CERC
Capital Cost Benchmarking Formatting of Headers / Dividers
Sheet Header 1 Sheet Header 2 Sheet Header 3 Header 1 Header 2 Header 3 Inputs Divider Table Heading 2 Table Heading 3 Table Heading 4
CERC
Capital Cost Benchmarking Transmission Substations
Header 1
Header 2 Header 3
Operational Assumptions
Table Heading 2
Infrastructure
Sub-Total Line Total Units Operation Line (Non-Addition) Operation (Addition / Total) Closing Balance Key Line USD 100 100 100 Sub-Total 100.00 Sub-Total Line_Summary Unit Line_Operation Line_Total Line_ClosingBal Line_Key
100
Development Styles
WIP W WIP
CERC
Capital Cost Benchmarking Transmission Substations
15.02
Add Substract Series Compensation 1 - For D/C Line Series Compensation 2- For S/C Line
1 -1
CERC
Capital Cost Benchmarking Transmission Substations
1 2 3
Please Select Computation_Sheet Select the type of compensation to be provided from drop down list in cell D8. Final Output shall be available in cell D11
CERC
Capital Cost Benchmarking Transmission Substations
C-14405-S162-3/PC-14405-S162-3/P-154 & 154 & 155/LOAC-13603-S162-3(R1)/LOA155/LOA-I/2571 I/2571 I/2821DT: 03/02/2009 DT: 10-07-2008 DT: 10-07-2008 Ballabhgarh Lucknow Meerut Ballabhgarh - Kanpur Lucknow - Gorakhpur D/C Tehri - Meerath 765 S/C kV D/C T/L T/L 40% 30% 50% C-46205-S162-1/CAC-33020-S162-1/CAI/2905 DT: 01-12I/3004 Dated 27.03.2009 2008 Raipur Raipur-Raigrah D/C T/L 40% Wardha Wadra -Raipur D/C line with Quad conductor 40%
S.No.
1 2 3 4 5
a) b)
Name of Equipment
SF6 Bypass Circuit Breaker -3-Ph Protective Spark Gap - forced triggered Damping Cirucit Series Capacitor Bank Disconnecting and Bypass Isolators (Individual Pole operated) Double Break.
3-Ph, with one earth switch 3-Ph, Without earth switch
Unit
INR Lakh INR Lakh INR Lakh INR Lakh 101.01 172.85 70.33 366.39 86.25 104.73 87.63 393.17 142.24 203.70 72.75 328.67 87.04 129.84 20.34 51.77 159.88 53.65 678.67
INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh 8.27 6.77 83.36 83.51 172.19 3.58 21.26 2.77 8.96 7.21 77.49 109.11 172.19 3.58 21.26 2.77 8.90 7.25 207.98 88.22 161.14 2.69 25.99 20.51 31.89 26.01 154.06 156.54 175.15 18.87 36.37 3.92 3.09 2.48 141.16 90.74 234.66 4.06
6 7 8 9 10 11 12
Insulated platforms -3-Ph - Including Plot form & BPS Etc Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformer Platform to ground signal transmission system Power supply Cubicles including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Mandatory Spares Civil Engineering Works Erection Charges
SF6 Bypass Circuit Breaker (3-Ph) Protective Spark Gap (forced triggered) Damping Cirucit Series Capacitor Bank Disconnecting and Bypass Isolators (Individual Pole operated) Double Break. 3-Ph, with one earth switch 3-Ph, Without earth switch Insulated platforms -3-Ph - Including Plot form & BPS Etc Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformer Platform to ground signal transmission system Power supply Cubictes including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Dismantling and re-erection of overhead stringing including insulator string along with necessary hardware etc. over the proposed installation of the series capacitor
INR Lakh
38.23
37.38
52.18
43.08
62.07
13
INR Lakh
70.14
74.77
195.87
191.72
105.65
14 15 16 17 18 19 20
a) b) c) e) f) i ii g) h) i) j) k) l) m) n) o) p) q) r) s)
INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh
52.94 1.40
57.19
45.22
0.38 0.38 6.36 1.99 2.65 0.38 1.06 0.27 5.97 4.64 3.25 0.29 0.53 5.30 0.33
0.38 0.38 6.36 1.99 2.65 0.38 1.06 0.27 5.97 4.64 3.25 0.29 0.53 5.30 0.33
0.26 0.26 207.98 1.99 2.63 0.37 1.05 1.84 5.93 4.61 3.23 0.29 5.27 0.33
0.19
CERC
Capital Cost Benchmarking Transmission Substations S.No. Name of Equipment
1 2 3 4 5
a) b)
Unit
INR Lakh INR Lakh INR Lakh INR Lakh
Average Rates
81.52 141.82 71.09 441.72
SF6 Bypass Circuit Breaker -3-Ph Protective Spark Gap - forced triggered Damping Cirucit Series Capacitor Bank Disconnecting and Bypass Isolators (Individual Pole operated) Double Break.
3-Ph, with one earth switch 3-Ph, Without earth switch
INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh 7.30 5.93 132.81 74.32 185.04 3.47 26.22 3.15
6 7 8 9 10 11 12
Insulated platforms -3-Ph - Including Plot form & BPS Etc Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformer Platform to ground signal transmission system Power supply Cubicles including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Mandatory Spares Civil Engineering Works Erection Charges
SF6 Bypass Circuit Breaker (3-Ph) Protective Spark Gap (forced triggered) Damping Cirucit Series Capacitor Bank Disconnecting and Bypass Isolators (Individual Pole operated) Double Break. 3-Ph, with one earth switch 3-Ph, Without earth switch Insulated platforms -3-Ph - Including Plot form & BPS Etc Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformer Platform to ground signal transmission system Power supply Cubictes including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Dismantling and re-erection of overhead stringing including insulator string along with necessary hardware etc. over the proposed installation of the series capacitor
INR Lakh
46.59
13
INR Lakh
127.63
14 15 16 17 18 19 20
a) b) c) e) f) i ii g) h) i) j) k) l) m) n) o) p) q) r) s)
INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh
INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh INR Lakh
1.21 1.20 5.71 3.17 4.54 0.82 2.20 0.86 5.69 4.33 3.38 0.29 5.29 0.33
CERC
Capital Cost Benchmarking Transmission Substations BOQ & Cost for Series Compensation
S.No.
1 2 3
SF6 Bypass Circuit Breaker (3-Ph) Protective Spark Gap (forced triggered) Damping Cirucit
Series Capacitor Bank (as per Tech Specification) Disconnecting and Bypass Isolators (Individual Pole operated) Double Break.
3-Ph, with one earth switch 3-Ph, Without eatth switch
Set
441.72
5
a) b)
No No Set
6
a) b)
Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformers Platform to ground signal transmission system Power supply Cubictes including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks
Set
74.32
8 9 10 11
Set
12
L/S
46.59
13
Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Civil Works Erection Chargers
SF6 Bypass Circuit Breaker (3-Ph) Protective Spark Gap (forced triggered) Damping Cirucit Series Capacitor Bank Disconnecting and Bypass Isolators (Individual Pole operated) Double Break. 3-Ph, with one earth switch 3-Ph, Without earth switch Insulated platforms -3-Ph - Including Plot form & BPS Etc Metal Oxide Varistor, (MOV) including 10% Spare Control & Protection Equipment excluding signal column Current Transformer Platform to ground signal transmission system Power supply Cubictes including ACDB & DCDB Power and Control cables including cables including cable accessories for both the banks Bus bar material including post insulators, disc insulator strings, Hardwares, Conductor, Aluminium Tube, GI wire, clamps and connectors, Earthig materials etc. for 3 phases for both the banks Galvanised Steel Structures for 3 phases for both the banks Surge Arrrestor (390kV) for 400kV system Air conditioned kiosks for two banks Fire Protection System Dismantling and re-erection of overhead stringing including insulator string along with necessary hardware etc. over the proposed installation of the series capacitor
L/S 127.63
14 15 16 17 18 19
a) b) c) e) f) i ii g) h) i) j) k) l) m)
L/S
No No L/S L/S
Nos Nos Sets Sets Sets Set Sets Set L/S 1.21 1.20 5.71 3.17 4.54 0.82 2.20 0.86 5.69
L/S L/S Nos Nos L/S L/S 0.33 4.33 3.38 0.29 0.00 5.29
n) o) p) q) r)
s)
20
Hard Cost
21 22 23
Material Portion in Rs lakhs Interest on Materials / equipments at 10.4048 % Total cost of Series compensation in Rs Lakhs
Series Compensation -1 - For D/C Line Quantity 2 2 2 Amount - INR 163.04 283.64 142.18
Series Compensation -2- For S/C Line Quantity 1 1 1 Amount - INR 81.52 141.82 71.09
883.45
441.72
4 2 2
2 1 1
148.63
74.32
370.09
185.04
2 2 2
1 1 1
46.59
0.5
23.29
127.63
0.5
63.82
36.13
0.5
18.06
6 1 1 1
3 1 0.5 0.75
2 2 2 2
1 1 1 1
4 2 2 2 2 2 2 2 1
2 1 1 1 1 1 1 1 0.75
1 1 6 1 1 1
2891.25
1501.68
CERC
Capital Cost Benchmarking Transmission Substations
Alternates
Series Compensation -1 - For D/C Line 28.91 Series Compensation -2For S/C Line 15.02
S.No.
Unit
INR Crore