FLEXI WCDMA NODE-B RFI CHECKLIST

SAM date:

RFI date

Site ID/SAM:

Lat/Long:

Site Name:
Address

(with PIN code)

Project Phase:
:

Owner name

Site Properties
AMSL
Tower type (GBT/RTT/Pole)
Tower Height:
Building height (in case of RTT/Pole):
Site type: Indoor/outdoor---Exiting 2G BTS type (ID cabinet/OD cabinet/stack/wall/pole:
Access to the site

OK or Not OK

Others: Specify (chain pulley required)..


Is site is OK from Health and safety point of view. I.e. proper access, parapet around the working area,
proper rings around the tower vertical ladder.
Existing Antenna Details
GSM Pole ht required: ---/---/---

GSM pole actual ht.:---/---/---

GSM Pole Azimuth required: ---/---/---

GSM Pole Azimuth actual:---/---/---

MW pole ht. required: ----/----

MW pole actual ht.: ----/----

MW pole orientation required: ----/----

MW pole actual orientation: ----/----

Independent / Co-located with

If co-located: Separate shelter Yes/No

No. of operators sharing-----Item


No.
1
1a
2
3
4

Description

Yes

Type of EB connection ( 3 ph/1


Ph) and Rating
If EB power not available,
tentative date of EB
availability
Tower/poles installed,
verticality checked
Vertical RF feeder cable
ladder installed properly
Are all antennas pole mounts
installed as per RF/TX
design(with 0 degree tilt),
Tightened
Is the cell site tested for
grounding resistance and test
result on file, ensure all
installed equipment grounded
(DG, Shelter, tower)
Is horizontal tray from hatch
plate to tower/pole mounts
installed and vertical supports
grouted properly

Space Available For New


Feeder Routing (HCT)

Space Available For Additional


Cable Tray

Reference: IND/SISO/3G/RFI/06/10/1
DATED: 11.6.2010
Version: 1

No

Not
applicabl
e

Proposed
date of
completi
on

Remarks

Value :
Pit 1; pit 2; pit3 separately

Item
No.
9

Description

Yes

No

Not
applicabl
e

Proposed
date of
completi
on

Remarks

Additional Cable Tray


required
Height-

10

2G AIRTEL GSM Antenna


sector 1

Feeder LengthAzimuthNo. Of Ports: Two/Four


GSM Antenna Band: Single
Band/Dual Band/Wide Band
Height-

11

2G AIRTEL GSM Antenna


sector 2

Feeder LengthAzimuthNo. Of Ports: Two/Four


GSM Antenna Band: Single
Band/Dual Band/Wide Band
HeightFeeder Length-

12

13

14
15

16

17
18
19

2G AIRTEL GSM Antenna


sector 3

AzimuthNo. Of Ports: Two/Four


GSM Antenna Band: Single
Band/Dual Band/Wide Band

Optical cable required for the


connection of system module
to Triple RF
module(<40meter)
Power cable required for the
connection of MCB to system
module (in meter).
Power cable required for the
Power connection of RF
module (in meter)
Feeder cable Length from
GSM To RF Module as per NSN
solution

1st sector GSM to RF


Module:_____
2nd sector GSM to RF
Module:_____
3rd sector GSM to RF
Module:_____

Free Holes available in WFT


for feeder/Power/Optical cable
Check for Additional WFT
Space.
Hatch plate installed properly
and sealed
qty -

20

Free pole mount available

Height Azimuth-

21
22
23
24
25
26
27

Type of transmission
equipment(SDH/PDH/Both)
Is the alarm box installed with
4 Krone blocks, Ext alarms
connected
Are lightning arrestors
provided for Towers/ Building
and grounded with Earth pit
Shelter Installed ( door
sealing& locking proper)
ID Ladder available for Feeder
& Cable routing
Lighting inside shelter and
availability of Power socket
Space Available inside BTS
cabinet ( 7U) for 3G BTS &
PDU

Reference: IND/SISO/3G/RFI/06/10/1
DATED: 11.6.2010
Version: 1

28

Space Available inside


Transmission Rack
( Minimum 3U) for 3G
SYSTEM MODULE

29

DG set installed and


commissioned and power
extending to shelter

Item
No.

30

31
32
33
34
35
36
37
38

39

40
41
42
43

44
45

Description

Yes

PIU unit installed &


commissioned, DG automation
done
Air conditioning
commissioned & working &
sealing done around unit
DC Power plant & Battery
installed, commissioned,
labeled
Site taken over by O&M
operator
Diesel filling of DG set
arranged
DC MCB Availability 32A &
16A for BTS
Cables from PP to DCDB are
as per the specified size.
Space Available for Installing
Additional MCB Inside DCDB
Feeder Cable Grounding
points availability in EGB
(2nos with nuts& Bolts)
BTS & Surge arrestor
grounding points availability
in IGB (4nos with nuts& Bolts)
ensure all bus bar connected
to earth pit
IP55 sub rack installed inside
OD BTS cabinet
IP 55 Tx Sub rack Installed
Outside OD BTS Cabinet
Space available on OD
Platform / Cage For Mounting
IP 55 rack
Space available on Tower Top
Platform or Tower Top Leg for
3G BTS Installation
Is it feasible to do RF Jumper
cabling from Hatch plate to
BTS( if not , please
recommend extra hatch plate)

No

Not
applicabl
e

Proposed
date of
completi
on

Remarks

Battery : .AH
O&M agency :

Media availability at site

Note:
1)
Attach site layout with existing equipment and proposed equipment location (including HCT) inside
shelter.
2)
Attach Photograph inside shelter and outside e.g. Pole, cable tray, hatch plate, EGB, Feeder Routing
Way, Node-B Proposed Location

Reference: IND/SISO/3G/RFI/06/10/1
DATED: 11.6.2010
Version: 1

RFI Conducted By
Signature

RFI Accepted By
Signature

TI Partner Agency Name:

NSN Representative

RFI Declared Date:

RFI Accepted Date:

Reference: IND/SISO/3G/RFI/06/10/1
DATED: 11.6.2010
Version: 1