory EI49 Thermodynamics Laboratory

Faculty of Information and Communication Engineering M.E. Applied Electronics (R 2009)

Semester I AP 916 Electronics Design Laboratory I

Semester II AP 926 Electronics Design Laboratory II

Faculty of Mechanical Engineering M.E. CAD/CAM (R 2009)

Semester I CC916 CAD Laboratory

Semester II CC926 CAM Laboratory

Faculty of Information and Communication Engineering M.E. Communication Systems (R 2009)

Semester I CU 916 Communication Systems Laboratory I

Semester II CU 926 Communication Systems Laboratory II

Faculty of Information and Communication Engineering M.E. Computer and Communication Engineering (R 2009)

Semester I CP 917 Computer and Communication Laboratory I

Semester II CP 927 Computer and Communication Laboratory II

Faculty of Information and Communication Engineering M.E. Computer Science and Engineering (R 2009)

Semester I CS 916 Data Structures Laboratory CS 917 Networking Laboratory

Semester II CS 926 Operating System Laboratory IT926 Internet Programming Laboratory

Faculty of Civil Engineering (R 2009) M.E. Construction Engineering and Management

Semester 1

No Laboratory Course

Semester 2

CN926 Advanced Construction Engg and Computing Techniques

Faculty of Electrical Engineering M.E. Embedded System Technologies (R 2009)

Semester I No Laboratory Courses

Semester II ET926 Embedded System Laboratory

Faculty of Mechanical Engineering M.E. Engineering Design (R 2009)

Semester I ED 916 CAD Laboratory

Semester II ED 926 Analysis & Simulation Laboratory

Faculty of Electrical Engineering M.E. Power Electronics and Drives (R 2009)

Semester I No Laboratory Courses

Semester II PE926 Power Electronics and Drives Laboratory

Faculty of Electrical Engineering M.E. Power System Engineering (R 2008)

Semester I PS916 Power System Simulation Lab I

Semester II PS926 Power System Simulation Lab II

Faculty of Information and Communication Engineering M.E. VLSI Design (R 2009)

Semester I VL916 VLSI Design Lab I

Semester II VL 926 VLSI Design Lab II

Faculty of Technology (R 2009) M.Tech. Bio-Technology

Semester I BT 914 Preparative and Analytical techniques in bio-technology

Semester II BT 925 Microbial and Immuno Technology Laboratory

Semester III BT 931 Advanced Molecular Biology and Genetic Engineering Laboratory BT 932 Advanced Bioprocess and downstream Processing Laboratory

Faculty of Management Studies M.B.A. Business Administration (R 2009)

Semester II BA928 Business Application Software

Faculty of Information and Communication Engineering M.C.A. Computer Application (R 2009) Semester I MC916 Programming and Data Structures Laboratory MC917 DBMS Laboratory Semester II MC 926 Object Oriented Programming Laboratory MC 927 System Software Laboratory MC 928 Algorithms Laboratory Semester III MC 936 Graphics Laboratory MC937 Microprocessor Laboratory MC 938 Web Programming Laboratory Semester IV MC 946 Visual Programming Laboratory MC 947 Network Programming Laboratory MC 948 Case Tools Semester V MC 956 Middleware Technology Laboratory MC 957 Software Development Laboratory

Faculty of Information and Communication Engineering M.Tech. Information Technology (R 2009)

Semester I CS916 Data Structures Laboratory CS917 Networking Laboratory

Semester II IT 926 Internet Programming Laboratory SE917 Case Tools Laboratory

Faculty of Mechanical Engineering B.E. Mechanical Engineering (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches) Semester 3 ME37 Manufacturing Technology Lab I ME38 - Fluid Mechanics and Machinery Lab.doc ME39 Electrical Engineering Laboratory Semester 4 ME47 - Strength of Materials Lab. ME48 - Computer Aided Machine Drawing Lab ME49 - Manufacturing Technology Lab II

Faculty of Technology B.Tech. Polymer Technology (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Semester 3 PT37 Polymer Chemistry Laboratory PT38 Organic Chemistry Laboratory

Semester 4 PT47 Chemical Engineering Laboratory PT48 Mould Engineering Laboratory

Faculty of Technology B.Tech. Textile Technology (Fashion Technology) (R 2008) Semester 1 CS17 Computer Practice Laboratory I (Common to all branches) GE19 Engineering Practices Laboratory (Common to all branches) PCP18 Physics & Chemistry Laboratory I (Common to all braches) Semester 2 GE 27 - Computer Practice Laboratory II (Common to all branches) GS28 Physics & Chemistry Laboratory II (Common to all branches) ME29 Computer Aided Drafting and Modeling Laboratory (Common for Non-Circuit Branches)

Faculty of Mechanical Engineering


III Semester B. E. Aeronautical Engineering (R2008) AE39 Thermodynamics Laboratory Requirement for a batch of 30 students S. No. Description of Equipment Quantity Quantity Deficiency required available % 1 1

1. 4 stroke twin cylinder diesel engine 2. Cut section model of 4 stroke kirloskar diesel engine and cut section model of 2 stroke petrol engine 3. Parallel and counter flow heat exchanger test rig 4. Bomb Calorimeter 5. Vapour compression refrigeration test rig 6. Vapour compression airconditioning test rig 7. Conductive Heat Transfer set up 8. Composite wall

1 1 1 1 1 1

Faculty of Mechanical Engineering


IV Semester B. E. Aeronautical Engineering (R2008) AE47 - Aircraft Structures Lab I Requirement for a batch of 30 students S. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Description of Equipment Universal Testing Machine Mechanical Extensometer Electrical stain gauge Hinged bar suspended by two wires of different materials. Stain indicator Dial Gauges Beam Test set up with various end conditions Column Test Apparatus Thin walled pressure vessel Quantity required 1 1 10 1 1 12 2 1 1 Quantity Deficiency available %

Faculty of Mechanical Engineering


IV Semester B. E. Aeronautical Engineering (R2008) AE48 - Aerodynamics Laboratory Requirement for a batch of 30 students S. No. Description of Equipment Quantity required 1 each. 1 set 1 No. 1 each. 1 No. 1 each 1 No. 1 No. 1 No. 1 No. each Quantity Deficiency available %

1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Blower, Balance, and small aspect ratio model Water flow channel & models Subsonic wind tunnel Smoke apparatus and rake Manometer, Pitot-Static tube Circular cylinder and Aerofoil pressure distribution models Wind tunnel strain gauge balance Supersonic wind tunnel, Mercury manometer Schlieren system and Shadow graph system Sharp nosed and Blunt nosed models

Faculty of Mechanical Engineering


IV Semester B. E. Aeronautical Engineering (R2008) AE49 Aircraft Component Drawing Requirement for a batch of 30 students S.No. Description of Equipment Quantity required Quantity Deficiency available %

1.

Drawing Boards, Drafting machines

30

Faculty of Information and Communication Engineering


M.E. Applied Electronics (R 2009) Semester I AP 916 Electronics Design Laboratory I (Requirement for a batch of 25 students) Sl. No. 1. 2. 3. 4. 5. 6. Quantity Required 5 Nos. 5 Nos. 5 Nos. Multi user Multi user 5 Nos. Quantity Deficiency Available in %

Description of Equipment PIC Microcontroller Development Boards and Tools (Compiler /Assembler) DSP Trainer Kit and Development tools 16-bit Microprocessor prototype / Development board MODELSIM Simulator/ Equivalent Software PSPICE circuits Simulator / Equivalent Software FPGA Trainer/ Development Board and Tools Personal Computers with following specifications P4, 2 GB RAM, 120 GB HDD

7.

12 Nos.

Faculty of Information and Communication Engineering


M.E. Applied Electronics (R 2009) Semester I AP 926 Electronics Design Laboratory II (Requirement for a batch of 25 students) S.No 1. 2. 3. Name of the Equipment CPLD / FPGA development board & tools Microcontroller Development Board and Tools Mathematical Simulating Tool Like MATLAB with control system tool boxes Personal Computers with following specifications P4, 2 GB RAM, 120 GB HDD Quantity required 10 Nos 10 Nos Multi user Quantity available Deficiency %

4.

12 Nos.

S. No. 1. 2. 3. 4. 5. 6. 7.

Faculty of Mechanical Engineering III Semester B. E. Automobile Engineering (R2008) AT39 Manufacturing Technology Laboratory Requirement for a batch of 30 students Description of Equipment Quantity Quantity Deficiency required available % Centre Lathe with accessories Shaping Machine Slotting Machine Radial Drilling Machine Upright Drilling Machine Milling Machine Cylindrical Grinding Machine 5 No. 2 No. 1 No. 2 No. 2 No. 2 No. 1 No.

S. No.

Faculty of Mechanical Engineering IV Semester B. E. Automobile Engineering (R2008) AT48 Engine Performance and Emission Testing Lab Requirement for a batch of 30 students Description of Equipment Quantity Quantity Deficiency required available % Hydraulic dynamometer Eddy current dynamometer Electrical dynamometer Single cylinder two stroke cut section engine Single cylinder four stroke cut section engine Two-wheeler engine test rig Automotive multicylinder SI engine test rig with heat balance arrangement Automotive multicylinder CI engine test rig with heat balance arrangement Emission Measuring Instruments for Petrol 7 Diesel Engines Piezo Electric pick up, Charge Amplifier, Angle Encoder and PC 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No.

1. 2. 3. 4. 5. 6. 7.

8.

1 No.

9. 10.

1 No. each 1 Set

Faculty of Mechanical Engineering


IV Semester B. E. Automobile Engineering (R2008) AT49 - Computer Aided Machine Drawing Lab Requirement for a batch of 30 students S. No. Description of Equipment Quantity required 30 Nos. 15 licenses 5 Nos. Quantity Deficiency available %

1. 2.

Computer nodes Software like i) ii) AutoCAD Pro-E

Faculty of Mechanical Engineering

IV Semester B. E. Automobile Engineering (R2008)


S.No. AT411 Electronics and Microprocessors Lab Requirement for a batch of 30 students Description of Equipment Quantity Quantity Deficiency required available % Voltmeters Ammeters PN Diode, BJT, JFET, Logic Gates, Shift Registers and Counters Digital Logic Trainer Kits Breadboards Microprocessor Kits 8085 D/A Converter Interface Stepper Motor Interface CRO Waveform Generator Multimeter 5 No. 5 No. 1 set.

1. 2. 3.

4. 5. 6. 7. 8. 9. 10. 11.

1 No. 1 No. 5 No. 1 No. 1 No. 1 No. 1 No. 1 No.

Faculty of Mechanical Engineering

III Semester B. E. Aeronautical Engineering (R2008)


AT411 Manufacturing Technology Laboratory Requirement for a batch of 30 students S. No. 8. 9. 10. 11. 12. 13. 14. Description of Equipment Quantity required 5 No. 2 No. 1 No. 2 No. 2 No. 2 No. 1 No. Quantity Deficiency available %

Centre Lathe with accessories Shaping Machine Slotting Machine Radial Drilling Machine Upright Drilling Machine Milling Machine Cylindrical Grinding Machine

Faculty of Mechanical Engineering

III Semester B. E. Automobile Engineering (R2008)


S. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. AT 37 Automotive Components Laboratory Requirement for a batch of 30 students Description of Equipment Quantity Quantity Deficiency required available % Multi Cylinder Petrol Engine Multi Cylinder Diesel Engine Petrol and Diesel fuel systems Heavy duty vehicle chassis frame Light duty vehicle chassis frame Front axle Rear axle Differential Clutch and Gear box 2 No. 2 No. 2 No. each 1 No. 1No. 2 No. 2 No.

2 No. 2 No. each Steering Systems with different 4 No. gearboxes

Faculty of Management Studies

M.B.A. Business Administration (R 2009)


II Semester BA928 Business Application Software (Requirement for a batch of 25 students) Sl. No Name of the Equipment Quantity Quantity Deficiency required available %

Hardware 1. P IV or above configured systems Software 1. 2. 3. 4. 5. 6. Office Automation Package Such as Microsoft Office Accounting Packages such as Tally/TCS EX / Wings Statistical Packages such as SPSS/SAS Operation Research Packages such as POM, TORA. DBMS Packages SQL Server / Oracle Fronted tools such as visual studio / Dev 2000 Data mining related downloadable packages from www.xlminer.com; www.dtreg.com (also supported by statistical packages) 5 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. 13 Nos.

7.

Faculty of Information and Communication Engineering III Semester B.E. Bio Medical Engineering (R2008) BM38 Bio Chemistry and Human Physiology Lab Requirement for a batch of 30 students Sl. No. 1. Description of Equipment Quantity Quantity Deficiency required available %

Test tube, microscope (Binocular), colorimeter Centrifuge, Test tubes, anticoagulant Blood Glucose kit Cholesterol kit SGOT/SGPT kit Creatinine kit Electrophoresis apparatus Glass tanks, thin layer chromatography ESR glan tube wintrobe PCV tube (Haematocrit tube) , sahlis Haemo globinometer, Microscope, Haemocytometer(Mirror coated) Differential count Leishman stain (readymade), Blood group antigen, microscope slides. Ishihara chart, Snellens chart, Opthalmoscope Webers and Rinnees test.

2. 3. 4. 5. 6. 7. 8. 9.

10.

11.

12.

Faculty of Information and Communication Engineering III Semester B. E. Bio Medical Engineering (R2008) BM39 - Electronic Circuits Lab Requirement for a batch of 30 students S.No 1 2 3 4 5 6 Name of the Equipments / Components Variable DC Power Supply (0-30V) Fixed Power Supply + / - 12V CRO 30MHz Multimeter Digital Function Generator (1 MHz) Digital LCR Meter Quantity Required 10 5 10 10 5 1 Quantity Available Deficiency %

Consumables 7 BC107, BF195, 2N2222, BC147, BFW10, SL100 IC 555, LEDs Resistors 1/4 Watt Assorted Capacitors Inductors Bread Boards Transformer Diodes, Zener Diodes (Minimum of 25 Nos. each)

8 9 10 11 12 13

Faculty of Information and Communication Engineering

IV Semester B. E. Bio Medical Engineering (R2008)


Sl. No BM47 - Integrated Circuits Lab Requirement for a batch of 30 students Name of the equipments / Quantity Components Required Dual ,(0-30V) variable Power Supply CRO 30MHz Digital Multimeter Function Generator 1 MHz IC Tester (Analog/Digital) Bread board 10 9 10 8 2 10 Quantity available Deficienc y%

1 2 3 4 5 6

Consumables (Minimum of 25 Nos. each) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 IC 741 IC NE555 LED Potentiometer Seven Segment Display Capacitor Resistors 1/4 Watt Assorted Single Strand Wire Encoder and Decoder ICs (IC7445, IC 74147) Multiplexer and Demultiplexer ICs. ( IC74150, IC74154) Shift register ICs, Counter ICs IC7400 IC7404 IC7402 IC7408 IC7411 IC7432 25 25 25 25 25 25

25

25 25 25 25 25 25 25

Faculty of Information and Communication Engineering

IV Semester B. E. Bio Medical Engineering (R2008)


BM48 - Pathology and Microbiology Lab Requirement for a batch of 30 students S.No. Description of Equipment Quantity Quantity Deficiency required available % 13. Test tubes, Test tube racks, Bunsen burner(gas),(Benedicts solution, Acetic 1 set acid, Sulphosalicylic acid), centrifuge, microscope. 14. Slides, cover slips,H & E stains 1 set 15. 16. Microscope Beakers, graded alcohols, acetone, moulds (or maling bodies), paradigm wax, water bath, microtone for section cutting,slides,cover slips,hotair oven,refrigerator to store chemical and ice. whanman filter paper for bleeding time Test tubes. Simple Stain test SIMPLE STAIN, Glass Slide Reagents Methylene blue Crystal Violet Cabal luschin Gram Stain test SIMPLE GRAM STAIN Reagents - Crystal Violet Grams Iodine 95% ethyl alcohol Safranin Urine bacterial count/ml exceeding 100,000(10s) denotes urinary tract infection. Normal : 0 1000ml Glass Slide 20. AFB Strain test ACID FAST STAIN (ZIEHL NEELSON METHOD) Reagents Carbal Iushin Acid Alcohol Methylene blue Glass Slide Bone marrow charts 1 set 1 set

17. 18.

1 set

1 set

19.

1 set

1 set

21.

Faculty of Technology

III Semester B.Tech. Bio Technology (R 2008)


BT37 Bio Chemistry Lab Requirement for a batch of 30 students S.No. 1. 2. 3. 4. 5. 6. Description of Equipment Heating Mantles Water Baths Buners TLC Plates Colorimeter Consumables and Reagents. Faculty of Technology Quantity required 5 5 10 Required Numbers 2 Nos. Quantity Deficiency available %

III Semester B.Tech. Bio Technology (R 2008)


Sl.No. BT38 Bio-organic Chemistry Lab Requirement for a batch of 30 students Description of Equipment Quantity Quantity Deficiency required available % Heating Mantles Water baths Bunsen Burners Round bottom flasks of various volumes (100ml, 500 ml, 250 ml) Condensers Distillation units Reagents and consumables Nos. 5 Nos. 5 Nos. 15 Nos. 5 Nos. 5 Nos. 2

15. 16. 17. 18. 19. 20. 21.

Faculty of Technology

III Semester B.Tech. Bio Technology (R 2008)


BT39 Cell Biology Lab Requirement for a batch of 30 students Sl.No. Description of Equipment Quantity required for 1 No. 10 Nos. 2 Nos. 1 No. Required amount. Quantity Deficiency available %

7. 8. 9. 10. 11.

Microbiological Hood sterilization with UV lighting Bunsen Burners

Orbital Shaker and Incubator Refrigerator Reagents and consumables

Faculty of Technology

IV Semester B.Tech. Bio Technology (R 2008)


BT47 Microbiology Lab Requirement for a batch of 30 students S.No. Description of Equipment Quantity required for One 15 2 Nos. 1 No. Required amount. Quantity Deficiency available %

1. 2. 3. 4. 5.

Microbiological Hood sterilization with UV lighting Bunsen Burners Orbital Shaker and incubator Refrigerator Reagents and consumables

Faculty of Technology

IV Semester B.Tech. Bio Technology (R 2008)


BT48 - Instrumental Methods of Analysis Lab Requirement for a batch of 30 students S.No. Description of Equipment Quantity required 1 (Optional). 1 Required amount Quantity Deficiency available %

22. 23. 24. 25. 26.

UV VIS Spectro photometer, Fluorimeter TLC chamber (common to biochemistry) Reagents and consumables Measuring cylinders, bathometric flasks of various volumes.

Faculty of Technology IV Semester B.Tech. Bio Technology (R 2008) BT49 Chemical Engineering Lab Requirement for a batch of 30 students S.No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Description of Equipment Simple Distillation Steam Distillation Orifice meter Venturi meter Flow through Straight pipe Flow through packet column Liquid Solid Fluidization Leaf Filter Plate and frame filter press Double pipe heat exchanger Packed Column Distillation Liquid-Liquid Extraction (Batch strain) Batch Adsorption Studies Spectrophotometer Quantity required 2 Nos. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. Quantity Deficiency available %

Faculty of Technology

I Semester M. Tech. Bio-Technology (R 2009)


BT 914 Preparative and analytical techniques in Bio-technology (Requirement for a batch of 25 students) Sl. No 1. Quantity Quantity Deficiency required available % 2

Name of the Equipment

pH Meter

2.

Spectro Photometer

3.

Spectro Flurometer

4.

TLC Plates

1 Box

5.

Ion Exchange resins

500 gms

6.

Gel Filtration

5 gms

7.

SDS Page Electrophoresis

Faculty of Technology

II Semester M. Tech. Bio-Technology (R 2009)


BT 925 Microbial and Immuno Technology Laboratory (Requirement for a batch of 25 students) Sl. No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Quantity Quantity Deficiency required available % 2 1 1 1 1 1 1 1 2 1 2 1 1 1 1 1 1 1

Name of the Equipment Laminar Flow Chamber Autoclave Hot air Oven Spectrophotometer pH meter Water bath Shaker Elisa washer Elisa Reader Microscope (Phase Contrast) High Speed Bench Top Centrifuge SDS PAGE Apparatus Gel Transfer Apparatus Animal House (Small) Refrigerator Freezer (-20C) Colony Counting Machine Dot blot Apparatus Microwave Oven

Faculty of Technology I Semester M. Tech. Bio-Technology (R 2009) BT 931 Advanced Molecular Biology and Genetic Engineering Laboratory (Requirement for a batch of 25 students) Sl. No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. Name of the Equipment DNA Electrophoresis Units SDS Page Units 370 C Incubator Shaker (room temperature) PCR machine Centrifuge - Non-Refrigerated Centrifuge - Refrigerated Laminar Hood -20o C deep freezer Refrigerator UV Transilluminator Gel documentation system Spectrophotometer U-V range Ice machine Micro oven Rocker Western blot apparatus Elisa plate Reader Southern blot Hybridization oven Water bath (10`C 60`C) Electroporator Quantity required 5 5 1 1 1 2 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 Quantity Deficiency available %

Faculty of Technology

III Semester M. Tech. Bio-Technology (R 2009)


BT 932 Advanced Bioprocess and downstream processing Laboratory (Requirement for a batch of 25 students) Sl. Quantity Quantity Deficiency Name of the Equipment No required available % 1. 2. 3. 4. 5. 6. 7. 8. 9. Shaker Laminar Flow Chamber Water Bath Spectrophotometer pH meter Weighing Balance Vortex Mixer Micro Centrifuge Bioreactor (One Insitu) 2 2 2 1 1 1 2 1 3
(2 bath 1 continuous)

10. Gas analyzer 11. Refrigerated water bath 12. Air Compressor 13. Peristaltic Pump 14. Sonicator 15. Dynomill / Homogenizer (any one) 16. Refrigerated Centrifuge 17. FPLC / HPLC 18. Chromatographic Column 19. Lyophilizer 20. Ice Machine 21. Micro filtration / Ultrafiltration Unit with membranes

1 1 1 6 1 1 1 1 1 1 1 1 1 1 1

22. -80`C deep freezer 23. CO2 Incubator 24. Spinner flask

Faculty of Mechanical Engineering

M.E. CAD/CAM
(R 2009) Semester I CC 916 CAD Laboratory (Requirement for a batch of 25 students) Sl. No. Description of Equipment Quantity Required Quantity Available Deficiency in %

1.

CAD Workstations CAD, 3D Modeling Software with assembly, Mechanism simulation and drafting modules

10 Nos

2.

10 Nos

Faculty of Mechanical Engineering

M.E. CAD/CAM
(R 2009) Semester II CC 926 CAM Laboratory (Requirement for a batch of 25 students) Sl. No. Description of Equipment CAM Software for tool path generation for planer machining, contour machining, drilling, turning etc. & post processing modulus for different CNC controllers Medium production type CNC turning center with popular industrial type controller Medium production type CNC machining center with popular industrial type controller Bench Model CMM Quantity Required Quantity Deficiency Available in %

1.

10 Nos

2.

3.

4.

5.

Vision & image processing software

6.

Data Processing Software

Faculty of Civil Engineering

III Semester B. E. Civil Engineering (R2008)


CE38 - Survey Practical I Requirement for a batch of 30 students Quantity availabl e

S. No. 27. 28.

Description of Equipment Total Station Theodolites

Quantity required 3 Nos Atleast 1 for every 10 students Atleast 1 for every 10 students Atleast 1 for every 10 students 1

Deficiency %

29.

Dumpy level

30.

Plain table

31. 32. 33. 34. 35. 36. 37.

Pocket stereoscope Ranging rods Leveling staff Cross staff Chains Tapes Arrows

1 for a set of 5 students

Faculty of Civil Engineering III Semester B. E. Civil Engineering (R2008) CE39 - Computer Aided Building Drawing Requirement for a batch of 30 students Sl. No. 1. Description of Equipment Computer system of Pentium IV or equivalent Licensed version of any reputed Analysis, Design & Drafting software Quantity required 1 for each student 1 copy for a set of 3 students Quantity Deficiency available %

2.

Faculty of Civil Engineering

IV Semester B. E. Civil Engineering (R2008)


CE47 Strength of Materials Lab Requirement for a batch of 30 students

S.No. 38. 39. 40. 41.

Description of Equipment UTM of minimum 400 KN capacity Torsion testing machine for steel rods Izod impact testing machine Hardness testing machine Rockwell Vickers (any 2) Brinnel Beam deflection test apparatus Extensometer Compressometer Dial gauges Le Chateliers Apparatus Vicats apparatus Mortar cube moulds

Quantity required 1 1 1

Quantity Deficiency available %

1 each

42. 43. 44. 45. 46. 47. 48.

1 1 1 few 2 2 10

Faculty of Civil Engineering

IV Semester B. E. Civil Engineering (R2008)


CE48 Hydraulic Engineering Laboratory Requirement for a batch of 30 students S.No. Description of Equipment Quantity Quantity Deficiency required available % 1. Bernoullis theorem Verification 1 No. Apparatus 2. Calculation of Metacentric height 1 No. water tank 1 No. Ship model with accessories 3. Measurement of velocity 1 No. Pitot tube assembly 4. Flow measurement open channel flow (i)Channel with provision for fixing notches (rectangular, triangular & trapezoidal 1 Unit forms) 1 Unit (ii)Flume assembly with provisions for conducting experiments on Hydraulic jumps, generation of surges etc. 5. Flow measurement in pipes (i) Venturimeter, U tube manometer fixtures like Valves, collecting tank (ii) Orifice meter, with all necessary fittings in 1 Unit pipe lines of different diameters (iii) Calibration of flow through orifice 1 Unit tank with Provisions for fixing orifices of different 1 Unit shapes, collecting tank (iv) Calibration of flow through mouth 1 Unit piece Tank with provisions for fixing mouth pieces Viz external mouth pieces & internal mouth piece Bordas mouth piece 6. Losses in Pipes Major loss Friction loss 1 Unit Pipe lengths (min. 3m) of different diameters with Valves and pressure rapping & collecting tank Minor Losses 1 Unit Pipe line assembly with provisions for having

7.

8.

Sudden contractions in diameter, expansions Bends, elbow fitting, etc. Pumps (i) Centrifugal pump assembly with accessories (single stage) (ii) Centrifugal pump assembly with accessories (multi stage) (iii) Reciprocating pump assembly with accessories (iv) Deep well pump assembly set with accessories Turbine (i)Impulse turbine assembly with fittings & accessories (ii)Francis turbine assembly with fittings & accessories (iii)Kaplan turbine assembly with fittings & accessories

1 Unit 1 Unit 1 Unit 1 Unit

1 Unit 1 Unit 1 Unit

Faculty of Civil Engineering

IV Semester B. E. Civil Engineering (R2008)


CE49 - Survey Practical II Requirement for a batch of 30 students S.No. Description of Equipment Quantity required Atleast 1 for every 10 students Atleast 1 for every 10 students Atleast 1 for every 10 students 1 1 for a set of 5 students Quantity Deficiency available %

1.

Theodolites

2.

Dumpy level

3.

Plain table

4. 5. 6. 7. 8.

Pocket stereoscope Ranging rods Leveling staff Cross staff Chains

9. 10.

Tapes Arrows

Faculty of Civil Engineering

M.E. Construction Engineering and Management


(R 2009) II Semester CN 926 Advanced Construction Engineering and Computing Technologies (Requirement for a batch of 25 students) Sl. No. 1. Not Deficiency Available in %

Description of the Equipment Concrete making equipments. Concrete Mixer Automatic /Automated Equipments for self- compacting concrete. Flow ability test -> U-box, V-funnel, Cbox Workability and slump equipments for hpc & scc. Flowability, slump cone Equipments for compression testing with very high precision with automated graph UTM-Displacement control machine Ndt equipments - upv, rebound hammer, core cutting machine (electrically operated) Permeability apparatus Permeability tester Oven (range 0 to 600 degree c)

Available

2.

3.

4.

5. 6. 7.

Software Required 8. 9. 10. 11. 12. 13. 14. 15. MS office QE pro MS office suit Primavera power user Primavera contractor standard Pert master Primavera monte carlo simulation Primavera expedition

Faculty of Information and Communication Engineering M.E. Computer and Communication Engineering (R 2009) Semester I CP 917 Computer and Communication Laboratory I (Requirement for a batch of 25 students) Sl. No. Quantity Required Multi user License 4 Nos. As required 13 Nos. 6 Nos. Quantity Deficiency Available in %

Description of Equipment

1.

MATLAB Package (30 user License)

2. 3. 4. 5.

DSP Processor Shift Register, Modulo-2 Adder Personal Computer (1:2) PIC Microcontroller

Faculty of Information and Communication Engineering M.E. Computer and Communication Engineering (R 2009) Semester II CP 927 Computer and Communication Laboratory II (Requirement for a batch of 25 students) Sl. No. 1. Description of Equipment Quantity Required 4 Nos. 4 user License 13 Nos. 4 user License Quantity Deficiency Available in %

Fiber Optics Trainer with LED/LD/PD/APD

2. 3.

Optical Link Simulator-OPTISM / SIMULINK Personal Computer (1:2)

4.

ATM Network Simulator / Equipment

5.

JAVA Tool JDK 1:2 / Equipment

Multiuser License

I Year B.E. / B.Tech. Semester I (R 2008)

CS17 COMPUTER PRACTICE LABORATORY I


Requirements for a batch of 30 students

S.No. Hardware 1. 2.

Description of Equipment

Quantity required

Quantity available

Deficiency %

LAN system with 33 nodes (OR) stand alone PCs Printer

33 Nos. 3 Nos.

Software Windows / Unix Clone C compiler Office suite Available / Not Available Available / Not Available Available / Not Available

1.

Operating System

2.

Compiler

3.

Application package

Faculty of Information and Communication Engineering

III Semester B. Tech. Information Technology (R 2008)


CS37 Digital Laboratory Requirement for a batch of 30 students S.No. Description of Equipment Quantity Quantity required available 1. Dual power supply/ single 15/30 mode powersupply +12/-12V 2. IC Trainer 10 bit 15 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. Bread Boards Multimeter IC 7400 IC7402 IC 7404 IC 7486 IC 7408 IC 7432 IC 7483 IC74150 IC74151 IC74147 IC7445 IC7476 IC7491 IC555 IC7494 IC7447 IC74180 IC7485 IC7473 IC74138 IC7411 IC7474 Computer with HDL software Seven segment display Assembled LED board/LEDs Wires 15 5 60 60 60 60 60 60 60 60 40 40 40 40 40 40 40 40 40 40 40 40 40 40 30 40 40/200 Single strand Deficiency %

Faculty of Information and Communication Engineering

III Semester B. E. Computer Science and Engineering (R2008)


CS38 Data Structures Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

1. 2. 3.

SOFTWARE REQUIRED TURBO C version 3 (or) GCC version 3.3.4 OPERATING SYSTEM WINDOWS 2000 / XP / NT OR LINUX COMPUTERS REQUIRED (Minimum Requirement : Pentium III or Pentium IV with 256 RAM and 40 GB harddisk)

30 Nos.

Faculty of Information and Communication Engineering

III Semester B. E. Computer Science and Engineering (R2008)


CS39 Object Oriented Programming Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

1 2

Software Turbo C (freeware) to be installed in all PCs. Hardware a) PCs. Processor 2.0 GHz or higher RAM 256 MB or higher Hard disk 20 GB or higher OS- Windows 2000/ Windows XP/ NT

30 Nos

Faculty of Information and Communication Engineering

III Semester B. Tech. Information Technology (R 2008)


CS39 Object Oriented Programming Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

1 2

Software Turbo C (freeware) to be installed in all PCs. Hardware a) PCs. Processor 2.0 GHz or higher RAM 256 MB or higher Hard disk 20 GB or higher OS- Windows 2000/ Windows XP/ NT

30 Nos

Faculty of Information and Communication Engineering

IV Semester B. Tech. Information Technology (R 2008)


CS47 Operating Systems Laboratory Requirement for a batch of 30 students

S.No. 1.

Description of Equipment

Quantity available

Deficiency %

Software Ubuntu / OpenSUSE / Fedora / Red Hat / Debian / Mint OS Linux could be loaded in individual PCs. (OR) A single server could be loaded with Linux and connected from the individual PCs.

2.

Hardware
30 PCs

Faculty of Information and Communication Engineering

IV Semester B. Tech. Information Technology (R 2008)


CS48 DBMS Lab Requirement for a batch of 30 students
S.No. 1. Software Front end : VB/VC ++/JAVA Back end: Oracle 11g, my SQL, DB2 Platform: Windows 2000 Professional/XP Oracle server could be loaded and can be connected from individual PCs. 2. Hardware 30 Personal Computers Description of Equipment Quantity available Deficiency %

Faculty of Information and Communication Engineering IV Semester B. E. Computer Science and Engineering (R2008) CS48 DBMS Lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity available Deficiency %

1.

Software Front end : VB/VC ++/JAVA Back end: Oracle 11g, my SQL, DB2 Platform: Windows 2000 Professional/XP Oracle server could be loaded and can be connected from individual PCs.

2.

Hardware 30 Personal Computers

aculty of Information and Communication Engineering

IV Semester B. Tech. Information Technology


CS49 Microprocessor Lab Requirement for a batch of 30 students
Sl. No. Description of Equipment Quantity Required 15 nos. 30 nos. 3. 8051 trainer kit 15 nos. 4. Interfacing with 8086 PC add-on cards with 8255, 8253, 8279 and 8251 5. Stepper motor interfacing module 5 nos. 6. Traffic light controller interfacing module 5 nos. 7. ADC, DAC interfacing module 5 nos. 8. CROs 5 nos. 15 nos Quantity Deficiency available %

1. 8085 Trainer Kit with onboard 8255, 8253, 8279 and 8251 2. TASM/MASM simulator in PC (8086 programs)

Faculty of Information and Communication Engineering M.Tech. Information Technology (R 2009) Semester I CS916 Data Structures Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of Equipment Quantity Required Quantity Available Deficiency in %

1.

Hardware Pentium PC Desktops

25

2.

Software Turboc3 complier / Borland C++ Complier / Developer C++/VC++ installed in 25 Desktop machines or can be made available with the server

Faculty of Information and Communication Engineering

M.Tech. Information Technology


(R 2009) Semester I CS 917 Networking Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of Equipment Hardware and Software Requirements: 1. Linux OS can be client / server type Or Pcs installed with Linux OS 25 Nos. Quantity Required Quantity Available Deficiency in %

2.

Software Requirements: Network Simulating Software NS2->Freely downloadable (Linux/Windows Version) OMNET++4.0-> Freely downloadable (Linux/Windows Version) Opnet -> Proprietory for 25 students

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering


(R 2009) Semester I CS916 Data Structures Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity Available Deficiency in %

Description of Equipment

1.

Hardware Pentium PC Desktops

25

2.

Software Turboc3 complier / Borland C++ Complier / Developer C++/VC++ installed in 25 Desktop machines or can be made available with the server

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering


(R 2009) Semester I CS 917 Networking Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity Available Deficiency in %

Description of Equipment Hardware and Software Requirements:

1.

Linux OS can be client / server type Or Pcs installed with Linux OS

25 Nos.

2.

Software Requirements: Network Simulating Software NS2->Freely downloadable (Linux/Windows Version) OMNET++4.0-> Freely downloadable (Linux/Windows Version) Opnet -> Proprietory for 25 students

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering


(R 2009) Semester II CS926 Operating System Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity Available Deficiency in %

Description of Equipment

1.

Machines with Unix/Linux or Linux/Unix server and Nodes with windows Java, C, JDBC Ethereal / Comview along with Windows/Linux/Unix Utilities like netstat, ipconfig, traceroute etc. 25 machines

2.

3.

4.

Simple_OS or any real time operating systems

Faculty of Information and Communication Engineering

M.E. Communication Systems


(R 2009) Semester I CU 916 Communication Systems Lab I (Requirement for a batch of 25 students) Sl. No. 1. 2. 3. 4. Description of Equipment MATLAB Package Personal Computers Antenna Trainer Kit Network Analyzer Shift Registers Modulo-2 Adders Bread Boards, Consumables Digital Fiber Optics Link Trainer Kit Glass Fiber Connectorized Pulse Generator 100 MHZ Digital Storage Oscilloscope Quantity Required 15 user License 13 Nos. 2 Nos. 1 Nos. Quantity Deficiency Available in %

5.

As Required

6. 7. 8. 9.

2 Nos. 2 Nos. 2 Nos. 2 Nos.

Faculty of Information and Communication Engineering M.E. Communication Systems (R 2009) Semester II CU 926 Communication Systems Lab II (Requirement for a batch of 25 students)
Sl. No. 1. 2. 3. 4. 5. 6. 7. Quantity Required 15 user License 2 Nos. 3 user License 2 Nos. 2 Nos. 2 Nos. 13 Nos. Quantity Available Deficiency in %

Description of Equipment MATLAB Package Network Analyzer Advanced Design Systems Package GPS Receivers / GPS Kit Microwave Devices for measurement Microstrip couplers Personal computers

I Year B. E. /B.Tech. Semester II (R 2008) EC29 Circuits and Devices Laboratory Requirement for a batch of 30 students (3 per Batch)
Quantity available Deficiency %

Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22.

Description of Equipment 0-30V RPS 0-50V RPS 0-5V RPS 0-30V Voltmeter 0-10V Voltmeter 0-50V Voltmeter 0-1V Voltmeter 0-30mA Ammeter 0-100mA AC Amplifier Audio Oscillator CRO (30 MHZ) Diodes, Zener Diodes Transistors (PNP & NPN) UJT SCR JFET MOSFET DIAC & TRIAC Photodiode Photo Transistor Required passive components Variable Resistor

Quantity required 12 2 2 10 5 2 3 5 2 5 15 20 10 10 10 10 10 10 5 5

Faculty of Information and Communication Engineering

III Semester B. E. Electronics and Communication Engineering


(R 2008) EC37 Digital Electronics Lab Requirement for a batch of 30 students
Sl. No 1 2 3 4 Name of the equipments / Components Digital IC Tester Power Supply 5V DC Multimeter Digital Quantity Required 2 Nos 10 10 2 Quantity available Deficiency %

Computer with HDL software Installed Consumables (Minimum of 25 Nos. each) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 IC7400 IC7404 IC74682 IC7402 IC7408 IC7411 IC7432 IC7483 IC7485 IC7486 IC74150 IC74151 IC74147 IC7445 IC7474 IC7476 IC7491 IC7494 IC7447 IC74180 IC555 Seven Segment Display LEDs Bread Board Wires

25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25

Faculty of Information and Communication Engineering

III Semester B. E. Electronics and Communication Engineering


(R 2008) EC38 Electronic Circuits Lab I Requirement for a batch of 30 students (3 per Batch)
S.No. Description of Equipment Quantity required 8 10 6 8 10 10 Quantity available Deficiency %

1. 2. 3. 4. 5. 6.

Variable DC Power Supply (030V) CRO 30MHz Multimeter Digital Function Generator 1 MHz DC Ammeter DC Voltmeter

Consumables (Minimum of 25 Nos. each) 7. BC107, BC147,BC 108, BC 148, BC547, BC 548, SL 100, SK100 or Equivalent transistors. Resistors 1/4 Watt Assorted Capacitors Inductors Diodes, Zener Diodes Bread Boards Transformers

8. 9. 10. 11. 12. 13.

Faculty of Information and Communication Engineering

III Semester B. E. Electronics and Communication Engineering


(R 2008) EC39 Data structures and Object Oriented Programming Lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

1.

P IV Computer Variable DC Power Supply C and C++ Compiler

30 Nos

2.

30 Users

Faculty of Information and Communication Engineering

IV Semester B. E. Electronics and Communication Engineering


(R 2008) EC47 Electronics circuits II and simulation lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 8 4 6 6 2 6 1 6 Quantity available Deficiency %

4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17.

Variable DC Power Supply (0-30V) Fixed Power Supply + / - 12V CRO 30MHz Multimeter Digital Multimeter Analog Function Generator 1 MHz Digital LCR Meter PC with SPICE Simulation Software BC 107,BF195, 2N2222, BC147 Resistors Capacitors Inductors Diodes , Zener Diodes Bread Boards

Consumables (Minimum of 25 Nos. each)

Faculty of Information and Communication Engineering IV Semester B. E. Electronics and Communication Engineering (R 2008) EC48 Linear Integrated Circuit Lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 10 9 10 1 MHz 8 2 10 1 Quantity available Deficiency %

1. 2. 3. 4. 5. 6. 7.

Dual, (0-30V) variable Power Supply CRO 30MHz Digital Multimeter Function Generator IC Tester (Analog) Bread board Computer (PSPICE installed)

Consumables (Minimum of 25 Nos. each) 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. IC 741 IC NE555 LED LM317 LM723 ICSG3524 / SG3525 Transistor 2N3391 Diodes, IN4001, BY126 Zener diodes Potentiometer Step-down transformer 230V/12-0-12V Capacitor Resistors 1/4 Watt Assorted Single Strand Wire 1 25 25 25 25 25 25 25 25 25

25

Faculty of Information and Communication Engineering

IV Semester B. E. Electronics and Communication Engineering (R 2008)


EC49 Electrical Engineering and Control System Lab Requirement for a batch of 30 students Quantity Available Deficiency

Sl. No.

Apparatus

Range

% 1. Open circuit and load characteristics of separately excited and self excited D.C. Generator. 1 1 Motor Generator set 2 3 4 5 6 7 Rheostat Voltmeter DC Ammeter DC DPST switch Three point starter Tachometer 200, 5A 175, 1.5A 300V 30V 30A 2A 1 2 1 1 1 2 2 1 1

Quantity

2. Load test on D.C. shunt motor. 1 2 3 4 5 6 7 DC Motor Rheostat Voltmeter DC Ammeter DC DPST switch Three point starter Tachometer 175, 1.5A 300V 30A 1 1 1 1 1 1 1

3. Swinburnes test and speed control of D.C. shunt motor 1 2 3 4 5 6 DC Motor Rheostat Voltmeter DC Ammeter DC DPST switch Tachometer 100, 5A 175, 1.5A 300V 5A 2A 1 1 1 1 1 1 1 1

4. Load test on single-phase transformer and open circuit and short circuit test on single-phase transformer. 1 2 3 4 5 6 Single phase Transformer Wattmeter Voltmeter AC Ammeter AC Single phase autotransformer Resistive load 300V, 5A,UPF 300V, 5A,LPF 300V 5A 30A 1 1 1 2 1 1 1 1

5. Regulation of three-phase alternator by EMF and MMF method. 1 2 3 4 5 6 Motor Alternator set Rheostat Voltmeter DC Voltmeter AC Ammeter DC Ammeter AC DPST switch TPST switch Tachometer 200, 5A 175, 1.5A 300V 600V 2A 30A 1 1 1 1 1 1 1 1 1 1

6. Load test on three phase Induction motor. 1 2 3 4 5 6 7 Three Phase Induction Motor Wattmeter Voltmeter AC Ammeter AC Brake drum arrangement Star delta starter Tachometer 1 1 600V 10A 600V, 10A,UPF 1 2 1 1

7. No load and blocked rotor test on three-phase induction motor (Determination of equivalent circuit parameters) 1 2 3 4 5 Three Phase Induction Motor Wattmeter Voltmeter AC Ammeter AC Brake drum arrangement 600V, 10A,UPF 600V, 5A,LPF 600V 150V 10A 5A 1 2 2 1 1 1 1

Three phase autotransformer

8. Study of D.C. motor and Induction motor starters. 1 2 3 4 5 Three point starter Four point starter Star-delta starter DOL starter Three phase autotransformer Digital simulation of linear systems. Simulink software 1 1 1 1 1 for minimum 3 users license for minimum 3 users license for minimum 3 users license

9.

10.

Stability analysis of linear system using Matlab software Mat lab.


Study of effect of P, PI, PID controllers using Mat lab.

11.

Matlab software

12. Design of lead and lag compensator. 1 Resistor 2 Capacitor 3 Function generator 4 Bread Board 13. Transfer function of separately excited D.C. generator. 1 1 Motor Generator set 200, 5A 2 1 Rheostat 175, 1.5A 2 3 300V 1 Voltmeter DC 30V 1 4 30A 1 Ammeter DC 2A 2 5 2 DPST switch 6 1 Three point starter 7 1 Tachometer 14. Transfer function of armature and field controller D.C. motor. 1 1 DC Motor 175, 1.5A 2 1 Rheostat 3 300V 1 Voltmeter DC 4 30A 1 Ammeter DC 5 6 7 DPST switch Three point starter Tachometer 1 1 1

Faculty of Mechanical Engineering

M.E. Engineering Design


(R 2009) Semester I ED 916 CAD Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of Equipment Hardware: Desktop Computer System of the following Configuration (Minimum) Processor : Dual Core Main Memory : 1 GB or Higher RAM Hard Disk : 40 GB or Higher Display : High Resolution 1024 x 768 AGP Licensed Operating System Printer / Plotter: A3 size. Application Software: 25 Licensed or more number of Modelling software to carryout CAD exercises (like Pro-E, CATIA, Solid works, Nx etc.) Quantity Required Quantity Available Deficiency in %

1.

25 Nos.

2.

25 License

Faculty of Mechanical Engineering M.E. Engineering Design (R 2009) Semester I ED 926 Analysis & Simulation Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of Equipment Hardware: Desktop Computer System of the following Configuration (Minimum) Processor : Dual Core Main Memory : 1 GB or Higher RAM Hard Disk : 80 GB or Higher Display : High Resolution 1024x768 AGP Licensed Operating System Printer / Plotter: A3 size. Application Software: 25 Licensed or more number of software to carryout Analysis of Mechanical Components exercises (like NASTRAN, ANSYS etc) Kinematics & Dynamics simulation software exercises (like ADAMS, MATLAB etc) Quantity Required Quantity Available Deficiency in %

1.

25 Nos.

2.

25 License

I Year B.E. /B.Tech. Semester II (R 2008) EE29- Electrical Circuits Laboratory Requirement for a batch of 30 students

Sl. No. 1. 2.

Name of the Equipment C.R.O D.C, Power Supply (regulated) Function Generator

Range / Spec 30MHZ 0-30 V

Quantity required 6 6

Quantity available

Deficienc y%

3.

Frequency: 1 MHZ Amplitude: Max volt: 20V Min volt: 20mV Waveforms: Sine, Square, triangular -

4.

Digital Storage Oscilloscope

Faculty of Electrical Engineering

IV Semester B.E. Electrical and Electronics Engineering (R 2008)


EE37 - Electronic Devices and Circuits Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 15 15 15 10 40 25 Nos. 10 Nos. 10 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. 10 Nos. 15 Nos. 10 Nos. 10 Nos. 50 Nos. 50 Nos. Sufficient Nos Quantity available Deficiency %

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

Regulated Power Supply Dual Tree CRO (20 MHz) Function Generator 31/2 Digit digital multimeter Bread Boards Transistor JFET Diode Zener Diode UJT Photo Diode Photo Transistor Thermistors OP-amp Milli Ammeter (0-100mA) Micro Ammeter (0-50A) Low range voltmeter (0-30V) Resistor of various ranges Capacitors of various ranges Connecting wires

Faculty of Electrical Engineering

III Semester B.E. Electronics and Instrumentation Engineering


(R 2008) EE39 - Data Structures and Algorithms Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 40 Nos with one server 3 Nos 2 Nos 2 40 Nodes Quantity available Deficiency %

1.

Computer(Pentium 4)

2. 3. 4. 5.

Dot matrix printer Laser Printer UPS (5 KVA) Turbo C

Faculty of Electrical Engineering

III Semester B.E. Electronics and Instrumentation Engineering


(R 2008) EE39 - Data Structures and Algorithms Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 40 Nos with one server 3 Nos 2 Nos 2 40 Nodes Quantity available Deficiency %

1.

Computer(Pentium 4)

2. 3. 4. 5.

Dot matrix printer Laser Printer UPS (5 KVA) Turbo C

Faculty of Electrical Engineering IV Semester B.E. Electrical and Electronics Engineering (R 2008) EE48 Linear and Integrated Circuits Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 4 each Quantity available Deficiency %

1. Interface such as, A/D, D/A converter, DMA, PIC Serial, Interface, Temperatures controller, Stepper motor, Key board 2. CRO and function generator 3. IC trainer Kit 4. Analog AC trainer kit 5. Components and bread boards 6. Chips IC 7400 7. Chips IC 7402 8. Chips IC 7408 9. Chips IC 7432 10. Chips IC 7410 11. Chips IC 555 12. Chips IC 741 13. Chips IC 74153 14. Chips IC 7474 15. Chips IC 7490 16. Chips IC 7447 17. Chips IC 7476 18. Chips IC 7420 19. Chips IC 7404 20. Chips LM 317 21. Chips LM 723 22. Chips MA 7840 23. Chips LM 380 24. Chips ICL - 8038 25. Traffic light control kit 26. VDU 27. 7 segment Display 28. Interfacing card such as keyboard etc. 29. Work tables

3 each 15 4 10 each 10 10 10 10 25 10 10 10 10 10 10 10 10 15 10 10 10 10 10 2 2 5 3 each 15

Faculty of Electrical Engineering

IV Semester B.E. Electronics and Instrumentation Engineering (R 2008)


EE48 Linear and Integrated Circuits Laboratory Requirement for a batch of 30 students
\S.No. Description of Equipment Quantity required 4 each Quantity available Deficiency %

1.

2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29.

Interface such as, A/D, D/A converter, DMA, PIC Serial, Interface, Temperatures controller, Stepper motor, Key board CRO and function generator IC trainer Kit Analog AC trainer kit Components and bread boards Chips IC 7400 Chips IC 7402 Chips IC 7408 Chips IC 7432 Chips IC 7410 Chips IC 555 Chips IC 741 Chips IC 74153 Chips IC 7474 Chips IC 7490 Chips IC 7447 Chips IC 7476 Chips IC 7420 Chips IC 7404 Chips LM 317 Chips LM 723 Chips MA 7840 Chips LM 380 Chips ICL - 8038 Traffic light control kit VDU 7 segment Display Interfacing card such as keyboard etc. Work tables

3 each 15 4 10 each 10 10 10 10 25 10 10 10 10 10 10 10 10 15 10 10 10 10 10 2 2 5 3 each 15

Faculty of Electrical Engineering

III Semester B.E. Instrumentation and Control Engineering (R 2008)


EI38 - Electrical Machines Laboratory Requirement for a batch of 30 students
Quantity required 2 set 2 set 2 Nos. 1 No. 1 No. 7 Nos. 2 Nos. 4 sets 3 Nos. 1 No. 2 Nos. 5 Nos. 1 No. 5 Nos. 3 Nos. 20 Nos. 20 Nos. 20 Nos. 20 Nos. 30 Nos. Quantity available Deficiency %

S.No. 1.

Description of Equipment D.C motor Generator set D.C motor Shunt Generator D.C motor Compound Generator D.C. Shunt Motor D.C. Series Motor D.C. Compound Motor Single phase transformers Three phase transformers D.C. Motor Alternator set Three phase Induction Motor (Squirrel cage) Three phase slip ring Induction Motor Single phase Induction Motor Resistive load 3 phase 2 , single phase - 3 Inductive load Single phase Auto transformer Three phase Auto transformer Moving Coil Ammeter of different ranges Moving Coil Voltmeter of different ranges Moving Iron Ammeter of different ranges Moving Iron voltmeter of different ranges Wire wound Rheostats of different ratings

2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

S.No. 20. 21.

Description of Equipment Tachometers Single element wattmeters of different ranges UPF / LPF Double element wattmeters of different ranges Power factor meter Digital multimeter Three point starter, four point starter,DOL starter, manual star / delta starter, semi automatic and fully automatic star / delta starter SCR based semi and fully controlled rectifier module SCR based chopper module SCR based inverter module SCR based AC voltage regulation module SCR, MOSFET, IGBT Trainer module

Quantity required 10 Nos. 20 Nos. 4 Nos. 2 Nos. 5 Nos. 1 No each for study experiment 2 Nos. 2 Nos. 2 Nos. 2 Nos. Each 2 Nos.

Quantity available

Deficiency %

22. 23. 24. 25.

26. 27. 28. 29. 30.

Faculty of Electrical Engineering

IV Semester B.E. Instrumentation and Control Engineering


(R 2008) EI47 - Transducer and Measurements Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

Loading Effect on potentiometer 1. Potentiometer Linear displacement transducer kit 2. Regulated power supply 3. FET voltmeter, ordinary voltmeter Characteristics of Strain Guage and Load cell 4. Strain guage and Load cell kit 5. Variable power supply 6. Loads for measurement Characteristics of LVDT 7. LVDT trainer kit 8. Power supply Half Effect Transducers 9. Hall effect characteristics trainer 10. Power supply 11. Voltmeter Photoelectric tachometer 12. Speed control trainer kit 13. Power supply 14. Wires 15. Multimeter Characteristics of LDR 16. Photo conductive trainer kit 17. Multimeter 18. Connecting wires Characteristics of thermistor 19. Thermistor Trainer kit 20. Heater 21. Thermistor 22. Thermometer 23. Voltmeter Characteristics of Thermocouple 24. Thermocouple trainer kit

1 No 1 No 1 No 1 No 1 No A set

1 No. 1 No.

1 No. 1 No. 1 No. 1 No 1 No. Some 1 No. 1 No. 1 No. 1 No.

1 No. 1 No. 1 No. 1 No. 1 No. 1 No.

S.No.

Description of Equipment

Quantity required 1 No. 1 No. 1 No.

Quantity available

Deficiency %

25. 26. 27.

Thermocouple Heater Voltmeter

Step Response characteristics of RTD and Thermocouple 28. Thermocouple and RTD trainer kit 1 No. 29. Thermocouple and RTD sensors 1 No. 30. Heater 1 No. 31. Thermometer 1 No. 32. Voltmeter 1 No. 33. I/P trainer kit 1 No. 34. Pressure source 1 No. 35. Control valve etc 1 No. Measurement Of Medium Resistance Using a) Wheatstones Bridge 36. Resistors 1 No. 37. Galvanometer 1 No. 38. Regulated Power Supply 1 No. 39. Bread Board 1 No. 40. Decade Resistance Box 1 No. 41. Multimeter 1 No. b) Kelvins Double Bridge 42. Power supply 1 No. 43. Fixed resistance 1 No. 44. Unknown resistance 1 No. 45. Decade Resistance box 1 No. 46. Multimeter 1 No. 47. Galvanometer 1 No. 48. Bread Board 1 No. Scherings Bridge for capacitance measurement 49. Resistors Some set 50. Capacitance Some set 51. Decade Resistance box 1 No. 52. Decade Capacitance Box 1 No. 53. CRO 1 No. 54. Function Generator 1 No. Andersons Bridge for inductance measurement. 55. Resistors Some Set 56. Decade Inductance box 1 No. 57. Decade Condenser box 1 No. 58. Regulated Power Supply 1 No. 59. CRO 1 No. 60. Bread Board 1 No. Calibration of Single Phase Energy Meter 61. Wattmeter 62. Voltmeter 63. Ammeter 64. Resistive Load

2 No. 1 No. 1 No. 1 No.

S.No.

Description of Equipment

Quantity required

Quantity available

Deficiency %

Calibration of wattmeter 65. Ammeter 66. Voltmeter 67. Wattmeter 68. Load Calibration of Ammeter 69. Standard Ammeter 70. Ammeter 71. Variable resistive load 72. RPS Calibration of Voltmeter 73. Standard Voltmeter 74. Voltmeter 75. Auto transformer 76. RPS Series type Ohmmeters 77. Ohmmeter (Analog Multimeter) 78. Voltmeter 79. Ammeter 80. Resistor 81. RPS Shunt type Ohmmeter 82. Ohmmeter (Analog Multimeter) 83. Voltmeter 84. Ammeter 85. Resistor 86. RPS

1 No. 1 No. 1 No. 1 No.

1 No. 1 No. 1 No. 1 No.

1 No. 1 No. 1 No. 1 No.

1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No.

Faculty of Electrical Engineering IV Semester B.E. Electronics and Instrumentation Engineering (R 2008) EI49 - Thermodynamics Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

Thermodynamics Lab
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Engine cut section models Single cylinder petrol engine with Mechanical dynamometer Multi cylinder petrol engine with hydraulic dynamometer Multi cylinder diesel engine with Electrical dynamometer Steam boilers with suitable mountings and accessories Refrigeration Test Rig Forced convection Heat transfer Test set up. Free convection Heat transfer test set up. Apparatus for measuring pipe friction Francis turbine Pelton wheel Turgo impulse wheel Stop watches 1 set 1 set 1 set 1 set 1 set 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 1 No. 6 Nos.

Faculty of Electrical Engineering

IV Semester B.E. Instrumentation and Control Engineering


(R 2008) EI49 - Thermodynamics Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

Thermodynamics Lab
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. Engine cut section models Single cylinder petrol engine with Mechanical dynamometer Multi cylinder petrol engine with hydraulic dynamometer Multi cylinder diesel engine with Electrical dynamometer Steam boilers with suitable mountings and accessories Refrigeration Test Rig Forced convection Heat transfer Test set up. Free convection Heat transfer test set up. Apparatus for measuring pipe friction Francis turbine Pelton wheel Turgo impulse wheel Stop watches 1 1 1 1 1 1 1 1 1 No. 1 No. 1 No. 1 No. 6 Nos.

Faculty of Electrical Engineering M.E. Embedded System and Technologies (R 2009) Semester II ET926 Embedded System Laboratory (Requirement for a batch of 25 students)
S.No 1. 2. 3. 4. 5. 6. 7. 8. Name of the Equipment Quantity required 25 1 1 1 1 1 5 Licenses 3 Quantity available Deficiency %

PC terminals-networked with high capacity server HP laser printer


UPS 5 kVA Dot matrix printer Visual Basic Visual C++ Matlab software KEIL IDE vision2 software with RTK51 & RT 166 real time kernel enabled Intel/Atmel/Philips/silabs 8083/87C5xx/803xx/80L5xx/8F5xx micro controller board Xilinx webpack 5.1 software with models 1m 5.6 xE Xilinx cool runner XCL 100 kit Code composer studio for C2x & C5x TMs 3202X/C5X series DSP processor bits Cypress/ ATMEL FPSLIC software Cypress/ ATMEL FPSLIC programmable kits 8031/89C51 trainer kit with interfacing boards Universal programmer VLSI Ki5 ATMEL trainer board KEIL PK 51 with trainer boards [S/W 5 user license] Vx works-tornado, and X86/Power PC boards 5 user license {RTOS}

9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

3 3 3 3 3 3 3 5 2 5 5 5

S.No 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31.

Name of the Equipment Cypress warp tools ORCAD 9.1 cadence, mentor graphics design tools OPNET/QUALNET/NS2, Simulator Software. Microcontroller kit with Ethernet Controller & Board Support Package 8051/ PIC Microcontroller boards Temp Sensor, Traffic Light Control, Stepper Motor 16 bit Processor : msp430 Microcontroller ARM 7 Development Board with RTOS RTOS : ARM7/ARM9 with RTOS ORCAD/Pspice. Licensed Version MatLab Lab View Licensed Version DSP Processor TMS 320FC5X/3X series with code compressor studio Xilinx/Alterc FPGA Kit like Spartan/Virtex/ Altera Cyclone FPGA with board support packages Opnet/ Qualnet/ NS2 simulator Software Microcontroller kit with Ethernet Controller & Board Support Package

Quantity required 5 licenses 1 Licenses Multi user 1 5 each 2 each 1 1 Multiuser Multiuser Multiuser

Quantity available

Deficiency %

32.

33.

34. 35.

Multiuser 1

I Year B.E./ B.Tech. Semester I (R 2008) GE19 Engineering Practices Laboratory Requirements for a batch of 30 students

Sl.No.

Description of Equipment

Quantity required

Quantity available

Deficiency %

CIVIL Assorted components for plumbing consisting of metallic pipes, plastic pipes, flexible pipes, couplings, unions, elbows, plugs and other fittings. Carpentry vice (fitted to work bench) Standard woodworking tools Models of industrial trusses, door joints, furniture joints Power Tools: (a) Rotary Hammer (b) Demolition Hammer (c) Circular Saw (d) Planer (e) Hand Drilling Machine (f) Jigsaw

1.

15 sets

2. 3. 4.

15 No. 15 sets 5 each

5.

2 Nos 2 Nos 2 Nos 2 Nos 2 Nos 2 Nos

MECHANICAL 1. 2. 3. 4. 5. 6. Arc welding transformer with cables and holders Welding booth with exhaust facility Welding accessories like welding shield, chipping hammer, wire brush, etc. Oxygen and acetylene gas cylinders, blow pipe and other welding outfit. Centre lathe Hearth furnace, anvil and smithy tools 5 No. 5 No. 5 sets 2 No. 2 No. 2 sets

7. 8. 9.

Moulding table, foundry tools Power Tool: Angle Grinder Study-purpose items: centrifugal pump, air-conditioner

2 sets 2 Nos One Each.

ELECTRICAL 1. 2. 3. 4. Assorted electrical components for house wiring Electrical measuring instruments Study purpose items: Iron box, fan and regulator, emergency lamp Megger (250V/500V) Power Tools: (a) Range Finder (b) Digital Live-wire detector 15 sets 10 sets One each 1 No. 2 Nos 2 Nos

5.

ELECTRONICS 1. 2. 3. 4. 5. Soldering guns Assorted electronic components for making circuits Small PCBs Multi Meters Study purpose items: Telephone, FM radio, low-voltage power supply 10 No. 50 No. 10 No. 10 No. 2 each

I Year B.E. / B.Tech. Semester - II (R2008) GE27 COMPUTER PRACTICE LABORATORY - II Requirements for a batch of 30 students

Sl.No. Hardware 3. 4. 5.

Description of Equipment

Quantity required

Quantity available

Deficiency %

UNIX Clone Server 33 Nodes (thin client or PCs) Printer Operating System (33 user license or License free Linux) Compiler

1 No. 33 Nos. 3 Nos. Available / Not Available Available / Not Available

Software 4. 5. Unix Clone C compiler

I Year B.E. / B.Tech. Semester - II (R 2008) GS28 PHYSICS & CHEMISTRY LABORATORY - II Requirements for a batch of 30 students Physics Laboratory
Sl.No. 1. 2. 3. 4. 5. 6. Description of Equipment Torsional Pendulum apparatus (With accessories) Non-uniform Bending apparatus (With accessories) Viscosity (Poiseuilles flow) apparatus (With accessories) Band gap apparatus/ Post office box Spectrometer (With grating, prism and accessories) Carey Foster Bridge Quantity required 5 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. 5 Nos. Quantity available Deficiency %

Chemistry Laboratory

S.No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10.

Description of Equipment Electronic balance pH meter Conductivity bridge Potentiometer Platinum electrodes Calomel electrodes Spectrophotometer Flame photometer Oswald viscometer Glassware

Quantity required 1 No. 8 Nos. 8 Nos. 8 Nos. 8 Nos. 8 Nos. 1 No. 1 No. 15 Nos. Sufficient Quantity

Quantity available

Deficiency %

Faculty of Information and Communication Engineering

III Semester B. Tech. Information Technology (R 2008)


IT38 Data Structures and Algorithm Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

18.

SOFTWARE REQUIRED TURBO C version 3 (or) GCC version 3.3.4 OPERATING SYSTEM WINDOWS 2000 / XP / NT OR LINUX COMPUTERS REQUIRED (Minimum Requirement : Pentium III or Pentium IV with 256 RAM and 40 GB harddisk)

19.

20.

30 Nos.

Faculty of Information and Communication Engineering

M.E. Computer Science and Engineering


(R 2009) Semester II IT 926 Internet Programming Laboratory (Requirement for a batch of 25 students)

Sl. No. 1. 2. 3. 4.

Description of the Equipment

Quantity Required 25 Open source Open Source

Quantity available

Deficiency in %

PCs Java, J2SEE, Browsers like IE, firefox Web server like Tomcat Any Database

All the software mentioned above should be installed in all the 25 Systems

Faculty of Information and Communication Engineering

M.Tech. Information Technology


(R 2009) Semester II IT 926 Internet Programming Laboratory (Requirement for a batch of 25 students)
Sl. No. 1. 2. 3. 4. Quantity Required 25 Open source Open Source Quantity available Deficiency in %

Description of the Equipment

PCs Java, J2SEE, Browsers like IE, firefox Web server like Tomcat Any Database

All the software mentioned above should be installed in all the 25 systems

M.Sc. (5 Years) COMPUTER TECHNOLOGY (R 2003) LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description

Quantity required

(i) Hardware

60 Terminals

(ii) Software

a. COBOL b. C c. Word Processing and Presentation Software d. RDBMS e. C++ f. JAVA g. Case Tool with UML h. VB i. VC++ j. Multimedia Software

M.Sc. (5 Years) INFORMATION TECHNOLOGY (R 2003) LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description

Quantity required

(i) Hardware (ii) Software

60 Terminals a. COBOL b. C c. Word Processing Presentation Software d. RDBMS e. C++ f. JAVA g. Case Tool with UML h. VB i. VC++ j. Multimedia Software k. Scripting Software

and

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester I MC 916 Programming and Data Structures Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of the Equipment Quantity Required Quantity available Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows 2000/any higher versions/ XP/ vista Turbo C Version 3.0 / Bortland C

25 Nos.

2.

25 Nos.

3.

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester I MC 917 DBMS Laboratory (Requirement for a batch of 25 students)
Sl. No. Hardware Computer System with Higher Configuration Quantity Required Quantity available Deficiency in %

Description of the Equipment

1.

25 Nos.

Softwares 1. Windows XP Operating System with Licensed Version Microsoft SQL Server with Licensed for 25 Numbers client connection Microsoft Office 2003 / 2007 with Licensed Version Microsoft Visual Studio 2008 with Licensed Version or Microsoft Developer 2000 with Licensed Version Antivirus with Licensed Version 25 Nos.

2.

1 No.

3.

25 Nos.

4.

25 Nos.

5.

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester III MC 937 Microprocessor Laboratory (Requirement for a batch of 25 students)
Sl. No. 1. 2. 3. 4. 5. 6. 7. 8. Quantity Required 25 Nos. 25 Nos. 25 Nos. 25 Nos. 25 Nos. 25 Nos. 25 Nos. 25 Nos. Quantity available Deficiency in %

Description of the Equipment 8086 Microprocessor Kit TASM /MASM/ NASM Software(PC) 8255 Traffic Controller Interface Stepper Motor Interface CRT Interface for waveform Generator DC Motor controller Interface 8279 Keyboard / Display Controller ADC / DAC Interface Board

Faculty of Information and Communication Engineering M.C.A. Computer Application (R 2009) Semester II MC 926 Object Oriented Programming Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of the Equipment Quantity Required Quantity available Deficiency in %

1.

System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows 2000/any higher versions/ XP/ vista Turbo C Version 3.0 / Bortland C

25 Nos.

2.

25 Nos.

Faculty of Information and Communication Engineering M.C.A. Computer Application (R 2009) Semester II MC 927 System Software Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity available Deficiency in %

Description of the Equipment

1.

Linux Server

2.

Desktop machines or Linux machines Softwares: C Complier available with Linux OS

25 Nos.

3.

25 user License

Faculty of Information and Communication Engineering M.C.A. Computer Application (R 2009) Semester II MC 928 Algorithm Laboratory (Requirement for a batch of 25 students)
Sl. No. 8. Softwares 1. 2. 3. 4. 5. Windows XP Operating System with Licensed Version Turbo C / C++ Or JDK, J2SDK Microsoft Office 2003/2007 with Licensed Version Microsoft Visual Studio with Licensed Version Antivirus with Licensed Version 25 Nos. 25 Nos. 25 Nos. 25 Nos. 25 Nos. Description of the Equipment Hardware: Computer System with High Configuration Quantity Required 25 Nos. Quantity available Deficiency in %

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester III MC 936 Graphics Laboratory (Requirement for a batch of 25 students)
Sl. No. 1. 2. 3. Description of the Equipment System C Compiler Opengl + VC++ Quantity Required 25 Nos. 25 Nos. 25 Nos. Quantity available Deficiency in %

4.

Image editing software (Crimp or Photoshop)

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester III MC 938 Web Programming Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity available Deficiency in %

Description of the Equipment

1.

System Configuration Latest Processor Minimum of 1 GB RAM, Hard Disk Drive with 80 GB or more, DVD Drive Operating Systems windows / linux

25 Nos.

2.

25 Nos.

3.

Java SDK (1.6) / Tomcat Server / IIS Server Browser (IE /Netscape/Mozilla) FrontPage / DreamWeaver / Web Page design S/W / Photoshop (for image processing in websites Visual studio .Net for Asp.Net Application development

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester IV MC 946 Visual Programming Laboratory (Requirement for a batch of 25 students)

Sl. No.

Description of the Equipment System Configuration: Latest Processor, 1 GB RAM, Hard Disk with 80 GB or more DVD Drive OS Windows

Quantity Required

Quantity available

Deficiency in %

1.

25 Nos.

2.

Visual Studio 6 / Visual Studio .net

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester IV MC 947 Network Programming Laboratory (Requirement for a batch of 25 students) Sl. No. Description of the Equipment System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows family OS/Linux Family OS 2. C/C++/Java 25 Nos. Quantity Required Quantity available Deficiency in %

1.

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester IV MC 948 Case Tools Laboratory (Requirement for a batch of 25 students)

Sl. No.

Description of the Equipment

Quantity Required

Quantity available

Deficiency in %

1.

Computers

25

2.

Rational Rose / Open Source case Tools

25

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester V MC 956 Middleware Technologies Laboratory (Requirement for a batch of 25 students)
Sl. No. Description of the Equipment Quantity Required Quantity available Deficiency in %

1.

System Configuration Latest Processor Minimum of 1 GB RAM, Hard Disk Drive with 80 GB or more, DVD Drive

25 Nos.

2.

Operating Systems windows / Linux Java SDK (1.6) Touscat Server / IIS Server Browser (IE /Netscape /Mozilla) Visual Studio (COM, DCOM) JAVA , J2EE (RMI, CORBA), Or C# and .NET

25 Nos.

3.

25 Nos.

Faculty of Information and Communication Engineering

M.C.A. Computer Application


(R 2009) Semester V MC 957 Software Development Laboratory (Requirement for a batch of 25 students)
Sl. No. Quantity Required Quantity available Deficiency in %

Description of the Equipment System Configuration : Intel Pentium IV Processor, Intel Mother Board, 512 MB RAM, 80 GB Hard Disk and CD Drive Windows 2000/any higher versions/ XP/ vista Rational Rose

1.

25 Nos.

2.

25 Nos.

I Year B. E. / B.Tech. Semester - II (R 2008) ME29 Computer Aided Drafting and Modeling Laboratory Requirements for a batch of 30 students

S. No.

Description of Equipment

Quantity Required

Quantity available

Deficiency %

1.

Pentium IV computer or better hardware, with suitable graphics facility Licensed software for Drafting and Modeling Laser Printer or Plotter to print / plot drawings

30 No.

2. 3.

30 licenses 2 No.

Faculty of Mechanical Engineering

III Semester B. E. Mechanical Engineering (R2008)


ME37 Manufacturing Technology Lab I Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

1. 2. 2.1 2.2 2.3


3. 3.1 3.2 3.3 4 4.1 4.2 5 5.1

Centre Lathe with accessories Welding


Arc welding machine Gas welding machine Brazing machine

15

04 01 01

Sheet Metal Work facility


Hand Shear 300mm Bench vice 01 05

Standard tools and calipers for sheet 05 metal work Sand moulding Facility Moulding Table Moulding boxes, tools and patterns Plastic Moulding Injection Moulding Machine 01 05 05

Faculty of Mechanical Engineering III Semester B.E. Automobile Engineering (R2008) ME38 - Fluid Mechanics and Machinery Lab Requirement for a batch of 30 students
S.No. 49. Description of Equipment Orifice meter setup Quantity required Quantity available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Available/ Not available Deficiency %

50.

Venturi meter setup

51.

Rotameter setup

52.

Pipe Flow analysis setup

53.

Centrifugal pump/submergible pump setup Reciprocating pump setup

54.

55.

Gear pump setup

56.

Pelton wheel setup

57.

Francis turbine setup Kaplan turbine setup Wind tunnel with pressure measuring devices

58.

Faculty of Mechanical Engineering III Semester B. E. Mechanical Engineering (R2008) ME38 - Fluid Mechanics and Machinery Lab Requirement for a batch of 30 students
S.No. 59. 60. 61. 62. 63. Description of Equipment Orifice meter setup Venturi meter setup Rotameter setup Pipe Flow analysis setup Centrifugal pump/submergible pump setup Quantity required 1 No. 1 No. 1 No. 1 No. 1 No. Quantity available Deficiency %

64. 65. 66. 67. 68.

Reciprocating pump setup Gear pump setup Pelton wheel setup Francis turbine setup Kaplan turbine setup

1 No. 1 No. 1 No. 1 No. 1 No.

Faculty of Mechanical Engineering

III Semester B. E. Aeronautical Engineering (R2008)


ME38 - Fluid Mechanics and Machinery Laboratory Requirement for a batch of 30 students
S. No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Description of Equipment Quantity required 1 1 1 1 1 1 1 1 1 1 Quantity available Deficiency %

Venturimeter setup Pipe friction set up Pitot tube set up Jet pump Submersible pump Centrifugal pump Reciprocating pump Pelton wheel turbine and Francis turbine Viscosity Meter Hele-shaw apparatus

Faculty of Mechanical Engineering III Semester B. E. Mechanical Engineering (R2008) ME39 - Electrical Engineering Laboratory Requirement for a batch of 30 students
S.No. 1. 2. 3. 4. Description of Equipment DC Shunt motor DC Series motor DC shunt motor-DC Shunt Generator set DC Shunt motor-DC Series Generator set Quantity required 2 1 1 1 Quantity available Deficiency %

5. 6. 7. 8. 9. 10.

Single phase transformer Three phase alternator Three phase synchronous motor Three phase Squirrel cage Induction motor Three phase Slip ring Induction motor Single phase Induction motor

2 2 1 1 1 1

Faculty of Mechanical Engineering

IV Semester B. E. Mechanical Engineering (R2008)


ME47 - Strength of Materials Lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 1 Quantity available Deficiency %

11.

12. 13. 14. 15. 16. 17. 18.

Universal Tensile Testing machine with double shear attachment 40 Ton Capacity Torsion Testing Machine (60 NM Capacity) Impact Testing Machine (300 J Capacity) Brinell Hardness Testing Machine Rockwell Hardness Testing Machine Spring Testing Machine for tensile and compressive loads (2500 N) Metallurgical Microscopes Muffle Furnace (800 C)

1 1 1 1 1 3 1

Faculty of Mechanical Engineering

IV Semester B.E. Aeronautical Engineering (R 2008)


ME47 Strength of Materials Laboratory Requirement for a batch of 30 students
S. No. 69. 70. Description of Equipment Quantity required 1 1 Quantity available Deficiency %

Hardness Testing Machine Universal Testing Machine

71. 72. 73.

Impact Testing Machine Fatigue tester- Rotating Beam Fatigue tester Reverse plate bending

1 1 1

Faculty of Mechanical Engineering

IV Semester B. E. Mechanical Engineering (R2008)


ME48 - Computer Aided Machine Drawing Lab Requirement for a batch of 30 students
S. No. 1. Description of Equipment Quantity required 30 Nos. Quantity available Deficiency %

Computer Systems
17 Graphics Terminal Pentium IV Processor 80 GB HDD 512 MB RAM Advanced graphics accelerator

2. 3. 4.

Laser Printer Plotter (A2 Size)

01 01

Software 30 seats of latest/recent versions of AutoCAD/CATIA/SOLIDWORKS/SOLID EDGE/NX/PRO-E/COLLABCAD or equivalent software Faculty of Mechanical Engineering IV Semester B. E. Mechanical Engineering (R2008) ME49 - Manufacturing Technology Lab II Requirement for a batch of 30 students

S.No.

Description of Equipment

Quantity required

Quantity available

Deficiency %

1. 2. 3. 4. 5. 6. 7. 8. 9.

Centre Lathes Turret and Capstan Lathes Horizontal Milling Machine Vertical Milling Machine Surface Grinding Machine Cylindrical Grinding Machine Shaper Slotter Planner

2 Nos 1 No each 1 No 1 No 1 No 1 No. 2 Nos 1 No. 1 No.

10. 11. 12. 13.

Radial Drilling Machine Tool Dynamometer Gear Hobbing Machine Tool Makers Microscope

1 No. 1 No 1 No 1 No

M.Sc. (5 Years) INFORMATION TECHNOLOGY (R 2003) LAB REQUIREMENTS FOR A BATCH SIZE OF 30

Description

Quantity required

(i) Hardware

30 Terminals

(ii) Software

a. b. c. d. e. f. g. h.

C C++ RDBMS VB VC++ Case Tool with UML JAVA Scripting Languages

Faculty of Mechanical Engineering

IIISemester B.E. Marine Engineering (R2008)


MV38 - Marine Hydraulics & Fluid Machinery Lab Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required Quantity available Deficiency %

FLUID MECHANICS LABORATORY 74.

Buoyancy Experiment
Cargo Ship Model War Ship Model Pitot tube Flow Nozzle Rotameter Notches Venturimeter Orifice meter Frictional Losses in pipes

01 01 01 01 02 02 02 01 01

75.

76. 77. 78.

FLUID MACHINERY LABORATORY 79. 80. 81. 82. 83. 84. 85. Centrifugal pump Multistage Centrifugal Pump Impulse Turbine (Pelton) Reaction Turbine (Francis) Reciprocating pump Submersible pump Jet pump 01 01 01 01 01 01 01

Faculty of Mechanical Engineering III Semester B. E. Marine Engineering (R2008) MV39 - Welding Techniques, Lathe and Special Machine Shop Requirement for a batch of 30 students
S. No. Description of Equipment Quantity required 10 03 04 01 01 01 01 01 01 01 03 01 01 01 01 01 01 01 04 01 01 01 02 01 02 01 02 02 40 Quantity available Deficiency %

1. Light duty Lathe 2. Medium duty Lathe 3. Heavy duty Lathe 4. Shaper 5. Slotter 6. Planner 7. Radial drilling m/c 8. Surface grinder 9. Pedestal grinder 10. Vertical milling m/c 11. Universal milling m/c 12. Tool & cutter grinder 13. Gear hobber 14. CNC Lathe Machine 15. Capstan Lathe 16. Cylindrical grinding m/c 17. Power hacksaw 18. Duplicating Lathe WELDING WORK SHOP 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. Welding Transformer Air Cooled with Fan Maxi MIG 400A Welding Set AOL make TIG Control Outfit Welding Rectifier Throluxe 401 MMA Water Cooled Torch 0150102071 400 AMPS Bending Machine Pipe dia to 3 Gas welding and cutting set FITTING SHOP Power Hacksaw Vernier Height Gauge Surface Plate with stand Fitting Bench Vice Hand tools (Different types)

Faculty of Mechanical Engineering IV Semester B. E. Marine Engineering (R 2008) MV48 Strength of Materials and Applied Mechanics Lab Requirement for a batch of 30 students
S. No. Description of Equipment Quantity required 01 01 01 01 01 01 01 01 01 01 01 01 01 01 Quantity available Deficiency %

1 2 3 4 5 6 7 8 9

UTM (Universal Testing Machine) Compression Testing Machine Deflection Testing Rig Hardness Vickers, Brinell, Rockwell, Testing Machines Spring Testing Machines Tension, Compression Impact Testing Machines (Izod, Charpy) Load Cells Fatigue Testing Machine Crucible furnace

10 Sand Strength Testing Machine 11 Permeability 12 Shear Strength Testing Machine 13 Compression Strength Testing Machine 14 Transfer Strength Testing Machine

Faculty of Mechanical Engineering

IV Semester B.E. Marine Engineering (R2008)


MV49 - Heat Engines Lab and Boiler Chemistry Lab Requirement for a batch of 30 students
S.No. Description of Equipment HEAT ENGINES LAB 1. 2. 3. 4. 5. 6. Orsat Apparatus 02 nos. Steam Turbine 01 Steam Calorimeter 01 Air Blower 01 Air Compressor 02 nos. Vapour Compression Refrigeration 01 test rig 7. Vapour compression Air Conditioning 01 test rig 8. Bomb calorimeter and Junkers 01 calorimeter 9. Crucible Metener Burner, Electric 01 Benser Hot air oven 10. Flash & Fire point closed cup 01 apparatus Redwoods Viscometer 01 Say bolts Viscometer 01 11. Carbon residue apparatus. 12. Wind Tunnel 01 FUELS AND LUBRICATION OIL TESTING EQUIPMENTS 13. Redwood Viscometer 14. Saybolts Viscometer 15. Abels flash point and fire point apparatus 16. Closed cup apparatus (Pensky) 17. Bomb Calorimeter with Beckman (Digital) 18. Junkers Gas Calorimeter BOILER CHEMISTRY LAB 19. Burette, Pipette, Beaker, Conical Flask, Bunsen Burner 20. Burette, Pipette, Conical Flask, STD 1 each 1 each 01 01 01 01 01 01 Quantity required Quantity available Deficiency %

Flask 100ml 21. Burette, Pipette, Conical Flask, STD Flask 22. Burette, Pipette, Conical Flask. 23. Do Bottle, Burette, Pipette, Conical Flask. 24. Wephlo turbidity meter, STD Flask Pipette. 25. PH meter, Buffer tablets, beaker. 26. Petridish, Hot air Oven, Weighing Balance 27. Water Analysis kit. 28. Meker Burner, Silica, Crucible, Electric Bunsen, Petridish Hot air Oven 29. Burette, Pipette, Conical Flask, turbidity meter, Bunsen Burner, Beaker, STD Flask. THERMAL ENGINEERING 30. Internal Combustion Engines Section 31. Fuel and Lubrication Oil Testing Equipments 32. Heat Transfer Equipments 33. Steam Lab. Equipments 34. Refrigeration and Air Conditioning Equipments 35. Automobile Components 36. Engine Research Centre 37. Computers with UPS 38. Miscellaneous Equipments 39. 40. 41. 42. 43. 44. 45. 46. 47. 48. 49.

1 each 1 each 1 each 1 each 1 each 1 each 1 no. 1 each 1 each

01 01 01 01 01 set 01 01 01 01

INTERNAL COMBUSTION ENGINES SECTION Multi Cylinder Petrol Engine 01 Twin Cylinder Diesel Engine 01 Kirloskar Diesel Engine 01 Greaves Cotton diesel engine 01 Two Stroke Petrol Engine 03 nos. Two Stroke Diesel Engine Model 01 Four Stroke Petrol Engine 01 Four Stroke Diesel Engine Model 01 Two Stroke Petrol Engine Model 01 Multi Cylinder Petrol Engine 01 Four Stroke Single Cylinder Diesel 01 Engine (Anil) 50. MK-12 Petrol Start Kerosene run 01 Engine 51. Battery charger 01

I Year B.E. / B.Tech. Semester - I (R 2008)

PCP18 PHYSICS & CHEMISTRY LABORATORY - I


Requirements for a batch of 30 students Physics Laboratory

S.No.

Description of Equipment

Quantity required

Quantity available

Deficiency %

7.

Lees disc apparatus (With accessories) Air Wedge apparatus (With traveling microscopes and accessories) Spectrometer (With grating, prism and accessories) Diode laser (2 mW power) or He-Ne laser (2mW) (Lycopodium powder, Optical fibre Kit and accessories) Ultrasonic interferometer (With accessories) B-H Curve traces apparatus

5 Nos

8.

5 Nos

9.

5 Nos

10.

5 Nos

11.

5 Nos

12.

5 Nos

Chemistry Laboratory

S.No. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.

Description of Equipment Electronic balance pH meter Conductivity bridge Potentiometer Platinum electrodes Calomel electrodes Spectrophotometer Flame photometer Oswald viscometer Glassware

Quantity required 1 No. 8 Nos. 8 Nos. 8 Nos. 8 Nos. 8 Nos. 1 No. 1 No. 15 Nos. Sufficient Quantity

Quantity available

Deficiency %

Faculty of Technology III Semester B.Tech. Polymer Technology (R 2008) PT37 - POLYMER CHEMISTRY LAB Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 15 1 2 1 15 Sufficient qty. Quantity available Deficiency %

86. 87. 88. 89. 90. 91.

Bunsen Burner Electronic Balance Thermostatic Water bath Melting Point Apparatus Retort Stand Polymer Samples and Glass wares

Faculty of Technology III Semester B.Tech. Polymer Technology (R 2008) PT38 - ORGANIC CHEMISTRY LABORATORY Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 15 15 15 15 15 15 01 Gross 15 15 15 -----Quantity available Deficiency %

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

Conical flask Liebig condenser Round bottom flask Burette Pipette Iodine flask Test tubes Test tube holder Tongs Bunsen burner Chemicals

Faculty of Technology IV Semester B.Tech. Polymer Technology (R 2008) PT47 Chemical Engineering Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 1 1 2 2 1 1 1 1 2 1 1 1 1 4 4 2 3 2 5 1 2 1 1 1 1 Quantity available Deficiency %

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25.

Fluidized bed Packed bed Stop watch Measuring cylinder (1 Lit) Sieve shaker and sieve set Ball mill Jaw crusher Electronic balance Plastics tray Friction pipe apparatus Single speed centrifugal pump Venturi meter apparatus Orifice/mouth piece apparatus Stop watch Meter scale Vernier caliper Flow measuring meters Stop watch Thermometer Tacho meter Measuring jar (2 lit and 1 Lit each one) Air compressor Parallel and counter flow heat exchanger Stephen Boltzman apparatus Thermal conductivity Apparatus

Faculty of Technology

IV Semester B.Tech. Polymer Technology (R 2008)


PT48 Mould Engineering Laboratory Requirement for a batch of 30 students
S.No. Description of Equipment Quantity required 5 2 2 15 1 2 2 2 2 1 1 Quantity available Deficiency %

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.

Shaping machine Vertical milling machine Horizontal milling machine Lathe Plain surface grinding machine Bench grinder Vernier caliper Vernier height gauge Sine bar Sine center Gear tooth vernier caliper

Faculty of Information and Communication Engineering M.Tech. Information Technology (R 2009) Semester I SE 917 Case Tools Laboratory (Requirement for a batch of 25 students)
Sl. No. Hardware 1. One High End Server 1 No. Description of Equipment Quantity Required Quantity Available Deficienc y in %

2.

PC and Desktop

25 Nos.

Software

3.

Rational Rose / Equivalent

Multiuser

Faculty of Information and Communication Engineering M.E. VLSI Design (R 2009) Semester I VL 916 VLSI Design Laboratory I (Requirement for a batch of 25 students)
Sl. No. Description of Equipment Quantity Required Quantity Available Deficienc y in %

1.

Xilinx or Altera kit with software

6 kits

2.

Tanner or Cadence or Mentor Graphics Texas Instruments or Analog Devices DSP kit with software Digital storage scope and logic analyzer

6 licenses

3.

6 licenses

4.

2 minimum

Faculty of Information and Communication Engineering M.E. VLSI Design (R 2009) Semester I VL 926 VLSI Design Laboratory II (Requirement for a batch of 25 students)
Deficienc y in %

Sl. No.

Description of Equipment

Quantity Required

Quantity Available

1.

Xilinx or Altera kit with software

6 kits

2.

ARM kits with software (or) Cypress PSOC kits with software (or) Renessas kits with software (or) Equivalent microcontroller kits with software

6 kits

Anda mungkin juga menyukai