Bagasse/Coal feeding Labours Bagasse & Coal is to be feed continuously in to the carrier at require rate by manually in three shifts round the clock. While feeding they should take proper care to avoid any stone and foreign materials etc. If any jamming occurs in chute or in Bagasse & Coal elevators are to be cleared immediately and the surrounding spot also be cleared immediately and each shift they have report the shift officers after coming & before leaving the factory premises. Per shift 8 male labour and one supervisor should be engaged in each shift. In case of shortage in Bagasse & Coal ,wood firing work is to be done. As per instructions of concern officers /engineers they should work. Bagasse & Coal feeding Dozer
No of Dozers required 03 nos for 24 hrs

4 5 6 7
III 1 2

Bagasse / Coal is to be feed continuously in to the carrier at require rate in three shifts round the clock. Excess/purchased Bagasse should be stacked as per the instruction of concern. They have to provide tractor dozer with good condition and shall process RTO license as per the transport rules and regulations under the RTO act and under safe condition. They shall provide two operators per dozer round the clock with proper driving license not to cause any interruption to the work. The tractor dozer shall be engaged as directed by the concerned officials from time to time by recording the starting hours and ending hours in the log book duly certified by the user department whenever it is engaged. As per instructions of concern officers /engineers they should work. Coal Unloading Coal is to be unloaded at coal yard by machine/manually as required by us. While unloading , they should maintain the serial no of trucks given by the concern authority.

3 4 5 IV 1 2 3 4 5 5

Unloading Machine/labour shall be available for 24 hours round the clock for minimum 10 trucks of coal per day. The coal unloading shall be done at required points as instructed by the concerned. They have to report the concerned, after coming and before leaving the factory premises.
Boiler Ash shifting No of Tractor required 02 nos with 02 trailers each -Bed ash and fly ash shifting for 24 hrs Shifting of ash from boiler to Ash yard without spillage. In ash yard it is to be shift as per our engineers instruction.

They should be provide two operators /tractor round the clock with proper driving license not to cause any interruption to the work. During the down time the tractors may engage for other jobs. As per instructions of concern officers /engineers they should work.