AOI utv
125
120
115
110
105
100
95
90
85
80
Number of user stories
75
70
65
60
55
50
45
40
35
30
25
20
15
10
5
0
8/14/2009
8/15/2009
8/16/2009
8/17/2009
8/18/2009
8/19/2009
8/20/2009
Sida 2
CDF diagram 090814 to 090828
8/20/2009
8/21/2009
8/22/2009
8/23/2009
8/24/2009
8/25/2009
8/26/2009
Sida 3
8/25/2009
CDF diagram 090814 to 090828
8/26/2009
8/27/2009
8/28/2009
production
Sida 4
Release cycle start Release cycle stop Inherited defects New defects Open defects Closed defects
9/1/2009 9/30/2009 0 2 2 1
10/1/2009 10/31/2009 1 3 4 1
Done user stories Defect rate
10 20%
14 29%
4
3.5
2.5
1.5
0.5
0
9/1/2009 10/1/2009
9/1/2009
10/1/2009
10/1/2009
Defect rate
Row 13
Row 14
Row 15
Row 16
Row 17
Row 18
Row 19
Row 20
To design Design done Design time Wait to construction To construction
2/2/2009 2/3/2009 1 1 2/4/2009
2/2/2009 2/3/2009 1 1 2/4/2009
3/6/2009 3/8/2009 2 2 3/10/2009
Construction done Construction time Wait to acc test To acc test Acc test done
2/6/2009 2 4 2/10/2009 2/11/2009
2/6/2009 2 4 2/10/2009 2/11/2009
3/17/2009 7 2 3/19/2009 3/22/2009
Acc test time Wait to RfP To RfP To archive Wait to archive (production)
1 1 2/12/2009 2/28/2009 16
1 1 2/12/2009 2/28/2009 16
3 1 3/23/2009 3/30/2009 7
Total wait time Cycle time (RtP - To archive) Process efficiency
23 27 15%
23 27 15%
14 26 46%