GOVERNMENT OF THE PUNJAB

MTDF 2009-12

DEVELOPMENT PROGRAMME 2009-10

VOLUME - I
SOCIAL SECTORS
Sr No Sector

1 School Education

2 Higher Education

3 Special Education

4 Literacy

5 Sports

6 Health

7 Water Supply & Sanitation

8 Social Protection

9 Regional Planning

10 LG&CD

7
School Education

8
SCHOOL EDUCATION

VISION

Enlightened and prosperous Punjab through equitable opportunities for quality education.

TREND OF ALLOCATIONS
(Rs. in million)
Years Original Allocation Revised Allocation
2005-06 2000.000 2020.344
2006-07 3305.000 1151.529
2007-08 8488.000 8305.514
2008-09 16454.000 9661.025
2009-10 13,600.000

POLICY INTERVENTIONS

Ensure achievement of education related Millennium Development Goals by 2015:

• Universal Primary Education.


• Completion of full Primary Schooling by all Children.
• Promote Gender Equality.
• Ensure 100% participation rate at primary level by 2011 and participation enhancement at the elementary & secondary level;
• Improving quality of education;
• Promotion of science & computer education upto secondary level;
• Reduction in gender and regional disparity in access to education;
• Equitable access to learning and life skills;
• Provision of Quality Education to most deprived and marginalized segments of society.

9
SECTORAL PRIORITY

• Education is the inherent right of all children. For providing quality education, different interventions like capacity building of teachers as well
as education managers; continued assessment of learning achievement through examinations; provision of quality text books; I.T. labs; and
state of the art libraries have already been introduced. In addition, up gradation of girls’ schools from primary to middle in general and from
Middle to high, in particular, will be the target areas during CFY 2009-10.

TARGETS

INTERVENTION Targets 2008-09 Achievements Targets


2008-09
2009-10 2010-11 2011-12

Establishment / Upgradation of Schools 1050 1100 900 1200 1400


Training of School Teachers and Managers 122,087 120,000 122,100 122,300 122,400
Provision of Computers in 4286 High / Higher Secondary Schools in Punjab - - 4,286 - -
Establishment of Centers of Excellence & Daanish Schools in Punjab - - 234 144 -
Provision of Edible Oil for promoting education among girls students 4,126 3,392 3,763 4,330 -
(metric tons)
Provision of Missing Facilities in Schools 2,800 2,791 1,500 1,500 -

10
STRATEGIC INTERVENTIONS

Establishment of Punjab Daanish School System (PDSS):

Provision of quality education is a high priority area of the Government and therefore it has been decided to set up Daanish School System and
convert existing schools in public sector as Centers of Excellence to achieve this goal. Poorest of the poor will get education of the standards of
richest of the rich in PDSS which may be termed as ‘Aitchison of the Poor’. It will target the most deprived and marginalized segments of the society.
The main objectives of Daanish School System are as under: -

• To provide quality education to most deprived and marginalized segments of the society.
• To combine the best features of traditional education in the context of progressive Islamic and modern learning paradigm with prime focus on
science subjects.
• To develop the students’ intellect, character and physique, thereby enabling them to make purposeful contribution to the community at the
micro level and to the nation at the national level.
• To cater for the overall development of marginalized students with emphasis on academics, sports and physical education mixed with
social/cultural activities.

Ninety Daanish Schools will be established and 144 existing schools will be converted into Centers of Excellence. Major components of the
scheme include (a) Provision of infrastructural facilities (b) Free boarding and lodging facilities (c) Establishment of science and I.T. Labs (d)
Establishment of Libraries and (e) Provision of transport facilities.

11
Provision of Computer / I.T. Education in Secondary and Higher Secondary Schools:

In order to better equip the students with I.T. education, 4286 I.T. Labs are being established at high and higher secondary level. Employment
opportunities for I.T. trained personnel would also be created.

Provision of Equipment for Vocational Training in 1050 High Schools:

To equip the students with market based skills, it has been proposed to provide skill development courses in secondary schools both for male and
female. Trades like stitching, flower making, paintings, dress designing, plumbing, electricity and woodwork will be introduced in these schools. In
the first phase, 1050 secondary schools (male & female) will be targeted.

Introduction of English as a Medium of Instructions:

Parallel to O’level and A’level, the Government has introduced English as the Medium of instruction in 2205 Schools this year all over the
Punjab.

MINIMUM SERVICE DELIVERY STANDARDS-SCHOOL EDUCATION

Establishment of a New Primary School:

Minimum Requirements Urban Areas Rural Areas


Population 1500 500
Number of Households -- 25
Distance from nearest primary school 1 km 1.5 km
Availability of land 1 kanal 2 kanals

12
Criteria for Upgradation of Schools:

From Primary to Middle School:

Boys Schools Girls Schools


Area 25 Marlas 20 Marlas
Total enrolment 100 Students 80 Students
Total enrolment in Class IV & V 20 Students 15 Students

From Middle to High School:

Boys Schools Girls Schools


Area 60 Marlas 40 Marlas
Total enrolment 200 Students 150 Students
Total enrolment in Class VII & VIII 40 Students 30 Students

From High to Higher Secondary School:

• Location at Tehsil Headquarters/Markaz headquarters to be determined/decided by the Provincial Government upon


identification/recommendation of District Government.
• No college/higher secondary school should exist in a radius of 10 km in case of girls and 20 km in case of boys.
• Minimum land requirement is 16 kanals. However, it could be less in urban areas with a vertical structure.

13
MTDF 2009-12
School Education: Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 1.861 4,148.139 4,150.000 0.000 4,150.000 0.000 1,000.000 1,000.000 0.000 1,000.000 1.861 5,148.139 5,150.000 0.000 5,150.000
Provision of Missing
0.000 4,000.000 4,000.000 0.000 4,000.000 0.000 0.000 0.000 0.000 0.000 0.000 4,000.000 4,000.000 0.000 4,000.000
Facilities
Provision for Incomplete
0.000 250.000 250.000 0.000 250.000 0.000 0.000 0.000 0.000 0.000 0.000 250.000 250.000 0.000 250.000
APSE Schemes
Accelerated Programme
0.000 0.000 0.000 0.000 0.000 0.000 700.000 700.000 0.000 700.000 0.000 700.000 700.000 0.000 700.000
for School Education
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 2,500.000 0.000 2,500.000 2,500.000 0.000 2,500.000
from Primary to Middle
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 1,000.000 0.000 1,000.000 1,000.000 0.000 1,000.000
from Middle to High
Total 1.861 8,398.139 8,400.000 0.000 8,400.000 0.000 5,200.000 5,200.000 0.000 5,200.000 1.861 13,598.139 13,600.000 0.000 13,600.000
Number of Schemes 43 7 50
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 0.000 1,106.833 1,106.833 0.000 1,106.833 0.000 1,593.167 1,593.167 0.000 1,593.167 0.000 2,700.000 2,700.000 0.000 2,700.000
Provision of Missing
0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Facilities
Provision for Incomplete
0.000 1,000.000 1,000.000 0.000 1,000.000 0.000 0.000 0.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 1,000.000
APSE Schemes
Accelerated Programme
0.000 0.000 0.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 2,500.000 0.000 2,500.000 2,500.000 0.000 2,500.000
for School Education
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 4,500.000 4,500.000 0.000 4,500.000 0.000 4,500.000 4,500.000 0.000 4,500.000
from Primary to Middle
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 2,300.000 2,300.000 0.000 2,300.000 0.000 2,300.000 2,300.000 0.000 2,300.000
from Middle to High
Total 0.000 5,106.833 5,106.833 0.000 5,106.833 0.000 10,893.167 10,893.167 0.000 10,893.167 0.000 16,000.000 16,000.000 0.000 16,000.000

14
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 0.000 1,750.000 1,750.000 0.000 1,750.000 0.000 1,150.000 1,150.000 0.000 1,150.000 0.000 2,900.000 2,900.000 0.000 2,900.000
Provision of Missing
0.000 4,000.000 4,000.000 0.000 4,000.000 0.000 0.000 0.000 0.000 0.000 0.000 4,000.000 4,000.000 0.000 4,000.000
Facilities
Provision for Incomplete
0.000 1,000.000 1,000.000 0.000 1,000.000 0.000 0.000 0.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 1,000.000
APSE Schemes
Accelerated Programme
0.000 0.000 0.000 0.000 0.000 0.000 2,000.000 2,000.000 0.000 2,000.000 0.000 2,000.000 2,000.000 0.000 2,000.000
for School Education
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 5,500.000 5,500.000 0.000 5,500.000 0.000 5,500.000 5,500.000 0.000 5,500.000
from Primary to Middle
Upgradation of Schools
0.000 0.000 0.000 0.000 0.000 0.000 3,300.000 3,300.000 0.000 3,300.000 0.000 3,300.000 3,300.000 0.000 3,300.000
from Middle to High
Total 0.000 6,750.000 6,750.000 0.000 6,750.000 0.000 11,950.000 11,950.000 0.000 11,950.000 0.000 18,700.000 18,700.000 0.000 18,700.000
SCHOOL EDUCATION - MTDF 2009-12 - GRAND TOTAL 48,300.000

15
SCHOOL EDUCATION: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Regular 7 1.861 4,148.139 0.000 0.000 1.861 4,148.139 4,150.000 558.960 0.000
Provision of missing 35 0.000 4,000.000 0.000 0.000 0.000 4,000.000 4,000.000 0.000 0.000
facilities
Provision for Incomplete 1 0.000 250.000 0.000 0.000 0.000 250.000 250.000 0.000 0.000
APSE Schemes
Total: ON-GOING SCHEMES 43 1.861 8,398.139 0.000 0.000 1.861 8,398.139 8,400.000 558.960 0.000
NEW SCHEMES
Regular 4 0.000 1,000.000 0.000 0.000 0.000 1,000.000 1,000.000 547.873 84.873
Accelerated Programme for 1 0.000 700.000 0.000 0.000 0.000 700.000 700.000 0.000 0.000
School Education
Upgradation of Schools 1 0.000 2,500.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 0.000
from Primary to Middle
Upgradation of Schools 1 0.000 1,000.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 0.000
from Middle to High
Total: NEW SCHEMES 7 0.000 5,200.000 0.000 0.000 0.000 5,200.000 5,200.000 547.873 84.873

Grand Total 50 1.861 13,598.139 0.000 0.000 1.861 13,598.139 13,600.000 1,106.833 84.873

16
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
1 1 Name of the Scheme Repair / Maintenance of Boys 0.000 6.477 3.060 1.861 1.556 0.000 0.000 1.861 1.556 3.417 0.000 0.000 0.000
Scouts Building Damaged due to
Earth Quake at Summer Training
Centre Ghora Gali Murree Hills.
Approval Date Approved 28-05-2009
Major Components Repair / Maintenance and furniture,
equipment etc.
Major Targets Refurbishing existing Boys Scouts
Building demaged due to earth quake.
District and Tehsil Rawalpindi , Murree

2 2 Name of the Scheme Provision of computers/ IT 0.000 4,997.851 2,068.851 0.000 2,929.000 0.000 0.000 0.000 2,929.000 2,929.000 0.000 0.000 0.000
education in 4286 high/ higher
secondary schools in Punjab
Approval Date Approved 12-02-2009
Major Components Establishmernt of IT labs in High/ HSS in
Punjab
Major Targets Provision of IT Education
District and Tehsil Punjab

3 3 Name of the Scheme Capacity building of School 0.000 780.858 82.030 0.000 438.572 0.000 0.000 0.000 438.572 438.572 260.256 0.000 0.000
Councils (Non-Pilot Districts)
Approval Date Approved 28-11-2008
Major Components Capacity Building/Training of School
Councils
Major Targets Capacity Building/Training of School
Councils
District and Tehsil Punjab

17
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

4 4 Name of the Scheme Connectivity of IT Labs and 0.000 1,090.912 600.000 0.000 306.000 0.000 0.000 0.000 306.000 306.000 184.912 0.000 0.000
Capacity Building of IT Teachers
in Punjab
Approval Date Approved 12-02-2009
Major Components Provision of Networking, Ducting and
Cabling for IT Labs in 4286 Schools
Major Targets Provision of Networking, Ducting and
Cabling for IT Labs in 4286 Schools
District and Tehsil Punjab

5 5 Name of the Scheme Capacity Building of Education 0.000 530.000 95.360 0.000 400.000 0.000 0.000 0.000 400.000 400.000 34.640 0.000 0.000
Department at District level.
Approval Date Approved 12-2-2006
Major Components Provision of Vehicles. Provision of
Computers Training. Testing
Major Targets Training/Testing, Provision of Computers,
Provision of Transport Facilities to EDOs
District and Tehsil Punjab

6 6 Name of the Scheme Promotion of Primary Education 1,805.353 2,076.156 499.596 0.000 68.792 0.000 0.000 0.000 68.792 68.792 79.152 0.000 0.000
for girls in rural areas (W.F.P)
(Revised)
Approval Date Approved 12-07-2004
Major Components Provision of edible oil
Major Targets Provision of edible oil to 123,000 students
of 700 schools of seven backward
districts.
District and Tehsil Punjab

7 7 Name of the Scheme Provision of Building for Punjab 0.000 26.092 21.873 0.000 4.219 0.000 0.000 0.000 4.219 4.219 0.000 0.000 0.000
Examination Commission
Approval Date Approved 03-01-2009
Major Components Civil Work & Furniture etc.
Major Targets Construction of building for Punjab
Examination Commission
District and Tehsil Punjab

Sub-Total: Regular 1,805.353 9,508.346 3,370.770 1.861 4,148.139 0.000 0.000 1.861 4,148.139 4,150.000 558.960 0.000 0.000

18
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Provision of missing facilities


8 8 Name of the Scheme Provision of missing facilities in 0.000 111.576 0.000 0.000 111.576 0.000 0.000 0.000 111.576 111.576 0.000 0.000 0.000
42 Schools of District Rawalpindi
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Rawalpindi

9 9 Name of the Scheme Provision of missing facilities in 0.000 135.742 0.000 0.000 135.742 0.000 0.000 0.000 135.742 135.742 0.000 0.000 0.000
52 Schools of District Attock
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Attock

10 10 Name of the Scheme Provision of missing facilities in 0.000 87.563 0.000 0.000 87.563 0.000 0.000 0.000 87.563 87.563 0.000 0.000 0.000
33 Schools of District Chakwal
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Chakwal

11 11 Name of the Scheme Provision of missing facilities in 0.000 85.024 0.000 0.000 85.024 0.000 0.000 0.000 85.024 85.024 0.000 0.000 0.000
31 Schools of District Jhelum
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Jhelum

12 12 Name of the Scheme Provision of missing facilities in 0.000 108.896 0.000 0.000 108.896 0.000 0.000 0.000 108.896 108.896 0.000 0.000 0.000
41 Schools of District Sargodha
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Sargodha

19
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

13 13 Name of the Scheme Provision of missing facilities in 0.000 131.293 0.000 0.000 131.293 0.000 0.000 0.000 131.293 131.293 0.000 0.000 0.000
50 Schools of District Khushab
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Khushab

14 14 Name of the Scheme Provision of missing facilities in 0.000 131.166 0.000 0.000 131.166 0.000 0.000 0.000 131.166 131.166 0.000 0.000 0.000
49 Schools of District Mianwali
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Mianwali

15 15 Name of the Scheme Provision of missing facilities in 0.000 107.507 0.000 0.000 107.507 0.000 0.000 0.000 107.507 107.507 0.000 0.000 0.000
40 Schools of District Bhakkar
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Bhakkar

16 16 Name of the Scheme Provision of missing facilities in 0.000 154.677 0.000 0.000 154.677 0.000 0.000 0.000 154.677 154.677 0.000 0.000 0.000
58 Schools of District Faisalabad
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Faisalabad

17 17 Name of the Scheme Provision of missing facilities in 0.000 134.858 0.000 0.000 134.858 0.000 0.000 0.000 134.858 134.858 0.000 0.000 0.000
50 Schools of District Jhang
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Jhang

20
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

18 18 Name of the Scheme Provision of missing facilities in 0.000 135.973 0.000 0.000 135.973 0.000 0.000 0.000 135.973 135.973 0.000 0.000 0.000
51 Schools of District T.T. Singh
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Toba Tek Singh

19 19 Name of the Scheme Provision of missing facilities in 0.000 105.182 0.000 0.000 105.182 0.000 0.000 0.000 105.182 105.182 0.000 0.000 0.000
39 Schools of District Gujranwala
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Gujranwala

20 20 Name of the Scheme Provision of missing facilities in 0.000 83.997 0.000 0.000 83.997 0.000 0.000 0.000 83.997 83.997 0.000 0.000 0.000
31 Schools of District Hafizabad
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Hafizabad

21 21 Name of the Scheme Provision of missing facilities in 0.000 128.666 0.000 0.000 128.666 0.000 0.000 0.000 128.666 128.666 0.000 0.000 0.000
48 Schools of District Gujrat
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Gujrat

22 22 Name of the Scheme Provision of missing facilities in 0.000 63.488 0.000 0.000 63.488 0.000 0.000 0.000 63.488 63.488 0.000 0.000 0.000
24 Schools of District M.B. Din
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Mandi Bahauddin

21
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

23 23 Name of the Scheme Provision of missing facilities in 0.000 85.928 0.000 0.000 85.928 0.000 0.000 0.000 85.928 85.928 0.000 0.000 0.000
32 Schools of District Sialkot
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Sialkot

24 24 Name of the Scheme Provision of missing facilities in 0.000 116.902 0.000 0.000 116.902 0.000 0.000 0.000 116.902 116.902 0.000 0.000 0.000
44 Schools of District Narowal
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Narowal

25 25 Name of the Scheme Provision of missing facilities in 0.000 144.349 0.000 0.000 144.349 0.000 0.000 0.000 144.349 144.349 0.000 0.000 0.000
54 Schools of District Lahore
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Lahore

26 26 Name of the Scheme Provision of missing facilities in 0.000 140.240 0.000 0.000 140.240 0.000 0.000 0.000 140.240 140.240 0.000 0.000 0.000
53 Schools of District Sheikhupura
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Sheikhupura

27 27 Name of the Scheme Provision of missing facilities in 0.000 134.866 0.000 0.000 134.866 0.000 0.000 0.000 134.866 134.866 0.000 0.000 0.000
51 Schools of District Nankana
Sahib
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Nankana Sahib

22
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

28 28 Name of the Scheme Provision of missing facilities in 0.000 105.442 0.000 0.000 105.442 0.000 0.000 0.000 105.442 105.442 0.000 0.000 0.000
39 Schools of District Kasur
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Kasur

29 29 Name of the Scheme Provision of missing facilities in 0.000 85.870 0.000 0.000 85.870 0.000 0.000 0.000 85.870 85.870 0.000 0.000 0.000
32 Schools of District Okara
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Okara

30 30 Name of the Scheme Provision of missing facilities in 0.000 123.222 0.000 0.000 123.222 0.000 0.000 0.000 123.222 123.222 0.000 0.000 0.000
46 Schools of District Multan
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Multan

31 31 Name of the Scheme Provision of missing facilities in 0.000 120.866 0.000 0.000 120.866 0.000 0.000 0.000 120.866 120.866 0.000 0.000 0.000
45 Schools of District Lodhran
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Lodhran

32 32 Name of the Scheme Provision of missing facilities in 0.000 101.040 0.000 0.000 101.040 0.000 0.000 0.000 101.040 101.040 0.000 0.000 0.000
38 Schools of District Khanewal
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Khanewal

23
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

33 33 Name of the Scheme Provision of missing facilities in 0.000 112.651 0.000 0.000 112.651 0.000 0.000 0.000 112.651 112.651 0.000 0.000 0.000
42 Schools of District Sahiwal
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Sahiwal

34 34 Name of the Scheme Provision of missing facilities in 0.000 102.438 0.000 0.000 102.438 0.000 0.000 0.000 102.438 102.438 0.000 0.000 0.000
39 Schools of District Pakpattan
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Pakpattan

35 35 Name of the Scheme Provision of missing facilities in 0.000 132.106 0.000 0.000 132.106 0.000 0.000 0.000 132.106 132.106 0.000 0.000 0.000
50 Schools of District Vehari
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Vehari

36 36 Name of the Scheme Provision of missing facilities in 0.000 115.765 0.000 0.000 115.765 0.000 0.000 0.000 115.765 115.765 0.000 0.000 0.000
43 Schools of District D.G. Khan
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Dera Ghazi Khan

37 37 Name of the Scheme Provision of missing facilities in 0.000 91.614 0.000 0.000 91.614 0.000 0.000 0.000 91.614 91.614 0.000 0.000 0.000
34 Schools of District Rajanpur
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Rajanpur

24
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

38 38 Name of the Scheme Provision of missing facilities in 0.000 114.525 0.000 0.000 114.525 0.000 0.000 0.000 114.525 114.525 0.000 0.000 0.000
43 Schools of District M/Garh
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Muzaffargarh

39 39 Name of the Scheme Provision of missing facilities in 0.000 103.189 0.000 0.000 103.189 0.000 0.000 0.000 103.189 103.189 0.000 0.000 0.000
39 Schools of District Layyah
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Layyah

40 40 Name of the Scheme Provision of missing facilities in 0.000 121.946 0.000 0.000 121.946 0.000 0.000 0.000 121.946 121.946 0.000 0.000 0.000
46 Schools of District B/Pur
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Bahawalpur

41 41 Name of the Scheme Provision of missing facilities in 0.000 106.994 0.000 0.000 106.994 0.000 0.000 0.000 106.994 106.994 0.000 0.000 0.000
40 Schools of District B/Nagar
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Bahawalnagar

42 42 Name of the Scheme Provision of missing facilities in 0.000 134.440 0.000 0.000 134.440 0.000 0.000 0.000 134.440 134.440 0.000 0.000 0.000
51 Schools of District R.Y. Khan
Approval Date
Major Components Provision of Missing facilities etc.
Major Targets Provision of Missing facilities etc.
District and Tehsil Rahim Yar Khan

Sub-Total: Provision of missing facilities 0.000 4,000.000 0.000 0.000 4,000.000 0.000 0.000 0.000 4,000.000 4,000.000 0.000 0.000 0.000

25
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Provision for Incomplete APSE Schemes


43 43 Name of the Scheme Provision for Incomplete APSE 0.000 250.000 0.000 0.000 250.000 0.000 0.000 0.000 250.000 250.000 0.000 0.000 0.000
Schemes of 2008-09
Approval Date Approved
Major Components Civil Work & Furniture etc.
Major Targets Civil Work & Furniture etc.
District and Tehsil Punjab

Sub-Total: Provision for Incomplete APSE Schemes 0.000 250.000 0.000 0.000 250.000 0.000 0.000 0.000 250.000 250.000 0.000 0.000 0.000
Total: ON-GOING SCHEMES 1,805.353 13,758.346 3,370.770 1.861 8,398.139 0.000 0.000 1.861 8,398.139 8,400.000 558.960 0.000 0.000

NEW SCHEMES
Regular
44 44 Name of the Scheme Internal Merit Scholarships 0.000 254.619 0.000 0.000 84.873 0.000 0.000 0.000 84.873 84.873 84.873 84.873 0.000
Approval Date Un-Approved
Major Components Prov. of Scholarship to talented students
Major Targets Prov. of Scholarship to students in Punjab
District and Tehsil Punjab

45 45 Name of the Scheme Provision of equipment for 0.000 578.000 0.000 0.000 315.000 0.000 0.000 0.000 315.000 315.000 263.000 0.000 0.000
Vocational training in 1050 High
Schools (male & female) @ 30
schools per district
Approval Date Un-Approved
Major Components Prov. of equipment for Stitching, Dress
Designing, Electricity / Electronics,
Plumbing etc.
Major Targets Prov. of equipment for Stitching, Dress
Designing, Electricity/Electronics,
Plumbing etc.
District and Tehsil Punjab

46 46 Name of the Scheme Construction of DPI's office 0.000 300.127 0.000 0.000 300.127 0.000 0.000 0.000 300.127 300.127 0.000 0.000 0.000
complex at Lahore.
Approval Date Un-Approved
Major Components Civil Work & Furniture etc.
Major Targets Civil Work & Furniture etc.
District and Tehsil Punjab

26
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

47 47 Name of the Scheme Up gradation / Establishment of 0.000 500.000 0.000 0.000 300.000 0.000 0.000 0.000 300.000 300.000 200.000 0.000 0.000
Labs schools in GCETs.
Approval Date Un-Approved
Major Components Provision of additional class rooms, lab
equipment & furnuture etc.
Major Targets Provision of additional class rooms, lab
equipment & furnuture etc.
District and Tehsil Punjab

Sub-Total: Regular 0.000 1,632.746 0.000 0.000 1,000.000 0.000 0.000 0.000 1,000.000 1,000.000 547.873 84.873 0.000

Accelerated Programme for School Education


48 48 Name of the Scheme Accelerated Programme for 0.000 700.000 0.000 0.000 700.000 0.000 0.000 0.000 700.000 700.000 0.000 0.000 0.000
School Education
Approval Date Un-Approved
Major Components Establishment / Upgradation
Major Targets Civil Work & Furniture etc.
District and Tehsil Punjab

Sub-Total: Accelerated Programme for School 0.000 700.000 0.000 0.000 700.000 0.000 0.000 0.000 700.000 700.000 0.000 0.000 0.000
Education

Upgradation of Schools from Primary to Middle


49 49 Name of the Scheme Upgradation of 600 Schools from 0.000 2,500.000 0.000 0.000 2,500.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 0.000 0.000
Primary to Middle
Approval Date Un-Approved
Major Components Upgradation of Schools from Primary to
Middle
Major Targets Civil Work & Furniture etc.
District and Tehsil Punjab

Sub-Total: Upgradation of Schools from Primary to 0.000 2,500.000 0.000 0.000 2,500.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 0.000 0.000
Middle

27
SCHOOL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Upgradation of Schools from Middle to High


50 50 Name of the Scheme Upgradation of 200 Schools from 0.000 1,000.000 0.000 0.000 1,000.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 0.000 0.000
Middle to High
Approval Date Un-Approved
Major Components Upgradation of Schools from Middle to
High
Major Targets Civil Work & Furniture etc.
District and Tehsil Punjab

Sub-Total: Upgradation of Schools from Middle to 0.000 1,000.000 0.000 0.000 1,000.000 0.000 0.000 0.000 1,000.000 1,000.000 0.000 0.000 0.000
High
Total: NEW SCHEMES 0.000 5,832.746 0.000 0.000 5,200.000 0.000 0.000 0.000 5,200.000 5,200.000 547.873 84.873 0.000

Grand Total 1,805.353 19,591.092 3,370.770 1.861 13,598.139 0.000 0.000 1.861 13,598.139 13,600.000 1,106.833 84.873 0.000

28
HIGHER EDUCATION

29
HIGHER EDUCATION

VISION

Enlightened and prospering Punjab reinforcing knowledge economy and equitable, quality learning at tertiary level.
TREND OF ALLOCATIONS

YEAR ORIGINAL REVISED


ALLOCATION ALLOCATION
2005-05 1200 1499.791
2006-07 2900 2749.24
2007-08 9936 4945.14
2008-09 9100 7257.579
2009-10 6125

POLICY INTERVENTIONS

• Improving quality of education


• Increasing equitable access to Higher Education
• Rehabilitation and development of colleges infrastructure
• Revamping college education by developing strong relationship between tertiary education and the job market

OBJECTIVES/STRATEGIC INTERVENTIONS

• Improving college infrastructure through provision of missing and additional facilities to public sector colleges
• Promotion of Science and Computer education at tertiary level
• Capacity building of college teachers as per need assessment
• Capacity building of Managers / field officers of college sector
• Use of MIS for decision making
• Development of monitoring and evaluation system
• Provision of merit scholarships for professional education

30
REFORMS INITIATED

College Teachers Training


For improved governance and quality education, capacity building & training of teachers and educational managers cannot be ignored. In
the Higher Education Sector, no institutional arrangement existed for the training of teachers and managers. For this purpose, a scheme
titled “Punjab College Teachers Training” was included in the Development Programme 2008-09.

The Scheme is of specific and innovative nature. Due to non availability of modules for College Teachers’ training and diversified
disciplines being offered in the colleges, the department intends to cover pedagogy, communication skills, class room management and
the modules for the training skill. To realize the objectives into reality, Teachers’ Need Assessment was got conducted through a research
team. The team after visiting 72 colleges of 18 districts interviewed 1042 teachers and 348 Principals / Heads of Departments, identified
professional paradigm involved in the training of college teachers and proposed parameters for the training Programme. Accordingly, the
scheme “Punjab College Teacher Training” with a cost of RS.727.722 million was got approved from the PDWP.

Internal Merit Scholarship for Professional Students


To recognize the brilliance of talented students, a scheme for scholarship for professional students has been a part of Development
Programme of Higher Education Sector. Taking into account the establishment of new universities in Public Sector and emerging
disciplines like Polymer and Process Engineering, Energy and Power Engineering, Mechatronics and Control Engineering and Industrial
and Manufacturing Engineering etc. implementations & mechanism of the scheme were redefined in Financial Year 2007-08.

Parameters of the scheme: -


• The scholarship is for degree program
• Scholarship is to be awarded to the students enrolled in professional discipline in the Public Sector Universities / Institutions of the
Punjab, on the basis of their merit
• Scholarship is not to be awarded to the students admitted in the university on any quota or self finance
• The Scholarship is to be paid annually and is continued for full study cycle
• Scholarships cover annual academic charges of the institution (tuition fee etc.) as well as other expenses

31
Punjab Education Endowment Fund
Punjab Educational Endowment Fund (PEEF) is an initiative of the Government of Punjab. It is established with the objective of providing
scholarships/monetary assistance to talented and needy students for pursuing quality education with equal opportunities. To make it more
efficient, transparent and autonomous in its functioning, it is established under Section 42 of the Companies Ordinance, 1984.

The Endowment Fund has been established with initial seed money of Rs. 2 billion, which is proposed to be raised subsequently.
Investment proceeds out of this fund will be utilized for the scholarship. At this point only students belonging to government institutions are
being considered for these scholarships, however, the same shall be extended to other sectors in due course of time. These scholarships
will be available for higher studies in both public and private institutions.

Allocation of these scholarships will be on the basis of Tehsils and District wise results of students. More focus of these scholarships will be
towards the fifteen less developed districts, especially from southern Punjab. Special quotas for orphans, children of govt. employees (up
to BS-14) disabled, minorities and widows have also been allocated. Bright and needy students of other provinces including Azad Kashmir
shall also be provided opportunities for higher education through this program.

Establishment of Cluster Examination Centers at Tehsil Level

At present eight Board of Intermediate and Secondary Educations(BISE) are functioning in Punjab. The Punjab Government has now
planned to establish a new BISE for Sahiwal Division. The primary function of the Board is to conduct examination of secondary and
intermediate levels. The Boards manage to conduct examination in the institutions affiliated with them. It has, however, been observed that
make’ shift examination centers do not provide customized environment for the safe and secure conduct of examinations. Experience of a
Cluster Centre established by BISE, Lahore shows the better conducting of examinations viz-a-viz temporary examination centers.
Accordingly, two schemes for “Establishment of Cluster Examination Centers at district level” have been included in the Development
Programme 2009-10.

Provision of Missing Facilities to Colleges

Punjab Government has embarked upon a comprehensive plan to enhance the quality of college education with special focus on
improvement of physical infrastructure of colleges. Punjab Education Sector Reform Programme (PESRP) has been launched in college

32
sector since Financial Year 2006-07.Under PERSP, the Department is providing missing / additional infrastructure facilities like boundary
wall, toilets, building, furniture etc. to the Colleges all over the Punjab.

For provision of facilities to Colleges (non-civil work) like transport, equipment e.g. computers, photocopiers, faxes etc. an umbrella
scheme has been approved by the PDWP for a cost of Rs. 1068.810 million.

TARGETS

INTERVENTION 2008-09 2008-09 TARGET TARGET TARGET


TARGETS ACHIEVEMENTS 2009-10 2010-11 2011-12
Training of College 3500 - 6400 6400 -
Teachers.
Training of College - - 500 - -
Managers
Training of Master - - 500 - -
Trainers
Rehabilitation/ 70 24 60 90 90
Improvement of
Public Sector
Colleges under
Missing Facilities
Programme
Establishment / Up 48 74 60 20 10
gradation of
Colleges

33
CRITERIA FOR ESTABLISHMENT OF DEGREE COLLEGE (PROPOSED)

• Minimum Population of the locality (Tehsil / Markz / Thana/Town): 35,000


• There should be at least 200 & 75 in case of male and 100 & 40 in case of female passing out students in Matriculation &
Intermediate, respectively in last three consecutive years.
• Minimum Distance from already available College/facility in the vicinity:-
Category Male Female
Rural 20 Km 10 Km
Urban 5 Km 5 Km
• Minimum Land required
i) For rural area : 30-Kanals
ii) For Urban area : 10-kanals
iii) For Hilly area (Murree, Kahota & Kotli Satiyan Tehsils) : 3 to 4-kanals

NOTE:-

i. Inter College will not be established due to introduction of Higher Secondary Schools (HSS) scheme and plan to have four
years Degree Programme under National Education Policy-1979.
ii. Data of population and classification of rural / urban part of the locality will be as per latest census figures of Bureau of
Statistics.
iii. Suitability of land for construction shall be certified by the Buildings Department.
iv. In case of non-availability of state land, the private land may be acquired / purchased on market rate, assessed by the District
Revenue Office.
v. The identified private land shall be preferably within ½ K.M from main road.

34
MTDF 2009-12
Higher Education : Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 455.582 709.764 1,165.346 0.000 1,165.346 70.000 55.000 125.000 0.000 125.000 525.582 764.764 1,290.346 0.000 1,290.346
Provision of Missing
531.000 1,029.000 1,560.000 0.000 1,560.000 0.000 0.000 0.000 0.000 0.000 531.000 1,029.000 1,560.000 0.000 1,560.000
Facilities
Establishment of Colleges 733.418 29.236 762.654 0.000 762.654 0.000 0.000 0.000 0.000 0.000 733.418 29.236 762.654 0.000 762.654
Upgradation of Colleges 385.000 127.000 512.000 0.000 512.000 0.000 0.000 0.000 0.000 0.000 385.000 127.000 512.000 0.000 512.000
Establishment /
0.000 0.000 0.000 0.000 0.000 2,000.000 0.000 2,000.000 0.000 2,000.000 2,000.000 0.000 2,000.000 0.000 2,000.000
Upgradation of Colleges
Total 2,105.000 1,895.000 4,000.000 0.000 4,000.000 2,070.000 55.000 2,125.000 0.000 2,125.000 4,175.000 1,950.000 6,125.000 0.000 6,125.000
Number of Schemes 124 9 133
DEVELOPMENT PROGRAMME 2010-11
On-Going Schemes New Schemes Total
Sub-Sector/ Department
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 1,208.000 0.000 1,208.000 0.000 1,208.000 242.000 50.000 292.000 0.000 292.000 1,450.000 50.000 1,500.000 0.000 1,500.000
Provision of Missing
0.000 2,500.000 2,500.000 0.000 2,500.000 0.000 0.000 0.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 2,500.000
Facilities
Establishment /
0.000 0.000 0.000 0.000 0.000 3,500.000 0.000 3,500.000 0.000 3,500.000 3,500.000 0.000 3,500.000 0.000 3,500.000
Upgradation of Colleges
Total 1,208.000 2,500.000 3,708.000 0.000 3,708.000 3,742.000 50.000 3,792.000 0.000 3,792.000 4,950.000 2,550.000 7,500.000 0.000 7,500.000
DEVELOPMENT PROGRAMME 2011-12
On-Going Schemes New Schemes Total
Sub-Sector/ Department
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 855.000 220.000 1,075.000 0.000 1,075.000 350.000 75.000 425.000 0.000 425.000 1,205.000 295.000 1,500.000 0.000 1,500.000
Provision of Missing
0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Facilities
Establishment /
0.000 0.000 0.000 0.000 0.000 4,500.000 0.000 4,500.000 0.000 4,500.000 4,500.000 0.000 4,500.000 0.000 4,500.000
Upgradation of Colleges
Total 855.000 3,220.000 4,075.000 0.000 4,075.000 4,850.000 75.000 4,925.000 0.000 4,925.000 5,705.000 3,295.000 9,000.000 0.000 9,000.000
HIGHER EDUCATION - MTDF 2009-12 - GRAND TOTAL 22,625.000

35
HIGHER EDUCATION: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Regular 5 455.582 709.764 0.000 0.000 455.582 709.764 1,165.346 897.000 48.000
Provision of Missing 1 0.000 800.000 0.000 0.000 0.000 800.000 800.000 0.000 0.000
Facilities (Phase-I)
Establishment of Colleges 50 733.418 29.236 0.000 0.000 733.418 29.236 762.654 525.000 41.000
Upgradation of Colleges 24 385.000 127.000 0.000 0.000 385.000 127.000 512.000 149.000 0.000
Provision of Missing 44 531.000 229.000 0.000 0.000 531.000 229.000 760.000 474.458 0.000
Facilities (Phase-II)
Total: ON-GOING SCHEMES 124 2,105.000 1,895.000 0.000 0.000 2,105.000 1,895.000 4,000.000 2,045.458 89.000
NEW SCHEMES
Regular 8 70.000 55.000 0.000 0.000 70.000 55.000 125.000 311.000 279.000
Establishment / 1 2,000.000 0.000 0.000 0.000 2,000.000 0.000 2,000.000 0.000 0.000
Upgradation of Colleges
Total: NEW SCHEMES 9 2,070.000 55.000 0.000 0.000 2,070.000 55.000 2,125.000 311.000 279.000

Grand Total 133 4,175.000 1,950.000 0.000 0.000 4,175.000 1,950.000 6,125.000 2,356.458 368.000

36
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
51 1 Name of the Scheme Establishment of University of 0.000 3,517.314 2,365.732 451.582 200.000 0.000 0.000 451.582 200.000 651.582 500.000 0.000 0.000
Gujrat (Phase-I & II Revised)
Approval Date Approved 28-06-2006
Major Components Construction of various academic blocks
and hostels.
Major Targets Establishment of new University.
District and Tehsil Gujrat

52 2 Name of the Scheme Preservation of Quaid-e-Azam 0.000 89.030 85.030 4.000 0.000 0.000 0.000 4.000 0.000 4.000 0.000 0.000 0.000
Library Building Lahore
Approval Date Approved 12-09-2005
Major Components Preservation of existing building
Major Targets Up-gradation of existing building /
facilities.
District and Tehsil Lahore

53 3 Name of the Scheme Punjab College Teachers Training 0.000 727.722 19.722 0.000 400.000 0.000 0.000 0.000 400.000 400.000 260.000 48.000 0.000
Approval Date Approved
Major Components Module development and training
Major Targets Training of college teachers and
managers
District and Tehsil Punjab

54 4 Name of the Scheme Internal Merit Scholarships for 0.000 309.080 70.080 0.000 102.000 0.000 0.000 0.000 102.000 102.000 137.000 0.000 0.000
Professional Colleges in Punjab.
Approval Date Approved 08-03-2008 Revised 21-02-
2009
Major Components Scholarship for students in professional
Institutions.
Major Targets Scholarship for students in professional
Institutions.
District and Tehsil Punjab

37
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

55 5 Name of the Scheme Establishment of Computer Labs 0.000 59.525 51.761 0.000 7.764 0.000 0.000 0.000 7.764 7.764 0.000 0.000 0.000
in Colleges
Approval Date Approved 16-09-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Punjab

Sub-Total: Regular 0.000 4,702.671 2,592.325 455.582 709.764 0.000 0.000 455.582 709.764 1,165.346 897.000 48.000 0.000

Provision of Missing Facilities (Phase-I)


56 6 Name of the Scheme Punjab Education Sector Reform 0.000 0.000 0.000 0.000 800.000 0.000 0.000 0.000 800.000 800.000 0.000 0.000 0.000
Programme (PESRP) Phase-I
Approval Date
Major Components Provision of missing facilities to colleges
Major Targets Provision of missing facilities to colleges
District and Tehsil Punjab

Sub-Total: Provision of Missing Facilities (Phase-I) 0.000 0.000 0.000 0.000 800.000 0.000 0.000 0.000 800.000 800.000 0.000 0.000 0.000

Establishment of Colleges
57 7 Name of the Scheme Establishment of Govt. Degree 0.000 65.023 13.500 30.000 0.000 0.000 0.000 30.000 0.000 30.000 21.523 0.000 0.000
College for Girls Kotli Sattian
Approval Date Approved 22-04-2008/07-03-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Rawalpindi , Kotli Sattian

58 8 Name of the Scheme Establishment of Govt. Degree 0.000 26.992 22.492 1.000 3.500 0.000 0.000 1.000 3.500 4.500 0.000 0.000 0.000
College for Boys Kotli Sattian
Approval Date Approved
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Rawalpindi , Kotli Sattian

38
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

59 9 Name of the Scheme Establishment of Govt. Inter 0.000 33.158 32.337 0.821 0.000 0.000 0.000 0.821 0.000 0.821 0.000 0.000 0.000
College for Women Dhoke Syedan
Approval Date Approved 21-02-2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Rawalpindi

60 10 Name of the Scheme Establishment of Govt. Girls 0.000 40.435 39.165 1.270 0.000 0.000 0.000 1.270 0.000 1.270 0.000 0.000 0.000
Degree College, Dhudial
Approval Date Approved 11-09-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Chakwal

61 11 Name of the Scheme Establishment of Govt. Inter 0.000 41.416 35.876 5.540 0.000 0.000 0.000 5.540 0.000 5.540 0.000 0.000 0.000
College for Women, Mulhal
Mughlan
Approval Date Approved 11-09-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Chakwal

62 12 Name of the Scheme Establishment of Govt. Girls 0.000 35.536 33.436 2.100 0.000 0.000 0.000 2.100 0.000 2.100 0.000 0.000 0.000
Degree College, Balkasar
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Chakwal

39
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

63 13 Name of the Scheme Establishment of Govt. Degree 0.000 92.693 5.000 40.000 0.000 0.000 0.000 40.000 0.000 40.000 47.693 0.000 0.000
College at Mangowal
Approval Date Approved 17-02-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Chakwal

64 14 Name of the Scheme Establishment of Govt. Degree 0.000 50.160 5.000 27.216 0.000 0.000 0.000 27.216 0.000 27.216 17.944 0.000 0.000
College at Aara Basharat
Approval Date Approved 17-02-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Chakwal , Chua Syedan Shah

65 15 Name of the Scheme Establishment of Govt. Inter 0.000 40.979 35.643 5.336 0.000 0.000 0.000 5.336 0.000 5.336 0.000 0.000 0.000
College for Women, Trandha
Approval Date Approved 21-02-2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Chakwal , Talagang

66 16 Name of the Scheme Establishment of Govt. Boys Inter 0.000 39.707 20.000 17.952 1.755 0.000 0.000 17.952 1.755 19.707 0.000 0.000 0.000
College at Rasool Pur
Approval Date Approved 15-09-2004 revised on 11-03-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Jhelum , Sohawa

40
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

67 17 Name of the Scheme Establishment of Govt. Boys 0.000 34.669 29.669 5.000 0.000 0.000 0.000 5.000 0.000 5.000 0.000 0.000 0.000
Degree College in Higher
Secondary School for Boys
Phullarwan
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Sargodha , Bhalwal

68 18 Name of the Scheme Establishment of Govt. Boys 0.000 34.999 32.699 2.300 0.000 0.000 0.000 2.300 0.000 2.300 0.000 0.000 0.000
Degree College in Higher
Secondary School for Boys Kot
Moman
Approval Date Approved 30-01-2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Sargodha , Kot Moman

69 19 Name of the Scheme Establishment of Govt. Girls 0.000 33.838 29.838 4.000 0.000 0.000 0.000 4.000 0.000 4.000 0.000 0.000 0.000
Degree College in Higher
Secondary School for Girls Kot
Moman
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Sargodha , Kot Moman

70 20 Name of the Scheme Establishment of Govt. College for 0.000 35.698 20.342 11.356 4.000 0.000 0.000 11.356 4.000 15.356 0.000 0.000 0.000
Women at Quaidabad
Approval Date Approved 09-12-2005 Revised on 11-
03-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Khushab , Quaidabad

41
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

71 21 Name of the Scheme Establishment of Govt. Degree 0.000 33.505 32.245 1.260 0.000 0.000 0.000 1.260 0.000 1.260 0.000 0.000 0.000
College for Women at Isa Khel
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mianwali , Isa Khel

72 22 Name of the Scheme Establishment of Govt. Degree 0.000 31.186 27.861 3.325 0.000 0.000 0.000 3.325 0.000 3.325 0.000 0.000 0.000
College for Women at Kammar
Mashani
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mianwali , Isa Khel

73 23 Name of the Scheme Establishment of Govt. Degree 0.000 34.505 33.505 1.000 0.000 0.000 0.000 1.000 0.000 1.000 0.000 0.000 0.000
College for Boys at Kala Bagh
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mianwali , Isa Khel

74 24 Name of the Scheme Establishment of Govt. Degree 0.000 33.505 26.070 7.435 0.000 0.000 0.000 7.435 0.000 7.435 0.000 0.000 0.000
College Kundian
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mianwali , Kundian

42
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

75 25 Name of the Scheme Establishment of Govt. Degree 0.000 61.456 56.589 4.867 0.000 0.000 0.000 4.867 0.000 4.867 0.000 0.000 0.000
College for Boys Ban Hafiz Jee
Approval Date Approved 25-10-2004
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mianwali

76 26 Name of the Scheme Establishment of Govt. Girls 0.000 47.069 42.011 5.058 0.000 0.000 0.000 5.058 0.000 5.058 0.000 0.000 0.000
Degree College at Mankera
Approval Date Approved 15-09-2004
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Bhakkar , Mankera

77 27 Name of the Scheme Establishment of Govt. Degree 0.000 54.415 34.415 17.000 3.000 0.000 0.000 17.000 3.000 20.000 0.000 0.000 0.000
College Satiana Road
Approval Date Approved
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Faisalabad

78 28 Name of the Scheme Establishment of Public Library at 0.000 33.093 25.093 4.000 4.000 0.000 0.000 4.000 4.000 8.000 0.000 0.000 0.000
Kamalia
Approval Date Approved 16-04-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Toba Tek Singh , Kamalia

43
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

79 29 Name of the Scheme Establishment of Govt. Degree 0.000 52.632 5.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 17.632 0.000 0.000
College for Boys at Aimanabad
Approval Date Approved 14-02-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala

80 30 Name of the Scheme Establishment of Govt. Girls 0.000 38.583 3.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 10.583 0.000 0.000
Degree College at Gakhar Mandi
Approval Date Approved 14-02-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala

81 31 Name of the Scheme Establishment of Government 0.000 86.380 83.931 2.449 0.000 0.000 0.000 2.449 0.000 2.449 0.000 0.000 0.000
Home Economics College
Gujranwala
Approval Date Approved 04-05-2007 Revised on 04-
05-2007
Major Components Construction of various academic blocks
and hostels.
Major Targets Construction of New Building
District and Tehsil Gujranwala

82 32 Name of the Scheme Establishment of Rachna College 0.000 68.042 65.991 2.051 0.000 0.000 0.000 2.051 0.000 2.051 0.000 0.000 0.000
of Engineering & Technology at
Gujranwala.
Approval Date Approved 04-05-2007 Revised on 04-
05-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Gujranwala

44
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

83 33 Name of the Scheme Establishment of Govt. Degree 0.000 18.170 4.709 12.593 0.868 0.000 0.000 12.593 0.868 13.461 0.000 0.000 0.000
College Peoples Colony
Approval Date Approved 22-04-2008 revised on 14-02-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Gujranwala

84 34 Name of the Scheme Establishment of Govt. Boys 0.000 70.066 5.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 30.066 0.000 0.000
Degree College Rahwali
Approval Date Approved 15-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala

85 35 Name of the Scheme Establishment of Govt. Degree 0.000 63.074 62.600 0.474 0.000 0.000 0.000 0.474 0.000 0.474 0.000 0.000 0.000
College for Women at Wando
Approval Date Approved on 09-12-2005 Revised on
04-05-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala

86 36 Name of the Scheme Establishment of Govt. Degree 0.000 58.619 5.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 33.619 0.000 0.000
College for Boys at Noushera
Virkan
Approval Date Approved 30-01-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala , Noushera Virkan

45
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

87 37 Name of the Scheme Establishment of Govt. Girls 0.000 68.778 5.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 33.778 0.000 0.000
Degree College Sagheer Shaheed
Park, Nowshera Road, Gujranwala
Approval Date Approved 15-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala , Noushera Virkan

88 38 Name of the Scheme Establishment of Govt. Girls 0.000 67.477 2.000 30.360 0.000 0.000 0.000 30.360 0.000 30.360 35.117 0.000 0.000
Degree College at Wazirabad
Approval Date Approved 28-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujranwala , Wazirabad

89 39 Name of the Scheme Establishment of Govt. Boys 0.000 40.435 40.335 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
Degree College at Kunjah
Mangowal
Approval Date Approved 11-09-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Gujrat

90 40 Name of the Scheme Establishment of Govt. Zulfiqar Ali 0.000 65.318 5.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 35.318 0.000 0.000
Bhutto Shaheed Degree College at
Pharianwali
Approval Date Approved 11-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mandi Bahauddin , Phalia

46
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

91 41 Name of the Scheme Establishment of Govt. Benazir 0.000 64.414 5.000 24.000 0.000 0.000 0.000 24.000 0.000 24.000 40.414 0.000 0.000
Shaheed Degree College at
Bhaghat
Approval Date Approved 11-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Mandi Bahauddin , Phalia

92 42 Name of the Scheme Establishment of Govt. Shahbaz 0.000 44.000 5.000 39.000 0.000 0.000 0.000 39.000 0.000 39.000 0.000 0.000 0.000
Sharif Degree College for Women
Jamke Cheema
Approval Date Approved 06-05-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Sialkot

93 43 Name of the Scheme Establishment of Govt. Girls 0.000 44.937 5.000 29.210 0.836 0.000 0.000 29.210 0.836 30.046 9.891 0.000 0.000
Degree College Sokinwind
Approval Date Approved 11-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Sialkot , Pasrur

94 44 Name of the Scheme Establishment of Mohtarma 0.000 44.000 1.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 33.000 0.000 0.000
Benazir Bhutto Shaheed Degree
College at Phukalian
Approval Date Approved 30-05-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Sialkot , Pasrur

47
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

95 45 Name of the Scheme Establishment of Govt. Girls 0.000 88.288 3.699 50.000 0.000 0.000 0.000 50.000 0.000 50.000 34.589 0.000 0.000
degree College Shahdara
Approval Date Approved 26-02-2008 Revised on 07-
03-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Lahore

96 46 Name of the Scheme Establishment of Govt. Boys 0.000 98.350 25.000 50.000 0.000 0.000 0.000 50.000 0.000 50.000 23.350 0.000 0.000
Degree College Shalimar Town
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Lahore

97 47 Name of the Scheme Establishment of Govt. Degree 0.000 108.962 103.962 5.000 0.000 0.000 0.000 5.000 0.000 5.000 0.000 0.000 0.000
College for Women, Shalimar
Town
Approval Date Approved 18-10-2005 revised on 09-02-
2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Lahore

98 48 Name of the Scheme Establishment of Govt. Degree 0.000 85.137 70.655 14.482 0.000 0.000 0.000 14.482 0.000 14.482 0.000 0.000 0.000
College Kot Lakhpat
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Lahore

48
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

99 49 Name of the Scheme Establishment of Govt. Girls 0.000 64.344 30.000 23.067 11.277 0.000 0.000 23.067 11.277 34.344 0.000 0.000 0.000
Degree College Marghzar Colony
Approval Date Approved 07-02-2008 revised on 19-09-
2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Lahore

100 50 Name of the Scheme Establishment of Govt. Girls 0.000 77.483 25.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 27.483 0.000 0.000
Degree College Chung
Approval Date Approved 25-08-2008 revised on 14-03-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Lahore

101 51 Name of the Scheme Establishment of Govt. Boys 0.000 36.850 23.730 13.120 0.000 0.000 0.000 13.120 0.000 13.120 0.000 0.000 0.000
Degree College at Qadirpur Ran
Approval Date Approved 06-02-2008
Major Components Construction of New Building
Major Targets Construction of New Building
District and Tehsil Multan

102 52 Name of the Scheme Establishment of Govt. Girls 0.000 51.534 42.534 9.000 0.000 0.000 0.000 9.000 0.000 9.000 0.000 0.000 0.000
Degree College Abdul Hakeem
Approval Date Approved 10-01-2008
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Khanewal , Abdul Hakeem

49
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

103 53 Name of the Scheme Establishment of Govt. Girls 0.000 36.723 33.547 3.176 0.000 0.000 0.000 3.176 0.000 3.176 0.000 0.000 0.000
Degree College Talamba
Approval Date Approved 09-12-2005 Revised on 14-
12-2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Khanewal , Mian Channu

104 54 Name of the Scheme Establishment of Govt. Girls 0.000 39.741 37.241 2.500 0.000 0.000 0.000 2.500 0.000 2.500 0.000 0.000 0.000
Degree College at Karam Dad
Qureshi
Approval Date Approved 18-10-2005 Revised on 04-
12-2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Muzaffargarh

105 55 Name of the Scheme Establishment of Govt. Girls 0.000 44.000 1.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 33.000 0.000 0.000
Degree College at Sanawaan
Approval Date Approved 07-05-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Muzaffargarh

106 56 Name of the Scheme Establishment of Government 0.000 92.000 1.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 40.000 41.000 0.000
Degree College for Women at
Mirhan
Approval Date Approved 18-05-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Layyah , Karor

Sub-Total: Establishment of Colleges 0.000 2,652.374 1,333.720 733.418 29.236 0.000 0.000 733.418 29.236 762.654 525.000 41.000 0.000

50
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Upgradation of Colleges

107 57 Name of the Scheme Up-Gradation of Govt. Inter 0.000 27.305 17.603 1.690 7.992 0.000 0.000 1.690 7.992 9.682 0.000 0.000 0.000
College for Boys Daultala
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Rawalpindi , Gujar Khan

108 58 Name of the Scheme Up-Gradation of Govt. Inter 0.000 25.261 10.000 7.269 7.992 0.000 0.000 7.269 7.992 15.261 0.000 0.000 0.000
College for Women Daultala
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Rawalpindi , Gujar Khan

109 59 Name of the Scheme Up-Gradation of Govt. Inter 0.000 52.823 10.000 24.912 7.911 0.000 0.000 24.912 7.911 32.823 10.000 0.000 0.000
Hashmat Ali Islamia College
Approval Date Approved 14-02-2009 revised on 07-03-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of college building.
District and Tehsil Rawalpindi

110 60 Name of the Scheme Up-Gradation of Govt. Inter 0.000 67.979 18.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 14.979 0.000 0.000
College for Women Taxila
Approval Date Approved 14-02-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Rawalpindi , Taxila

51
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

111 61 Name of the Scheme Up-Gradation of Govt. Inter 0.000 24.166 19.624 0.542 4.000 0.000 0.000 0.542 4.000 4.542 0.000 0.000 0.000
College for Women Fateh Jang
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Attock , Fateh Jang

112 62 Name of the Scheme Up-Gradation of Govt. Inter 0.000 21.868 8.868 9.000 4.000 0.000 0.000 9.000 4.000 13.000 0.000 0.000 0.000
College for Women Jand
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Attock , Jand

113 63 Name of the Scheme Up-gradation of Govt. Inter 0.000 31.915 5.000 18.915 8.000 0.000 0.000 18.915 8.000 26.915 0.000 0.000 0.000
College Bhera
Approval Date Approved 16-12-2008 revised on 28-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Sargodha , Bhalwal

114 64 Name of the Scheme Up-gradation of Govt. Inter 0.000 31.945 10.000 13.945 7.972 0.000 0.000 13.945 7.972 21.917 0.000 0.000 0.000
College Miani
Approval Date Approved 16-09-2008 revised on 28-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Sargodha , Bhalwal

52
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

115 65 Name of the Scheme Up-gradation of Govt. Inter 0.000 17.976 5.000 6.858 6.118 0.000 0.000 6.858 6.118 12.976 0.000 0.000 0.000
College for Women Phullarwan
Approval Date Approved 16-12-2008 revised on 28-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Sargodha , Bhalwal

116 66 Name of the Scheme Up-Gradation of Govt. Inter 0.000 44.573 7.500 26.893 10.180 0.000 0.000 26.893 10.180 37.073 0.000 0.000 0.000
College for Boys Mankera to
Degree Level
Approval Date Approved 16-09-2008 revised on 19-02-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Bhakkar , Mankera

117 67 Name of the Scheme Up-Gradation of Govt. Inter 0.000 29.178 9.506 18.822 1.850 0.000 0.000 18.822 1.850 20.672 0.000 0.000 0.000
Muslim College Chak NO. 41/JB
Approval Date Approved 25-08-2008 revised on 14-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Faisalabad

118 68 Name of the Scheme Up-Gradation of Govt. Inter K.A. 0.000 43.547 10.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 23.547 0.000 0.000
Islamia College Jamia
Muhammadi Sharif
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Jhang , Bhawana

53
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

119 69 Name of the Scheme Up-Gradation of Ghazali College 0.000 43.077 10.000 25.077 8.000 0.000 0.000 25.077 8.000 33.077 0.000 0.000 0.000
Approval Date Approved 16-09-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Jhang

120 70 Name of the Scheme Up-gradation of Govt. Inter 0.000 25.730 16.530 0.000 9.200 0.000 0.000 0.000 9.200 9.200 0.000 0.000 0.000
College Ali Pur Chatha to Degree
Level
Approval Date Approved 09-12-2005 Revised on 21-
12-2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of academic block, Admin
Block, Labs, etc.
District and Tehsil Gujranwala , Ali Pur Chatha

121 71 Name of the Scheme Up-Gradation of Govt. Inter A.H. 0.000 18.463 3.807 13.104 1.552 0.000 0.000 13.104 1.552 14.656 0.000 0.000 0.000
Islamia College Jalalpur Jattan
Approval Date Approved 16-12-2008 revised on 28-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Gujrat

122 72 Name of the Scheme Up-gradation of Govt. Boys Inter 0.000 22.834 21.221 1.613 0.000 0.000 0.000 1.613 0.000 1.613 0.000 0.000 0.000
College at Jalalpur Jattan
Approval Date Approved 09-12-2005
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of academic block, Admin
Block, Labs, etc.
District and Tehsil Gujrat

54
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

123 73 Name of the Scheme Up-Gradation of Govt. Inter 0.000 49.868 20.000 27.607 2.261 0.000 0.000 27.607 2.261 29.868 0.000 0.000 0.000
College for Women Kunjah
Approval Date Approved 16-09-2008 revised on 14-03-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Gujrat

124 74 Name of the Scheme Up-Gradation of Govt. Degree 0.000 45.513 10.000 33.556 1.957 0.000 0.000 33.556 1.957 35.513 0.000 0.000 0.000
College Lalamusa
Approval Date Approved 16-09-2008 revised on 19-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Gujrat , Kharian

125 75 Name of the Scheme Up-Gradation of Govt. Inter 0.000 18.127 5.000 6.944 6.183 0.000 0.000 6.944 6.183 13.127 0.000 0.000 0.000
College for Women Raiwind
Approval Date Approved 11-11-2008 revised on 27-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Lahore

126 76 Name of the Scheme Up-Gradation of Govt. Inter 0.000 45.122 5.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 20.122 0.000 0.000
College for Women Ferozewala
Approval Date Approved 16-12-2008 revised on 09-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Sheikhupura , Ferozewala

55
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

127 77 Name of the Scheme Up-Gradation of Govt. Inter 0.000 62.337 13.000 20.000 7.921 0.000 0.000 20.000 7.921 27.921 21.416 0.000 0.000
College Narang Mandi
Approval Date Approved 16-12-2008 revised on 09-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Sheikhupura , Muridkey

128 78 Name of the Scheme Up-gradation of Govt. Degree 0.000 64.828 10.000 26.828 8.000 0.000 0.000 26.828 8.000 34.828 20.000 0.000 0.000
College Shahkot
Approval Date Approved 16-09-2008 revised on 03-02-
2009
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Nankana Sahib , Shahkot

129 79 Name of the Scheme Up-gradation of Govt. Inter Millat 0.000 44.425 20.000 16.425 8.000 0.000 0.000 16.425 8.000 24.425 0.000 0.000 0.000
College Mumtazabad
Approval Date Approved 25-08-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Multan

130 80 Name of the Scheme Up-gradation of Govt. Inter 0.000 76.847 10.000 20.000 7.911 0.000 0.000 20.000 7.911 27.911 38.936 0.000 0.000
College Karor Pacca
Approval Date Approved 16-09-2008
Major Components Construction of academic block, Labs
and allied facilities.
Major Targets Construction of academic block, Labs
and allied facilities.
District and Tehsil Lodhran , Karor Pacca

Sub-Total: Upgradation of Colleges 0.000 935.707 275.659 385.000 127.000 0.000 0.000 385.000 127.000 512.000 149.000 0.000 0.000

56
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Provision of Missing Facilities (Phase-II)


131 81 Name of the Scheme Construction of additional Block 0.000 38.810 1.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 23.810 0.000 0.000
in Govt. College for Girls at Gujar
Khan
Approval Date Approved on 17-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Rawalpindi , Gujar Khan

132 82 Name of the Scheme Re-construction of Building for 0.000 51.615 18.604 25.011 8.000 0.000 0.000 25.011 8.000 33.011 0.000 0.000 0.000
Govt. College for Women Murree
Approval Date Approved 11-11-2008 revised on 13-02-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Reconstruction of College Building.
District and Tehsil Rawalpindi , Murree

133 83 Name of the Scheme Provision of Missing Facilities in 0.000 40.744 5.000 25.000 7.250 0.000 0.000 25.000 7.250 32.250 3.494 0.000 0.000
Govt. Degree College for Women,
Zafar-ul-Haq Road, Rawalpindi
Approval Date Approved 11-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Rawalpindi

134 84 Name of the Scheme Construction of Academic Block 0.000 44.918 10.000 31.104 3.814 0.000 0.000 31.104 3.814 34.918 0.000 0.000 0.000
& Library at Govt. Degree College
for Women Murree Road,
Rawalpindi.
Approval Date Approved 16-12-2008 revised on 11-02-
2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of academic block for the
college and 3 class rooms.
District and Tehsil Rawalpindi

57
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

135 85 Name of the Scheme Provision of Missing Facilities in 0.000 33.784 1.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 13.784 0.000 0.000
Govt. Degree College Gujar Khan
(Additional Block)
Approval Date Approved 11-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Up-gradation of existing building /
facilities.
District and Tehsil Rawalpindi

136 86 Name of the Scheme Provision of Missing facilities in 0.000 8.710 8.610 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
Govt. Degree College Hasanabdal
Approval Date Approved 07-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Attock , Hasanabdal

137 87 Name of the Scheme Provision of Missing Facilities in 0.000 16.135 1.000 13.000 0.000 0.000 0.000 13.000 0.000 13.000 3.135 0.000 0.000
Govt. Degree College for Women
Talagang
Approval Date Approved 20-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Up-gradation of existing building /
facilities.
District and Tehsil Chakwal , Talagang

138 88 Name of the Scheme Provision of Missing Facilities in 0.000 21.966 2.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 11.966 0.000 0.000
Govt. Degree College for Boys
Dina
Approval Date Approved 20-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Up-gradation of existing building /
facilities.
District and Tehsil Jhelum , Dina

58
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

139 89 Name of the Scheme Provision of Missing Facilities in 0.000 24.415 1.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 14.415 0.000 0.000
Govt. Degree College for Women
Dina
Approval Date Approved 20-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Up-gradation of existing building /
facilities.
District and Tehsil Jhelum , Dina

140 90 Name of the Scheme Construction of Multipurpose Hall 0.000 17.094 16.029 1.065 0.000 0.000 0.000 1.065 0.000 1.065 0.000 0.000 0.000
in Govt. Girls Degree College
Bhagtanwala
Approval Date Approved 18-10-2005, 02-03-2006
Major Components Construction of multipurpose hall
Major Targets Provision of missing facilities.
District and Tehsil Sargodha

141 91 Name of the Scheme Construction of Building of Govt. 0.000 33.325 32.443 0.882 0.000 0.000 0.000 0.882 0.000 0.882 0.000 0.000 0.000
Boys Degree College at
Bhagtanwala
Approval Date Approved 12-09-2005, Revised 01-03-
2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of New Building
District and Tehsil Sargodha

142 92 Name of the Scheme Provision of missing facilities to 0.000 7.228 6.278 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Govt. Post Graduate College Noor
Pur Thal
Approval Date Approved 14-07-2007
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Khushab , Noor Pur

59
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

143 93 Name of the Scheme Construction of Degree Block with 0.000 28.417 23.551 4.866 0.000 0.000 0.000 4.866 0.000 4.866 0.000 0.000 0.000
Allied Facilities and Construction
of Multipurpose Hall in Govt. Boys
Degree College Kalur Kot
Approval Date Approved 15-09-2004
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of academic block, Admin
Block, Labs, etc.
District and Tehsil Bhakkar , Kalur Kot

144 94 Name of the Scheme Provision of missing facilities in 0.000 19.882 19.782 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
Govt. College for Women Gulshan
Colony
Approval Date Approved 18-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Faisalabad

145 95 Name of the Scheme Construction of Building of Govt. 0.000 56.410 10.000 19.431 16.773 0.000 0.000 19.431 16.773 36.204 10.000 0.000 0.000
College for Boys Gojra
Approval Date Approved 25-08-2008 revised on 12-02-
2009
Major Components Construction of building for Post
Graduate Block & Library.
Major Targets Construction of building
District and Tehsil Toba Tek Singh , Gojra

146 96 Name of the Scheme Construction of building of Govt. 0.000 4.516 2.405 1.803 0.308 0.000 0.000 1.803 0.308 2.111 0.000 0.000 0.000
College for Women Gojra
Approval Date Approved 16-09-2008
Major Components Construction of New Building
Major Targets Construction of New Building
District and Tehsil Toba Tek Singh , Gojra

60
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

147 97 Name of the Scheme Construction of Govt. Boys 0.000 67.948 2.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 37.948 0.000 0.000
Degree College Kotla Arab Ali
Khan
Approval Date Approved 28-04-2009
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets New Establishment / Provision of building
District and Tehsil Gujrat , Kharian

148 98 Name of the Scheme Construction of Academic Block 0.000 52.044 32.910 19.134 0.000 0.000 0.000 19.134 0.000 19.134 0.000 0.000 0.000
& Post Graduate Block in Govt.
Girls Degree College M.B. Din
Approval Date Approved 18-10-2005
Major Components Construction of New Building
Major Targets Construction of New Building
District and Tehsil Mandi Bahauddin

149 99 Name of the Scheme Provision of Missing facilities in 0.000 8.650 7.800 0.000 0.850 0.000 0.000 0.000 0.850 0.850 0.000 0.000 0.000
Govt. Degree College for Boys
Pasrur
Approval Date Approved
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Sialkot , Pasrur

150 100 Name of the Scheme Erection of barbed wire fence 0.000 3.980 3.880 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
around 500 acres land for the
Establishment of Swedish
University of Engineering at
Samberial
Approval Date Approved 23-02-2009
Major Components Erection of barbed wire
Major Targets Provision of missing facilities
District and Tehsil Sialkot

61
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

151 101 Name of the Scheme Provision of missing facilities in 0.000 43.194 43.094 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
Govt. Islamia College for Women
Cooper Road
Approval Date Approved 18-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Lahore

152 102 Name of the Scheme Provision of Missing facilities in 0.000 194.370 50.000 35.876 59.950 0.000 0.000 35.876 59.950 95.826 48.544 0.000 0.000
Govt. Queen Marry College
Approval Date Approved 18-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Lahore

153 103 Name of the Scheme Provision of missing facilities in 0.000 12.212 12.112 0.000 0.100 0.000 0.000 0.000 0.100 0.100 0.000 0.000 0.000
Govt. Degree College for Women
Gulshan-e-Ravi
Approval Date Approved 26-09-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Lahore

154 104 Name of the Scheme Construction of Building of Govt. 0.000 152.728 79.428 30.000 0.000 0.000 0.000 30.000 0.000 30.000 43.300 0.000 0.000
College for Commerce Sabzazar
Approval Date Approved 07-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Lahore

62
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

155 105 Name of the Scheme Construction of addl. Rooms in 0.000 22.542 17.957 4.585 0.000 0.000 0.000 4.585 0.000 4.585 0.000 0.000 0.000
Govt. Aiwa College for Women
Lahore
Approval Date Approved 25-08-2008
Major Components Construction of 8 class rooms / staff room
and renovation of Govt. APWA College
for Women, Lahore
Major Targets Construction of New Building
District and Tehsil Lahore

156 106 Name of the Scheme Construction of Building for 0.000 127.425 40.000 35.319 17.106 0.000 0.000 35.319 17.106 52.425 35.000 0.000 0.000
Government College (Boys)
Gulberg Lahore
Approval Date Approved 21-02-2008
Major Components Construction of building for introduction of
general classes
Major Targets Construction of New Building
District and Tehsil Lahore

157 107 Name of the Scheme Construction of Multipurpose Hall 0.000 29.246 4.000 19.085 6.161 0.000 0.000 19.085 6.161 25.246 0.000 0.000 0.000
and Provision of Missing Facilities
at Govt. Degree College for
Women Chunian
Approval Date Approved 09-01-2007
Major Components Construction of Hall and provision of
other facilities
Major Targets Construction of Hall and provision of
other facilities
District and Tehsil Kasur , Chunian

158 108 Name of the Scheme Construction of Building of Govt. 0.000 74.954 63.957 3.383 0.000 0.000 0.000 3.383 0.000 3.383 7.614 0.000 0.000
Degree College for Boys Renala
Khurd
Approval Date Approved 08-04-2004, Revised 11-03-
2006
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Construction of academic block, Admin
Block, Labs, etc.
District and Tehsil Okara , Renala Khurd

63
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

159 109 Name of the Scheme Provision of missing facilities in 0.000 10.030 5.000 5.030 0.000 0.000 0.000 5.030 0.000 5.030 0.000 0.000 0.000
Govt. Islamia College Willayat
Hussain
Approval Date Approved 25-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Multan

160 110 Name of the Scheme Provision of missing facilities in 0.000 20.889 11.845 9.044 0.000 0.000 0.000 9.044 0.000 9.044 0.000 0.000 0.000
Govt. Degree College for Women
Jahania
Approval Date Approved 25-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Khanewal , Jahanian

161 111 Name of the Scheme Construction of Building of Govt. 0.000 45.763 42.881 2.882 0.000 0.000 0.000 2.882 0.000 2.882 0.000 0.000 0.000
College for Boys Khanewal
Approval Date Approved 23-03-2007
Major Components Construction of academic block, Admin
Block, Labs, etc.
Major Targets Provision of building
District and Tehsil Khanewal

162 112 Name of the Scheme Provision of missing facilities in 0.000 2.873 2.073 0.000 0.800 0.000 0.000 0.000 0.800 0.800 0.000 0.000 0.000
Govt. College for Women
Pakpattan
Approval Date Approved 12-06-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Pakpattan

64
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

163 113 Name of the Scheme Provision of Missing facilities in 0.000 6.601 5.415 0.000 1.186 0.000 0.000 0.000 1.186 1.186 0.000 0.000 0.000
Govt. Degree College for Women
Rajanpur
Approval Date Approved 17-09-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Rajanpur

164 114 Name of the Scheme Provision of Post Graduate 0.000 8.881 6.531 0.000 2.350 0.000 0.000 0.000 2.350 2.350 0.000 0.000 0.000
College for Boys Muzaffargarh
Approval Date Approved 12-06-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Muzaffargarh

165 115 Name of the Scheme Provision of missing facilities in 0.000 32.031 29.481 0.000 2.550 0.000 0.000 0.000 2.550 2.550 0.000 0.000 0.000
Govt. College for Boys Dera
Nawab Sahib
Approval Date Approved 12-06-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalpur , Ahmedpur East

166 116 Name of the Scheme Provision of missing facilities in 0.000 136.891 33.040 50.000 6.000 0.000 0.000 50.000 6.000 56.000 47.851 0.000 0.000
Govt. Girls Degree College
Satellite Town
Approval Date Approved 07-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalpur

65
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

167 117 Name of the Scheme Provision of Missing facilities in 0.000 87.756 78.886 0.000 8.870 0.000 0.000 0.000 8.870 8.870 0.000 0.000 0.000
Govt. S.E College for Boys
Bahawalpur
Approval Date Approved 12-06-2008
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalpur

168 118 Name of the Scheme Provision of missing facilities in 0.000 114.430 16.520 25.000 6.520 0.000 0.000 25.000 6.520 31.520 66.390 0.000 0.000
Govt. Girls Degree College
Minchnabad
Approval Date Approved 07-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar , Minchnabad

169 119 Name of the Scheme Demolishing and reconstruction 0.000 1.834 1.734 0.100 0.000 0.000 0.000 0.100 0.000 0.100 0.000 0.000 0.000
of boundary wall at Govt. Post
Graduate College for Women
Approval Date Approved 23-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar

170 120 Name of the Scheme Provision of Missing facilities in 0.000 11.193 8.643 0.000 2.550 0.000 0.000 0.000 2.550 2.550 0.000 0.000 0.000
Govt. Degree College for Boys
Approval Date Approved
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar

66
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

171 121 Name of the Scheme Provision of missing facilities in 0.000 77.779 16.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 31.779 0.000 0.000
Govt. Post Graduate College for
Boys Chishtian
Approval Date Approved 24-03-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar , Chishtian

172 122 Name of the Scheme Provision of missing facilities in 0.000 69.769 3.000 27.000 4.051 0.000 0.000 27.000 4.051 31.051 35.718 0.000 0.000
Govt. Girls Degree College
Dharanwala
Approval Date Approved 17-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar , Chishtian

173 123 Name of the Scheme Provision of missing facilities in 0.000 73.761 3.000 27.000 4.051 0.000 0.000 27.000 4.051 31.051 39.710 0.000 0.000
Govt. Boys Degree College
Dharanwala
Approval Date Approved 17-02-2009
Major Components Provision of missing facilities
Major Targets Provision of missing facilities
District and Tehsil Bahawalnagar , Chishtian

174 124 Name of the Scheme Provision of Facilities in Colleges 0.000 1,068.810 1,000.000 0.000 68.810 0.000 0.000 0.000 68.810 68.810 0.000 0.000 0.000
Approval Date Approved
Major Components Establishment / Up-gradation / Cost of
additional block
Major Targets New Establishment / Provision of building
District and Tehsil Punjab

Sub-Total: Provision of Missing Facilities (Phase-II) 0.000 3,006.553 1,779.889 531.000 229.000 0.000 0.000 531.000 229.000 760.000 474.458 0.000 0.000
Total: ON-GOING SCHEMES 0.000 11,297.305 5,981.593 2,105.000 1,895.000 0.000 0.000 2,105.000 1,895.000 4,000.000 2,045.458 89.000 0.000

67
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NEW SCHEMES
Regular
175 125 Name of the Scheme Erection of Barbed wire around 0.000 10.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
800 acres land for Swedish
University Muridkey
Approval Date Un-Approved
Major Components Erection of barbed wire
Major Targets Erection of Barbed wire
District and Tehsil Sheikhupura , Muridkey

176 126 Name of the Scheme Establishment of Public Library at 0.000 30.000 0.000 5.000 5.000 0.000 0.000 5.000 5.000 10.000 20.000 0.000 0.000
Roshan Bhilla
Approval Date Un-Approved
Major Components Establishment of Library
Major Targets Establishment of Public Library
District and Tehsil Kasur

177 127 Name of the Scheme Establishment of PMU for Women 0.000 53.833 0.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
University, Multan
Approval Date Un-Approved
Major Components Preparation of feasibility Study
Major Targets Preparation of feasibility Study
District and Tehsil Multan

178 128 Name of the Scheme Construction of Cluster 0.000 500.000 0.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 50.000 80.000 350.000
Examination Centres at District
Level (North Zone)
Approval Date Un-Approved
Major Components Construction of Cluster Examination
Center
Major Targets Construction of Cluster Examination
Center
District and Tehsil Punjab

68
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

179 129 Name of the Scheme Construction of Cluster 0.000 500.000 0.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 50.000 80.000 350.000
Examination Centres at District
Level (South Zone)
Approval Date Un-Approved
Major Components Construction of Cluster Examination
Center
Major Targets Construction of Cluster Examination
Center
District and Tehsil Punjab

180 130 Name of the Scheme Construction of Complex for 0.000 100.000 0.000 20.000 6.000 0.000 0.000 20.000 6.000 26.000 74.000 0.000 0.000
Higher Education Department
Approval Date Un-Approved
Major Components Educational Complex for Higher
Education Department. (Policy, DPI and
Divisional Directorate)
Major Targets Educational Complex for Higher
Education Department. (Policy, DPI and
Divisional Directorate)
District and Tehsil Punjab

181 131 Name of the Scheme Capacity Building for Higher 0.000 170.000 0.000 0.000 21.000 0.000 0.000 0.000 21.000 21.000 67.000 82.000 0.000
Education Department
Approval Date Approved
Major Components 1)Provision of missing facilities.
2)Strengthening of Planning Wing
Major Targets Capacity Building for Higher Education
Department, Provision of Better Facilities
to Planning Wing like computers, vehicles
and financial benefits.
District and Tehsil Punjab

182 132 Name of the Scheme Provision of Facilities for the 0.000 100.000 0.000 5.000 8.000 0.000 0.000 5.000 8.000 13.000 50.000 37.000 0.000
Divisional Directorate of Colleges
Approval Date Un-Approved
Major Components Provision of Furniture & Equipment etc.
Major Targets Provision of Furniture & Equipment etc.
District and Tehsil Punjab

Sub-Total: Regular 0.000 1,463.833 0.000 70.000 55.000 0.000 0.000 70.000 55.000 125.000 311.000 279.000 700.000

69
HIGHER EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Establishment / Upgradation of Colleges


183 133 Name of the Scheme Establishment / Upgradation of 0.000 2,000.000 0.000 2,000.000 0.000 0.000 0.000 2,000.000 0.000 2,000.000 0.000 0.000 0.000
Colleges
Approval Date Un-Approved
Major Components Establishment / Upgradation / Missing
Facililties
Major Targets Establishment / Upgradation / Missing
Facililties
District and Tehsil Punjab

Sub-Total: Establishment / Upgradation of Colleges 0.000 2,000.000 0.000 2,000.000 0.000 0.000 0.000 2,000.000 0.000 2,000.000 0.000 0.000 0.000
Total: NEW SCHEMES 0.000 3,463.833 0.000 2,070.000 55.000 0.000 0.000 2,070.000 55.000 2,125.000 311.000 279.000 700.000

Grand Total 0.000 14,761.138 5,981.593 4,175.000 1,950.000 0.000 0.000 4,175.000 1,950.000 6,125.000 2,356.458 368.000 700.000

70
SPECIAL EDUCATION

71
SPECIAL EDUCATION
VISION

To provide conducive learning environment to the disabled and physically challenged persons so as to make them useful members of the society and
utilize their potential and skills in all spheres of life.

TREND OF ALLOCATIONS
(Rs. in million)
Years Original Allocation Revised Allocation
2005-06 500.000 409.245
2006-07 600.000 600.000
2007-08 945.450 844.134
2008-09 1825.000 604.742
2009-10 1000.000

POLICY INTERVENTIONS
• Provide educational facilities to school going age special children and ensure maximum coverage by 2015

• Enhance enrolment of special children in the institutions/ centers of special education in Punjab through improved facilities

• Impart knowledge and skills to physically challenged children to enable them to become economically independent members of the society

• Provide healthy atmosphere to the special children in the institutions / centers of special education in Punjab by providing them buildings
with special facilities

• Skill development & rehabilitation of physically challenged children

STRATEGIC INTERVENTIONS

To achieve above mentioned goals, the following measures will be taken: -

• Enhancement of enrolment through provision of:-


o Buildings with special facilities to special education centres

72
o Cochlear Implant Devices to Hearing Impaired Students
o Stipend
o Free uniform
o Free text & Braille books
o Free pick & drop facility
o Merit scholarship
o Free boarding & lodging facility
o Free Teaching Aids

• Improvement of teaching methodologies through teachers training programme


• Adoption of Internationally accepted best practices

(i) PROVISION OF COCHLEAR IMPLANT FOR THE STUDENTS OF HEARING IMPAIRED CHILDREN IN PUNJAB (PHASE-I)

The scheme titled “Provision of Cochlear Implant for the Students of Hearing Impaired in Punjab (Phase-I)” was approved at a total cost of
Rs.177.662 million by the Departmental Development Sub Committee in its meeting held on 23.12.2008. Under this scheme, 115 Cochlear Implant
Devices were proposed to be provided to Hearing Impaired students of Special Education Institutions / Centres in Punjab during the period of 03-
years. Year wise allocation and number of beneficiaries is as under:-

Sr.No. Year No. of Beneficiaries Allocation


1. 2008-09 30 Rs. 41.762 million
2. 2009-10 30 Rs. 50.000 million
3. 2010-11 55 Rs. 85.900 million

(ii) ESTABLISHMENT OF INTERNATIONAL STANDARD REHABILITATION CENTRE FOR DISABLED

Government of the Punjab is committed to provide free education, vocational and rehabilitation facilities to the special children on modern and
scientific lines so as to bring them at par with the normal children and to make them self supportive and self reliant members of the society. Chief

73
Minister Punjab desired to establish an International Standard Rehabilitation Centre for the Disabled at Lahore. The scheme would be executed by
the Board of Management to be constituted by the Chief Minister.

(iii) CONSTRUCTION OF BUILDINGS OF SPECIAL EDUCATION CENTRES IN PUNJAB (PHASE-II)

Special Education Department has planned to provide buildings to special education centres in Punjab which are functioning in rented buildings. The
buildings will be constructed in accordance with the need of special students of four disabilities for which a standard design prepared by the
Architecture Department has been approved by the Special Education Department. During the year 2007-08, a sum of Rs. 478.980 million was
provided to 05-District Governments for construction of 13-buildings. Construction work on these buildings is under progress. During the year 2008-
09, a sum of Rs. 361.155 million has been provided to six District Governments for the construction of 08-buildings of special education centres.

The Department has planned to construct 15-buildings of Centres of Special Education in seven Districts through Development Programme 2009-10.
For these buildings, land has been transferred / allotted to Special Education Department by the Board of Revenue, Punjab. These buildings will be
completed during the year 2009-10 and 2010-11. 1500 special students of centres of special education will benefit out of it. The detail of buildings to
be constructed during the year 2009-2010 is as under:-
Sr.No. Name of District Name of Centre
1. Sargodha. GSEC, Sahiwal
(05) GSEC, Silanwali
GSEC, Kot Moman
GSEC, Shahpur Saddar
GSEC, Bhalwal
2. Bhakkar. GSEC, Bhakkar
(02) GSEC, Mankara
3. T.T.Singh. (01) GSEC, Gojra
4. Khanewal. GSEC, Jahanian
(03) GSEC, Mian Channu
GSEC, Kabirwala
5. Lahore. GSEC, Nishter Town
(02) GSEC, Wagha Town
6. Hafizabad GSEC, Pindi Bhattian
(01)
7. Bahawalpur GSEC, Khairpur Tamiwali
(01)

74
(iv) CONSTRUCTION OF BUILDING OF GOVT. DEGREE COLLEGE OF SPECIAL EDUCATION AT LAHORE

At present two Degree Colleges of Special Education, one at Lahore and the other at Bahawalpur are functioning. Government Degree College of
Special Education, Lahore was established in 2004-05. This college is functioning in the building of Govt. Training College of the Teachers of Deaf
(Special House), Lahore. The functioning of both the colleges in same premises is creating problems for the college administrations, especially in
terms of boarding facilities. The enrolment of special students is increasing day by day and students from other cities demand hostel facilities. To
cope with the demand, the department has planned to provide a separate building of its own to Govt. Degree College of Special Education, Lahore.
The estimated cost of the project is Rs.300.000 million, out of which Rs.66.000 million are proposed to be provided during the year 2009-2010.

(v) CONSTRUCTION OF 09-BUILDINGS OF OFFICES OF DISTRICT EDUCATION OFFICERS (SPL. EDU) IN PUNJAB RS.31.500 MILLION.

At present, offices of District Education Officers (Spl.Edu) in Punjab are functioning in the buildings of Institutions of Special Education which is not
conducive for office as well as educational environment. To provide them a separate building, the Department has decided to construct the office
buildings of District Education Officers (Spl.Edu) in Punjab in the premises of institutions / schools of Special Education Punjab where sufficient land
to construct the offices is available. Necessary equipment / furniture will also be provided to these offices.

75
MTDF 2009-12
Special Education Department : Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 0.000 50.000 50.000 0.000 50.000 927.000 23.000 950.000 0.000 950.000 927.000 73.000 1,000.000 0.000 1,000.000
Total 0.000 50.000 50.000 0.000 50.000 927.000 23.000 950.000 0.000 950.000 927.000 73.000 1,000.000 0.000 1,000.000
No. of Schemes 1 9 10

Development Programme 2010-11


Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 817.000 123.900 940.900 0.000 940.900 219.000 40.100 259.100 0.000 259.100 1,036.000 164.000 1,200.000 0.000 1,200.000
Total 817.000 123.900 940.900 0.000 940.900 219.000 40.100 259.100 0.000 259.100 1,036.000 164.000 1,200.000 0.000 1,200.000

Development Programme 2011-12


Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Regular 700.000 200.000 900.000 0.000 900.000 444.000 156.000 600.000 0.000 600.000 1,144.000 356.000 1,500.000 0.000 1,500.000
Total 700.000 200.000 900.000 0.000 900.000 444.000 156.000 600.000 0.000 600.000 1,144.000 356.000 1,500.000 0.000 1,500.000
SPECIAL EDUCATION - MTDF 2009-12 - GRAND TOTAL 3,700.000

76
SPECIAL EDUCATION: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES 1 0.000 50.000 0.000 0.000 0.000 50.000 50.000 85.900 0.000

NEW SCHEMES 9 927.000 23.000 0.000 0.000 927.000 23.000 950.000 855.000 330.000

Grand Total 10 927.000 73.000 0.000 0.000 927.000 73.000 1,000.000 940.900 330.000

77
SPECIAL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
184 1 Name of the Scheme Provision of Cochlear Implant for 0.000 177.662 41.762 0.000 50.000 0.000 0.000 0.000 50.000 50.000 85.900 0.000 0.000
Hearing Impaired Students (Phase-
I)
Approval Date Approved 27-01-2009
Major Components Purchase of 30-cochlear implant devices
Major Targets Provision of Implant facility to 30 Hearing
Impaired students of Special Education
Institutions/centres in Punjab
District and Tehsil Punjab

Sub-Total: Regular 0.000 177.662 41.762 0.000 50.000 0.000 0.000 0.000 50.000 50.000 85.900 0.000 0.000
Total: ON-GOING SCHEMES 0.000 177.662 41.762 0.000 50.000 0.000 0.000 0.000 50.000 50.000 85.900 0.000 0.000

NEW SCHEMES
Regular
185 2 Name of the Scheme Construction of Building of Govt. 0.000 85.000 0.000 34.000 0.000 0.000 0.000 34.000 0.000 34.000 51.000 0.000 0.000
Special Education School for
Hearing Impaired Girls
Approval Date Un-Approved
Major Components Civil work, equipment, furniture, transport
& hostel utensils, etc.
Major Targets 200 hearing impaired girls.
District and Tehsil Sargodha , Sargodha.

186 3 Name of the Scheme Establishment of International 0.000 1,000.000 0.000 100.000 0.000 0.000 0.000 100.000 0.000 100.000 700.000 200.000 0.000
Standard Rehabilitation Centre for
the Disabled
Approval Date Un-Approved
Major Components Civil work, equipment, furniture.
Major Targets Civil work, equipment, furniture.
District and Tehsil Lahore

78
SPECIAL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

187 4 Name of the Scheme Construction of building of Govt. 0.000 300.000 0.000 66.000 0.000 0.000 0.000 66.000 0.000 66.000 104.000 130.000 0.000
Degree College of Special
Education
Approval Date Un-Approved
Major Components Cost of land. Civil work, furniture & hostel
utensils, etc.
Major Targets 300-disabled students of visually
impaired, hearing impaired and physically
disabled.
District and Tehsil Lahore

188 5 Name of the Scheme Capacity building of Directorate of 0.000 5.000 0.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
Special Education Punjab
Approval Date Un-Approved
Major Components Office equipment, I.T. equipment &
furniture, etc.
Major Targets Office equipment, I.T. equipment &
furniture, etc.
District and Tehsil Lahore

189 6 Name of the Scheme Establishment of Computer Lab, 0.000 6.000 0.000 0.000 6.000 0.000 0.000 0.000 6.000 6.000 0.000 0.000 0.000
Resource & Guidance Centre in
Existing Govt. In-service Training
College for the Teachers of
Disabled Children
Approval Date Un-Approved
Major Components Purchase of I.T.equipment, furniture
Major Targets Training of Teachers of Special Education
District and Tehsil Lahore

190 7 Name of the Scheme Establishment of Govt. Special 0.000 6.000 0.000 0.000 6.000 0.000 0.000 0.000 6.000 6.000 0.000 0.000 0.000
Education School for Visually
Impaired
Approval Date Un-Approved
Major Components Equipment, furniture, transport & hostel
utensils.
Major Targets 50 visually impaired. students.
District and Tehsil Sahiwal

79
SPECIAL EDUCATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

191 8 Name of the Scheme Construction of Buildings of 0.000 700.000 0.000 700.000 0.000 0.000 0.000 700.000 0.000 700.000 0.000 0.000 0.000
Special Education Centre (Phase-
II).
Approval Date Un-Approved
Major Components Construction of 15-buildings of special
education centres
Major Targets 1500-disabled students.
District and Tehsil Sargodha, Bhakkar,Toba Tek Singh,
Khanewal, Lahore, Bahawalpur,
Hafizabad. , Sahiwal, Silanwali, Kot
Moman, Shahpur Saddar, Bhalwal,
Bhakkar, Mankera, Gojra, Jahanian,
Mian Chunnu, Kabirwala, Nishter
Town, Wahga Town, Khairpur Temiwali
& Pindi Bhattian.

192 9 Name of the Scheme Establishment of Low Vision 0.000 1.500 0.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Assessment Centres in Visually
Impaired Institutions
Approval Date Un-Approved
Major Components Ophthalmic equipment & furniture, etc.
Major Targets Students of Institutions/ centres of Multan
& D.G.Khan Division.
District and Tehsil Multan, Dera Ghazi Khan. , Multan,
D.G.Khan.

193 10 Name of the Scheme Construction of 09-office 0.000 31.500 0.000 27.000 4.500 0.000 0.000 27.000 4.500 31.500 0.000 0.000 0.000
buildings of District Education
Officer (Spl.Edu)
Approval Date Un-Approved
Major Components Civil work, I.T. equipment & furniture.
Major Targets Provision of office buildings of DEO
(Spl.Edu).
District and Tehsil Lahore, Gujranwala, Faislabad,
Sargodha, Dera Ghazi Khan, Multan,
Bahawalpur, Sahiwal, Rawalpindi ,
Lahore, Gujranwala, Faislabad,
Sargodha, D.G. Khan, Multan,
Bahawalpur, Sahiwal, Rawalpindi

Sub-Total: Regular 0.000 2,135.000 0.000 927.000 23.000 0.000 0.000 927.000 23.000 950.000 855.000 330.000 0.000
Total: NEW SCHEMES 0.000 2,135.000 0.000 927.000 23.000 0.000 0.000 927.000 23.000 950.000 855.000 330.000 0.000

Grand Total 0.000 2,312.662 41.762 927.000 73.000 0.000 0.000 927.000 73.000 1,000.000 940.900 330.000 0.000

80
LITERACY

81
LITERACY

VISION

Literate, aware and thriving Punjab

TREND OF ALLOCATIONS
(Rs. in million)
YEARS ORIGINAL ALLOCATION REVISED ALLOCATION
2005-06 200.000 179.840
2006-07 275.000 198.940
2007-08 1200.000 650.000
2008-09 1250.000 682.473
2009-10 800.000

POLICY /MISSION STATEMENT

We, in the Literacy & Non Formal Basic Education Department, are committed to providing quality learning opportunities and Education for All,
through focused and continuous non-formal means, to illiterate/out of school population of all age groups of both genders in Punjab by the year 2020.

STRATEGY
• Ensure access to basic education by adopting Non Formal Basic Education (NFBE) options linked with poverty alleviation strategy
• Support initiatives of formal education towards achieving Universal Primary Education (UPE) by adopting NFBE option
• Integrate all basic education and Literacy Programmes with life and marketable earning skills
• Mobilize community and civil society for achievement of the targets
• Reduce gender and urban – rural disparities

STRATEGIC INTERVENTIONS

i) Opening of literacy centres on need basis (PC-II)


Targets

82
Study to develop mechanism for promotion of literacy

ii) Punjab Literacy & Livelihood Programme


Targets
• Opening of centres in Punjab.
• Provision of Literacy material for the centres.
• Technical and vocational training component of learners.
• Research component at Provincial level.
• Monitoring and evaluation

iii) Capacity Building of the Department

Major Components
To enhance the capacity of the officers and officials of the Provincial Department and EDOs (Literacy)

Targets
• Creating institutional base for capacity building activities.
• Research, case/ impacts/ process studies.
• Establishment of MIS wing for managing database for base line data.
• Material, curriculum and training modules development.

iv) Establishment of 300 Adult Literacy Centres & 200 NFBE Schools at Brick Kilns (5 years Programme)

Major Components
• Establishment of 300 ALC at Brick Kilns
• Establishment of 200 NFBES in at Brick Kilns

v) Community Learning Centres (CLCs) Project

Major Components
Establishment of 360 Community Learning Centres CLCs/ Literacy Resource Centres - 10 in each District as an intervention for Literacy &
Continuing Education.

83
Targets
Providing post Literacy & Continuing Education options to Neo-Literate & NFBE Graduates.

vi) Construction of Literacy House

Targets
Construction of Office Building of Literacy Department

vii) Literacy in Mother Tongue

viii) Awareness Campaign for Promotion of Literacy

Major Components
Awareness campaign through print & electronic media and through traditional means like use of mosque, distribution of pamphlets, stickers,
etc.
Targets
Creating Awareness among the masses about the importance of Education and Literacy in improving their standards of life. Generating
movement for a paradigm shift for creating demand for Literacy i.e. shift from supply driven to a demand driven service.

The aforementioned interventions coupled with a number of management reforms and inputs undertaken through the non-development budget would
help achieve the Millennium Development Goals commitments.

Indicator 2001-02 2006-07 2007-08 2008-09 2009-10 Projected year of 2015 (MDGs)
(PHIS) (PSLM) reaching MDGs
Literacy rate 10 years and 47 58 65 68 71 2013 88
above (%)

84
MTDF TARGETS
The following summary of Medium Term Development Framework (MTDF) is based on the population projections and other indicators as provided in
the PSLM 2006-07. Literacy rate of Punjab, estimated in the PSLM 2006-07 as 58%, has been projected to be 65% in 2007-08, 68% in 2008-09 and
71% in 2009-10 on the basis of the efforts of Government to eradicate illiteracy from the province.

YEAR 2006-07 2007-08 2008-09 2009-10 2010-


(BASE 11
YEAR)
Literacy Total 60.93 64.8 70.6 76.6 82.3
Rate % Male 69.93 73.63 78.03 82.73 90
Female 51.93 55.97 63.17 70.47 74
Planned Literacy Rate Coverage (18.33 3.01 3.7 4.4 4.7 5.56
% Increase)
Planned Coverage of illiterates 1926680 3400312 3759612 3766575 4.12
No. of Adult Literacy Centers 32111 56672 62660 62776 0.24

85
MTDF 2009-12
Literacy & NFBE Department: Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Literacy & NFBE 0.000 250.000 250.000 0.000 250.000 75.000 475.000 550.000 0.000 550.000 75.000 725.000 800.000 0.000 800.000
Total 0.000 250.000 250.000 0.000 250.000 75.000 475.000 550.000 0.000 550.000 75.000 725.000 800.000 0.000 800.000
No. of Schemes 2 8 10
DEVELOPMENT PROGRAMME 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Literacy & NFBE 25.000 974.853 999.853 0.000 999.853 25.147 75.000 100.147 0.000 100.147 50.147 1,049.853 1,100.000 0.000 1,100.000
Total 25.000 974.853 999.853 0.000 999.853 25.147 75.000 100.147 0.000 100.147 50.147 1,049.853 1,100.000 0.000 1,100.000
DEVELOPMENT PROGRAMME 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Literacy & NFBE 665.000 0.000 665.000 0.000 665.000 0.000 735.000 735.000 0.000 735.000 665.000 735.000 1,400.000 0.000 1,400.000
Total 665.000 0.000 665.000 0.000 665.000 0.000 735.000 735.000 0.000 735.000 665.000 735.000 1,400.000 0.000 1,400.000
Literacy & NFBE MTDF 2009-12 - GRAND TOTAL 3,300.000

86
LITERACY: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES 2 0.000 250.000 0.000 0.000 0.000 250.000 250.000 529.853 466.815

NEW SCHEMES 8 75.000 475.000 0.000 0.000 75.000 475.000 550.000 470.000 105.840

Grand Total 10 75.000 725.000 0.000 0.000 75.000 725.000 800.000 999.853 572.655

87
LITERACY (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
194 1 Name of the Scheme Model Districts for Literacy 0.000 981.374 327.896 0.000 195.000 0.000 0.000 0.000 195.000 195.000 129.853 145.685 182.940
Campaigns to achieve 100%
Literacy with JICA Assistance in
M.B.Din, Khushab, Khanewal &
D.G.Khan districts (Federal Govt.
Share 35%, Provincial Share 37%,
District Govt. share 20%& JICA
Share 8%)
Approval Date Approved 07-12-2004
Major Components Adult Literacy Centers NFBE Centers
Awareness Campaigns
Major Targets Achieving 100% Literacy and UPE in four
Districts (Khanewal, Khushab, M.B.Din &
D.G.Khan)
District and Tehsil Khushab, Khanewal, Mandi Bahauddin
, Dera Ghazi Khan

195 2 Name of the Scheme Literacy Programme: 0.000 1,754.130 978.000 0.000 55.000 0.000 0.000 0.000 55.000 55.000 400.000 321.130 0.000
Establishment of District Literacy
Management Information System
(LitMIS) Cell. Establishment of
6200 Adult Literacy Centres (200
in each of 31 Districts)
Establishment of 6200 Non-
Formal Basic Education Schools
(200 NFBE in each of 31 Districts)
Approval Date Approved 07-01-2008
Major Components Conduct of household data collection
under District Literacy Management
Information System (LitMIS)Cell. Adult
Literacy Centres Non-Formal Basic
Education Centres
Major Targets Establishment of District LitMIS.
Establishment of 6200 ALCS,
Establishment of 6200 NFBE Schools
District and Tehsil 31 districts except Khanewal,
Khushab, M.B.Din & D.G.Khan

Sub-Total: Regular 0.000 2,735.504 1,305.896 0.000 250.000 0.000 0.000 0.000 250.000 250.000 529.853 466.815 182.940
Total: ON-GOING SCHEMES 0.000 2,735.504 1,305.896 0.000 250.000 0.000 0.000 0.000 250.000 250.000 529.853 466.815 182.940

88
LITERACY (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NEW SCHEMES
Regular
196 3 Name of the Scheme Opening of Literacy Centres on 0.000 10.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
need basis (PC-II)
Approval Date Un-Approved
Major Components Study to develop mechanism for
promotion of literacy
Major Targets Study to develop mechanism for
promotion of literacy
District and Tehsil Punjab

197 4 Name of the Scheme Punjab Literacy and Livelihood 0.000 385.000 0.000 0.000 195.000 0.000 0.000 0.000 195.000 195.000 190.000 0.000 0.000
Programme
Approval Date Un-Approved
Major Components To open centres for skill training and
literacy in Punjab.
Major Targets Opening of centres in Punjab. Provision
of Literacy material for the
centres.Technical and vocational training
component of learners. Research
component at Provincial level. Monitoring
and evaluation
District and Tehsil Punjab

198 5 Name of the Scheme Awareness Campaign for 0.000 100.000 0.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 50.000 0.000 0.000
Promotion of Literacy
Approval Date Un-Approved
Major Components Awareness campagin through print and
electronic media. Awareness campaign
through traditional means like use of
mosque, distribution of pamphlets,
stickers, etc.
Major Targets Creating Awareness among the masses
about the importance of Education and
Literacy in improving their standards of
life. Generating movement for a paradigm
shift for creating demand for Literacy i.e.
shift from supply driven to a demand
driven service
District and Tehsil Punjab

89
LITERACY (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

199 6 Name of the Scheme Establishment of 300 Adult 0.000 235.840 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 95.000 65.840 0.000
Literacy Centres & 200 NFBE
Schools at Brick Kiln
Approval Date Un-Approved
Major Components Establishment of 300 ALCs at Brick Kilns
Establishment of 200 NFBE Schools at
Brick Kilns
Major Targets Educating Brick Kilns workers.
District and Tehsil Punjab

200 7 Name of the Scheme Community Learning Centres 0.000 195.000 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 80.000 40.000 0.000
(CLCs) Project (Establishment of
360 CLCs/ Literacy Resource
Centres - 10 in each District
Approval Date Un-Approved
Major Components Establishment of Community learning
Centres as an intervention for Literacy &
Continuing Education Institution
Major Targets Providing post Literacy & Continuing
Education options to Neo-Literate &
NFBE Graduates.
District and Tehsil Punjab

201 8 Name of the Scheme Construction of Literacy House 0.000 100.000 0.000 75.000 0.000 0.000 0.000 75.000 0.000 75.000 25.000 0.000 0.000
Approval Date Un-Approved
Major Components Construction of Office Building of Literacy
Department
Major Targets Construction of Office Building of Literacy
Department
District and Tehsil Punjab

202 9 Name of the Scheme Literacy in Mother Tongue. 0.000 50.000 0.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 0.000 0.000 0.000
Approval Date Un-Approved
Major Components Literacy in Mother Tongue.
Major Targets Literacy in Mother Tongue.
District and Tehsil Punjab

90
LITERACY (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

203 10 Name of the Scheme Capacity Building of the 0.000 50.000 0.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 30.000 0.000 0.000
Department
Approval Date Un-Approved
Major Components Enhance the capacity of the officers and
officials of the Provincial Department and
EDOs (Literacy)
Major Targets 1. Creating institutional base for capacity
building activities. 2. Research, case/
impacts/ process studies.3. MIS wing for
managing database for base line data
determining numbers and names of
illiterates and centres, teachers, learners
and monitoring staff (NGOs, project
staff).4. Material, curriculum and training
modules development.
District and Tehsil Punjab

Sub-Total: Regular 0.000 1,125.840 0.000 75.000 475.000 0.000 0.000 75.000 475.000 550.000 470.000 105.840 0.000
Total: NEW SCHEMES 0.000 1,125.840 0.000 75.000 475.000 0.000 0.000 75.000 475.000 550.000 470.000 105.840 0.000

Grand Total 0.000 3,861.344 1,305.896 75.000 725.000 0.000 0.000 75.000 725.000 800.000 999.853 572.655 182.940

91
SPORTS

92
SPORTS

VISION

Provide world class sports facilities and equal sporting opportunities to all citizens of the province; develop healthy life styles through sports; and help
develop competitive advantage in sports.

TREND OF ALLOCATIONS
(Rs. in million)
Years Original Allocation Revised Allocation
2005-06 300.000 8.500
2006-07 400.000 225.616
2007-08 902.000 638.000
2008-09 1500.000 1077.983
2009-10 1600.000

POLICY INTERVENTIONS

• To set up sports nurseries by establishing sports infrastructure at grassroots level;

• To build better and modern sports infrastructure at district, tehsil and union council levels for local and traditional games along with
multipurpose gymnasium halls for indoor games;

• To provide quality coaching facilities all over the province and introduce training for coaches;

• To encourage participation of females in sports; and

• To introduce scientific training to help develop competitive advantage in various sports.

93
STRATEGIC INTERVENTIONS

• Construction of international level swimming pool at Nishtar Park Sports Complex, Lahore.

• Construction of Gymnasiums at district level.

• Capacity Building of Sports Department.

• Construction of international level tennis stadium at Nishtar Park Sports Complex, Lahore.

• Construction of international level multipurpose (indoor) gymnasium at Nishtar Park Sports Complex, Lahore.

• Construction of prototype gymnasiums at tehsil level.

• Construction of Squash Complex at Lahore.

• Development of sports facilities around school clusters in districts/tehsils.

• Improvement / Development of Existing Cricket Grounds to the 1st Class Ground level in the Urban Areas at Ex-Divisional Headquarters in
Punjab.

• Development / improvement of grounds in districts.

94
MTDF 2009-12
Sports : Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Sports 1,382.500 17.500 1,400.000 0.000 1,400.000 150.000 50.000 200.000 0.000 200.000 1,532.500 67.500 1,600.000 0.000 1,600.000
Total 1,382.500 17.500 1,400.000 0.000 1,400.000 150.000 50.000 200.000 0.000 200.000 1,532.500 67.500 1,600.000 0.000 1,600.000
No. of Schemes 99 9 108
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Sports 1,341.467 0.000 1,341.467 0.000 1,341.467 858.533 0.000 858.533 0.000 858.533 2,200.000 0.000 2,200.000 0.000 2,200.000
Total 1,341.467 0.000 1,341.467 0.000 1,341.467 858.533 0.000 858.533 0.000 858.533 2,200.000 0.000 2,200.000 0.000 2,200.000
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Sports 700.000 0.000 700.000 0.000 700.000 1,300.000 0.000 1,300.000 0.000 1,300.000 2,000.000 0.000 2,000.000 0.000 2,000.000
Total 700.000 0.000 700.000 0.000 700.000 1,300.000 0.000 1,300.000 0.000 1,300.000 2,000.000 0.000 2,000.000 0.000 2,000.000
SPORTS MTDF 2009-12 - GRAND TOTAL 5800.000

95
SPORTS: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Regular 5 172.401 0.000 0.000 0.000 172.401 0.000 172.401 170.000 159.319
Upgradation of existing 5 34.374 0.000 0.000 0.000 34.374 0.000 34.374 0.000 0.000
cricket grounds to first
class level
Construction of 26 576.234 0.000 0.000 0.000 576.234 0.000 576.234 275.295 74.670
Gymnasiums
Upgradation of Sports 23 126.624 0.000 0.000 0.000 126.624 0.000 126.624 0.000 0.000
Grounds
Development of sports 24 140.072 0.000 0.000 0.000 140.072 0.000 140.072 0.000 0.250
facilities around school
clusters
Construction of Prototype 11 303.845 0.000 0.000 0.000 303.845 0.000 303.845 342.990 56.171
Gymnasiums at Tehsil Level
Others 5 28.950 17.500 0.000 0.000 28.950 17.500 46.450 13.182 0.000
Total: ON-GOING SCHEMES 99 1,382.500 17.500 0.000 0.000 1,382.500 17.500 1,400.000 801.467 290.410
NEW SCHEMES
Regular 9 150.000 50.000 0.000 0.000 150.000 50.000 200.000 540.000 0.000
Total: NEW SCHEMES 9 150.000 50.000 0.000 0.000 150.000 50.000 200.000 540.000 0.000

Grand Total 108 1,532.500 67.500 0.000 0.000 1,532.500 67.500 1,600.000 1,341.467 290.410

96
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
204 1 Name of the Scheme Construction of International 0.000 173.560 97.936 75.624 0.000 0.000 0.000 75.624 0.000 75.624 0.000 0.000 0.000
Level Swimming Pool at Nishtar
Park Sports Complex
Approval Date Approved 21-08-2007
Major Components Civil Works
Major Targets Training of 250 Swimmers annually
District and Tehsil Lahore

205 2 Name of the Scheme Construction of Squash Complex 0.000 220.000 0.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 95.000 89.500 0.000
at Lahore
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Lahore

206 3 Name of the Scheme Construction of International 0.000 74.425 2.000 26.000 0.000 0.000 0.000 26.000 0.000 26.000 25.000 21.425 0.000
Level Multipurpose indoor
Gymnasium at Nishtar Park
Sports Complex Lahore.
Approval Date Approved 27-09-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Lahore

207 4 Name of the Scheme Construction of International 0.000 120.012 0.500 30.000 0.000 0.000 0.000 30.000 0.000 30.000 50.000 39.512 0.000
Level Tennis Stadium at Nishtar
Park Sports Complex , Lahore
Approval Date Approved 04-06-2009
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Lahore

97
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

208 5 Name of the Scheme Improvement & Renovation of 0.000 21.777 16.000 5.777 0.000 0.000 0.000 5.777 0.000 5.777 0.000 8.882 0.000
Sports Fields at: A) Iqbal Park
Sports Complex, Lahore;
B) Nishtar Park Sports Complex
Qaddafi Stadium , Lahore
Approval Date Approved 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Lahore

Sub-Total: Regular 0.000 609.774 116.436 172.401 0.000 0.000 0.000 172.401 0.000 172.401 170.000 159.319 0.000

Upgradation of existing cricket grounds to first class level


209 6 Name of the Scheme Up gradation of Existing Cricket 0.000 11.276 7.264 4.012 0.000 0.000 0.000 4.012 0.000 4.012 0.000 0.000 0.000
Grounds to the level of first class
ground at ex-divisional
headquarters in Punjab - One at
Multan
Approval Date Approved
04-06-2009
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Multan

210 7 Name of the Scheme Up gradation of existing cricket 0.000 16.342 4.500 11.842 0.000 0.000 0.000 11.842 0.000 11.842 0.000 0.000 0.000
grounds to the level of first class
ground at ex-Divisional
Headquarters in Punjab - One at
Sargodha
Approval Date Approved 23-12-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Sargodha

98
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

211 8 Name of the Scheme Up gradation of existing cricket 0.000 13.000 3.500 9.500 0.000 0.000 0.000 9.500 0.000 9.500 0.000 0.000 0.000
grounds to the level of first class
ground at ex-Divisional
Headquarters in Punjab - One at
Faisalabad.
Approval Date Approved 30-06-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Faisalabad

212 9 Name of the Scheme Up gradation of existing cricket 0.000 5.322 2.947 2.375 0.000 0.000 0.000 2.375 0.000 2.375 0.000 0.000 0.000
grounds to the level of first class
ground at ex-Divisional
Headquarters in Punjab - One at
Lahore.
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Lahore

213 10 Name of the Scheme Up gradation of existing cricket 0.000 11.145 4.500 6.645 0.000 0.000 0.000 6.645 0.000 6.645 0.000 0.000 0.000
grounds to the level of first class
ground at ex-Divisional
Headquarters in Punjab - One at
D.G. Khan
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Dera Ghazi Khan

Sub-Total: Upgradation of existing cricket grounds 0.000 57.085 22.711 34.374 0.000 0.000 0.000 34.374 0.000 34.374 0.000 0.000 0.000
to first class level

Construction of Gymnasiums
214 11 Name of the Scheme Construction of Gymnasium at 0.000 52.297 42.925 9.372 0.000 0.000 0.000 9.372 0.000 9.372 0.000 0.000 0.000
Rawalpindi.
Approval Date 28-02-2006
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Rawalpindi

99
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

215 12 Name of the Scheme Construction of Gymnasium at 0.000 49.700 18.050 31.650 0.000 0.000 0.000 31.650 0.000 31.650 0.000 0.000 0.000
Attock
Approval Date 25-09-2006
Major Components Civil Works
Major Targets Training of 275 players annually
District and Tehsil Attock

216 13 Name of the Scheme Construction of Gymnasium at 0.000 51.566 47.855 3.711 0.000 0.000 0.000 3.711 0.000 3.711 0.000 0.000 0.000
Chakwal
Approval Date 17-02-2006
Major Components Civil Works
Major Targets Training of 250 Swimmers annually
District and Tehsil Chakwal

217 14 Name of the Scheme Construction of Gymnasium at 0.000 73.957 7.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 41.957 0.000 0.000
Jhelum
Approval Date 23-12-2008
Major Components Civil Works
Major Targets Training of 275 players annually
District and Tehsil Jhelum

218 15 Name of the Scheme Construction of Gymnasium at 0.000 50.623 40.373 10.250 0.000 0.000 0.000 10.250 0.000 10.250 0.000 0.000 0.000
Sargodha.
Approval Date 17-02-2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Sargodha

219 16 Name of the Scheme Construction of Gymnasium at 0.000 45.658 6.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 19.658 0.000 0.000
Khushab
Approval Date 27-11-2007
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Khushab

100
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

220 17 Name of the Scheme Construction of Gymnasium at 0.000 49.842 8.489 30.000 0.000 0.000 0.000 30.000 0.000 30.000 1.353 10.000 0.000
Bhakkar.
Approval Date 21-08-2007
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Bhakkar

221 18 Name of the Scheme Construction of Gymnasium at 0.000 46.688 40.148 1.540 0.000 0.000 0.000 1.540 0.000 1.540 5.000 0.000 0.000
Faisalabad.
Approval Date 17-02-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Faisalabad

222 19 Name of the Scheme Construction of Gymnasium at 0.000 75.423 60.000 15.423 0.000 0.000 0.000 15.423 0.000 15.423 0.000 0.000 0.000
Gujranwala.
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 275 players annually
District and Tehsil Gujranwala

223 20 Name of the Scheme Construction of Gymnasium at 0.000 51.814 35.769 16.045 0.000 0.000 0.000 16.045 0.000 16.045 0.000 0.000 0.000
Hafizabad
Approval Date 25-09-2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Hafizabad

224 21 Name of the Scheme Construction of Gymnasium at 0.000 53.277 29.212 24.065 0.000 0.000 0.000 24.065 0.000 24.065 0.000 0.000 0.000
Gujrat.
Approval Date 25-09-2006
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Gujrat

101
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

225 22 Name of the Scheme Construction of Gymnasium at 0.000 72.573 10.000 31.395 0.000 0.000 0.000 31.395 0.000 31.395 31.178 0.000 0.000
Sialkot.
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Sialkot

226 23 Name of the Scheme Construction of Gymnasium at 0.000 69.035 3.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 46.035 0.000 0.000
Narowal.
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 175 players annually
District and Tehsil Narowal

227 24 Name of the Scheme Construction of Gymnasium at 0.000 77.908 2.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 35.908 10.000 0.000
Sheikhupura.
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Sheikhupura

228 25 Name of the Scheme Construction of Gymnasium at 0.000 56.257 23.486 32.771 0.000 0.000 0.000 32.771 0.000 32.771 0.000 0.000 0.000
Kasur
Approval Date 17-02-2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Kasur

229 26 Name of the Scheme Construction of Gymnasium at 0.000 55.572 29.761 25.811 0.000 0.000 0.000 25.811 0.000 25.811 0.000 0.000 0.000
Multan.
Approval Date 3/10/2007
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Multan

102
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

230 27 Name of the Scheme Construction of Gymnasium at 0.000 50.594 20.000 25.594 0.000 0.000 0.000 25.594 0.000 25.594 5.000 0.000 0.000
Lodhran
Approval Date 31-10-2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Lodhran

231 28 Name of the Scheme Construction of Gymnasium at 0.000 52.505 32.451 20.054 0.000 0.000 0.000 20.054 0.000 20.054 0.000 0.000 0.000
Khanewal
Approval Date 16-11-2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Khanewal

232 29 Name of the Scheme Construction of Gymnasium at 0.000 70.660 16.000 32.948 0.000 0.000 0.000 32.948 0.000 32.948 14.660 7.052 0.000
Sahiwal.
Approval Date 30-11-2007
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Sahiwal

233 30 Name of the Scheme Construction of Gymnasium at 0.000 64.606 6.000 15.988 0.000 0.000 0.000 15.988 0.000 15.988 25.000 17.618 0.000
Pakpattan.
Approval Date 28-11-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Pakpattan

234 31 Name of the Scheme Construction of Gymnasium at 0.000 69.928 10.704 30.000 0.000 0.000 0.000 30.000 0.000 30.000 19.224 10.000 0.000
D.G.Khan.
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Dera Ghazi Khan

103
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

235 32 Name of the Scheme Construction of Gymnasium at 0.000 51.837 30.588 21.249 0.000 0.000 0.000 21.249 0.000 21.249 0.000 0.000 0.000
Rajanpur
Approval Date 2/6/2006
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Rajanpur

236 33 Name of the Scheme Construction of Gymnasium at 0.000 67.875 17.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 10.875 10.000 0.000
Muzaffargarh.
Approval Date 9/8/2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Muzaffargarh

237 34 Name of the Scheme Construction of Gymnasium at 0.000 53.720 27.930 25.790 0.000 0.000 0.000 25.790 0.000 25.790 0.000 0.000 0.000
Layyah
Approval Date 25-09-2006
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Layyah

238 35 Name of the Scheme Construction of Gymnasium at 0.000 66.797 15.350 22.000 0.000 0.000 0.000 22.000 0.000 22.000 19.447 10.000 0.000
Bahawalpur.
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Bahawalpur

239 36 Name of the Scheme Construction of Gymnasium at 0.000 47.415 21.837 25.578 0.000 0.000 0.000 25.578 0.000 25.578 0.000 0.000 0.000
Bahawalnagar
Approval Date 25-09-2006
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Bahawalnagar

Sub-Total: Construction of Gymnasiums 0.000 1,528.127 601.928 576.234 0.000 0.000 0.000 576.234 0.000 576.234 275.295 74.670 0.000

104
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Upgradation of Sports Grounds


240 37 Name of the Scheme Up gradation of Sports Grounds 0.000 7.126 4.000 3.126 0.000 0.000 0.000 3.126 0.000 3.126 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Attock
Approval Date 9/8/2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Attock

241 38 Name of the Scheme Up gradation of Sports Grounds 0.000 5.653 1.000 4.653 0.000 0.000 0.000 4.653 0.000 4.653 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Chakwal
Approval Date 28-11-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Chakwal

242 39 Name of the Scheme Up gradation of Sports Grounds 0.000 5.759 3.000 2.759 0.000 0.000 0.000 2.759 0.000 2.759 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Jhelum
Approval Date 31-12-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Jhelum

243 40 Name of the Scheme Up gradation of Sports Grounds 0.000 6.060 1.000 5.060 0.000 0.000 0.000 5.060 0.000 5.060 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Faisalabad
Approval Date 9/8/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Faisalabad

244 41 Name of the Scheme Up gradation of Sports Grounds 0.000 7.248 2.000 5.248 0.000 0.000 0.000 5.248 0.000 5.248 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Jhang
Approval Date 28-11-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Jhang , Shorkot
105
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

245 42 Name of the Scheme Up gradation of Sports Grounds 0.000 3.363 2.000 1.363 0.000 0.000 0.000 1.363 0.000 1.363 0.000 0.000 0.000
in 24 Districts in Punjab - One at
T.T. Singh
Approval Date 22-12-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Toba Tek Singh

246 43 Name of the Scheme Up gradation of Sports Grounds 0.000 12.849 4.000 8.849 0.000 0.000 0.000 8.849 0.000 8.849 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Hafizabad
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Hafizabad

247 44 Name of the Scheme Up gradation of Sports Grounds 0.000 4.930 1.000 3.930 0.000 0.000 0.000 3.930 0.000 3.930 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Mandi Bahauddin
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Mandi Bahauddin

248 45 Name of the Scheme Up gradation of Sports Grounds 0.000 12.575 6.000 6.575 0.000 0.000 0.000 6.575 0.000 6.575 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Narowal
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 175 players annually
District and Tehsil Narowal

249 46 Name of the Scheme Up gradation of Sports Grounds 0.000 4.958 2.400 2.558 0.000 0.000 0.000 2.558 0.000 2.558 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Lahore
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Lahore

106
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

250 47 Name of the Scheme Up gradation of Sports Grounds 0.000 12.118 2.000 10.118 0.000 0.000 0.000 10.118 0.000 10.118 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Nankana.
Approval Date 18-02-2009
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Nankana Sahib

251 48 Name of the Scheme Up gradation of Sports Grounds 0.000 13.001 2.000 11.001 0.000 0.000 0.000 11.001 0.000 11.001 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Multan
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Multan

252 49 Name of the Scheme Up gradation of Sports Grounds 0.000 10.224 3.000 7.224 0.000 0.000 0.000 7.224 0.000 7.224 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Lodhran
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 175 players annually
District and Tehsil Lodhran

253 50 Name of the Scheme Up gradation of Sports Grounds 0.000 10.000 1.000 9.000 0.000 0.000 0.000 9.000 0.000 9.000 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Khanewal
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Khanewal

254 51 Name of the Scheme Up gradation of Sports Grounds 0.000 7.441 4.000 3.441 0.000 0.000 0.000 3.441 0.000 3.441 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Sahiwal
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Sahiwal

107
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

255 52 Name of the Scheme Up gradation of Sports Grounds 0.000 7.077 2.000 5.077 0.000 0.000 0.000 5.077 0.000 5.077 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Pakpattan
Approval Date 9/8/2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Pakpattan

256 53 Name of the Scheme Up gradation of Sports Grounds 0.000 6.612 2.000 4.612 0.000 0.000 0.000 4.612 0.000 4.612 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Vehari
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 100 players annually
District and Tehsil Vehari , Mailsi

257 54 Name of the Scheme Up gradation of Sports Grounds 0.000 9.273 2.000 7.273 0.000 0.000 0.000 7.273 0.000 7.273 0.000 0.000 0.000
in 24 Districts in Punjab - One at
D.G Khan
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Dera Ghazi Khan

258 55 Name of the Scheme Up gradation of Sports Grounds 0.000 10.391 4.000 6.391 0.000 0.000 0.000 6.391 0.000 6.391 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Rajanpur
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Rajanpur

259 56 Name of the Scheme Up gradation of Sports Grounds 0.000 7.596 1.000 6.596 0.000 0.000 0.000 6.596 0.000 6.596 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Layyah
Approval Date 23-12-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Layyah

108
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

260 57 Name of the Scheme Up gradation of Sports Grounds 0.000 6.909 4.000 2.909 0.000 0.000 0.000 2.909 0.000 2.909 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Bahawalpur
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Bahawalpur , Hasilpur

261 58 Name of the Scheme Up gradation of Sports Grounds 0.000 8.029 2.000 6.029 0.000 0.000 0.000 6.029 0.000 6.029 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Bahawalnagar
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Bahawalnagar

262 59 Name of the Scheme Up gradation of Sports Grounds 0.000 3.832 1.000 2.832 0.000 0.000 0.000 2.832 0.000 2.832 0.000 0.000 0.000
in 24 Districts in Punjab - One at
Rahim Yar Khan
Approval Date 22-12-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Rahim Yar Khan

Sub-Total: Upgradation of Sports Grounds 0.000 183.024 56.400 126.624 0.000 0.000 0.000 126.624 0.000 126.624 0.000 0.000 0.000

Development of sports facilities around school clusters


263 60 Name of the Scheme Development of sports facilities 0.000 6.204 4.750 1.454 0.000 0.000 0.000 1.454 0.000 1.454 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Rawalpindi
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Rawalpindi , Kahota

109
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

264 61 Name of the Scheme Development of sports facilities 0.000 7.228 3.750 3.478 0.000 0.000 0.000 3.478 0.000 3.478 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Attock
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Attock

265 62 Name of the Scheme Development of sports facilities 0.000 7.929 4.750 3.179 0.000 0.000 0.000 3.179 0.000 3.179 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Jhelum
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Jhelum

266 63 Name of the Scheme Development of sports facilities 0.000 11.290 2.000 9.290 0.000 0.000 0.000 9.290 0.000 9.290 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Sargodha
Approval Date 18-02-2009
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Sargodha

267 64 Name of the Scheme Development of sports facilities 0.000 11.868 2.000 9.868 0.000 0.000 0.000 9.868 0.000 9.868 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Khushab
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Khushab , Johar Abad

110
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

268 65 Name of the Scheme Development of sports facilities 0.000 4.474 1.750 2.724 0.000 0.000 0.000 2.724 0.000 2.724 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Mianwali
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Mianwali

269 66 Name of the Scheme Development of sports facilities 0.000 11.972 1.750 10.222 0.000 0.000 0.000 10.222 0.000 10.222 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Bhakkar
Approval Date 18-02-2009
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Bhakkar

270 67 Name of the Scheme Development of sports facilities 0.000 7.137 1.750 5.387 0.000 0.000 0.000 5.387 0.000 5.387 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Jhang.
Approval Date 28-11-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Jhang , Ahmadpur Sial

271 68 Name of the Scheme Development of sports facilities 0.000 8.819 2.000 6.819 0.000 0.000 0.000 6.819 0.000 6.819 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Toba Tek Singh
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 175 players annually
District and Tehsil Toba Tek Singh

111
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

272 69 Name of the Scheme Development of sports facilities 0.000 11.491 4.355 7.136 0.000 0.000 0.000 7.136 0.000 7.136 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Hafizabad
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Hafizabad

273 70 Name of the Scheme Development of sports facilities 0.000 11.983 4.750 6.983 0.000 0.000 0.000 6.983 0.000 6.983 0.000 0.250 0.000
around school clusters in 24
Districts at Tehsil level - One at
Pindi Bhattian, Hafiz Abad
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Hafizabad , Pindibhattian

274 71 Name of the Scheme Development of sports facilities 0.000 14.449 6.750 7.699 0.000 0.000 0.000 7.699 0.000 7.699 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Gujrat
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Gujrat

275 72 Name of the Scheme Development of sports facilities 0.000 3.750 2.000 1.750 0.000 0.000 0.000 1.750 0.000 1.750 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Mandi Bahauddin
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Mandi Bahauddin

112
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

276 73 Name of the Scheme Development of sports facilities 0.000 11.639 2.000 9.639 0.000 0.000 0.000 9.639 0.000 9.639 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Pasroor, Sialkot
Approval Date 23-12-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Sialkot , Pasroor

277 74 Name of the Scheme Development of sports facilities 0.000 1.874 1.174 0.700 0.000 0.000 0.000 0.700 0.000 0.700 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Lahore
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Lahore

278 75 Name of the Scheme Development of sports facilities 0.000 7.278 1.000 6.278 0.000 0.000 0.000 6.278 0.000 6.278 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Kasur
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Kasur

279 76 Name of the Scheme Development of sports facilities 0.000 10.825 4.750 6.075 0.000 0.000 0.000 6.075 0.000 6.075 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Multan
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Multan

113
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

280 77 Name of the Scheme Development of sports facilities 0.000 8.826 2.000 6.826 0.000 0.000 0.000 6.826 0.000 6.826 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Dunya Pur, Lodhran
Approval Date 23-12-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Lodhran , Dunyapur

281 78 Name of the Scheme Development of sports facilities 0.000 6.621 1.000 5.621 0.000 0.000 0.000 5.621 0.000 5.621 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Vehari
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Vehari

282 79 Name of the Scheme Development of sports facilities 0.000 8.911 4.750 4.161 0.000 0.000 0.000 4.161 0.000 4.161 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
D.G Khan
Approval Date 13-10-2008
Major Components Civil Works
Major Targets Training of 350 players annually
District and Tehsil Dera Ghazi Khan

283 80 Name of the Scheme Development of sports facilities 0.000 6.683 1.750 4.933 0.000 0.000 0.000 4.933 0.000 4.933 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Rajanpur
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Rajanpur

114
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

284 81 Name of the Scheme Development of sports facilities 0.000 11.307 1.000 10.307 0.000 0.000 0.000 10.307 0.000 10.307 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Layyah.
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Layyah

285 82 Name of the Scheme Development of sports facilities 0.000 5.326 3.750 1.576 0.000 0.000 0.000 1.576 0.000 1.576 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Bahawalpur
Approval Date 9/8/2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Bahawalpur

286 83 Name of the Scheme Development of sports facilities 0.000 9.717 1.750 7.967 0.000 0.000 0.000 7.967 0.000 7.967 0.000 0.000 0.000
around school clusters in 24
Districts at Tehsil level - One at
Bahawalnagar
Approval Date 30-06-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Bahawalnagar

Sub-Total: Development of sports facilities around 0.000 207.601 67.279 140.072 0.000 0.000 0.000 140.072 0.000 140.072 0.000 0.250 0.000
school clusters

Construction of Prototype Gymnasiums at Tehsil Level


287 84 Name of the Scheme Construction of prototype 0.000 69.718 7.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 37.718 0.000 0.000
Gymnasium at Kallur Kot
Approval Date 24-11-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Bhakkar , Kallur Kot

115
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

288 85 Name of the Scheme Construction of Prototype 0.000 70.999 6.500 25.000 0.000 0.000 0.000 25.000 0.000 25.000 39.499 0.000 0.000
Gymnasium at Tehsil Level - One
at Darya Khan
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Bhakkar , Darya Khan

289 86 Name of the Scheme Construction of Prototype 0.000 70.939 6.500 20.000 0.000 0.000 0.000 20.000 0.000 20.000 40.939 3.500 0.000
Gymnasium at Tehsil Level - One
at Mankera
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Bhakkar , Mankera

290 87 Name of the Scheme Construction of Prototype 0.000 74.516 1.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 25.000 18.516 0.000
Gymnasium at Tehsil Level - One
at Chak Jhumra
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Faisalabad , Chak Jhumra

291 88 Name of the Scheme Construction of Prototype 0.000 75.219 6.500 25.000 0.000 0.000 0.000 25.000 0.000 25.000 33.719 10.000 0.000
Gymnasium at Tehsil Level one at
Tandlianwala
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Faisalabad , Tandlianwala

292 89 Name of the Scheme Construction of Prototype 0.000 76.096 5.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 46.096 0.000 0.000
Gymnasium one at Samundri
Approval Date 16-01-2009
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Faisalabad , Samundri

116
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

293 90 Name of the Scheme Construction of Prototype 0.000 70.139 14.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 16.139 5.000 0.000
Gymnasium at Tehsil Level - One
at Burewala
Approval Date 1/9/2008
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Vehari , Burewala

294 91 Name of the Scheme Construction of Prototype 0.000 67.875 6.500 30.000 0.000 0.000 0.000 30.000 0.000 30.000 21.375 10.000 0.000
Gymnasium at Tehsil Level - One
at Mailsi
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Vehari , Mailsi

295 92 Name of the Scheme Construction of Prototype 0.000 62.555 6.000 31.845 0.000 0.000 0.000 31.845 0.000 31.845 21.555 3.155 0.000
Gymnasium at Tehsil Level - One
at Jampur
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 300 players annually
District and Tehsil Rajanpur , Jampur

296 93 Name of the Scheme Construction of Prototype 0.000 63.992 2.000 22.000 0.000 0.000 0.000 22.000 0.000 22.000 33.992 6.000 0.000
Gymnasium at Tehsil Level - One
at Tamewali
Approval Date 27-09-2008
Major Components Civil Works
Major Targets Training of 200 players annually
District and Tehsil Bahawalpur , Khairpur Tamewali

297 94 Name of the Scheme Construction of Prototype 0.000 63.958 2.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 26.958 0.000 0.000
Gymnasium at Tehsil Level - One
at Sadiqabad
Approval Date 17-11-2008
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Rahim Yar Khan , Sadiqabad

117
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sub-Total: Construction of Prototype Gymnasiums 0.000 766.006 63.000 303.845 0.000 0.000 0.000 303.845 0.000 303.845 342.990 56.171 0.000
at Tehsil Level

Others
298 95 Name of the Scheme Construction of Sports Stadium at 0.000 14.000 5.000 9.000 0.000 0.000 0.000 9.000 0.000 9.000 0.000 0.000 0.000
Sohawa
Approval Date 2/1/2006
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Jhelum , Sohawa

299 96 Name of the Scheme Provision of missing facilities at 0.000 29.947 10.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 4.947 0.000 0.000
Sports Stadium, Bhakkar
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Bhakkar

300 97 Name of the Scheme Computerization of Sports 0.000 17.500 10.000 0.000 7.500 0.000 0.000 0.000 7.500 7.500 0.000 0.000 0.000
Department
Approval Date 9/8/2008
Major Components Establishment of Computer Lab
Major Targets Computerization of data
District and Tehsil Lahore

301 98 Name of the Scheme Capacity Building of Sports 0.000 60.681 42.446 0.000 10.000 0.000 0.000 0.000 10.000 10.000 8.235 0.000 0.000
Department.
Approval Date 21-03-2007
Major Components Capacity Building
Major Targets Capacity Building
District and Tehsil Lahore

302 99 Name of the Scheme Rehabilitation/Construction of 0.000 9.950 5.000 4.950 0.000 0.000 0.000 4.950 0.000 4.950 0.000 0.000 0.000
stadium at Muridkey City
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Sheikhupura , Muridkey

118
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sub-Total: Others 0.000 132.078 72.446 28.950 17.500 0.000 0.000 28.950 17.500 46.450 13.182 0.000 0.000
Total: ON-GOING SCHEMES 0.000 3,483.695 1,000.200 1,382.500 17.500 0.000 0.000 1,382.500 17.500 1,400.000 801.467 290.410 0.000

NEW SCHEMES
Regular
303 100 Name of the Scheme Development of Sports Facilities 0.000 10.000 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 0.000 0.000 0.000
at Government Boys Higher
Secondary School, Choa Khalsa
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Rawalpindi , Kallar Syedan

304 101 Name of the Scheme Laying of Astroturf at Hockey 0.000 60.000 0.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 40.000 0.000 0.000
Stadium, Gojra
Approval Date Un-Approved
Major Components Astroturf
Major Targets Training of 250 players annually
District and Tehsil Toba Tek Singh , Gojra

305 102 Name of the Scheme Construction of Sports Hall at 0.000 25.000 5.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 0.000 0.000 0.000
Nowshera Virkan
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Gujranwala , Nowshera Virkan

306 103 Name of the Scheme Up-gradation of existing structure 0.000 25.000 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 15.000 0.000 0.000
to convert into Players' Hostel at
Nishtar Park Sports Complex
under the stairs of National
Hockey Stadium, Lahore.
Approval Date Un-Approved
Major Components Civil Works
Major Targets To facilitate the players during the
matches
District and Tehsil Lahore

119
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

307 104 Name of the Scheme Provision of Gym Equipments in 0.000 80.000 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 50.000 0.000 0.000
35 districts of Punjab
Approval Date Un-Approved
Major Components Gym Equipments
Major Targets Training of 250 players annually
District and Tehsil 35 districts of Punjab

308 105 Name of the Scheme Up gradation of Sports Grounds 0.000 100.000 0.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 75.000 0.000 0.000
in 12 District in Punjab
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Sargodha, Gujranwala, Gujrat,
Mianwali, Muzaffargarh, Narowal,
Okara, Rawalpindi, Toba Tek Singh,
Sheikhupura, Sialkot, Sahiwal

309 106 Name of the Scheme Development of sports facilities 0.000 120.000 0.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 95.000 0.000 0.000
around schools clusters in 12
Districts at Tehsil level in Punjab
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Chakwal, Sargodha, Faisalabad,
Gujranwala, Rahim Yar Khan,
Nankana, Narowal, Okara, Pakpattan,
Rahim Yar Khan, Khushab , Tala Gang,
Shahpur, Jaranwala, Wazirabad, R.Y.
Khan, Shahkot, Shakargarh, Depalpur,
Arifwala, Khanpur, Quidabad

310 107 Name of the Scheme Construction of Prototype 0.000 300.000 0.000 45.000 0.000 0.000 0.000 45.000 0.000 45.000 255.000 0.000 0.000
Gymnasium at Tehsil Level in 7
Tehsils of Punjab
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 150 players annually
District and Tehsil Jhang, Bahawalnagar, Bahawalpur,
Faisalabad, Khanewal, Hafizabad,
Rahim Yar Khan , Shorkot, Jaranwala,
Haroonabad, Hasilpur, Mian Channu,
Pindibhattian, R.Y. Khan

120
SPORTS (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

311 108 Name of the Scheme Missing facilities around 0.000 25.000 0.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 10.000 0.000 0.000
constructed Gymnasium in 4
Tehsils
Approval Date Un-Approved
Major Components Civil Works
Major Targets Training of 250 players annually
District and Tehsil Rahim Yar Khan ,Nankana , Bhakkar ,
Kasur , Khanpur, Nankana Sahib,
Bhakkar, Kasur

Sub-Total: Regular 0.000 745.000 5.000 150.000 50.000 0.000 0.000 150.000 50.000 200.000 540.000 0.000 0.000
Total: NEW SCHEMES 0.000 745.000 5.000 150.000 50.000 0.000 0.000 150.000 50.000 200.000 540.000 0.000 0.000

Grand Total 0.000 4,228.695 1,005.200 1,532.500 67.500 0.000 0.000 1,532.500 67.500 1,600.000 1,341.467 290.410 0.000

121
HEALTH

122
HEALTH

VISION

Healthy population with a sound health care system practicing healthy life style, in partnership with private sector including civil society, which
is effective, efficient and responsive to the needs of low socio-economic groups especially women in the reproduction age.

OBJECTIVES

• Measurable impact on Millennium Development Goals (MDGs) through major interventions in the health services delivery with significant
reduction in incidence of diseases
• Implementation of standardized service delivery package through effective implementation of Minimum Service Delivery Standards
(MSDS)
• Bringing in that hitherto lacking element of regional equity in the developmental portfolio
• Focus on Preventive Health Care through inter-sectoral coordination and regular health education/promotion
• Improved primary, secondary and tertiary health care through inclusion of needs-based and result-oriented schemes
• Complement the current side pro-poor investments effectively and strategically
• Alignment with the Health Policy Framework

Trend of Allocation
(Million Rs.)
Year Original Allocation Revised Allocation
2005-06 3,290 3,499
2006-07 4,300 4,369
2007-08 6,500 6,901
2008-09 9,000 9,278
2009-10 12,525

123
STRATEGIC INTERVENTIONS

MICS Punjab 2007-08 highlights Infant Mortality Rate as 77/1000 births and Under-five Mortality Rate as 111/1000 births whereas only 43% of the
deliveries are attended by the Skilled Birth Attendants. This situation along with a heavy toll of communicable / non-communicable diseases
demands change in interventions with a focus on the pro-poor initiatives. 7 Criteria for selection of schemes have been developed and each of
them addresses and reinforces the over-arching goal of pro-poor service delivery. The 7 criteria are explained hereunder:

Greater Focus on Preventive Health Care & Attainment of the MDGs:

Punjab has a unique situation of a Double Burden of Disease, wherein there is parity between Communicable and Non-Communicable
Diseases. Yet, the preventable diseases still take heavy tolls and diseases which are believed to have been rolled back / re-emerged.
Obviously pro-poor in essence, the two criteria have been clubbed together for better targeting, synergizing and streamlining efforts. The
following interventions are going to contribute towards this end:

y Punjab Millennium Development Goals Programme (PMDGP)


y Punjab Safe Motherhood Initiative Project
y National Blood Transfusion Service Programme
y HIV/AIDS Programme
y TB Control Programme
y Expanded Programme of Immunization
y Prevention & Control of Hepatitis Programme
y Dengue Control Programme
y Punjab Thalassemia Prevention Programme
y Malaria Control Programme
y National Maternal and New Born Child Health Programme (Federal)

Focus on Rural Health Centres (RHCs) and Renewed Focus on Secondary Health Care

y Policy is to consolidate the existing health facilities instead of creating new infrastructure. No new Basic Health Unit (BHU) will be
established. Focus, now, would be on strengthening Primary Health Care facilities (RHCs) based on yardsticks.
y Secondary Health Care level has re-emerged as critical for effective and efficient service delivery. It also has the potential of

124
meaningful pro-poor interventions. The emphasis is on upgradation of THQ & DHQ Hospitals as well as establishment of new ones.
In the case of THQ Hospitals, priority would be given to those THQ Hospitals which are farthest from the DHQ Hospital. As for the
DHQ Hospitals, the upgradation would be prioritized on needs basis and geographical as well as equity considerations would be kept
paramount.
y Rs. 2955 million has been allocated for such facilities, which is 23.5% of total allocation for health sector

NEED BASED & RESULT ORIENTED ALLOCATION FOR TERTIARY HEALTH CARE
y Being autonomous, the tertiary health care level is witnessing a great deal of dynamism and several innovations which need
substantial funding and support. Therefore, the tertiary health care allocations remain high but they have been made more need-
based and targeted.
y The high level of allocation for Tertiary Health Care is also because of the intended establishment of Centres of Excellence which
obviously are cost-intensive.
y Rs. 3,981 million have been allocated, which is 33% of total funds for health sector.

IMPROVED DIAGNOSTIC FACILITIES

The area of diagnostics needs to be strengthened appreciably to keep pace with the ever-changing demands of time and to make health and
medical analyses more scientific. There a few schemes in this ADP which would help in refurbishing the diagnostic facilities and also help in
ascertaining the quality and purity of food and beverages. The significant ones are given below:

y Establishment of Drug Testing Labs at Faisalabad and Rawalpindi


y Strengthening of Drug Testing Lab at Multan
y Establishment of Food Testing Labs at Rawalpindi and Faisalabad
y Establishment of Mobile Food Testing Lab
y Upgradation of Bacteriologist Lab at Institute of Public Health, Lahore
y PCR Facilities at Tertiary level

125
NEW STRATEGIC THRUST

Delivering services in the traditional manner has shown to be riddled with typical public sector inefficiencies. With this in perspective, priorities
have been re-orientated leading to a new strategic thrust. This would enable to grapple with service delivery issues with a fresh approach and
in a focused manner. The following are the salient initiatives in this respect:

y Mobile Health Unit system is being introduced/piloted at Tehsil level to make up for the deficiencies of static coverage. This
initiative shall be piloted in three Tehsils and then subsequently shall be expanded in phases. The Mobile Health Unit shall comprise
collapsible and non-collapsible diagnostic, invasive and non-invasive electro-medical equipment. It would also contain health
education material that would be disseminated strategically. Stationed at the THQ Hospital, its destination would be RHC where, or
close to where, it would administer services on well-advertised date and time. An allocation of Rs. 300 million is being proposed to
take this off to a good start.
y Model THQ Hospital as future Lynch-pin of Service Delivery. Absenteeism, particularly in respect of female doctors in RHCs and
BHUs is the principal factor contributing to unsatisfactory service delivery. With the inescapable obligation to attain the MDGs under
the PMDGP, ensuring the required improvement in service delivery mandates out of the box approach over and above the traditional
arrangements. Currently, about 70% of total enrolment in Medical Colleges comprises female students. Sustaining outreach in the
near future by way of ensuring their presence in Primary Health Care facilities is going to be a daunting challenge. To address this,
there is a policy to develop prototype in which THQ Hopsital would be the base from where Primary Health Care facilities shall be
provided medical coverage. The concept entails providing accommodation facilities to all Medical Officers (MOs) and Women Medical
Officers (WMOs) posted in RHCs and BHUs who would be provided joint transportation facilities to travel to their respective stations
of duty in the morning and return to the security of their enclave after duty hours. Compact apartment type, functionally efficient
affordable accommodation is being recommended to house different categories of doctors. The concept also involves rotation of
doctors between the upgraded THQ Hopsital, where Secondary level health care facilities are being envisioned and Primary Health
Care facilities to provide them incentive of simultaneously updating the professional skills while working in the rural areas. The
Minimum Service Delivery Standards (MSDS) implementation would also benefit from this effort. Rs. 225 million is allocated for this
purpose.

126
y Emergency Services Block at 10 DHQ Hospitals; this would again be pro-poor as well as a result-oriented intervention and give a
real boost to service delivery. The service delivery has to be expanded in a manner so that people living in different districts and rural
areas are provided quality health care services at the local level. With this object in mind, a plan has been chalked out to undertake
construction of dedicated Emergency Blocks in a phased manner which would be equipped with all necessary diagnostic and trauma
facilities. An initial allocation of Rs. 500 million would take this initiative forward rapidly.

ESTABLISHMENT OF CENTRES OF EXCELLENCE

Centres of Excellence augment specialized service delivery at the high-end level and could become avenues of revenue generation in times to
come as well. The possibility of medical tourism also becomes more likely because of their establishment. The approved Health Policy
Framework also recognized their significance. Their establishment is now believed to be appropriate and result-oriented. The following can be
enlisted in this regard:

y Rawalpindi Institute of Cardiology


y Institute of Urology & Transplantation at Rawalpindi
y Liver Disease Management Centre at Lahore
y Kidney Centre at Multan
y Cancer Hospital at Lahore
y Institute of Neurosciences at Lahore
y Faisalabad Institute of Cardiology
y Multan Institute of Cardiology
y Fatima Jinnah Institute of Dental Sciences, Lahore
y Burn Units in 4 Tertiary level Hospitals

The Centres of Excellence have been allocated Rs. 1,300 million i.e. 10% of the total.

127
ENHANCED FOCUS ON MEDICAL EDUCATION

The inequity in Doctor to Population Ratio has impeded efficient service delivery as well. The current Doctor-Population Ratio stands at 1:2187
instead of the WHO recommended 1:1000. With a view to rectifying this mis-match, the Punjab Government intends to establish new Medical
Colleges at Gujranwala, Sialkot, Sahiwal, Multan and D.G. Khan while MBBS class for 1st year has commenced in April, 2009 in the newly-
established Medical College, Gujrat. Nursing Education has also been prioritized through the successful partnership with the Fatima Memorial
Hospital. This is a manifestation of priority to this critical area.

MDGs & MTDF TARGETS

Targets 2009-10 2010-11 2011-12 Year of reaching MDGs MDGs 2015

Performance Indicators

Children fully immunized 12-23 months (%) 84 88 92 2010-11 >90

Delivery by Trained Birth Attendants (%) 52 57 62 2014-15 >90

Infant Mortality Rate per 1000 live births 73 70 67 2014-15 40

Maternal Mortality Ratio per 100,000 live births 232 225 218 2018-19 140

128
MTDF 2009-12
Health: Summary
Development Programme 2009-10
(Million Rs)
Ongoing Program New Program Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total

Preventive and Primary Health Care 200.000 790.248 990.248 100.000 1,090.248 0.000 790.000 790.000 0.000 790.000 200.000 1,580.248 1,780.248 100.000 1,880.248
Acclerated Programme for Health 690.735 643.721 0.000 1,334.456 1,303.566 1,302.400 0.000 1,994.301 1,946.121 0.000
1,334.456 2,605.966 2,605.966 3,940.422 3,940.422
Care
Tertiary Care Hospitals 1,349.060 1,418.280 2,767.340 0.000 2,767.340 675.497 538.185 1,213.682 0.000 1,213.682 2,024.557 1,956.465 3,981.022 0.000 3,981.022
Medical Education 566.385 1,111.437 1,677.822 0.000 1,677.822 203.520 50.180 253.700 0.000 253.700 769.905 1,161.617 1,931.522 0.000 1,931.522
Research & Development 49.855 105.279 155.134 0.000 155.134 70.000 66.652 136.652 0.000 136.652 119.855 171.931 291.786 0.000 291.786
Total 2,856.035 4,068.965 6,925.000 100.000 7,025.000 2,252.583 2,747.417 5,000.000 0.000 5,000.000 5,108.618 6,816.382 11,925.000 100.000 12,025.000
No. of Schemes 216 82 298
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total

Preventive and Primary Health Care 0.000 1,600.000 1,600.000 500.000 2,100.000 360.000 540.000 900.000 0.000 900.000 360.000 2,140.000 2,500.000 500.000 3,000.000

Acclerated Programme for Health


1,176.000 1,764.000 2,940.000 0.000 2,940.000 504.000 756.000 1,260.000 0.000 1,260.000 1,680.000 2,520.000 4,200.000 0.000 4,200.000
Care
Tertiary Care Hospitals 1,386.000 2,079.000 3,465.000 0.000 3,465.000 594.000 891.000 1,485.000 0.000 1,485.000 1,980.000 2,970.000 4,950.000 0.000 4,950.000
Medical Education 714.000 1,071.000 1,785.000 0.000 1,785.000 306.000 459.000 765.000 0.000 765.000 1,020.000 1,530.000 2,550.000 0.000 2,550.000
Research & Development 84.000 126.000 210.000 0.000 210.000 36.000 54.000 90.000 0.000 90.000 120.000 180.000 300.000 0.000 300.000
Total 3,360.000 6,640.000 10,000.000 500.000 10,500.000 1,800.000 2,700.000 4,500.000 0.000 4,500.000 5,160.000 9,340.000 14,500.000 500.000 15,000.000
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total

Preventive and Primary Health Care 0.000 2,100.000 2,100.000 500.000 2,600.000 320.000 480.000 800.000 0.000 800.000 320.000 2,580.000 2,900.000 500.000 3,400.000
Acclerated Programme for Health 1,200.000 1,800.000 0.000 3,000.000 400.000 600.000 0.000 1,600.000 2,400.000 0.000
3,000.000 1,000.000 1,000.000 4,000.000 4,000.000
Care
Tertiary Care Hospitals 1,800.000 2,700.000 4,500.000 0.000 4,500.000 600.000 900.000 1,500.000 0.000 1,500.000 2,400.000 3,600.000 6,000.000 0.000 6,000.000
Medical Education 1,260.000 1,440.000 2,700.000 0.000 2,700.000 320.000 480.000 800.000 0.000 800.000 1,580.000 1,920.000 3,500.000 0.000 3,500.000
Research & Development 120.000 180.000 300.000 0.000 300.000 40.000 60.000 100.000 0.000 100.000 160.000 240.000 400.000 0.000 400.000
Total 4,380.000 8,220.000 12,600.000 500.000 13,100.000 1,680.000 2,520.000 4,200.000 0.000 4,200.000 6,060.000 10,740.000 16,800.000 500.000 17,300.000
HEALTH MTDF 2009-12 GRAND TOTAL: 44,325.000

129
HEALTH: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Preventive & Primary Health 5 200.000 790.248 0.000 100.000 200.000 890.248 1,090.248 2,008.375 1,275.643
Care
Accelerated Programme for 136 690.735 643.721 0.000 0.000 690.735 643.721 1,334.456 1,962.647 1,206.103
Health Care
Tertiary Care Hospitals 52 1,349.060 1,418.280 0.000 0.000 1,349.060 1,418.280 2,767.340 3,318.921 3,847.093
Medical Education 18 566.385 1,111.437 0.000 0.000 566.385 1,111.437 1,677.822 2,352.867 2,507.045
Research & Development 5 49.855 105.279 0.000 0.000 49.855 105.279 155.134 200.631 53.792
Total: ON-GOING SCHEMES 216 2,856.035 4,068.965 0.000 100.000 2,856.035 4,168.965 7,025.000 9,843.441 8,889.676
NEW SCHEMES
Preventive & Primary Health 9 0.000 790.000 0.000 0.000 0.000 790.000 790.000 1,015.000 560.183
Care
Accelerated Programme for 25 1,303.566 1,302.400 0.000 0.000 1,303.566 1,302.400 2,605.966 3,158.832 608.141
Health Care
Tertiary Care Hospitals 31 675.497 538.185 0.000 0.000 675.497 538.185 1,213.682 4,535.685 1,559.410
Medical Education 10 203.520 50.180 0.000 0.000 203.520 50.180 253.700 2,112.981 2,000.000
Research & Development 7 70.000 66.652 0.000 0.000 70.000 66.652 136.652 15.000 0.000
Total: NEW SCHEMES 82 2,252.583 2,747.417 0.000 0.000 2,252.583 2,747.417 5,000.000 10,837.498 4,727.734

Grand Total 298 5,108.618 6,816.382 0.000 100.000 5,108.618 6,916.382 12,025.000 20,680.939 13,617.410

130
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Preventive & Primary Health Care
312 1 Name of the Scheme Enhanced HIV / AIDS Control 2,304.881 2,881.101 291.608 0.000 80.000 0.000 100.000 0.000 180.000 180.000 598.624 575.643 1,235.226
Programme Punjab
Approval Date Approved 22-11-2008
Major Components Improved preventive care and practices
to reduce incidence of HIV / AIDS.
Capacity building & programme
management. Service delivery packages
in major cities for awareness and
treatment.
Major Targets Service delivery to 14000 Injecting Drug
Users, 12000 Female Sex Workers and
8000 Male Sex Workers. Uninterrupted
supply of kits to 120 Blood Banks.
Behavior Change Communication
through media.
District and Tehsil Punjab

313 2 Name of the Scheme Hepatitis Control Program in 0.000 191.230 140.000 0.000 51.230 0.000 0.000 0.000 51.230 51.230 0.000 0.000 0.000
Punjab
Approval Date Approved 12-08-2008
Major Components Prevention and Treatment of Hepatitis,
awareness and training
Major Targets Treatment of 3500 patients , awareness,
staff training and workshops.
District and Tehsil Punjab

314 3 Name of the Scheme Provision of Missing Facilities in 0.000 6,000.000 4,754.000 200.000 300.000 0.000 0.000 200.000 300.000 500.000 746.000 0.000 0.000
RHCs / BHUs in the Punjab
Approval Date Approved
Major Components Provision of missing facilities in RHCs /
BHUs like repair of main building,
compound wall, mortuary, garages B/wall
etc.Provision of clinical and surgical
equipment, ambulances etc.
Major Targets Work for provision of Missing Facilities on
918 BHUs & 275 RHCs already taken up.
Work on remaining 1338 BHUs & 18
RHCs to be completed.
District and Tehsil Punjab

131
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

315 4 Name of the Scheme Establishment of Health Sector 0.000 183.327 60.558 0.000 59.018 0.000 0.000 0.000 59.018 59.018 63.751 0.000 0.000
Reforms Unit, Punjab
Approval Date Approved 26-06-2006 Revised 29-11-
2007
Major Components Health Sector Reforms Unit to supervise
the Programme.
Major Targets Operational expenditures and staff salary
for the Health Sector Reforms Unit.
District and Tehsil Punjab

316 5 Name of the Scheme Punjab Integrated Primary Health 0.000 3,377.025 800.000 0.000 300.000 0.000 0.000 0.000 300.000 300.000 600.000 700.000 977.025
Care Model Programme.
Approval Date Approved 28-11-2007
Major Components Strengthening of Field Health
Interventions, Staff Training, Program
Monitoring, Equipment & Supplies,
Information Dissemination, Research &
Development and School Health.
Integrated PHC Model (including School
Health and Nutrition) being implemented
in 919 BHUs in collaboration with
National Commission for Human
Development.
Major Targets Integrated Primary Health Care Model in
919 BHUs. Redefining catchment areas
of BHUs. De-worming medicines for
students in Primary Schools. 149,975
spectacles for students. Focus on Mother
& Child Health Care
District and Tehsil Attock, Jhelum, Gujrat,
Sheikhupura,Jhang, Sargodha, Sialkot,
Khanawal, Muzaffargarh, Bahawalpur,
Mandi Bahauddin, Gujranwala

Sub-Total: Preventive & Primary Health Care 2,304.881 12,632.683 6,046.166 200.000 790.248 0.000 100.000 200.000 890.248 1,090.248 2,008.375 1,275.643 2,212.251

Accelerated Programme for Health Care


317 6 Name of the Scheme Upgradation of RHC Kotli Sattian 0.000 110.224 10.000 50.000 0.000 0.000 0.000 50.000 0.000 50.000 50.224 0.000 0.000
into 60 bedded THQ Hospital
District Rawalpindi.
Approval Date Approved 05-06-2007/13-03-2008
Major Components Construction of building. Purchase of
equipment.
Major Targets Civil works to be completed.
District and Tehsil Rawalpindi , Kotli Sattian

132
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

318 7 Name of the Scheme Upgradation of RHC Kallar 0.000 94.474 20.000 40.000 0.000 0.000 0.000 40.000 0.000 40.000 34.474 0.000 0.000
Syedan into THQ Hospital District
Rawalpindi.
Approval Date Approved 26.09.08
Major Components Building and Equipment
Major Targets Civil works to be taken up.
District and Tehsil Rawalpindi , Kallar Syedan

319 8 Name of the Scheme Upgradation of THQ Hospital, 0.000 75.360 13.544 30.899 0.000 0.000 0.000 30.899 0.000 30.899 30.917 0.000 0.000
Hazro, District Attock.
Approval Date Approved 29.11.07
Major Components Building and Equipment
Major Targets Renovation of existing main building in
progress. Remaining civil works to be
executed.
District and Tehsil Attock , Hazro

320 9 Name of the Scheme Establishment of 50 Bedded 0.000 99.386 81.493 8.493 9.400 0.000 0.000 8.493 9.400 17.893 0.000 0.000 0.000
Hospital Talagang District Chakwal
Approval Date Approved 24.01.06
Major Components Triple storey Hospital and purchase of
equipment.
Major Targets Completion of scheme.
District and Tehsil Chakwal , Talagang

321 10 Name of the Scheme Construction of 20 bedded 0.000 42.225 20.977 10.118 11.130 0.000 0.000 10.118 11.130 21.248 0.000 0.000 0.000
Hospital at Khewra Tehsil P.D.
Khan District Jhelum.
Approval Date Approved 30.01.06
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Jhelum , P.D. Khan

322 11 Name of the Scheme Establishment of BHU at 0.000 20.000 5.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 0.000 0.000 0.000
Baragwah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Jhelum

133
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

323 12 Name of the Scheme Upgradation of BHU at Chak 0.000 19.980 16.990 0.000 2.990 0.000 0.000 0.000 2.990 2.990 0.000 0.000 0.000
No.75/SB to RHC, district
Sargodha
Approval Date Approved 14.07.05
Major Components Building & Equipment
Major Targets Completion of scheme
District and Tehsil Sargodha , Shah pur

324 13 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary without Residential
accommodation at Luk More UC
No. 109 Mari, Tehsil & District
Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha

325 14 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary at Chak No. 17/NB UC
No. 19 Chak No. 18/NB Tehsil
Bhalwal, district Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Bhalwal

326 15 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary Sardar Alam Colony
Dhakhali Ratto Kala UC No. 15
Ratto Kala, Tehsil Bhalwal &
district Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Bhalwal

134
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

327 16 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary at Gulshanpura
Havali Dhali uppi UC No.41 Chak
19/SB Tehsil Bhalwal District
Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Bhalwal

328 17 Name of the Scheme Construction of Government 0.000 7.458 2.960 0.000 4.498 0.000 0.000 0.000 4.498 4.498 0.000 0.000 0.000
Rural Dispensary at Laksian
including 2 Nos. quarters 990 Sft
each
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha

329 18 Name of the Scheme Improvement of Mullah Bakhsh 0.000 10.000 2.600 0.000 7.400 0.000 0.000 0.000 7.400 7.400 0.000 0.000 0.000
Hospital Sargodha by addition of
10 beds wards and 6 Nos.
Consultant rooms in OPD Block.
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha

330 19 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary at Tirkhanwala, UC
No. 81 Jhanianshah Tehsil
Bhalwal, District Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Bhalwal

135
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

331 20 Name of the Scheme Construction of Government 0.000 4.737 0.900 0.000 3.837 0.000 0.000 0.000 3.837 3.837 0.000 0.000 0.000
Rural Dispensary at Noshera
Khokran, district Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha

332 21 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary at Lehhar UC No. 64
Kandan, Tehsil Shahpur, District
Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Shahpur

333 22 Name of the Scheme Establishment of Govt. Rural 0.000 4.737 3.837 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Dispensary at Chakrala, UC No. 67
Sabowal, Tehsil Shahpur, District
Sargodha
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Shahpur

334 23 Name of the Scheme Upgradation of RHC Sillanwali, 0.000 22.915 9.872 13.043 0.000 0.000 0.000 13.043 0.000 13.043 0.000 0.000 0.000
District Sargodha.
Approval Date Approved 26.11.07, 08.03.08
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Sargodha , Sillanwali

335 24 Name of the Scheme Establishment of THQ Hospital, 0.000 184.584 5.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 40.000 70.000 59.584
Quaidabad, District Khushab.
Approval Date Approved 18.10.08
Major Components Building and Equipment
Major Targets Completion of civil works and
procurement of equipment.
District and Tehsil Khushab , Quaidabad

136
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

336 25 Name of the Scheme Establishment of BHU at Chak 0.000 13.112 11.826 1.286 0.000 0.000 0.000 1.286 0.000 1.286 0.000 0.000 0.000
No.59/MB, District Khushab
Approval Date Approved 28.09.05 11.04.07
Major Components Building
Major Targets Completion of scheme
District and Tehsil Khushab

337 26 Name of the Scheme Establishment of BHU at Jaura 0.000 12.410 8.640 3.770 0.000 0.000 0.000 3.770 0.000 3.770 0.000 0.000 0.000
kalan District Khushab
Approval Date Approved
Major Components Building
Major Targets Completion of scheme.
District and Tehsil Khushab

338 27 Name of the Scheme Upgradation of THQ Hospital 0.000 20.000 19.588 0.412 0.000 0.000 0.000 0.412 0.000 0.412 0.000 0.000 0.000
IsaKhel District Mianwali.
Approval Date Approved
Major Components Building
Major Targets Completion of scheme.
District and Tehsil Mianwali. , IsaKhel

339 28 Name of the Scheme Construction of 40 bedded THQ 0.000 68.909 61.392 4.043 3.474 0.000 0.000 4.043 3.474 7.517 0.000 0.000 0.000
Hospital Piplan District Mianwali.
Approval Date Approved 18.10.08
Major Components Construction of building. Purchase of
equipment.
Major Targets Completion of scheme.
District and Tehsil Mianwali , Piplan

340 29 Name of the Scheme Construction of BHU Bhrami 0.000 16.013 5.000 0.000 11.013 0.000 0.000 0.000 11.013 11.013 0.000 0.000 0.000
Nawab, district Bhakkar
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bhakkar

137
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

341 30 Name of the Scheme Construction of BHU Chak No. 0.000 14.812 5.000 0.000 9.812 0.000 0.000 0.000 9.812 9.812 0.000 0.000 0.000
47/TDA, district Bhakkar
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bhakkar

342 31 Name of the Scheme Rehabilitation of THQ Hospital, 0.000 49.897 5.000 0.000 44.897 0.000 0.000 0.000 44.897 44.897 0.000 0.000 0.000
Sammundari, district Faisalabad
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Faisalabad , Sammundari

343 32 Name of the Scheme Establishment of RHC 0.000 38.816 33.816 0.661 4.339 0.000 0.000 0.661 4.339 5.000 0.000 0.000 0.000
Waryamwala (Chak No. 492)
Tehsil Shorkot District, Jhang.
Approval Date Approved 17.01.06 12.01.07
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Jhang , Shorkot

344 33 Name of the Scheme Rehabilitation & Renovation of 0.000 1.270 0.500 0.000 0.770 0.000 0.000 0.000 0.770 0.770 0.000 0.000 0.000
main building & residences BHU
Chak No. 126/JB Tehsil Chiniot
Approval Date Approved
Major Components Rehabilitation & Renovation of building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

345 34 Name of the Scheme Rehabilitation & Renovation of 0.000 1.290 0.300 0.000 0.990 0.000 0.000 0.000 0.990 0.990 0.000 0.000 0.000
main building & residences RHC
Chak No. 14/JB, Tehsil Chiniot,
district Jhang
Approval Date Approved
Major Components Rehabilitation & Renovation of building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

138
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

346 35 Name of the Scheme Rehabilitation & Renovation of 0.000 1.297 0.500 0.000 0.797 0.000 0.000 0.000 0.797 0.797 0.000 0.000 0.000
main building & residences BHU
Hersa Sheikh Tehsil Chiniot
Approval Date Approved
Major Components Rehabilitation & Renovation of building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

347 36 Name of the Scheme Construction & Repair of 0.000 3.300 0.300 0.000 3.000 0.000 0.000 0.000 3.000 3.000 0.000 0.000 0.000
Boundary Wall and Building of
THQ Hospital Chiniot, district
Jhang
Approval Date Approved
Major Components Repair of building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

348 37 Name of the Scheme Rehabilitation & Renovation of 0.000 2.237 0.650 0.000 1.587 0.000 0.000 0.000 1.587 1.587 0.000 0.000 0.000
main building of BHU Chak No.
143/JB Tehsil Chiniot, district
Jhang
Approval Date Approved
Major Components Rehabilitation & Renovation of building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

349 38 Name of the Scheme Repair work of main building with 0.000 2.500 1.500 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
boundary wall and residences of
BHU Bheroo, District Jhang
Approval Date Approved
Major Components M&R of Building
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

139
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

350 39 Name of the Scheme Repair work of main building and 0.000 2.480 1.490 0.000 0.990 0.000 0.000 0.000 0.990 0.990 0.000 0.000 0.000
residences of BHU Salyana,
District Jhang
Approval Date Approved
Major Components M&R of Building
Major Targets M&R of Building and Equipment
District and Tehsil Jhang , Chiniot

351 40 Name of the Scheme Repair work of main building with 0.000 2.730 1.490 0.000 1.240 0.000 0.000 0.000 1.240 1.240 0.000 0.000 0.000
boundary wall and residences of
BHU Ali Pur, District Jhang
Approval Date Approved
Major Components M&R of Building
Major Targets M&R of Building and Equipment
District and Tehsil Jhang , Chiniot

352 41 Name of the Scheme Repair work of main building of 0.000 2.730 1.490 0.000 1.240 0.000 0.000 0.000 1.240 1.240 0.000 0.000 0.000
BHU Hassan Khan, District Jhang
Approval Date Approved
Major Components M&R of Building
Major Targets M&R of Building
District and Tehsil Jhang , Chiniot

353 42 Name of the Scheme Construction of Mortuary at RHC 0.000 1.580 0.951 0.000 0.629 0.000 0.000 0.000 0.629 0.629 0.000 0.000 0.000
Shah Juana, district Jhang
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Jhang , Chiniot

354 43 Name of the Scheme Construction of RHC at 0.000 21.914 13.591 3.388 4.935 0.000 0.000 3.388 4.935 8.323 0.000 0.000 0.000
Sandahiliwali Tehsil Kamalia
District T.T. Singh.
Approval Date Approved
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Kamalia

140
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

355 44 Name of the Scheme Construction of BHU at Chak No. 0.000 13.747 9.847 0.000 3.900 0.000 0.000 0.000 3.900 3.900 0.000 0.000 0.000
322/JB Toba Tak Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , T.T. Singh

356 45 Name of the Scheme Construction of BHU at Chak No. 0.000 12.473 9.418 0.000 3.055 0.000 0.000 0.000 3.055 3.055 0.000 0.000 0.000
269/GB Adda Kot Kathran, Toba
Tak Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , T.T. Singh

357 46 Name of the Scheme Construction of Eye Out Door and 0.000 12.624 9.662 0.000 2.962 0.000 0.000 0.000 2.962 2.962 0.000 0.000 0.000
Operation Theatre at THQ Hospital
Kamalia, District T.T.Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Kamalia

358 47 Name of the Scheme Construction of BHU at Chak No. 0.000 13.683 10.023 0.000 3.660 0.000 0.000 0.000 3.660 3.660 0.000 0.000 0.000
668/9/GB Kamalia, District Toba
Tak Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Kamalia

359 48 Name of the Scheme Up gradation of MCH Centre to 0.000 14.063 10.213 0.000 3.850 0.000 0.000 0.000 3.850 3.850 0.000 0.000 0.000
BHU at Chak No. 305/GB, District
T.T.Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Kamalia

141
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

360 49 Name of the Scheme Construction of RHC Mongi 0.000 69.765 9.715 0.000 60.050 0.000 0.000 0.000 60.050 60.050 0.000 0.000 0.000
Bunglow, Tehsil Gojra
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Gojra

361 50 Name of the Scheme Establishment of City Hospital at 0.000 7.500 6.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Kamalia, District T.T.Singh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Toba Tek Singh , Kamalia

362 51 Name of the Scheme Upgradation of Civil Hospital, 0.000 174.689 5.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 85.000 69.689 0.000
Lalamusa into 40-Bedded Tehsil
Level Hospital, District Gujrat.
Approval Date Approved 23.12.08
Major Components Building & Equipment
Major Targets Civil works to be taken up.
District and Tehsil Gujrat , Lalamusa

363 52 Name of the Scheme Establishment Civil Hospital at 0.000 38.000 20.000 5.000 13.000 0.000 0.000 5.000 13.000 18.000 0.000 0.000 0.000
Kotla Arab Ali Khan District Gujrat
Approval Date Approved 23.12.08
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Gujrat , Lalamusa

364 53 Name of the Scheme Construction of Mother & Child 0.000 5.000 0.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
Health Care Centre at Sukh
Chana, District Gujrat
Approval Date Approved 29.5.09
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Gujrat

142
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

365 54 Name of the Scheme Upgradation of BHU Bosal to RHC 0.000 29.287 26.690 0.000 2.597 0.000 0.000 0.000 2.597 2.597 0.000 0.000 0.000
District M.B. Din.
Approval Date Approved 26.06.06
Major Components Building and Equipment.
Major Targets Completion of scheme.
District and Tehsil Mandi Bahauddin , Malikwal

366 55 Name of the Scheme Reconstruction of 80 Bedded out 0.000 130.492 96.008 22.825 11.659 0.000 0.000 22.825 11.659 34.484 0.000 0.000 0.000
of 179 Bedded Civil Hospital,
Daska, District Sialkot.
Approval Date Approved 19.01.05 21.02.06
Major Components Main building, residences and
procurement of equipment.
Major Targets Completion of scheme.
District and Tehsil Sialkot , Daska

367 56 Name of the Scheme Upgradation of THQ Hospital 0.000 80.123 39.267 27.506 13.350 0.000 0.000 27.506 13.350 40.856 0.000 0.000 0.000
Pasrur, District Sialkot.
Approval Date Approved 22.04.06 27.11.07
Major Components Main building, residences and
procurement of equipment.
Major Targets Completion of scheme.
District and Tehsil Sialkot , Pasrur

368 57 Name of the Scheme Construction of DHQ Hospital, 0.000 449.750 214.809 52.636 0.000 0.000 0.000 52.636 0.000 52.636 182.305 0.000 0.000
Narowal
Approval Date Approved 12.06.04
02.01.0613.12.06
Major Components Main building, residences, hostel and
equipment.
Major Targets Work on 2-hostels and main building near
completion. Civil works to be completed
in all respects.
District and Tehsil Narowal

143
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

369 58 Name of the Scheme Upgradation of THQ Hospital 0.000 53.905 42.577 2.328 9.000 0.000 0.000 2.328 9.000 11.328 0.000 0.000 0.000
Shakargarh, District Narowal.
Approval Date Approved 08.11.04
Major Components 2-storey building and provision of
equipment.
Major Targets Completion of scheme.
District and Tehsil Narowal , Shakargarh

370 59 Name of the Scheme Maintenance & Operation of 0.000 1.215 1.000 0.000 0.215 0.000 0.000 0.000 0.215 0.215 0.000 0.000 0.000
Health Centre Terkhana
(Installation of instruments like
BP Apparatus Ultrasound, ECG
etc.)
Approval Date Approved
Major Components Maintenance of building & procurement of
equipment
Major Targets Maintenance of building & procurement of
equipment
District and Tehsil Narowal , Shakargarh

371 60 Name of the Scheme Establishment of RHC at Mureeda, 0.000 20.000 5.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 0.000 0.000 0.000
Tehsil Shakargarh, District
Narowal
Approval Date Un-Approved
Major Components Building, equipment and furniture
Major Targets Civil works to be taken up.
District and Tehsil Narowal , Shakargarh

372 61 Name of the Scheme Ambulance for BHU Chak Amru, 0.000 10.000 5.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
District Narowal
Approval Date Approved
Major Components Vehicle
Major Targets Vehicle
District and Tehsil Narowal , Shakargarh

144
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

373 62 Name of the Scheme Dispensary at Bamboo, Sungran, 0.000 10.500 0.500 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Dussari, Chaura & Pandori
Dhoonda, District Narowal
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Narowal

374 63 Name of the Scheme Dispensary for Chak Beeka 0.000 4.300 0.700 0.000 3.600 0.000 0.000 0.000 3.600 3.600 0.000 0.000 0.000
(U.C.Phalwari), District Narowal
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Narowal

375 64 Name of the Scheme Purchase of Ambulance for RHC 0.000 4.100 2.670 0.000 1.430 0.000 0.000 0.000 1.430 1.430 0.000 0.000 0.000
Baddomalhi, District Narowal
Approval Date Approved
Major Components Ambulance
Major Targets Ambulance
District and Tehsil Narowal

376 65 Name of the Scheme Establishment of New Emergency 0.000 105.985 94.590 11.395 0.000 0.000 0.000 11.395 0.000 11.395 0.000 0.000 0.000
Block at Kot Khawaja Saeed
Hospital (DHQ-II), Lahore
Approval Date Approved 17.12.08
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

377 66 Name of the Scheme Construction of Mian Mir Hospital, 0.000 440.704 66.926 17.000 0.000 0.000 0.000 17.000 0.000 17.000 145.000 211.778 0.000
Lahore.
Approval Date Approved 28.02.07
Major Components Building and purchase of equipment.
Major Targets Work up to roof of basement in progress.
Civil works to be continued.
District and Tehsil Lahore

145
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

378 67 Name of the Scheme Reconstruction of Govt. Said 0.000 321.567 10.000 42.297 0.000 0.000 0.000 42.297 0.000 42.297 269.270 0.000 0.000
Mitha Hospital, Lahore
Approval Date Approved 29.04.09
Major Components Building and Equipment
Major Targets Construction of Hospital Buildings
District and Tehsil Lahore

379 68 Name of the Scheme Purchase of Equipment for Up 0.000 360.236 53.000 0.000 31.383 0.000 0.000 0.000 31.383 31.383 275.853 0.000 0.000
gradation of existing departments
of Govt. Mian Muhammad Nawaz
Sharif Hospital ,Govt Kot Khawaja
Saeed Hospital and establishment
of PMU
Approval Date Approved 13.04.09
Major Components Equipment
Major Targets Procurement of equipment for up
gradation of existing departments.
District and Tehsil Lahore

380 69 Name of the Scheme Improvement / Rehabilitation of 0.000 32.268 9.550 22.718 0.000 0.000 0.000 22.718 0.000 22.718 0.000 0.000 0.000
Exiting building at Kot khawaja
Saeed Hospital, Lahore
Approval Date Approved 27.4.09
Major Components Renovation Building
Major Targets Renovation of building
District and Tehsil Lahore

381 70 Name of the Scheme Construction of Residential Flats 0.000 129.494 5.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 94.494 0.000 0.000
at Kot Khawaja Saeed Hospital,
Lahore
Approval Date Approved
18.4.09
Major Components Construction of residential flats
Major Targets Construction of residential flats
District and Tehsil Lahore

146
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

382 71 Name of the Scheme Establishment of THQ Hospital, 0.000 188.804 10.000 9.553 0.000 0.000 0.000 9.553 0.000 9.553 80.000 89.251 0.000
Sharaqpur, District Sheikhupura.
Approval Date Approved 01.01.09
Major Components Building & Equipment
Major Targets Work allotted on 2.3.09. Civil works to be
continued.
District and Tehsil Sheikhupura , Sharaqpur

383 72 Name of the Scheme Establishment of THQ Hospital, 0.000 169.237 5.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 60.000 89.237 0.000
Ferozwala, District Sheikhupura.
Approval Date Approved 18.10.08
Major Components Building & Equipment
Major Targets Work allotted on 11.4.09. Civil works to
be continued.
District and Tehsil Sheikhupura , Ferozwala

384 73 Name of the Scheme Upgradation of DHQ Hospital, 0.000 31.926 24.288 7.638 0.000 0.000 0.000 7.638 0.000 7.638 0.000 0.000 0.000
Nankan Sahib, District Nankana
Sahib
Approval Date Approved 04.11.04
Major Components Buildings and Residences
Major Targets Completion of scheme.
District and Tehsil Nankana Sahib

385 74 Name of the Scheme Establishment of THQ Hospital, 0.000 189.047 5.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 75.000 89.047 0.000
Sangla Hill, District Nankana Sahib
Approval Date Approved 23.12.08
Major Components Hospital Building, additional block,
residences, mortuary, laundry, boundary
wall and equipment.
Major Targets Civil works to be continued.
District and Tehsil Nankana Sahib , Sangla Hill

386 75 Name of the Scheme Establishment of THQ Hospital, 0.000 166.563 5.000 15.715 0.000 0.000 0.000 15.715 0.000 15.715 59.647 86.201 0.000
Shahkot, District Nankana Sahib.
Approval Date Approved 23.12.08
Major Components Building, equipment, furniture,
management systems and training.
Major Targets Work allotted on 8.4.09. Civil works to be
continued.
District and Tehsil Nankana Sahib , Shahkot

147
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

387 76 Name of the Scheme Government Rural Dispensary 0.000 6.500 4.700 0.000 1.800 0.000 0.000 0.000 1.800 1.800 0.000 0.000 0.000
Hanjli Chak No. 121, District
Nankana Sahib
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Nankana Sahib

388 77 Name of the Scheme Government Rural Dispensary 0.000 6.500 4.700 0.000 1.800 0.000 0.000 0.000 1.800 1.800 0.000 0.000 0.000
Hanjli Chak No. 284 Lalan Wala,
District Nankana Sahib
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Nankana Sahib

389 78 Name of the Scheme Construction of BHU Chajoo shah 0.000 22.000 3.000 0.000 19.000 0.000 0.000 0.000 19.000 19.000 0.000 0.000 0.000
Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

390 79 Name of the Scheme Establishment of 268 bedded DHQ 0.000 1,681.591 63.517 46.083 0.000 0.000 0.000 46.083 0.000 46.083 273.917 330.000 968.074
Hospital, Multan
Approval Date Approved 27.10.07 19.09.08
Major Components Main building, residences, hostel and
equipment.
Major Targets Work on external development and
boundary wall near completion. Civil
works on main building to be continued.
District and Tehsil Multan

391 80 Name of the Scheme Construction of Health Centre 0.000 13.000 7.032 0.000 5.968 0.000 0.000 0.000 5.968 5.968 0.000 0.000 0.000
Ansari Chowk or St. Tanki Wali
Shaheen Abad, District Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

148
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

392 81 Name of the Scheme Construction / Repair & Boundary 0.000 0.491 0.400 0.000 0.091 0.000 0.000 0.000 0.091 0.091 0.000 0.000 0.000
Walls, Floors, Bath Room and
Repair and Purchase of Furniture,
Computer etc. at Multan Faqir,
district Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

393 82 Name of the Scheme Construction of RHC Miran 0.000 15.000 4.750 0.000 10.250 0.000 0.000 0.000 10.250 10.250 0.000 0.000 0.000
Mallah, Tehsil Jalapur Pirwala,
district Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

394 83 Name of the Scheme Construction of Dispensary Union 0.000 3.000 2.372 0.000 0.628 0.000 0.000 0.000 0.628 0.628 0.000 0.000 0.000
Council No. 10 (Hassan Abad),
district Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

395 84 Name of the Scheme Construction of Dispensary Union 0.000 3.628 3.000 0.000 0.628 0.000 0.000 0.000 0.628 0.628 0.000 0.000 0.000
Council No. 4 (Nizam Abad Kotla
Tolay Khan), district Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

149
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

396 85 Name of the Scheme Construction of Dispensary Union 0.000 7.000 3.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 0.000 0.000 0.000
Council No. 1 (Dewan ka Bagh),
district Multan
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Multan

397 86 Name of the Scheme Establishment of 125 bedded DHQ 0.000 394.156 273.570 57.496 63.090 0.000 0.000 57.496 63.090 120.586 0.000 0.000 0.000
Hospital, Lodhran
Approval Date Approved 25.11.04 31.12.05
Major Components Main building, residences, hostel and
equipment.
Major Targets Work on main building and residences at
flooring stage. Completion of scheme.
District and Tehsil Lodhran

398 87 Name of the Scheme Establishment / Construction of 0.000 4.475 3.415 1.060 0.000 0.000 0.000 1.060 0.000 1.060 0.000 0.000 0.000
Govt Rural Dispensary at chak No
36-M District Lodhran
Approval Date Approved 28.09.05
Major Components Building.
Major Targets Main building completed. Electric
connection to be provided.
District and Tehsil Lodhran

399 88 Name of the Scheme Construction of BHU Chak No. 0.000 14.781 8.439 0.000 6.342 0.000 0.000 0.000 6.342 6.342 0.000 0.000 0.000
28/10-R Khanewal, District
Khanewal
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Khanewal

400 89 Name of the Scheme Construction of BHU Chak No. 0.000 14.140 2.000 0.000 12.140 0.000 0.000 0.000 12.140 12.140 0.000 0.000 0.000
141/10-R Jahanian, District
Khanewal
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Khanewal , Jahanian

150
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

401 90 Name of the Scheme Provision of Ambulance BHU 0.000 3.500 2.950 0.000 0.550 0.000 0.000 0.000 0.550 0.550 0.000 0.000 0.000
Mumdal
Approval Date Approved
Major Components Provision of ambulance.
Major Targets Completion of scheme.
District and Tehsil Khanewal , Kabirwala

402 91 Name of the Scheme Provision of Dental Unit THQ 0.000 1.440 0.900 0.000 0.540 0.000 0.000 0.000 0.540 0.540 0.000 0.000 0.000
Hospital, Kabirwala
Approval Date Approved
Major Components Provision of dental unit.
Major Targets Completion of scheme.
District and Tehsil Khanewal , Kabirwala

403 92 Name of the Scheme Provision of 10 Nos. Mobile BP 0.000 0.190 0.100 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Operates (Bauman meter)
Approval Date Approved
Major Components Provision of 10 Nos. mobile.
Major Targets Completion of scheme.
District and Tehsil Khanewal , Kabirwala

404 93 Name of the Scheme Construction of RHC Thatha 0.000 38.542 28.535 7.823 2.184 0.000 0.000 7.823 2.184 10.007 0.000 0.000 0.000
Sadiqabad Tehsil Jhanian District
Khanewal.
Approval Date Approved 19.07.05 09.01.07
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Khanewal , Jhanian

405 94 Name of the Scheme Provision of 01 No. Generator for 0.000 2.200 1.000 0.000 1.200 0.000 0.000 0.000 1.200 1.200 0.000 0.000 0.000
CCU (100 KV) in DHQ Hospital,
Khanewal
Approval Date Approved
Major Components Provision of generator.
Major Targets Completion of scheme.
District and Tehsil Khanewal , Kabirwala

151
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

406 95 Name of the Scheme Provision of 02 Nos. Ventilator in 0.000 3.500 3.000 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
CCU, DHQ Hospital, Khanewal
Approval Date Approved
Major Components Provision of ventilator.
Major Targets Completion of scheme.
District and Tehsil Khanewal , Kabirwala

407 96 Name of the Scheme Construction of BHU at Chak No. 0.000 7.000 3.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 0.000 0.000 0.000
50/12L, district Sahiwal
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sahiwal

408 97 Name of the Scheme Upgradation of DHQ Hospital, 0.000 81.514 60.514 8.000 13.000 0.000 0.000 8.000 13.000 21.000 0.000 0.000 0.000
Pakpattan
Approval Date Approved 30.09.05
Major Components Main building and equipment.
Major Targets completion of scheme.
District and Tehsil Pakpattan

409 98 Name of the Scheme Mortuary in THQ Hospital, 0.000 2.032 1.999 0.000 0.033 0.000 0.000 0.000 0.033 0.033 0.000 0.000 0.000
Burewala, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari

410 99 Name of the Scheme Upgradation of Sub Health Centre 0.000 1.792 1.700 0.000 0.092 0.000 0.000 0.000 0.092 0.092 0.000 0.000 0.000
Chak No.327/EB, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari

152
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

411 100 Name of the Scheme Upgradation of Sub Health Centre 0.000 1.792 1.700 0.000 0.092 0.000 0.000 0.000 0.092 0.092 0.000 0.000 0.000
331/EB Burewala, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari , Burewala

412 101 Name of the Scheme Upgradation of Sub Health Centre 0.000 1.792 1.600 0.000 0.192 0.000 0.000 0.000 0.192 0.192 0.000 0.000 0.000
269/EB Burewala, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari , Burewala

413 102 Name of the Scheme Upgradation of BHU 148/EB 0.000 7.032 5.000 0.000 2.032 0.000 0.000 0.000 2.032 2.032 0.000 0.000 0.000
Burewala as RHC, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari , Burewala

414 103 Name of the Scheme Upgradation of BHU 188/EB Velar 0.000 7.032 3.516 0.000 3.516 0.000 0.000 0.000 3.516 3.516 0.000 0.000 0.000
as RHC Mian Pakhi, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari , Burewala

415 104 Name of the Scheme Upgradation from BHU to RHC 0.000 7.032 6.219 0.000 0.813 0.000 0.000 0.000 0.813 0.813 0.000 0.000 0.000
Karampur Mailsi, district Vehari
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Vehari , Melsi

153
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

416 105 Name of the Scheme Upgradation of Civil Hospital Fort 0.000 21.378 3.078 18.000 0.300 0.000 0.000 18.000 0.300 18.300 0.000 0.000 0.000
Munro Tribal Area, D.G.Khan.
Approval Date Approved 07.10.05 06.12.06
Major Components Main building / medical ward.
Major Targets Completion of scheme.
District and Tehsil Dera Ghazi Khan , Fort Munro

417 106 Name of the Scheme Upgradation of DHQ Hospital, 0.000 437.974 143.900 18.454 0.564 0.000 0.000 18.454 0.564 19.018 166.546 108.510 0.000
D.G.Khan
Approval Date Approved 28.06.06
Major Components Main building for Orthopiedic,Urology &
TB Wards. Equipment.
Major Targets Work on main building up to flooring
completed. Remaining civil works to be
executed & equipment to be procured.
District and Tehsil Dera Ghazi Khan , D.G.Khan

418 107 Name of the Scheme Construction of Building of 0.000 2.460 2.015 0.000 0.445 0.000 0.000 0.000 0.445 0.445 0.000 0.000 0.000
Dispensary at Bait Baharwali U.C.
Hanjrai, district Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

419 108 Name of the Scheme Construction of Building of 0.000 2.460 2.015 0.000 0.445 0.000 0.000 0.000 0.445 0.445 0.000 0.000 0.000
Dispensary at Chakar Dari U.C.
Bait Qaim Wala, district
Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

154
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

420 109 Name of the Scheme Construction of Building of 0.000 2.460 2.015 0.000 0.445 0.000 0.000 0.000 0.445 0.445 0.000 0.000 0.000
Dispensary at Thatta Salian,
district Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

421 110 Name of the Scheme Upgradation of BHU to RHC level 0.000 9.345 8.200 0.000 1.145 0.000 0.000 0.000 1.145 1.145 0.000 0.000 0.000
at Muradabad, district
Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

422 111 Name of the Scheme Construction of Dispensary at 0.000 2.460 2.015 0.000 0.445 0.000 0.000 0.000 0.445 0.445 0.000 0.000 0.000
Azmat Pur U/C Multan Wali,
district Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

423 112 Name of the Scheme Construction of Dispensary at 0.000 2.460 2.015 0.000 0.445 0.000 0.000 0.000 0.445 0.445 0.000 0.000 0.000
Mud Wala, district Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

424 113 Name of the Scheme Construction of Dispensary at 0.000 3.500 3.000 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
Mauza Dera Wadhoo U/C
Ghazanfargarh, district
Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

155
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

425 114 Name of the Scheme Construction of Dispensary at 0.000 3.500 3.000 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
Katchy Jai U/C Thatha Qureshi,
district Muzaffargarh
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Muzaffargarh

426 115 Name of the Scheme Provision of C.T Scan Machine at 0.000 51.632 51.032 0.600 0.000 0.000 0.000 0.600 0.000 0.600 0.000 0.000 0.000
DHQ Hospital Layyah.
Approval Date Approved 02.01.06
Major Components Construction of building for CT Scan
Major Targets Remaining civil works to be completed.
District and Tehsil Layyah.

427 116 Name of the Scheme Establishment of Cardiac Unit at 0.000 21.139 18.567 2.572 0.000 0.000 0.000 2.572 0.000 2.572 0.000 0.000 0.000
DHQ Hospital Layyah
Approval Date Approved 28.09.05
Major Components Building and equipment
Major Targets Completion of scheme.
District and Tehsil Layyah.

428 117 Name of the Scheme Establishment of Trauma Centre 0.000 158.386 20.996 35.000 0.000 0.000 0.000 35.000 0.000 35.000 40.000 62.390 0.000
at Fatehpur, District Layyah.
Approval Date Approved 29.09.07 25.10.08
Major Components Building and equipment.
Major Targets Brick work on main building completed up
to door level. Civil works to be continued.
District and Tehsil Layyah , Karor

429 118 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
Buchi Wala, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

156
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

430 119 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
239-A/TDA, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

431 120 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
Imrani Tibba Dstian Wala, district
Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

432 121 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
113/ML, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

433 122 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
Tibbi Khurad, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

434 123 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
240/TDA, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

157
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

435 124 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
95/ML, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , Karor

436 125 Name of the Scheme Purchase of Van for THQ Hospital 0.000 1.630 0.600 0.000 1.030 0.000 0.000 0.000 1.030 1.030 0.000 0.000 0.000
Choubara, district Layyah
Approval Date Approved
Major Components Vehicle
Major Targets Vehicle
District and Tehsil Layyah , Choubara

437 126 Name of the Scheme Upgradation of RHC Kot Sultan up 0.000 14.203 1.500 0.000 12.703 0.000 0.000 0.000 12.703 12.703 0.000 0.000 0.000
to THQ facilities, District Layyah
Approval Date Approved
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Layyah

438 127 Name of the Scheme Upgradation of BHU Mehran up to 0.000 14.006 1.000 0.000 13.006 0.000 0.000 0.000 13.006 13.006 0.000 0.000 0.000
RHC facilities, Layyah
Approval Date Approved
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Layyah

439 128 Name of the Scheme Establishment of Paramedical 0.000 16.245 2.500 0.000 13.745 0.000 0.000 0.000 13.745 13.745 0.000 0.000 0.000
School at Layyah
Approval Date Approved
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Layyah

158
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

440 129 Name of the Scheme Construction of Civil Dispensary 0.000 4.176 0.850 0.000 3.326 0.000 0.000 0.000 3.326 3.326 0.000 0.000 0.000
86/ML, district Layyah
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Layyah , karor

441 130 Name of the Scheme Construction of Basic Health Unit 0.000 8.812 5.000 0.000 3.812 0.000 0.000 0.000 3.812 3.812 0.000 0.000 0.000
Kot Khalifa Tehsil Ahmedpur East,
district Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur , Ahmedpur East

442 131 Name of the Scheme Construction of BHU Bukhtiari 0.000 5.533 5.000 0.000 0.533 0.000 0.000 0.000 0.533 0.533 0.000 0.000 0.000
(UC-Bukhtiari) Tehsil Ahmadpur
East, district Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur , Ahmedpur East

443 132 Name of the Scheme Construction of Hospital for Dera 0.000 18.051 15.000 0.000 3.051 0.000 0.000 0.000 3.051 3.051 0.000 0.000 0.000
Nawab Sahib BHU level (Saeed
Park Tehsil Ahmedpur East,
district Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur , Ahmedpur East

444 133 Name of the Scheme Construction / Extension and 0.000 2.005 1.500 0.000 0.505 0.000 0.000 0.000 0.505 0.505 0.000 0.000 0.000
Repair of Building Govt. Tibbia
College near vegetable market
Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

159
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

445 134 Name of the Scheme Construction of New Dispensary 0.000 3.292 1.500 0.000 1.792 0.000 0.000 0.000 1.792 1.792 0.000 0.000 0.000
Building Islami Colony near Girls
Middle School Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

446 135 Name of the Scheme Construction of new Dispensary 0.000 3.373 2.000 0.000 1.373 0.000 0.000 0.000 1.373 1.373 0.000 0.000 0.000
Building Muhajir Colony, Baghdad
near Masjid Al-Farooq, Gali
Nouman Model Middle School (UC-
17) Bahawalpur City
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

447 136 Name of the Scheme Construction of Basic Health Unit 0.000 18.200 15.000 0.000 3.200 0.000 0.000 0.000 3.200 3.200 0.000 0.000 0.000
Bhinda Ghulam Hussain Miani
Jhabail (UC-27) Tehsil Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

448 137 Name of the Scheme Renovation/ Improvement of 0.000 6.200 4.559 0.000 1.641 0.000 0.000 0.000 1.641 1.641 0.000 0.000 0.000
Nursery room with provision of
fully equipped ambulance and 2
No. Infant Incubators for THQ
Hospital, Khair Pur Tamewali,
district Bahawalpur
Approval Date Approved
Major Components Equipment
Major Targets Equipment
District and Tehsil Bahawalpur

160
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

449 138 Name of the Scheme Provision of Delivery Table, 0.000 1.015 0.800 0.000 0.215 0.000 0.000 0.000 0.215 0.215 0.000 0.000 0.000
Emergency Light, Three No. Iron
beds and Sucker Machine for BHU
Jamalpur, district Bahawalpur
Approval Date Approved
Major Components Provision of equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

450 139 Name of the Scheme Upgradation of BHU Kud wala into 0.000 39.300 9.000 0.000 30.300 0.000 0.000 0.000 30.300 30.300 0.000 0.000 0.000
RHC level (UC-68/DB) Tehsil
Yazman, district Bahawalpur
Approval Date Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Bahawalpur , Yazman

451 140 Name of the Scheme Upgradation of BHU Bhong, 0.000 31.991 22.568 0.000 9.423 0.000 0.000 0.000 9.423 9.423 0.000 0.000 0.000
Tehsil Sadiqabad District R.Y.
Khan.
Approval Date Approved 06.11.06 03.02.07
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Rahim Yar Khan , Sadiqabad

452 141 Name of the Scheme Upgradation of THQ Hospital 0.000 23.735 10.812 2.923 10.000 0.000 0.000 2.923 10.000 12.923 0.000 0.000 0.000
Liaquatpur district R.Y. Khan.
Approval Date Approved
Major Components Building & Equipment
Major Targets Completion of scheme.
District and Tehsil Rahim Yar Khan , Liaquatpur

Sub-Total: Accelerated Programme for Health Care 0.000 7,605.651 2,074.787 690.735 643.721 0.000 0.000 690.735 643.721 1,334.456 1,962.647 1,206.103 1,027.658

161
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Tertiary Care Hospitals

453 142 Name of the Scheme Safe Motherhood Initiative Project 0.000 29.850 14.130 0.000 15.720 0.000 0.000 0.000 15.720 15.720 0.000 0.000 0.000
(in collaboration with Holy Family
Hospital, Rawalpindi), District
Chakwal.
Approval Date Approved 05.06.07
Major Components Outreach Gyane / Obstetric services
through the teaching faculty members /
post graduate trainees at BHU, RHC and
THQ Hospitals.
Major Targets Field visits of the teaching faculty
members / post graduate trainees of Holy
Family Hospital, Rawalpindi at BHUs,
RHCs and THQs in District Chakwal for
Gynae / Obstetric Care.
District and Tehsil Chakwal , Chakwal.

454 143 Name of the Scheme Upgradation of DHQ Hospital, 0.000 611.667 15.000 50.000 5.000 0.000 0.000 50.000 5.000 55.000 145.000 354.145 42.522
Sargodha.
Approval Date Approved 15.12.08
Major Components Addition of 350 beds. Upgradation of
existing facilities to affiliate the hospital
with Medical College, Sargodha.
Major Targets Civil works to be executed & equipment
to be purchased.
District and Tehsil Sargodha

455 144 Name of the Scheme Establishment of Faisalabad 0.000 1,528.683 1,455.559 42.290 30.834 0.000 0.000 42.290 30.834 73.124 0.000 0.000 0.000
Institute of Cardiology,
Faisalabad.
Approval Date Approved 30.06.05 16.07.05 13.09.08
Major Components 4-storey building, 200 bedded Institute,
hostels and procurement of equipment.
Major Targets Completion of scheme.
District and Tehsil Faisalabad

162
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

456 145 Name of the Scheme Establishment of Allied Burn & 0.000 478.815 55.000 50.000 0.000 0.000 0.000 50.000 0.000 50.000 100.000 273.815 0.000
Reconstructive Surgery Centre in
Allied Hospital, Faisalabad.
Approval Date Approved 02.11.06
Major Components 65-bedded Burn Centre. To provide
quality and prompt health care facilities to
the cases of burn injuries.
Major Targets 5-storey building with 65-beds Burn
Centre. Work up to 1st floor in progress.
Civil works to be continued.
District and Tehsil Faisalabad

457 146 Name of the Scheme Construction of Additional 100 0.000 134.317 7.007 25.000 0.000 0.000 0.000 25.000 0.000 25.000 50.000 52.310 0.000
Bedded Ward at DHQ Hospital,
Faisalabad.
Approval Date Approved 08.02.07 21.02.08
Major Components 100 Bedded Ward and provision of
equipment.
Major Targets Work on ward up to DPC level. Civil
works to be continued.
District and Tehsil Faisalabad

458 147 Name of the Scheme Establishment of Wazirabad 0.000 1,953.926 331.233 80.000 20.000 0.000 0.000 80.000 20.000 100.000 220.000 400.000 902.693
Institute of Cardiology,
Wazirabad, District Gujranwala.
Approval Date Approved 02.08.06 16.03.07 20.10.07
13.04.09
Major Components 200 Bedded Institute, Hostels,
Residences, equipment, PMU and
management systems.
Major Targets Civil works to be executed & equipment
to be purchased.
District and Tehsil Gujranwala , Wazirabad

459 148 Name of the Scheme Replacement of Sewerage/ 0.000 25.726 12.466 13.260 0.000 0.000 0.000 13.260 0.000 13.260 0.000 0.000 0.000
Drainage System Jinnah Hospital
Lahore
Approval Date Approved
18.01.08
Major Components Replacement of Sewerage/ Drainage
System
Major Targets Sewerage/ Drainage System
District and Tehsil Lahore

163
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

460 149 Name of the Scheme Extension & Upgradation of 0.000 32.685 23.510 9.175 0.000 0.000 0.000 9.175 0.000 9.175 0.000 0.000 0.000
Obstetrics & Gynae: Operation
Theaters & Labor Room in Jinnah
hospital Lahore
Approval Date Approved
Major Components Extension & Upgradation of Obstetrics &
Gynae: Operation Theaters & Labor
Room
Major Targets Completion of Scheme
District and Tehsil Lahore

461 150 Name of the Scheme Upgradation / Strengthening of 0.000 177.969 48.287 29.864 1.840 0.000 0.000 29.864 1.840 31.704 97.978 0.000 0.000
School of Nursing, Mayo Hospital,
Lahore.
Approval Date Approved 21.08.07 20.3.09
Major Components Building and Equipment.
Major Targets Nursing School building completed.
Hostel work still to be taken up.
Remaining civil works and procurement
of equipment to be completed.
District and Tehsil Lahore

462 151 Name of the Scheme Construction of Surgical Tower at 0.000 656.150 176.462 70.000 0.000 0.000 0.000 70.000 0.000 70.000 180.000 229.688 0.000
Mayo Hospital, Lahore
Approval Date Approved 25.07.0521.02.06
Major Components Four storey building, 8 Private wards, 50
Private rooms, 120 beds ICU, 16
Operation Theatre Rooms and Electro-
Medical Equipment.
Major Targets Building structure completed up to 3rd
floor. Civil works to continued.
District and Tehsil Lahore

463 152 Name of the Scheme Upgradation of Renal 0.000 56.465 55.466 0.000 0.999 0.000 0.000 0.000 0.999 0.999 0.000 0.000 0.000
Transplantation and
Haemodialysis Unit, Urology
Department, Mayo Hospital,
Lahore.
Approval Date Approved 8.11.04
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

164
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

464 153 Name of the Scheme Modernization of Urology 0.000 83.611 68.210 0.000 15.401 0.000 0.000 0.000 15.401 15.401 0.000 0.000 0.000
Operation Theatre, Mayo Hospital,
Lahore
Approval Date Approved 08.11.04
Major Components Building and purchase of equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

465 154 Name of the Scheme Completion of Children Medical 0.000 250.623 113.497 2.843 38.127 0.000 0.000 2.843 38.127 40.970 96.156 0.000 0.000
Specialties Block, Mayo Hospital,
Lahore.
Approval Date Approved 22.03.05 16.5.09
Major Components Five storey building and provision of
equipment.
Major Targets Main building completed. Finishing of
main building and procurement of
remaining equipment to be completed.
District and Tehsil Lahore

466 155 Name of the Scheme Renovation / Protection of 0.000 145.250 67.005 18.860 59.385 0.000 0.000 18.860 59.385 78.245 0.000 0.000 0.000
Institute of Ophthalmology, Mayo
Hospital, Lahore
Approval Date Approved 21.08.07 18.10.08
Major Components Renovation of the existing infrastructure
and procurement of equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

467 156 Name of the Scheme Construction of 200 beds Lady 0.000 140.400 61.655 30.000 48.745 0.000 0.000 30.000 48.745 78.745 0.000 0.000 0.000
Aitchison Hospital, Lahore.
(Balance work of Internees Hostel,
Private Wards & Rooms, Removal
of defects).
Approval Date Approved 09.08.05 29.09.07 18.04.09
Major Components Completion of civil works and purchase of
equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

165
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

468 157 Name of the Scheme Construction of New Operation 0.000 94.700 0.030 20.000 0.000 0.000 0.000 20.000 0.000 20.000 44.670 30.000 0.000
Theatre and Store Complex, Lady
Willingdon Hospital, Lahore.
Approval Date Approved 13.12.06 29.11.07
Major Components Construction of new operation theatre
and store complex. Provision of
Operation Theatre equipment.
Major Targets Site yet to be cleared. Civil works to be
continued.
District and Tehsil Lahore

469 158 Name of the Scheme Construction of OPD Block in 0.000 803.977 88.000 50.000 0.000 0.000 0.000 50.000 0.000 50.000 110.000 250.000 305.977
Services Hospital, Lahore.
Approval Date Approved 08.05.07 28.11.07
Major Components Building and purchase of equipment for
OPD Block.
Major Targets Civil Works completed up to basement.
Civil works to be continued.
District and Tehsil Lahore

470 159 Name of the Scheme Upgradation of Radiology / 0.000 1,188.971 5.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 100.000 300.000 753.971
Specialties Departments in
Services Hospital, Lahore.
Approval Date Approved 20.10.08
Major Components Civil works. Provision of electro medical
equipments.
Major Targets Civil works to be initiated.
District and Tehsil Lahore.

471 160 Name of the Scheme Improvement of Water Supply, 0.000 103.338 70.429 32.909 0.000 0.000 0.000 32.909 0.000 32.909 0.000 0.000 0.000
Sewerage System, Roads and
Provision of CSSD, Generators &
Laundry Plant in Sir Ganga Ram
Hospital, Lahore.
Approval Date Approved 28.02.06 10.07.08
Major Components Laying of water supply / sewerage
system and roads. Provision of CSSD &
Laundry Plant.
Major Targets Completion of scheme.
District and Tehsil Lahore

166
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

472 161 Name of the Scheme Upgradation / Renovation of Sir 0.000 167.250 5.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 50.000 87.250 0.000
Ganga Ram Hospital, Lahore.
Approval Date Approved 18.10.08
Major Components Renovation of existing old buildings &
installations.
Major Targets Renovation works to be executed.
District and Tehsil Lahore.

473 162 Name of the Scheme Provision of MRI and upgradation 0.000 192.500 159.000 0.000 33.500 0.000 0.000 0.000 33.500 33.500 0.000 0.000 0.000
of existing facilities of CT Scan for
FJMC / Sir Ganga Ram Hospital,
Lahore
Approval Date Approved 5.6.07 27.4.09
Major Components MRI and CT Scan upgradation.
Major Targets Completion of scheme.
District and Tehsil Lahore

474 163 Name of the Scheme Implementation of Master Plan in 0.000 649.260 290.531 80.000 0.000 0.000 0.000 80.000 0.000 80.000 150.000 128.729 0.000
Lahore General Hospital,
Lahore(Phase-II)
Approval Date Approved 25.11.04 29.08.05
Major Components Building, Equipment and Furniture.
Major Targets Tiling works up to 4th floor completed &
civil works to be executed.
District and Tehsil Lahore

475 164 Name of the Scheme Implementation of Master Plan in 0.000 440.765 79.958 60.000 0.000 0.000 0.000 60.000 0.000 60.000 100.000 200.807 0.000
Lahore General Hospital,
Lahore(Phase-III)
Approval Date Approved 19.09.05 22.11.06
Major Components Construction of building and procurement
of equipment for Urology, Gynae, and
Orthopedics Departments.
Major Targets Roof laid on 1st floor. 34% of civil works
to be executed.
District and Tehsil Lahore

167
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

476 165 Name of the Scheme Purchase of equipment for 0.000 109.641 11.422 0.000 98.219 0.000 0.000 0.000 98.219 98.219 0.000 0.000 0.000
Physiotherapy & Neuro Radiology
Department, Lahore General
Hospital, Lahore.
Approval Date Approved 21.08.08
Major Components Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

477 166 Name of the Scheme Punjab Institute of Neuro 0.000 196.634 0.343 0.000 10.000 0.000 0.000 0.000 10.000 10.000 50.000 75.000 61.291
Sciences, Lahore (PC-II)
Approval Date Approved 24.10.07
Major Components Feasibility, preparation of PC-I and
designing of the Institute of Neuro
Sciences by the consultants.
Major Targets Feasibility and designing of the Institute.
District and Tehsil Lahore

478 167 Name of the Scheme Upgradation of Neurosurgery 0.000 195.150 89.000 0.000 51.250 0.000 0.000 0.000 51.250 51.250 54.900 0.000 0.000
Department & Head Injury Unit in
Jinnah Hospital, Lahore
Approval Date Approved 21.08.07
Major Components Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore.

479 168 Name of the Scheme Establishment of Fatima Jinnah 0.000 892.954 523.529 90.000 10.000 0.000 0.000 90.000 10.000 100.000 269.425 0.000 0.000
Burn and Reconstructive Surgery
Centre, Lahore.
Approval Date Approved 07.09.04 29.05.06
Major Components Building, equipment, furniture, training
and management systems of patients,
inventory, financial and human resource.
Major Targets Civil works to be executed & equipment
to be purchased.
District and Tehsil Lahore

168
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

480 169 Name of the Scheme Construction of 4th Floor of 0.000 393.233 159.775 41.580 18.807 0.000 0.000 41.580 18.807 60.387 173.071 0.000 0.000
Jinnah Hospital, Lahore.
Approval Date Approved 19.09.05 23.04.09
Major Components Construction of 4th floor for Neurosurgery
Department, Liver Diseases & Endoscopy
Unit, TB, Pediatric, Pediatric Surgery,
Neurology and a bay of private rooms.
Major Targets Roof laid. Remaining civil works to be
completed. Equipment to be procured.
District and Tehsil Lahore

481 170 Name of the Scheme Establishment of Pediatric 0.000 2,676.966 1,271.602 70.000 30.000 0.000 0.000 70.000 30.000 100.000 250.000 450.000 605.364
Hospital / Institute, Lahore.
Approval Date Approved 13.07.88 26.11.05
05.11.0811.02.09
Major Components Inpatient Block, comprising 684 beds..
Major Targets One out of 3 blocks completed. Civil
works to be continued. Equipment to be
procured.
District and Tehsil Lahore

482 171 Name of the Scheme Female / Male Internees Hostel in 0.000 297.224 25.000 35.000 0.000 0.000 0.000 35.000 0.000 35.000 75.000 162.224 0.000
Children Hospital Lahore
Approval Date Approved 05.1.08 11.02.09
Major Components Building and furniture.
Major Targets Civil works to be continued.
District and Tehsil Lahore

483 172 Name of the Scheme Upgradation of 5 Operation 0.000 162.975 132.975 0.000 30.000 0.000 0.000 0.000 30.000 30.000 0.000 0.000 0.000
Theatres & Purchase of
Equipment for 10 Bedded New
ICU at Punjab Institute of
Cardiology, Lahore.
Approval Date Approved 14.04.05
Major Components Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

169
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

484 173 Name of the Scheme Construction of New OPD Block in 0.000 160.420 135.420 25.000 0.000 0.000 0.000 25.000 0.000 25.000 0.000 0.000 0.000
Punjab Institute of Cardiology,
Lahore.
Approval Date Approved 10.10.05
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

485 174 Name of the Scheme Extension of 10 bedded 0.000 18.669 7.035 0.000 11.634 0.000 0.000 0.000 11.634 11.634 0.000 0.000 0.000
emergency / Diagnostic centre
and provision of Diagnostic
Equipment in Punjab institute of
Mental Health Lahore.
Approval Date Approved 12.1.04
Major Components Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore.

486 175 Name of the Scheme Establishment of Cancer Hospital 0.000 92.680 3.425 0.000 15.000 0.000 0.000 0.000 15.000 15.000 25.000 49.255 0.000
at Lahore. (PC-II)
Approval Date Approved 28.02.07
Major Components Feasibility study for designing and
preparation of PC-I.
Major Targets Feasibility for detailed designing and
preparation of PC-I.
District and Tehsil Lahore.

487 176 Name of the Scheme Upgradation of Urology 0.000 63.230 8.000 0.000 55.230 0.000 0.000 0.000 55.230 55.230 0.000 0.000 0.000
Department Lahore General
Hospital, Lahore
Approval Date Approved 29.09.07
Major Components Provision of latest equipment for the
treatment of kidney patients.
Major Targets Completion of scheme.
District and Tehsil Lahore.

170
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

488 177 Name of the Scheme Upgradation of Department of 0.000 72.325 41.325 0.000 31.000 0.000 0.000 0.000 31.000 31.000 0.000 0.000 0.000
Medicine, Medical Unit-II, Lahore
General Hospital, Lahore.
Approval Date Approved 29.09.07
Major Components Provision of equipment to improve GI
diagnostic and therapeutic services.
Major Targets Completion of scheme.
District and Tehsil Lahore.

489 178 Name of the Scheme Punjab Safe Motherhood Initiative 0.000 53.208 37.368 0.000 15.840 0.000 0.000 0.000 15.840 15.840 0.000 0.000 0.000
Project, Sheikhupura.
Approval Date Approved 05.06.07
Major Components Outreach Gynae / Obstetric services
through the teaching faculty members /
post-graduate trainees of Lady Willingdon
Hospital at health facilities in District
Sheikhupura.
Major Targets Field visits of the teaching faculty
members / post graduate trainees of Lady
Willingdon Hospital at BHUs, RHCs and
THQs in District Sheikhupura for Gynae /
Obstetric Care.
District and Tehsil Sheikhupura

490 179 Name of the Scheme Safe Motherhood Initiative Project 0.000 29.850 12.705 0.000 17.145 0.000 0.000 0.000 17.145 17.145 0.000 0.000 0.000
(in collaboration with Sir Ganga
Ram Hospital, Lahore), District
Nankana Sahib.
Approval Date Approved 05.06.07
Major Components Outreach Gyne / Obstetric services
through the teaching faculty members /
post graduate trainees at BHUs, RHCs
and THQs Hospitals.
Major Targets Field visits of the teaching faculty
members / post graduate trainees of Sir
Ganga Ram Hospital at BHUs, RHCs and
THQs in District Nankana Sahib for
Gynae / Obstetric Care.
District and Tehsil Nankana Sahib

171
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

491 180 Name of the Scheme Construction / Expansion of 150 0.000 1,367.732 10.000 40.000 141.198 0.000 0.000 40.000 141.198 181.198 278.000 340.000 558.534
Beds for Provision of Sub-
Specialist Services at Children
Hospital Complex, Multan.
Approval Date Approved 03.7.08
Major Components 4-storey building. MRI, Incinerator,
Laundry, electro-medical equipment, etc
Major Targets Civil works to be continued. Equipment
like MRI and incinerator to be procured.
District and Tehsil Multan

492 181 Name of the Scheme Upgradation of Neurosurgery 0.000 195.150 100.600 0.000 94.550 0.000 0.000 0.000 94.550 94.550 0.000 0.000 0.000
Department & Head Injury Unit in
Nishtar Medical College, Multan.
Approval Date Approved 29.9.07 18.01.08
Major Components Provision of latest equipments & Training
for treatment of Head Injury / Neuro
Patients.
Major Targets Completion of scheme.
District and Tehsil Multan

493 182 Name of the Scheme Establishment of Modern Burn 0.000 392.177 119.925 80.275 5.000 0.000 0.000 80.275 5.000 85.275 186.977 0.000 0.000
Unit at Nishtar Hospital, Multan.
Approval Date Approved 01.08.05 18.07.07
Major Components Building, equipment and furniture.
Major Targets Civil Works except finishing completed.
Civil works to be completed. Equipment
to be procured.
District and Tehsil Multan.

494 183 Name of the Scheme Construction of Doctors' 0.000 277.422 137.121 40.000 0.201 0.000 0.000 40.000 0.201 40.201 100.000 0.000 0.000
Residences in Multan Institute of
Cardiology, Multan.
Approval Date Approved 12.07.06 21.04.07
Major Components 4-residences and 3-guest houses. 5-
storey hostel comprising 20 single units +
12 family suites.
Major Targets Completion of scheme.
District and Tehsil Multan

172
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

495 184 Name of the Scheme Provision of Lacking Facilities in 0.000 569.381 346.175 0.000 223.206 0.000 0.000 0.000 223.206 223.206 0.000 0.000 0.000
Multan Institute of Cardiology,
Multan.
Approval Date Approved 12.07.06 20.03.08
Major Components Equipment.
Major Targets Equipment to be procured: Gama
Camera, Angiography machine, Cardiac
CT Scan, 40 Beds, Fluoroscopy, Two
ambulances, electro physiology, ultra
sound system and Blood Warmer.
Scheme to be completed.
District and Tehsil Multan

496 185 Name of the Scheme Establishment of Kidney 0.000 372.077 230.406 16.093 125.578 0.000 0.000 16.093 125.578 141.671 0.000 0.000 0.000
Transplantation / Dialysis Unit,
B.V. Hospital, Bahawalpur.
Approval Date Approved 19.01.05 30.09.06
Major Components 4-storey building and equipment.
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

497 186 Name of the Scheme Upgradation and Improvement of 0.000 68.785 34.995 7.560 26.230 0.000 0.000 7.560 26.230 33.790 0.000 0.000 0.000
Jubilee Female Hospital,
Bahawalpur.
Approval Date Approved 05.06.07
Major Components Renovation of the existing building,
construction of additional floor and
equipment.
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

498 187 Name of the Scheme Establishment of ICU at B.V. 0.000 208.721 62.000 59.221 87.500 0.000 0.000 59.221 87.500 146.721 0.000 0.000 0.000
Hospital, Bahawalpur.
Approval Date Approved 29.11.07 09.10.08
Major Components 2-storey 20 bedded ICU and procurement
of equipment.
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

173
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

499 188 Name of the Scheme Upgradation of Neurosurgery 0.000 198.725 188.595 10.130 0.000 0.000 0.000 10.130 0.000 10.130 0.000 0.000 0.000
Department & Head Injury Unit in
B.V. Hospital, Bahawalpur.
Approval Date Approved 29.09.07 29.11.07
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Bahawalpur

500 189 Name of the Scheme Addition of 4 Nos. Operation 0.000 197.519 19.775 20.000 0.000 0.000 0.000 20.000 0.000 20.000 157.744 0.000 0.000
Theatres in Accident &
Emergency Department B.V.
Hospital, Bahawalpur
Approval Date Approved 10.07.08
Major Components Construction of building for four
Operation Theatres. Procurement of
equipment: Vital Sign Monitor, Auto
Claves, Venture Suction System, CT
Scan 16 Slice, Multipurpose Hydraulic
Operation Table, Furniture and Fixture
etc.
Major Targets Completion of civil works for four
Operation Theatres.
District and Tehsil Bahawalpur

501 190 Name of the Scheme Construction of Cardiology and 0.000 742.637 15.000 50.000 0.000 0.000 0.000 50.000 0.000 50.000 175.000 400.000 102.637
Cardiac Surgery Block at B.V.
Hospital, Bahawalpur.
Approval Date Approved 19.08.08
Major Components Civil works for construction of cardiac
block. Purchase and installation of
cardiac equipment.
Major Targets Civil works to be executed.
District and Tehsil Bahawalpur

502 191 Name of the Scheme Provision of 20 Bedded Coronary 0.000 191.073 146.073 45.000 0.000 0.000 0.000 45.000 0.000 45.000 0.000 0.000 0.000
Care Unit (CCU) & Angiography
System in SZMC/H, R.Y.Khan
Approval Date Approved 12.08.08
Major Components Building and Equipment.
Major Targets Completion of scheme.
District and Tehsil Rahim Yar Khan , R.Y. Khan

174
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

503 192 Name of the Scheme Upgradation of Blood Units 0.000 85.400 54.259 0.000 31.141 0.000 0.000 0.000 31.141 31.141 0.000 0.000 0.000
located at Teaching Hospitals.
Approval Date Approved 17.05.04
Major Components Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore, Multan,
Rawalpindi,Bahawalpur,Faisalabad

504 193 Name of the Scheme Provincial Programme for 0.000 186.110 22.240 0.000 20.000 0.000 0.000 0.000 20.000 20.000 80.000 63.870 0.000
Prevention & Control of
Blindness, Punjab
Approval Date Approved 29.11.07
Major Components Human Resource Development. Mass
distribution of drugs for prevention &
control Trachoma and blindness.
Provision of equipment.
Major Targets Facilities to be provided for treatment of
blindness and trachoma. Training of
doctors / paramedics.
District and Tehsil Punjab

Sub-Total: Tertiary Care Hospitals 0.000 20,414.966 7,148.523 1,349.060 1,418.280 0.000 0.000 1,349.060 1,418.280 2,767.340 3,318.921 3,847.093 3,332.989

Medical Education
505 194 Name of the Scheme Construction of Hostel No.2 for 0.000 64.782 45.000 14.852 4.930 0.000 0.000 14.852 4.930 19.782 0.000 0.000 0.000
200 Girls Students at RMC Staff
Colony Rawal Road, Rawalpindi.
Approval Date Approved 13.12.06
Major Components Hostel accommodation for female
students.
Major Targets Completion of scheme.
District and Tehsil Rawalpindi

506 195 Name of the Scheme Establishment of Institute of 0.000 43.939 28.241 10.363 5.335 0.000 0.000 10.363 5.335 15.698 0.000 0.000 0.000
Paramedics at Rawalpindi General
Hospital, Rawalpindi.
Approval Date Approved 29.11.07 18.10.08
Major Components Building and equipment / furniture.
Major Targets Completion of scheme.
District and Tehsil Rawalpindi

175
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

507 196 Name of the Scheme Upgradation of School of Nursing 0.000 38.388 20.000 8.093 10.295 0.000 0.000 8.093 10.295 18.388 0.000 0.000 0.000
to degree level at Holy Family
Hospital, Rawalpindi.
Approval Date Approved 18.10.08
Major Components Renovation of existing building to start
nursing classes. Purchase of lab.
equipment, furniture and fixture.
Major Targets Completion of scheme.
District and Tehsil Rawalpindi , Rawalpindi.

508 197 Name of the Scheme Establishment of Nawaz Sharif 0.000 1,351.810 0.000 100.000 300.000 0.000 0.000 100.000 300.000 400.000 550.000 401.810 0.000
Medical College, University of
Gujrat and Uplifting of Aziz Bhatti
Shaheed (DHQ) as Teaching
Hospital.
Approval Date Approved 13.4.09
Major Components Establishment of 7 Basic Sciences
Departments, equipment & furniture, labs,
up gradation of DHQ hospital and
residences for faculty & student hostels.
Major Targets Equipment and furniture for
establishment of 7 Basic Sciences
Departments, labs and up gradation of
DHQ hospital. Civil works for residences
for faculty & student hostels to be
initiated.
District and Tehsil Gujrat

509 198 Name of the Scheme Establishment of Services 0.000 1,244.300 759.233 150.000 119.626 0.000 0.000 150.000 119.626 269.626 215.441 0.000 0.000
Institute of Medical Sciences,
Lahore.
Approval Date Approved 19.01.05 17.01.06
Major Components Academic Block, 16-apartments, Boys
and Girls Hostels, equipment and
furniture.
Major Targets Tiling works in academic block in
progress. Civil works to be continued.
Equipment to be procured.
District and Tehsil Lahore

176
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

510 199 Name of the Scheme Construction of Building / 0.000 18.790 5.000 6.030 7.760 0.000 0.000 6.030 7.760 13.790 0.000 0.000 0.000
Provision of Equipment & Staff for
Research in Surgical & Medical
Skills in Services Institute of
Medical Sciences / Services
Hospital, Lahore.
Approval Date Approved 29.11.07
Major Components Civil works and equipments for research
works by medical students.
Major Targets Completion of scheme.
District and Tehsil Lahore

511 200 Name of the Scheme Establishment of Nursing College 0.000 99.087 49.087 13.000 37.000 0.000 0.000 13.000 37.000 50.000 0.000 0.000 0.000
for B.Sc Nursing and Up-
gradation of Lecture Theatres for
Basic Departments, etc in Allama
Iqbal Medical College, Lahore.
Approval Date Approved 29.09.07
Major Components Building, Teaching Aides, Nurses
Training, equipment & furniture.
Major Targets Completion of scheme.
District and Tehsil Lahore

512 201 Name of the Scheme Construction of Forensic 0.000 50.416 0.001 27.910 22.505 0.000 0.000 27.910 22.505 50.415 0.000 0.000 0.000
Department / Mortuary at Allama
Iqbal Medical College / Jinnah
Hospital, Lahore.
Approval Date Approved 18.10.08
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

513 202 Name of the Scheme Establishment of Post-graduate 0.000 1,083.198 105.064 100.000 0.000 0.000 0.000 100.000 0.000 100.000 232.006 400.000 246.128
Medical Institute, Lahore.
Approval Date Approved 24.07.06
Major Components Civil works, equipment and furniture.
Major Targets Roof laid on upper basement. Civil works
to be continued.
District and Tehsil Lahore

177
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

514 203 Name of the Scheme Construction of Forensic 0.000 54.595 0.001 26.973 27.621 0.000 0.000 26.973 27.621 54.594 0.000 0.000 0.000
Department / Mortuary at Lahore
General Hospital / PGMI, Lahore.
Approval Date Approved 18.10.08
Major Components Construction of Forensic Department /
Mortuary.
Major Targets Civil works to be completed and
equipment to be purchased.
District and Tehsil Lahore

515 204 Name of the Scheme Improvement and Upgradation of 0.000 21.281 14.170 0.000 7.111 0.000 0.000 0.000 7.111 7.111 0.000 0.000 0.000
de'Montmorency College of
Dentistry, Lahore (Old Campus).
Approval Date Approved 07.09.06
Major Components Procurement & installation of equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

516 205 Name of the Scheme Establishment of Fatima Jinnah 0.000 2,778.051 332.795 0.000 150.000 0.000 0.000 0.000 150.000 150.000 578.843 750.000 966.413
Institute of Dental Sciences,
Jubilee Town, Lahore.
Approval Date Approved
Major Components Dental College, Dental Hospital,
Paramedics Training Institute and Centre
of Excellence for Post Graduate Students.
Major Targets Civil works on Academic Block to be
continued.
District and Tehsil Lahore

517 206 Name of the Scheme Improvement and Upgradation of 0.000 30.184 22.658 7.526 0.000 0.000 0.000 7.526 0.000 7.526 0.000 0.000 0.000
Post-Graduate College of Nursing
Punjab at Bird wood Road Lahore,
Lahore
Approval Date Approved
Major Components Building
Major Targets Completion of scheme.
District and Tehsil Lahore

178
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

518 207 Name of the Scheme Establishment of New College of 0.000 58.881 32.684 5.600 20.597 0.000 0.000 5.600 20.597 26.197 0.000 0.000 0.000
Nursing, Multan
Approval Date Approved 07.09.07
Major Components Main building, equipment and furniture.
Major Targets Main building completed. Dental chairs
and furniture to be procured.
District and Tehsil Multan

519 208 Name of the Scheme Establishment of an Independent 0.000 428.137 364.246 5.000 58.891 0.000 0.000 5.000 58.891 63.891 0.000 0.000 0.000
Dental College Block at Nishtar
Medical College, Multan
Approval Date Approved 07.09.04 20.06.05 23.06.06
07.10.07
Major Components Main building, equipment and furniture.
Major Targets Main building completed. Dental chairs
and furniture to be procured.
District and Tehsil Multan

520 209 Name of the Scheme Construction of Phase-II Sheikh 0.000 4,990.381 26.000 91.038 15.000 0.000 0.000 91.038 15.000 106.038 369.597 513.518 3,975.228
Zayed Medical Complex, R.Y. Khan
Approval Date Approved 27.10.07 15.01.08
13.4.09
Major Components Medical College, Hospital, Hostels and
Residences. Development of
Management Systems.
Major Targets Civil works on main building medical
college to be continued.
District and Tehsil Rahim Yar Khan , R.Y. Khan

521 210 Name of the Scheme Nursing Health Care in Punjab in 0.000 3,205.493 356.016 0.000 305.680 0.000 0.000 0.000 305.680 305.680 406.980 441.717 1,695.100
partnership with Fatima Memorial
Hospital, Lahore.
Approval Date Approved 28.11.07
Major Components Training of nurses in partnership with
Fatima Memorial Hospital.
Major Targets Nurses to be trained. 140 nurses in
Diploma in General Nursing, 100 in Post-
Basic Diploma, 50 in Post Registered
Nureses B.Sc. Nursing and 50 in B.Sc.
Nursing.
District and Tehsil Punjab

179
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

522 211 Name of the Scheme Upgradation of training facilities 0.000 69.600 50.514 0.000 19.086 0.000 0.000 0.000 19.086 19.086 0.000 0.000 0.000
in 44 General Nursing Schools in
Punjab.
Approval Date Approved 05.08.04
Major Components Equipment, buses, Educational Models
and Books.
Major Targets Completion of scheme.
District and Tehsil Punjab

Sub-Total: Medical Education 0.000 15,631.313 2,210.710 566.385 1,111.437 0.000 0.000 566.385 1,111.437 1,677.822 2,352.867 2,507.045 6,882.869

Research & Development


523 212 Name of the Scheme Establishment of PCR based 0.000 24.740 23.740 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
diagnostic laboratory, Lahore
Approval Date Approved 04.02.09
Major Components Building and equipment
Major Targets Completion of scheme.
District and Tehsil Lahore

524 213 Name of the Scheme Survey of Child Blindness in 0.000 184.660 30.868 0.000 26.390 0.000 0.000 0.000 26.390 26.390 73.610 53.792 0.000
Punjab by the Punjab Institute of
Preventive Ophthalmology, KEMU
/ Mayo Hospital, Lahore.
Approval Date Approved 29.11.07
Major Components Survey for finding out causes for child
blindness and low vision in Punjab.
Major Targets Survey of 100,000 children to determine
the causes of blindness and low vision in
Punjab.
District and Tehsil Lahore

525 214 Name of the Scheme Upgradation of Lab. of 0.000 54.215 6.000 25.955 22.260 0.000 0.000 25.955 22.260 48.215 0.000 0.000 0.000
Bacteriologist Punjab at Institute
of Public Health, Lahore.
Approval Date Approved 13.09.08
Major Components Civil works. Equipment.
Major Targets Completion of scheme.
District and Tehsil Lahore

180
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

526 215 Name of the Scheme Accommodation and Upgradation 0.000 76.420 20.000 23.900 32.520 0.000 0.000 23.900 32.520 56.420 0.000 0.000 0.000
of Food Testing Laboratory
(Government Public Analyst
Laboratory), Lahore.
Approval Date Approved 11.07.07
Major Components Building, Staff, Equipment, Furniture &
Vehicles for Food Testing / Analysis.
Major Targets Completion of scheme.
District and Tehsil Lahore

527 216 Name of the Scheme Strengthening of Health 0.000 194.780 44.222 0.000 23.109 0.000 0.000 0.000 23.109 23.109 127.021 0.000 0.000
Management Information System
in Punjab.
Approval Date Approved 21.08.07
Major Components JICA HMIS Model to be made
operational in all districts.
Major Targets Procurement of software modules, IT
equipment and training of staff.
District and Tehsil Punjab

Sub-Total: Research & Development 0.000 534.815 124.830 49.855 105.279 0.000 0.000 49.855 105.279 155.134 200.631 53.792 0.000
Total: ON-GOING SCHEMES 2,304.881 56,819.428 17,605.016 2,856.035 4,068.965 0.000 100.000 2,856.035 4,168.965 7,025.000 9,843.441 8,889.676 13,455.767

NEW SCHEMES
Preventive & Primary Health Care
528 217 Name of the Scheme Prevention and Control of 0.000 1,000.000 0.000 0.000 225.000 0.000 0.000 0.000 225.000 225.000 435.000 340.000 0.000
Hepatitis in Punjab
Approval Date Un-Approved
Major Components Prevention of Hepatitis. Screening &
Diagnosis. Treatment and management.
Targeted initiatives. Training & Capacity
building. Establishment of PMU
Major Targets Treatment of 35,500 patients. Stop the
transmission of Hepatitis B and C.
Reduce the incidence and mortality by
the disease. Provision of free treatment to
poor and deserving patients. Education
and awareness.
District and Tehsil Punjab

181
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

529 218 Name of the Scheme Strengthening Expanded 0.000 200.000 0.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 150.000 0.000 0.000
Programme for Immunization (EPI)
Approval Date Un-Approved
Major Components Immunization delivery system, Human
Resource Development, Communication,
Advocacy and Programme Management
Major Targets 84% Immunization of 3.29 million children
under one year age and 14 million
children under 5 years age. Purchase of
cold chains and staff salary.
District and Tehsil Punjab

530 219 Name of the Scheme TB Control Programme 0.000 300.000 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 225.000 0.000 0.000
Approval Date Un-Approved
Major Components Diagnosis centers in hospitals, free
medicine to all patients, laboratory
supplies, awareness and programme
management Directly Observed
Treatment Short Courses (DOTS)
Major Targets DOTS Coverage: 100% Case Detection
Rate all types: 90% Treatment success
rate: 85% free medicine to all patients,
laboratory supplies, awareness and
programme management
District and Tehsil Punjab

531 220 Name of the Scheme Punjab Thalassemia Prevention 0.000 149.503 0.000 0.000 40.000 0.000 0.000 0.000 40.000 40.000 60.000 49.503 0.000
Program
Approval Date Approved 20.3.09
Major Components Awareness, screening out carriers,
genetic counseling and pre-natal
diagnosis.
Major Targets Awareness, screening out carriers,
genetic counseling and pre-natal
diagnosis.
District and Tehsil Punjab

182
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

532 221 Name of the Scheme Roll Back Malaria (RBM) 0.000 185.680 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 55.000 100.680 0.000
Approval Date Approved 9.2.09
Major Components Case detection, diagnosis, and treatment.
Capacity building of staff, Research
activities and monitoring & evaluation
Major Targets Early detection and prompt treatment at
health outlets and community level
(outreach service). Free medicines to be
distributed. Reduced reliance on
insecticide. Spraying in selected union
councils in endemic areas.
District and Tehsil Punjab

533 222 Name of the Scheme National Blood Transfusion 200.530 323.750 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 20.000 20.000 253.750
Service, Punjab
Approval Date Approved 25.4.09
Major Components Setting up a network of Regional Blood
Transfusion Centres (RBTCs) linked to
Hospital Based Blood Banks (HBBBs).
Major Targets Setting up a network of Regional Blood
Transfusion Centres (RBTCs) linked to
Hospital Based Blood Banks (HBBBs).
The RBTCs will serve as blood
procurement and distribution centres
ensuring quality systems.
District and Tehsil Punjab

534 223 Name of the Scheme Dengue Control Program in Punjab 0.000 60.000 0.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 40.000 0.000 0.000
Approval Date Un-Approved
Major Components Integrated Vector Control and
Strengthening Disease Surveillance
Major Targets Integrated Vector Control and
Strengthening Disease Surveillance
District and Tehsil Punjab

183
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

535 224 Name of the Scheme Introduction of Mobile Health 0.000 300.000 0.000 0.000 300.000 0.000 0.000 0.000 300.000 300.000 0.000 0.000 0.000
Units at Tehsil Level (Pilot)
Approval Date Un-Approved
Major Components Introduction of Mobile Health Units for
diagnostic and treatment at Tehsil level.
Major Targets Mobile Health Units to make up for
deficiencies of static coverage and
provide diagnostic and treatment facilities
at remote areas.
District and Tehsil Punjab

536 225 Name of the Scheme Nutrition Support Project 0.000 100.000 0.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 30.000 50.000 0.000
Approval Date Un-Approved
Major Components Provision of supplements and awareness
for nutrition.
Major Targets Provision of supplements and awareness
for nutrition.
District and Tehsil Punjab

Sub-Total: Preventive & Primary Health Care 200.530 2,618.933 0.000 0.000 790.000 0.000 0.000 0.000 790.000 790.000 1,015.000 560.183 253.750

Accelerated Program for Health Care


537 226 Name of the Scheme Construction of 150 bedded 0.000 200.000 0.000 40.000 0.000 0.000 0.000 40.000 0.000 40.000 55.000 55.000 50.000
Hospital at Murree
Approval Date Un-Approved
Major Components Provision of 150 beds. Building,
equipment and furniture
Major Targets Civil works to be taken up.
District and Tehsil Rawalpindi , Murree

538 227 Name of the Scheme Upgradation of Govt. General 0.000 924.633 0.000 200.000 200.000 0.000 0.000 200.000 200.000 400.000 524.633 0.000 0.000
Hospital Ghulam Muhammadabad,
Faisalabad
Approval Date Approved 13.4.09
Major Components Addition of 200-beds, Building and
Equipment
Major Targets Civil works to be taken up and
procurement of equipment
District and Tehsil Faisalabad

184
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

539 228 Name of the Scheme Upgradation of DHQ Hospital, 0.000 100.000 0.000 19.000 1.000 0.000 0.000 19.000 1.000 20.000 80.000 0.000 0.000
Toba Tek Singh
Approval Date Un-Approved
Major Components Building and Equipment
Major Targets Civil works and equipment
District and Tehsil Toba Tek Singh , T.T.Singh

540 229 Name of the Scheme Establishment of 50-Bedded 0.000 120.000 0.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 90.000 0.000 0.000
Hospital on Western Side of
Gujranwala City
Approval Date Un-approved
Major Components Building & equipment
Major Targets Civil Works to be taken up
District and Tehsil Gujranwala

541 230 Name of the Scheme Establishment of ICU and Ward at 0.000 120.000 0.000 15.000 15.000 0.000 0.000 15.000 15.000 30.000 90.000 0.000 0.000
DHQ Hospital, Gujranwala
Approval Date Un-Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Gujranwala

542 231 Name of the Scheme Upgradation of DHQ Hospital, 0.000 200.000 0.000 19.000 1.000 0.000 0.000 19.000 1.000 20.000 180.000 0.000 0.000
Hafizabad
Approval Date Un-Approved
Major Components Addition of 125 beds. Building,
Equipment and furniture
Major Targets Civil works and procurement of
equipment
District and Tehsil Hafizabad

543 232 Name of the Scheme Construction of THQ Hospital, 0.000 173.707 0.000 20.000 0.000 0.000 0.000 20.000 0.000 20.000 40.000 70.000 43.707
Sarai Alamgir, District Gujrat.
Approval Date Approved 29.5.09
Major Components 60-bedded building, equipment and
furniture
Major Targets Civil works to be taken up.
District and Tehsil Gujrat , Sarai Alamgir

185
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

544 233 Name of the Scheme Establishment of DHQ Hospital, 0.000 955.159 0.000 120.000 5.000 0.000 0.000 120.000 5.000 125.000 415.000 415.159 0.000
M.B. Din (on cost sharing basis)
Approval Date Approved 13.4.09
Major Components Building Equipment and Furniture
Major Targets Civil works to be taken up
District and Tehsil Mandi Bahauddin , M.B. Din

545 234 Name of the Scheme Establishment of THQ Hospital 0.000 150.000 0.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 135.000 0.000 0.000
Malikwal, District M.B. Din
Approval Date Un-Approved
Major Components 40-bedded building, equipment and
furniture.
Major Targets Completion of civil works
District and Tehsil Mandi Bahauddin , M.B. Din

546 235 Name of the Scheme Establishment of ICU, Neurology 0.000 180.206 0.000 15.206 14.000 0.000 0.000 15.206 14.000 29.206 0.000 0.000 0.000
Ward, Burn Unit and Orthopedic
Ward, Allama Iqbal Memorial
Hospital, Sialkot
Approval Date Un-Approved
Major Components Building and Equipment
Major Targets Completion of scheme.
District and Tehsil Sialkot

547 236 Name of the Scheme Eatablishment of ICU, 0.000 20.000 0.000 10.000 10.000 0.000 0.000 10.000 10.000 20.000 0.000 0.000 0.000
Government Sardar Begum
Hospital, Sialkot
Approval Date Un-Approved
Major Components Building and equipment.
Major Targets Completion of scheme.
District and Tehsil Sialkot

548 237 Name of the Scheme Provision of CT Scan at Govt. 0.000 160.000 0.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 60.000 0.000 0.000
Said Mitha Hospital and MRI at
Mian Muhammad Nawaz Sharif
Hospital, Yakki Gate, Lahore
Approval Date Un-Approved
Major Components CT Scan Equipment
Major Targets CT Scan Equipment
District and Tehsil Lahore

186
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

549 238 Name of the Scheme Construction of Emergency and 0.000 310.578 0.000 21.180 0.000 0.000 0.000 21.180 0.000 21.180 289.398 0.000 0.000
Trauma Center at Government
Mian Muhammad Nawaz Sharif
Hospital, Lahore
Approval Date Approved 13.04.09
Major Components Building and Equipment
Major Targets Construction of building civil works
District and Tehsil Lahore

550 239 Name of the Scheme Establishment of 20-Bedded 0.000 80.000 0.000 25.180 0.000 0.000 0.000 25.180 0.000 25.180 54.820 0.000 0.000
Hospital at Ghaziabad Aziz Bhatti
Town, Lahore
Approval Date Un-Approved
Major Components 20-bedded building, equipment and
furniture
Major Targets Civil works to be taken up.
District and Tehsil Lahore

551 240 Name of the Scheme Establishment of 40 bedded 0.000 177.982 0.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 80.000 67.982 0.000
Tehsil level Hospital at Lal
Quarters Samanabad, Lahore
Approval Date Approved 18.10.08
Major Components 40-bedded building, equipment and
furniture
Major Targets Civil works to be taken up.
District and Tehsil Lahore

552 241 Name of the Scheme Upgradation of Governor's House 0.000 5.400 0.000 0.000 5.400 0.000 0.000 0.000 5.400 5.400 0.000 0.000 0.000
Medical Center, Lahore
Approval Date Approved 27.11.07
Major Components Equipment
Major Targets Procurement of equipment
District and Tehsil Lahore

187
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

553 242 Name of the Scheme Establishment of 40 bedded 0.000 100.000 0.000 25.000 0.000 0.000 0.000 25.000 0.000 25.000 75.000 0.000 0.000
Hospital at Roshan Bheela,
District Kasur
Approval Date Un-Approved
Major Components 40-bedded building, equipment and
furniture
Major Targets Civil works to be taken up.
District and Tehsil Kasur

554 243 Name of the Scheme Upgradation of DHQ Hospital 0.000 100.000 0.000 19.000 1.000 0.000 0.000 19.000 1.000 20.000 80.000 0.000 0.000
Okara
Approval Date Un-Approved
Major Components A 40 bedded Cardiology ward10 bedded
CCU ward40 bedded Urology ward with
Dialysis unit40-bedded C-Neuro Surgery
ward along with CT Scan
Major Targets Civil works to be taken up.
District and Tehsil Okara

555 244 Name of the Scheme Construction of Residences at 0.000 59.981 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 49.981 0.000 0.000
THQ Hospital Dunyapur, District
Lodhran
Approval Date Un-Approved
Major Components Residences
Major Targets Civil works on residences to be taken up.
District and Tehsil Lodhran , Dunyapur

556 245 Name of the Scheme Establishment of Trauma Centre 0.000 90.000 0.000 30.000 0.000 0.000 0.000 30.000 0.000 30.000 60.000 0.000 0.000
at DHQ Hospital, D.G.Khan
Approval Date Un-Approved
Major Components Civil work / purchase of equipment.
Major Targets Civil work.
District and Tehsil Dera Ghazi Khan , D.G.Khan

557 246 Name of the Scheme Upgradation of DHQ Hospital, 0.000 60.000 0.000 30.000 5.000 0.000 0.000 30.000 5.000 35.000 25.000 0.000 0.000
Layyah
Approval Date Un-Approved
Major Components Addition of 40-beds at the land of Thal
Dispensary. Building and Equipment
Major Targets Civil works to be initiated.
District and Tehsil Layyah

188
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

558 247 Name of the Scheme Upgradation of THQ Hospital, 0.000 30.000 0.000 10.000 20.000 0.000 0.000 10.000 20.000 30.000 0.000 0.000 0.000
Khanpur District R.Y. Khan
Approval Date Un-Approved
Major Components Addition of 60-beds, building, equipment
and furniture.
Major Targets Civil works to be taken up.
District and Tehsil Rahim Yar Khan , Khanpur

559 248 Name of the Scheme Strengthening Primary Health 0.000 800.000 0.000 300.000 500.000 0.000 0.000 300.000 500.000 800.000 0.000 0.000 0.000
Care (RHCs) and Secondary
Health Care Facilities in Punjab
Approval Date Un-approved
Major Components Provision of Building and Equipment for
RHCs and DHQ / THQ Hospitals
Major Targets Provision of Building and Equipment for
RHCs and DHQ / THQ Hospitals
District and Tehsil Punjab

560 249 Name of the Scheme Establishment of Separate 0.000 1,000.000 0.000 200.000 300.000 0.000 0.000 200.000 300.000 500.000 500.000 0.000 0.000
Emergency Blocks in 10 DHQ
Hospitals
Approval Date Un-Approved
Major Components Building & Equipment
Major Targets Construction of Emergency Block and
Procurement of equipment for all
emergency cases.
District and Tehsil Punjab

189
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

561 250 Name of the Scheme Piloting of Model THQ Hospitals 0.000 500.000 0.000 100.000 125.000 0.000 0.000 100.000 125.000 225.000 275.000 0.000 0.000
as Linchpin of Service delivery in
Punjab
Approval Date Un-Approved
Major Components Equipment for THQ Hospital and
residential enclave for doctors working in
RHCs / BHUs.
Major Targets Model THQ Hospital to serve as a base
for providing Primary Health Care
facilities by accommodation facilities for
doctors posted in RHCs / BHUs alongwith
joint transportation facility. Professional
skills will improve which will facilitate in
implementation of Minimum Service
Delivry Standards.
District and Tehsil Punjab

Sub-Total: Accelerated Program for Health Care 0.000 6,617.646 0.000 1,303.566 1,302.400 0.000 0.000 1,303.566 1,302.400 2,605.966 3,158.832 608.141 93.707

Tertiary Care Hospitals


562 251 Name of the Scheme Upgradation of Gastroenterology, 0.000 130.000 0.000 0.000 50.683 0.000 0.000 0.000 50.683 50.683 122.517 0.000 0.000
Hepatology & Endoscopy in Holy
Family Hospital, Rawalpindi
Approval Date Un-Approved
Major Components Equipment
Major Targets Equipment for Gastroenterology,
Hepatology & Endoscopy
District and Tehsil Rawalpindi

563 252 Name of the Scheme Rawalpindi Institute of Cardiology 0.000 2,500.000 0.000 90.000 10.000 0.000 0.000 90.000 10.000 100.000 500.000 500.000 1,400.000
Approval Date Un-Approved
Major Components 200-bedded building, equipment and
furniture etc.
Major Targets Construction of building
District and Tehsil Rawalpindi

190
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

564 253 Name of the Scheme Institute of Urology & 0.000 2,500.000 0.000 90.000 10.000 0.000 0.000 90.000 10.000 100.000 500.000 500.000 1,400.000
Transplantation, Rawalpindi
Approval Date Un-Approved
Major Components 200-bedded building, equipment and
furniture etc.
Major Targets Construction of building
District and Tehsil Rawalpindi

565 254 Name of the Scheme Improvement / Upgradation of 0.000 115.651 0.000 20.000 5.000 0.000 0.000 20.000 5.000 25.000 90.651 0.000 0.000
DHQ Hospital, Faisalabad
Approval Date Approved 29.11.07
Major Components Building & Equipment
Major Targets Civil works to be taken up
District and Tehsil Faisalabad

566 255 Name of the Scheme Upgradation of Diagnostic & 0.000 18.000 0.000 0.000 18.000 0.000 0.000 0.000 18.000 18.000 0.000 0.000 0.000
Research Centre at Eye
Department, Allied Hospital,
Faisalabad
Approval Date Approved 20.3.2009
Major Components Equipment
Major Targets Purchase of Equipment for Eye Ward
District and Tehsil Faisalabad

567 256 Name of the Scheme Purchase of 6 ambulances for 0.000 24.000 0.000 0.000 24.000 0.000 0.000 0.000 24.000 24.000 0.000 0.000 0.000
Allied Hospital, Faisalabad
Approval Date Approved 27.4.09
Major Components 6 ambulances
Major Targets Purchase of 6 ambulances
District and Tehsil Faisalabad

568 257 Name of the Scheme Upgradation of Pediatric 0.000 31.806 0.000 0.000 31.806 0.000 0.000 0.000 31.806 31.806 0.000 0.000 0.000
Gastroenterology and Hepatology
Department and Establishment of
Pediatric Endoscopy Unit,
Children Hospital, Lahore
Approval Date Approved 20.3.09
Major Components Equipment
Major Targets Procurement of Equipment
District and Tehsil Lahore

191
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

569 258 Name of the Scheme Upgradation of Neuro Surgery 0.000 198.890 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 168.890 0.000 0.000
Department, Mayo Hospital,
Lahore
Approval Date Approved 20.3.09
Major Components Equipment
Major Targets Equipment for Neuro Surgery
District and Tehsil Lahore

570 259 Name of the Scheme Procurement of Equipment for 0.000 45.500 0.000 0.000 36.500 0.000 0.000 0.000 36.500 36.500 9.000 0.000 0.000
Cardiology Department, Mayo
Hospital, Lahore
Approval Date Approved 20.3.09
Major Components Equipment
Major Targets Procurement of equipment
District and Tehsil Lahore

571 260 Name of the Scheme Upgradation of Plastic Surgery 0.000 195.700 0.000 0.000 29.396 0.000 0.000 0.000 29.396 29.396 166.304 0.000 0.000
Unit, Mayo Hospital, Lahore
Approval Date Approved 27.4.09
Major Components Equipment
Major Targets Procurement of equipment
District and Tehsil Lahore

572 261 Name of the Scheme Upgradation of Neuro-surgery 0.000 121.548 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 111.548 0.000 0.000
Department, Sir Ganga Ram
Hospital, Lahore
Approval Date Approved 27.11.08
Major Components Equipment
Major Targets Modular Operation TheatreHVAC Unit,
Neuro Navigation System, Operating
Microscope, ICU Ventilator, etc.
District and Tehsil Lahore

573 262 Name of the Scheme Purchase of Equipment for Sir 0.000 130.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 120.000 0.000 0.000
Ganga Ram Hospital, Lahore
Approval Date Approved 27.11.08
Major Components Equipment
Major Targets Procurement of equipment
District and Tehsil Lahore

192
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

574 263 Name of the Scheme Construction of 400 bedded 0.000 600.000 0.000 5.000 0.000 0.000 0.000 5.000 0.000 5.000 195.000 200.000 200.000
Fatima Block, Sir Ganga Ram
Hospital, Lahore (4 Modules of
100 Beds each)
Approval Date Un-Approved
Major Components Building, Equipment and Furniture
Major Targets Civil works to be taken up
District and Tehsil Lahore

575 264 Name of the Scheme Expansion and Upgradation of 0.000 94.050 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 84.050 0.000 0.000
Cardiovascular Services, Jinnah
Hospital, Lahore
Approval Date Approved 27.04.09
Major Components Equipment
Major Targets Procurement of equipment including
Angiography machine
District and Tehsil Lahore

576 265 Name of the Scheme Extension of 10 bedded ICU 0.000 48.382 0.000 12.497 0.000 0.000 0.000 12.497 0.000 12.497 35.885 0.000 0.000
Jinnah Hospital, Lahore
Approval Date Approved 9.2.09
Major Components Building and equipment
Major Targets Civil works to be completed.
District and Tehsil Lahore

577 266 Name of the Scheme Establishment of Laparoscopic 0.000 198.000 0.000 0.000 54.500 0.000 0.000 0.000 54.500 54.500 113.500 0.000 0.000
Surgery Centre, AIMC / Jinnah
Hospital, Lahore
Approval Date Approved
Major Components Equipment.
Major Targets Purchase of equipment.
District and Tehsil Lahore

578 267 Name of the Scheme Provision of two Angiography 0.000 160.000 0.000 0.000 80.000 0.000 0.000 0.000 80.000 80.000 80.000 0.000 0.000
Machines in Punjab Institute of
Cardiology, Lahore
Approval Date Approved 09.02.09
Major Components Two Angiography Machines
Major Targets Procurement of Angiography Machine
District and Tehsil Lahore

193
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

579 268 Name of the Scheme Renovation of Building and 0.000 120.000 0.000 5.000 5.000 0.000 0.000 5.000 5.000 10.000 110.000 0.000 0.000
Procuremet of Electro-Medical
Equipment for Services Hospital,
Lahore
Approval Date Un-Approved
Major Components Addition / Alteration in existing building
and procurement of equipment on need
basis.
Major Targets Renovation of existing building.
District and Tehsil Lahore

580 269 Name of the Scheme Establishment of Liver Disease 0.000 1,300.000 0.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 300.000 300.000 600.000
Management Cell, Lahore
Approval Date Un-Approved
Major Components Procurement of equipment
Major Targets Procurement of equipment
District and Tehsil Lahore

581 270 Name of the Scheme Establishment of Kidney Centre, 0.000 400.000 0.000 195.000 5.000 0.000 0.000 195.000 5.000 200.000 200.000 0.000 0.000
Multan
Approval Date Un-Approved
Major Components Building and equipment
Major Targets Civil works to be taken up
District and Tehsil Multan

582 271 Name of the Scheme Renovation of Nishtar Medical 0.000 150.000 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 140.000 0.000 0.000
College, Multan
Approval Date Un-Approved
Major Components Renovation work on old college building.
Major Targets Renovation.
District and Tehsil Multan

583 272 Name of the Scheme Construction of Sarai for 0.000 9.000 0.000 9.000 0.000 0.000 0.000 9.000 0.000 9.000 0.000 0.000 0.000
Attendants in Nishtar Hospital,
Multan
Approval Date Un-Approved
Major Components Building and furniture
Major Targets Civil works and procurement of furniture
District and Tehsil Multan

194
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

584 273 Name of the Scheme Construction of Two Pedestrain 0.000 28.000 0.000 15.000 0.000 0.000 0.000 15.000 0.000 15.000 13.000 0.000 0.000
Bridges at Nishtar Medical
College, Multan
Approval Date Un-Approved
Major Components Bridges
Major Targets Bridges
District and Tehsil Multan

585 274 Name of the Scheme Expansion of Emergency Block in 0.000 155.160 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 145.160 0.000 0.000
Institute of Cardiology, Multan
Approval Date Approved 18.4.09
Major Components Building and equipment
Major Targets Civil works.
District and Tehsil Multan

586 275 Name of the Scheme Upgradation of Thalassaemia Unit 0.000 400.000 0.000 100.000 0.000 0.000 0.000 100.000 0.000 100.000 300.000 0.000 0.000
and Bone Marrow Transplant
Centre at Bahawal Victoria
Hospital, Bahawalpur
Approval Date Un-Approved
Major Components Building, Equipment, Furniture, etc.
Major Targets Civil works and procurement of
equipment
District and Tehsil Bahawalpur

587 276 Name of the Scheme Establishment of 20 bedded Burn 0.000 300.000 0.000 10.000 0.000 0.000 0.000 10.000 0.000 10.000 290.000 0.000 0.000
Unit at B.V. Hospital, Bahawalpur
Approval Date Un-Approved
Major Components 20-bedded building & electro medical
equipments
Major Targets Civil works to be taken up
District and Tehsil Bahawalpur , Bahawalpur

588 277 Name of the Scheme Establishment of Children 0.000 300.000 0.000 95.000 5.000 0.000 0.000 95.000 5.000 100.000 200.000 0.000 0.000
Complex, B.V. Hospital,
Bahawalpur
Approval Date Un-Approved
Major Components Building, equipment and furniture
Major Targets Civil works to be taken up
District and Tehsil Bahawalpur , Bahawalpur

195
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

589 278 Name of the Scheme Construction of Gynae & 0.000 300.000 0.000 5.000 0.000 0.000 0.000 5.000 0.000 5.000 295.000 0.000 0.000
Obstetric Care Complex, B.V.
Hospital, Bahawalpur
Approval Date Un-Approved
Major Components Building, equipment and furniture
Major Targets Civil works to be taken up
District and Tehsil Bahawalpur , Bahawalpur

590 279 Name of the Scheme Establishment of Orthopaedic 0.000 150.000 0.000 4.000 1.000 0.000 0.000 4.000 1.000 5.000 145.000 0.000 0.000
Unit-II at B.V. Hospital, Bahawalpur
Approval Date Un-Approved
Major Components Building, equipment and furniture
Major Targets Civil works to be taken up
District and Tehsil Bahawalpur , Bahawalpur

591 280 Name of the Scheme Construction of Sheikh Zayed 0.000 2.500 0.000 0.000 2.500 0.000 0.000 0.000 2.500 2.500 0.000 0.000 0.000
Institute of Cardiology in Rahim
Yar Khan (PC-II)
Approval Date Un-Approved
Major Components Feasibility study by consultants.
Major Targets Feasibility study including preparation of
PC-I.
District and Tehsil Rahim Yar Khan

592 281 Name of the Scheme Provision of Cell Separator 0.000 169.400 0.000 0.000 9.800 0.000 0.000 0.000 9.800 9.800 100.180 59.410 0.010
Machines (Aphaeresis Machines)
and other Blood Component
Preparation Equipment to Blood
Banks of all Teaching Hospitals of
Punjab
Approval Date Approved 27.04.09
Major Components Equipment
Major Targets Procurement of equipment
District and Tehsil Punjab

Sub-Total: Tertiary Care Hospitals 0.000 10,895.587 0.000 675.497 538.185 0.000 0.000 675.497 538.185 1,213.682 4,535.685 1,559.410 3,600.010

196
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Medical Education
593 282 Name of the Scheme Additional Compensation for Land 0.000 4.000 0.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 0.000 0.000 0.000
acquired for Rawalpindi Medical
College Colony, Rawalpindi
Approval Date Un-Approved
Major Components Payment as compensation of Land under
court judgment
Major Targets Payment as compensation of Land.
District and Tehsil Rawalpindi

594 283 Name of the Scheme Establishment of Medical College, 0.000 2,000.000 0.000 98.000 2.000 0.000 0.000 98.000 2.000 100.000 500.000 500.000 900.000
Gujranwala
Approval Date Un-Approved
Major Components Building, Equipment, Furninture, Training,
etc.
Major Targets Civil works to be taken up.
District and Tehsil Gujranwala

595 284 Name of the Scheme Establishment of Medical College, 0.000 2,000.000 0.000 45.000 5.000 0.000 0.000 45.000 5.000 50.000 512.000 500.000 938.000
Sialkot (Public-Private
Partnership)
Approval Date Un-Approved
Major Components Building, Equipment, Furniture, Training,
etc.
Major Targets Civil Works to be taken up.
District and Tehsil Sialkot

596 285 Name of the Scheme Upgradation of Pathology Lab, 0.000 43.617 0.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 28.617 0.000 0.000
Allama Iqbal Medical College,
Lahore
Approval Date Approved
Major Components Purchase of equipment.
Major Targets Purchase of equipment.
District and Tehsil Lahore

597 286 Name of the Scheme Providing and Installation of 0.000 4.520 0.000 0.000 4.500 0.000 0.000 0.000 4.500 4.500 0.000 0.000 0.020
Passenger Lift in King Edward
Medical University, Lahore
Approval Date Approved 9.2.09
Major Components Passenger lift.
Major Targets Completion of scheme.
District and Tehsil Lahore
197
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

598 287 Name of the Scheme Training Plan for Paramedics in all 0.000 8.680 0.000 0.000 8.680 0.000 0.000 0.000 8.680 8.680 0.000 0.000 0.000
districts of Punjab, Institute of
Public Health, Lahore
Approval Date Approved
Major Components Training of paramedics in various
specialities for improving skills.
Major Targets Training in various specialities.
District and Tehsil Lahore

599 288 Name of the Scheme Establishment of Women Medical 0.000 1.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
College, Multan (PC-II)
Approval Date Un-Approved
Major Components Feasibility Study by consultants.
Major Targets Feasibility Study
District and Tehsil Multan

600 289 Name of the Scheme Establishment of Medical College, 0.000 2,000.000 0.000 20.000 5.000 0.000 0.000 20.000 5.000 25.000 515.000 500.000 960.000
Sahiwal
Approval Date Un-Approved
Major Components Building, Equipment, Furniture, Training,
etc.
Major Targets Civil Works to be taken up.
District and Tehsil Sahiwal

601 290 Name of the Scheme Establishment of Medical College, 0.000 2,000.000 0.000 20.000 5.000 0.000 0.000 20.000 5.000 25.000 515.000 500.000 960.000
D.G. Khan
Approval Date Un-Approved
Major Components Building, Equipment, Furniture, Training,
etc.
Major Targets Civil Works to be taken up
District and Tehsil Dera Ghazi Khan , D.G.Khan

602 291 Name of the Scheme Upgradation of Nursing Hostel at 0.000 62.884 0.000 20.520 0.000 0.000 0.000 20.520 0.000 20.520 42.364 0.000 0.000
Sheikh Zayed Medical College /
Hospital, Rahim Yar Khan
Approval Date Approved 9.2.09
Major Components Hostel, Building, Furniture
Major Targets Civil Works for nursing hostel
District and Tehsil Rahim Yar Khan

Sub-Total: Medical Education 0.000 8,124.701 0.000 203.520 50.180 0.000 0.000 203.520 50.180 253.700 2,112.981 2,000.000 3,758.020

198
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Research & Development


603 292 Name of the Scheme Establishment of Drugs Testing 0.000 30.000 0.000 20.000 10.000 0.000 0.000 20.000 10.000 30.000 0.000 0.000 0.000
Laboratory, Rawalpindi
Approval Date Un-Approved
Major Components Construction of Building & Purchase of
Equipment
Major Targets Construction of Building & Purchase of
Equipment
District and Tehsil Rawalpindi

604 293 Name of the Scheme Establishment of Food Testing 0.000 20.000 0.000 10.000 10.000 0.000 0.000 10.000 10.000 20.000 0.000 0.000 0.000
Laboratory, Rawalpindi
Approval Date Un-Approved
Major Components Purchase of Equipment/ Machinery,
Furniture, Glass etc.
Major Targets Purchase of Equipment/ Machinery,
Furniture, Glass etc.
District and Tehsil Rawalpindi

605 294 Name of the Scheme Establishment of Drugs Testing 0.000 30.000 0.000 20.000 10.000 0.000 0.000 20.000 10.000 30.000 0.000 0.000 0.000
Laboratory, Faisalabad
Approval Date Un-Approved
Major Components Construction of Building & Purchase of
Equipment
Major Targets Construction of Building & Purchase of
Equipment
District and Tehsil Faisalabad

606 295 Name of the Scheme Establishment of Food Testing 0.000 20.000 0.000 10.000 10.000 0.000 0.000 10.000 10.000 20.000 0.000 0.000 0.000
Laboratory, Faisalabad
Approval Date Un-Approved
Major Components Purchase of Equipment/ Machinery,
Furniture, Glass etc.
Major Targets Purchase of Equipment/ Machinery,
Furniture, Glass etc.
District and Tehsil Faislabad

199
HEALTH (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

607 296 Name of the Scheme Establishment of Mobile Food 0.000 11.652 0.000 0.000 11.652 0.000 0.000 0.000 11.652 11.652 0.000 0.000 0.000
Testing Laboratory, Lahore
Approval Date Un-Approved
Major Components Purchase of Equipment/ Machinery,
Furniture, Glass etc.
Major Targets Purchase of Equipment/ Machinery,
Furniture, Glass etc.
District and Tehsil Lahore

608 297 Name of the Scheme Upgradation of Drugs Testing 0.000 20.000 0.000 10.000 10.000 0.000 0.000 10.000 10.000 20.000 0.000 0.000 0.000
Laboratory, Multan
Approval Date Un-Approved
Major Components Construction of Building & Purchase of
Equipment
Major Targets Construction of Building & Purchase of
Equipment
District and Tehsil Multan

609 298 Name of the Scheme Establishment of Health Care 0.000 20.000 0.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 15.000 0.000 0.000
Commission, Punjab
Approval Date Un-Approved
Major Components Overall improvement of Health Care
System by establishing HCC.
Major Targets Regulation, performance evaluation and
regular surveillance of health care
institutions.
District and Tehsil Punjab

Sub-Total: Research & Development 0.000 151.652 0.000 70.000 66.652 0.000 0.000 70.000 66.652 136.652 15.000 0.000 0.000
Total: NEW SCHEMES 200.530 28,408.519 0.000 2,252.583 2,747.417 0.000 0.000 2,252.583 2,747.417 5,000.000 10,837.498 4,727.734 7,705.487

Grand Total 2,505.411 85,227.947 17,605.016 5,108.618 6,816.382 0.000 100.000 5,108.618 6,916.382 12,025.000 20,680.939 13,617.410 21,161.254

200
WATER SUPPLY & SANITATION

201
WATER SUPPLY & SANITATION

VISION

Achievement of Millennium Development Goals (MDGs) within the stipulated time period by providing Safe Drinking Water & Sanitation
coverage to the community.

POLICY INTERVENTIONS/CRITERIA

• Identification of Rural Water Supply Schemes on need base particularly in Barani & Brackish areas and involvement of community from
day one in scheme’s identification, execution and monitoring.
• Discouraging provision of “Sewerage System” in the rural areas. Instead, open drains of Type-I & Type-II will be provided in the
compact/consolidated Abadies/Villages. Scattered houses/areas will not qualify to attract this facility.
• Rehabilitation of need based non-functional schemes requiring minimum cost and ensured sustainability.
• “Linking investment with achievements” particularly stepping forward to attain MDGs.
• Only such schemes under would be considered which are technically and financially viable/feasible.
• Priority for Rural water supply schemes and rural sewerage/drainage, PCC initiatives would generally be discouraged.
• No financial contribution/subsidy to the Rural Communities for the O&M of schemes and community will have to generate resources for the
same.
OBJECTIVES/STRATEGIC INTERVENTIONS:

Attaining Millennium Development Goals (MDG`s)

• 961 Water Supply Schemes (88 Urban and 863 Rural) are being executed at a total cost of Rs. 5,122 Million.
• Like wise 622 Sanitation Schemes (92 Urban and 530 Rural) have been conceived at a cost of Rs. 2,394 million.
• 232 schemes costing Rs. 800.00 million are being rehabilitated in the Barani and Brackish areas.
• Execution of these interventions will result into substantial improvement of population coverage and will lead to the attainment of MDGs.

202
Ensuring Sustainability of the Completed Schemes

• Community participation/mobilization has been made mandatory in projects identification & execution for sustainability.
• Formulation of “Regulatory Frame Work” for the maintenance of Rural schemes is under way which will define the role and responsibility of
the community viz a viz the Government functionaries, ensuring sustainability of WATSAN schemes.
• Maintenance of schemes will also be tried on pilot based either through out sourcing or involving the Union Administration in the process.

Judicious Resource Distribution

• Need based resource distribution have been encouraged and more funds provided to the low profiled areas as identified in the MICS 2007-
08.
• Balance maintained between the districts located Northern and Southern part of the province.
• Main emphasis and resource provisions to the Barani and Brackish areas for meeting the public demand and improving the coverage in the
deserving communities.

Ensuring Quality Control

• Water testing laboratories are being established at each district headquarter for continuous water quality monitoring, at source, in the
system and at users end.
• Water filtration plants are being installed in each union council to provide safe drinking water particularly to the rural community.
• “Reverse Osmosis” technology is being promoted where quality drinking water is not economically available.
• Replacement of the damaged water supply lines to avoid intermixing and controlling water born diseases.

203
Improving Sanitation and Environmental Sustainability

• Making “Waste Water Treatment Plant” as an integral part of Urban Sewerage Drainage schemes such as.
o Kasur Environmental Improvement Project with total outlay of Rs.2332 million.
o Provision of Sewerage System Rahim Yar Khan City with treatment plant at the total cost of Rs.2009 million.
• Provision of appropriate disposal station for efficient drainage and disposal of the effluent in the urban localities such as: -
o Water supply and sewerage scheme Arifwala and Pakpattan costing Rs.486 million.
o Urban water supply and Drainage scheme D.G Khan costing Rs.1057 million.
o Provision of south disposal station Okara city costing Rs.275 million.
• Encouraging provision of economical disposal of Rural Sewage by provision of oxidation ponds.
• Making Environmental Impact Analysis (EIA) as an integral part of PC-I for the Urban Sewerage schemes and no intervention will be
undertaken except environmentally friendly.

Preservation of the Water Resources

• Proper management of Ground Water resources and its conservation at Provincial level.
• Controlling over pumpage and maintaining a balance between in and out flows.
• Promoting water metering concept in the rural communities and ensuring 100% metering in the urban localities for economical and efficient
use of water.
Capacity Building of PHED

• Provision of MIS & IT services for data collection, monitoring and capacity building of PHED.
• Digital mapping of the Urban and Rural communities for comprehensive planning and prioritizing the future interventions.
• Establishment of Research and Training institute in PHED.

204
SALIENT FEATURES OF THE PROJECTS TAKEN UNDER MTDF 2009-10

• Need Based.
• Covers all the districts.
• Main focus to the low profiled districts/areas.
• Maintaining balance between the Northern and Southern part of the Province.
• Operationalization of non-functional and closed schemes.
• Providing resources to the sectors lagging in attaining the MDGs.
• Focusing on the main issues i.e. institutional strengthening & capacity building, environmental de-gradation, qualitative policy shift, role of
community, regulatory frame work and public private partnership.

YEAR-WISE RESOURCE PROVISION

9000
8500
8000
8000

7000 6500

6000
5200
Rs. in Million

5000 4500

4000
2900
3000

2000

1000

0
2004-05 2005-06 2006-07 2007-08 2008-09 2009-10
Year

205
SUB-SECTOR WISE ALLOCATIONS

(Rs. in Million)
COMPLETION TARGET
Total
SUB SECTOR ON-GOING NEW TOTAL Schemes
No. of %age
to be
Schemes
completed
Urban Water Supply 1119 453 1572 88 50 55
Urban Sewerage / Drainage 1499 154 1653 92 52 53
Rural Water supply 1875 1675 3550 863 768 83
Rural Sewerage / Drainage 708 33 741 530 227 42
Punjab Basis 535 185 720 16 5 31
Others 264 0 264 13 5 38
TOTAL 6000 2500 8500 1602 1107 69

Sub-Sectoral Weight age

• Water Supply Component 5122 (60%)


• Sewerage Drainage Component 2394 (28%)
• Others 984 (12%)

206
COMPONENT WISE PROJECTIONS FOR THE YEAR 2009-10
Punjab Basis
12%
UWS
18%

RSD
9%

USD
20%

RWS
41%

INVESTMENT VS MILLENNIUM DEVELOPMENT GOALS (MDGS)

Population
Population Population Population
Coverage Additional Population Projected MDG’s
Coverage Coverage Coverage
Sub Sector (Baseline population Coverage year of Targets
(2006-07) (2007-08) (2008-09)
Year 2001) coverage (2009-10) Reaching 2015
( %) ( %) ( %)
( %) ( %) MDG ( %)
Urban Water Supply 56 66.2 72.0 75.5 7.5 83.0 2009-10 80.00
Rural Water Supply 25 30.8 33.0 36.1 2.9 39.0 2020-21 64.62
Urban Sew./Drainage 51 68.5 72.0 76.0 3.0 79.0 2010-11 82.10
Rural Sew./ Drainage 33 41.3 43.8 48.6 3.4 52.0 2015-16 69.85

207
MTDF 2009-12
Water Supply & Sanitation : Summary
Development Programme 2009-10

(Million Rs)
On going Programme New Programme Total
Sub-Sector
Capital Revenue Total F.Aid Total Capital Revenue Total F.Aid G.Total Capital Revenue Total F.Aid Total
RURAL WATER SUPPLY & SANITATION 0.000 2,605.000 2,605.000 0.000 2,605.000 0.000 1,808.000 1,808.000 0.000 1,808.000 0.000 4,413.000 4,413.000 0.000 4,413.000
URBAN WATER SUPPLY & SANITATION 0.000 3,395.000 3,395.000 0.000 3,395.000 0.000 692.000 692.000 0.000 692.000 0.000 4,087.000 4,087.000 0.000 4,087.000
TOTAL 0.000 6,000.000 6,000.000 0.000 6,000.000 0.000 2,500.000 2,500.000 0.000 2,500.000 0.000 8,500.000 8,500.000 0.000 8,500.000
DEVELOPMENT PROGRAMME 2010-11
On going Programme New Programme Total
Sub-Sector
Capital Revenue Total F.Aid Total Capital Revenue Total F.Aid G.Total Capital Revenue Total F.Aid Total
RURAL WATER SUPPLY & SANITATION 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 1,200.000 1,200.000 0.000 1,200.000 0.000 4,200.000 4,200.000 0.000 4,200.000
URBAN WATER SUPPLY & SANITATION 0.000 4,000.000 4,000.000 0.000 4,000.000 0.000 1,800.000 1,800.000 0.000 1,800.000 0.000 5,800.000 5,800.000 0.000 5,800.000
TOTAL 0.000 7,000.000 7,000.000 0.000 7,000.000 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 10,000.000 10,000.000 0.000 10,000.000
DEVELOPMENT PROGRAMME 2011-12
On going Programme New Programme Total
Sub-Sector
Capital Revenue Total F.Aid Total Capital Revenue Total F.Aid G.Total Capital Revenue Total F.Aid Total
RURAL WATER SUPPLY & SANITATION 0.000 3,200.000 3,200.000 0.000 3,200.000 0.000 1,400.000 1,400.000 0.000 1,400.000 0.000 4,600.000 4,600.000 0.000 4,600.000
URBAN WATER SUPPLY & SANITATION 0.000 5,200.000 5,200.000 0.000 5,200.000 0.000 2,200.000 2,200.000 0.000 2,200.000 0.000 7,400.000 7,400.000 0.000 7,400.000
TOTAL 0.000 8,400.000 8,400.000 0.000 8,400.000 0.000 3,600.000 3,600.000 0.000 3,600.000 0.000 12,000.000 12,000.000 0.000 12,000.000
WATER SUPPLY & SANITATION MTDF 2009-10: GRAND TOTAL 30,500.000

208
WATER SUPPLY & SANITATION: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Urban Water Supply 82 0.000 1,118.930 0.000 0.000 0.000 1,118.930 1,118.930 4,040.455 3,670.544
Urban Sewerage Drainage 89 0.000 1,498.829 0.000 0.000 0.000 1,498.829 1,498.829 3,416.721 3,314.574
Rural Water Supply 861 0.000 1,875.863 0.000 0.000 0.000 1,875.863 1,875.863 1,608.754 83.924
Rural Sewerage Drainage 530 0.000 708.398 0.000 0.000 0.000 708.398 708.398 1,544.874 124.178
Punjab Basis 10 0.000 534.980 0.000 0.000 0.000 534.980 534.980 382.652 51.304
Forieign Aided Project 1 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000
PSDP 12 0.000 243.000 0.000 0.000 0.000 243.000 243.000 528.207 528.110
Total: ON-GOING SCHEMES 1,585 0.000 6,000.000 0.000 0.000 0.000 6,000.000 6,000.000 11,521.663 7,772.634
NEW SCHEMES
Urban Water Supply 6 0.000 420.000 0.000 0.000 0.000 420.000 420.000 770.000 845.000
Urban Sewerage Drainage 3 0.000 140.000 0.000 0.000 0.000 140.000 140.000 250.000 215.000
Rural Water Supply 2 0.000 1,755.000 0.000 0.000 0.000 1,755.000 1,755.000 0.000 0.000
Punjab Basis 6 0.000 185.000 0.000 0.000 0.000 185.000 185.000 190.000 200.000
Total: NEW SCHEMES 17 0.000 2,500.000 0.000 0.000 0.000 2,500.000 2,500.000 1,210.000 1,260.000

Grand Total 1,602 0.000 8,500.000 0.000 0.000 0.000 8,500.000 8,500.000 12,731.663 9,032.634

209
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Urban Water Supply
610 1 Name of the Scheme Replacement of Outlived / Old 0.000 25.870 12.860 0.000 16.891 0.000 0.000 0.000 16.891 16.891 0.000 0.000 0.000
Damaged Pipe Lines Attock
(Revised)
Approval Date Apporved 03-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

611 2 Name of the Scheme Replacement of Outlived / Old 0.000 16.176 11.957 0.000 6.645 0.000 0.000 0.000 6.645 6.645 0.000 0.000 0.000
Damaged Pipe Lines Bhakkar
Approval Date Approved 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Bhakkar

612 3 Name of the Scheme Urban Water Supply Scheme, 0.000 35.856 34.331 0.000 2.000 0.000 0.000 0.000 2.000 2.000 0.000 0.000 0.000
Haroonabad
Approval Date Approved 03-12-2008
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 88%
District and Tehsil Bahawalnagar , Haroonabad

613 4 Name of the Scheme Urban Water Supply Scheme, 0.000 83.586 48.096 0.000 10.000 0.000 0.000 0.000 10.000 10.000 38.028 0.000 0.000
Faqir Wali
Approval Date Approved 03-11-2007
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 60%
District and Tehsil Bahawalnagar , Haroonabad

210
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

614 5 Name of the Scheme Replacement of Outlived/Old 0.000 117.949 19.631 0.000 10.000 0.000 0.000 0.000 10.000 10.000 40.000 66.010 0.000
Damaged Pipe Lines
Bahawalnagar
Approval Date Approved 21-03-09
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 22%
District and Tehsil Bahawalnagar

615 6 Name of the Scheme Comprehensive Urban Water 0.000 80.800 11.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 30.000 41.920 0.000
Supply Scheme, Chishtian Phase-
IV
Approval Date Approved 10.11.08
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 23%
District and Tehsil Bahawalnagar , Chishtian

616 7 Name of the Scheme Water Supply Scheme / 0.000 117.249 0.500 0.000 5.000 0.000 0.000 0.000 5.000 5.000 40.000 89.336 0.000
Replacement of old damaged
Pipelines, Tehsil Chishtian, Distt:
Bahawalnagar.
Approval Date 21.03.09
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 4%
District and Tehsil Bahawalnagar , Chishtian

617 8 Name of the Scheme Providing Laying 4" to 3" dia PVC 0.000 2.438 2.000 0.000 0.804 0.000 0.000 0.000 0.804 0.804 0.000 0.000 0.000
pipe in PP-279
Approval Date 02.02.09
Major Components Laying of 3",4" dia PVC pipe etc.
Major Targets 100%
District and Tehsil Bahawalnagar

211
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

618 9 Name of the Scheme Rehabilitation and Augmentation 0.000 7.125 3.000 0.000 5.194 0.000 0.000 0.000 5.194 5.194 0.000 0.000 0.000
of Water Supply Scheme / Water
Works No.2 Fortabbas
Approval Date 02.02.09
Major Components Laying of 3",4" dia PVC pipe etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Fortabbas

619 10 Name of the Scheme Rehabilitation and Augmentation 0.000 199.988 125.175 0.000 15.000 0.000 0.000 0.000 15.000 15.000 30.000 59.811 0.000
of Water Supply Scheme,
Bahawalpur
Approval Date 03.12.08
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 61%
District and Tehsil Bhawalpur

620 11 Name of the Scheme Rehabilitation and Augmentation 0.000 3.957 3.957 0.000 0.594 0.000 0.000 0.000 0.594 0.594 0.000 0.000 0.000
of Urban Water Supply Scheme,
Islamia Colony Bahawalpur
Approval Date 11.9.08
Major Components Source,Main Pipe Disatribution,
P/Machineryetc.
Major Targets 100%
District and Tehsil Bhawalpur

621 12 Name of the Scheme Water Supply Scheme Talagang 0.000 45.984 39.256 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000

2nd (Revised)
Approval Date 11.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 93%
District and Tehsil Chakwal

212
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

622 13 Name of the Scheme Replacement of Outlived / Old 0.000 23.786 6.806 0.000 10.000 0.000 0.000 0.000 10.000 10.000 10.548 0.000 0.000
Damaged Pipe Lines Chakwal
(Revised)
Approval Date 11.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 61%
District and Tehsil Chakwal

623 14 Name of the Scheme Ext. & Improvement Urban Water 0.000 453.540 338.844 0.000 40.000 0.000 0.000 0.000 40.000 40.000 142.727 0.000 0.000
Supply Scheme, D.G.Khan City &
Adj.abadies.
Approval Date 20.06.08
Major Components Rising Main,D/system, P/House,
P.Machinery,OHR,Generating sets etc.
Major Targets 73%
District and Tehsil Dera Ghazi Khan

624 15 Name of the Scheme Replacement of Outlived/Old 0.000 99.984 55.452 0.000 10.000 0.000 0.000 0.000 10.000 10.000 49.530 0.000 0.000
Damaged Pipe Lines D.G.Khan
Approval Date 25.05.2009
Major Components Replacement of outlived pipe
lines,Machinery,Distribution system etc.
Major Targets 57%
District and Tehsil Dera Ghazi Khan

625 16 Name of the Scheme Ext./Reh. Urban Water Supply 0.000 99.570 83.455 0.000 18.000 0.000 0.000 0.000 18.000 18.000 0.000 0.000 0.000
Scheme, Jaranwala.
Approval Date 09.03.06
Major Components Source,Main Pipe Disatribution,
P/Machinery
Major Targets 89%
District and Tehsil Faisalabad , Jaranwala

626 17 Name of the Scheme Replacement of Outlived/Old 0.000 5.197 4.120 0.000 1.267 0.000 0.000 0.000 1.267 1.267 0.000 0.000 0.000
Damaged Pipe Lines Faisalabad
Approval Date 27.1.09
Major Components Water Testing Labortaryetc.
Major Targets 90%
District and Tehsil Faisalabad

213
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

627 18 Name of the Scheme Urban Water Supply Scheme, 0.000 142.568 10.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 50.000 73.953 0.000
Sammundri
Approval Date 27.1.09
Major Components Source,Main Pipe Disatribution,
P/Machinery
Major Targets 24%
District and Tehsil Faisalabad , Sammundri

628 19 Name of the Scheme Urban Water Supply Scheme, 0.000 55.318 5.750 0.000 10.000 0.000 0.000 0.000 10.000 10.000 47.866 0.000 0.000
Chak No.263/RB(Dijkot) (Revised)
Approval Date 3.12.08
Major Components Source,Main Pipe Disatribution,
P/Machinery
Major Targets 25%
District and Tehsil Faisalabad

629 20 Name of the Scheme Water Supply Scheme in 0.000 5.309 5.178 0.000 0.927 0.000 0.000 0.000 0.927 0.927 0.000 0.000 0.000
Franchisabad
Approval Date 26-01-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

630 21 Name of the Scheme Urban Water Supply Scheme 0.000 50.000 5.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 37.500 0.000 0.000
Wazirabad (Revised)
Approval Date 27-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 35%
District and Tehsil Gujranwala

631 22 Name of the Scheme Extension Urban Water Supply 0.000 11.036 7.053 0.000 5.638 0.000 0.000 0.000 5.638 5.638 0.000 0.000 0.000
Scheme Kharian ,District Gujrat
Approval Date 16-08-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

214
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

632 23 Name of the Scheme Urban Water Supply Scheme Lala 0.000 10.150 10.665 0.000 1.008 0.000 0.000 0.000 1.008 1.008 0.000 0.000 0.000
Musa
Approval Date 26-01-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

633 24 Name of the Scheme Construction of Urban Water 0.000 684.050 30.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 300.100 406.558 0.000
Supply Scheme Gujrat
Approval Date 28-01-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 10%
District and Tehsil Gujrat

634 25 Name of the Scheme Ext:/Imp: of Urban Water Supply 0.000 49.985 18.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 29.483 0.000 0.000
Scheme Sarai Alam Gir
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 49%
District and Tehsil Gujrat , Sarai Alamgir

635 26 Name of the Scheme Replacement of Outlived / Old 0.000 42.580 8.180 0.000 10.000 0.000 0.000 0.000 10.000 10.000 30.787 0.000 0.000
Damaged Pipe Lines Gujrat
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 37%
District and Tehsil Gujrat

636 27 Name of the Scheme Replacement of Outlived / Old 0.000 21.180 12.480 0.000 11.877 0.000 0.000 0.000 11.877 11.877 0.000 0.000 0.000
Damaged Pipe Lines Hafizabad
(Revised)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Hafizabad

215
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

637 28 Name of the Scheme Water Supply Scheme Based on 0.000 154.356 130.184 0.000 10.000 0.000 0.000 0.000 10.000 10.000 37.325 0.000 0.000
Naromi Dhun Spring (Revised)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 79%
District and Tehsil Jhelum

638 29 Name of the Scheme Urban Water Supply Scheme 0.000 24.070 26.160 0.000 1.521 0.000 0.000 0.000 1.521 1.521 0.000 0.000 0.000
Sohawa
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

639 30 Name of the Scheme Replacement of Outlived / Old 0.000 22.418 12.962 0.000 12.819 0.000 0.000 0.000 12.819 12.819 0.000 0.000 0.000
Damaged Pipe Lines Jhelum
(Revised)
Approval Date 27-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

640 31 Name of the Scheme Replacement of Outlived/Old 0.000 107.962 68.758 0.000 10.000 0.000 0.000 0.000 10.000 10.000 45.398 0.000 0.000
Damaged Pipe Lines Jhang
Approval Date 21.03.09
Major Components T/well, Sewer,DisposalWorks,D/system
etc.
Major Targets 63%
District and Tehsil Jhang

641 32 Name of the Scheme Urban Water Supply Scheme 0.000 54.034 50.726 0.000 11.413 0.000 0.000 0.000 11.413 11.413 0.000 0.000 0.000
(Rabwah)
Approval Date 24.3.2008
Major Components T/well, OHR,D/system etc.
Major Targets 100%
District and Tehsil Jhang , Chiniot

216
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

642 33 Name of the Scheme Urban Water Supply & Sewerage/ 0.000 389.496 20.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 150.000 247.920 0.000
Drainage Scheme Phool Nagar
Approval Date 23-01-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Kasur

643 34 Name of the Scheme Water Supply Scheme Chunian 0.000 199.874 15.400 0.000 20.000 0.000 0.000 0.000 20.000 20.000 194.455 0.000 0.000
(Amended)
Approval Date 12/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Kasur

644 35 Name of the Scheme Water Supply Scheme in Pattoki 0.000 173.397 27.813 0.000 20.000 0.000 0.000 0.000 20.000 20.000 151.594 0.000 0.000
Approval Date 23-11-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 24%
District and Tehsil Kasur

645 36 Name of the Scheme Replacement of Outlived / Old 0.000 132.204 20.290 0.000 25.000 0.000 0.000 0.000 25.000 25.000 106.745 0.000 0.000
Damaged Pipe Lines Kasur
Approval Date 4/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 30%
District and Tehsil Kasur

646 37 Name of the Scheme Replacement of Outlived / Old 0.000 23.589 17.499 0.000 9.628 0.000 0.000 0.000 9.628 9.628 0.000 0.000 0.000
Damaged Pipe Lines Khushab
(Revised)
Approval Date 24-12-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

217
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

647 38 Name of the Scheme Replacement of Outlived/Old 0.000 22.626 19.227 0.000 6.793 0.000 0.000 0.000 6.793 6.793 0.000 0.000 0.000
Damaged Pipe Lines
Khanewal(Revised)
Approval Date 24.12.08
Major Components Replacement of outlived pipe lines &
Labortary.
Major Targets 100%
District and Tehsil Khanewal

648 39 Name of the Scheme Rehabilitation Urban Water 0.000 10.822 6.100 0.000 6.345 0.000 0.000 0.000 6.345 6.345 0.000 0.000 0.000
Supply Scheme Old Khanewal.
Approval Date 16.1.09
Major Components Boundary wall,Repair of P/Machinery
/P.House,Replacement of rising main and
d/system ext.electrification.
Major Targets 100%
District and Tehsil Khanewal

649 40 Name of the Scheme Rehabilitation Urban Water 0.000 7.326 5.000 0.000 3.425 0.000 0.000 0.000 3.425 3.425 0.000 0.000 0.000
Supply Scheme Kabirwala.
Approval Date 16.1.09
Major Components Boundary wall,Repair of P/Machinery
/P.House,Replacement of rising main and
d/system ext.electrification.
Major Targets 100%
District and Tehsil Khanewal , Kabirwala

650 41 Name of the Scheme Urban Water Supply and 0.000 18.747 13.797 0.000 7.762 0.000 0.000 0.000 7.762 7.762 0.000 0.000 0.000
Sewerage/ Drainage Scheme
Dubai Town
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

218
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

651 42 Name of the Scheme Urban Water Supply Scheme 0.000 13.708 3.627 0.000 12.137 0.000 0.000 0.000 12.137 12.137 0.000 0.000 0.000
Hanjarwal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

652 43 Name of the Scheme Urban Water Supply & Sewerage / 0.000 17.803 8.136 0.000 12.337 0.000 0.000 0.000 12.337 12.337 0.000 0.000 0.000
Drainage Scheme, Nawazishabad
(Revised)
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

653 44 Name of the Scheme Urban Water Supply Scheme 0.000 86.623 35.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 0.000 0.000 0.000
Raiwind (Revised)
Approval Date 4/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 85%
District and Tehsil Lahore

654 45 Name of the Scheme Replacement of Outlived/Old 0.000 9.946 8.363 0.000 3.075 0.000 0.000 0.000 3.075 3.075 0.000 0.000 0.000
Damaged Pipe Lines Lodhran
Approval Date 3.12.08
Major Components Replacement of outlived pipe lines,
Machinery,House connections,
Laboratory etc.
Major Targets 100%
District and Tehsil Lodhran

219
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

655 46 Name of the Scheme Replacement of Outlived/Old 0.000 33.000 22.510 0.000 15.440 0.000 0.000 0.000 15.440 15.440 0.000 0.000 0.000
Damaged Pipe Lines Layyah
Approval Date 27.01.09
Major Components Replacement of outlived pipe lines,
Machinery,House connections,
Laboratory etc.
Major Targets 100%
District and Tehsil Layyah

656 47 Name of the Scheme Replacement of Outlived / Old 0.000 22.960 11.180 0.000 15.224 0.000 0.000 0.000 15.224 15.224 0.000 0.000 0.000
Damaged Pipe Lines Mianwali
(Revised)
Approval Date 24-12-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

657 48 Name of the Scheme Replacement of Outlived / Old 0.000 20.680 12.564 0.000 11.218 0.000 0.000 0.000 11.218 11.218 0.000 0.000 0.000
Damaged Pipe Lines M.B.Din
(Amended)
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

658 49 Name of the Scheme Replacement of Outlived/Old 0.000 6.454 4.151 0.000 3.271 0.000 0.000 0.000 3.271 3.271 0.000 0.000 0.000
Damaged Pipe Lines Muzaffargarh
Approval Date 7.2.09
Major Components Testing labortorty and allied works.
Major Targets 100%
District and Tehsil Muzaffargarh

659 50 Name of the Scheme Water Supply Scheme for Shah 0.000 118.147 30.173 0.000 10.000 0.000 0.000 0.000 10.000 10.000 35.696 30.000 30.000
Kot Town
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 30%
District and Tehsil Nankana Sahib

220
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

660 51 Name of the Scheme Replacement of Outlived / Old 0.000 25.159 10.915 0.000 18.018 0.000 0.000 0.000 18.018 18.018 0.000 0.000 0.000
Damaged Pipe Lines Nankana
Sahib (Revised)
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

661 52 Name of the Scheme Replacement of Outlived / Old 0.000 27.287 14.360 0.000 17.020 0.000 0.000 0.000 17.020 17.020 0.000 0.000 0.000
Damaged Pipe Lines Narowal
(Revised)
Approval Date 27-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

662 53 Name of the Scheme Replacement of Outlived / Old 0.000 19.098 12.684 0.000 9.279 0.000 0.000 0.000 9.279 9.279 0.000 0.000 0.000
Damaged Pipe Lines Okara
Approval Date 11/10/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

663 54 Name of the Scheme Replacement of Outlived/Old 0.000 28.972 24.219 0.000 6.032 0.000 0.000 0.000 6.032 6.032 3.067 0.000 0.000
Damaged Pipe Lines Pakpattan
Approval Date Approved
Major Components T/well, P/house,Labortary, R.Main
Distributin system and OHR.
Major Targets 91%
District and Tehsil Pakpattan

221
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

664 55 Name of the Scheme Water Supply Scheme for Benazir 0.000 680.000 3.210 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
Bhutto New International Airport
Islamabad
Approval Date 17-10-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 1%
District and Tehsil Rawalpindi

665 56 Name of the Scheme Augmentation of Water Supply 0.000 99.960 101.307 0.000 13.520 0.000 0.000 0.000 13.520 13.520 0.000 0.000 0.000
Scheme Murree
Approval Date 12/3/2005
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

666 57 Name of the Scheme Urban Water Supply Scheme 0.000 92.706 30.149 0.000 15.000 0.000 0.000 0.000 15.000 15.000 61.463 0.000 0.000
Daultala
Approval Date 20-03-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 42%
District and Tehsil Rawalpindi

667 58 Name of the Scheme Feasibility Study of Augmentation 0.000 3.200 3.200 0.000 0.480 0.000 0.000 0.000 0.480 0.480 0.000 0.000 0.000
Urban Water Supply Scheme
Kahuta City
Approval Date 9/3/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

668 59 Name of the Scheme Bulk Water Supply Project from 0.000 4,254.000 200.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 2,000.000 2,592.100 0.000
River Jhelum to Murree
Approval Date 5/1/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 6%
District and Tehsil Rawalpindi

222
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

669 60 Name of the Scheme Urban Water Supply Scheme 0.000 172.117 10.000 0.000 25.000 0.000 0.000 0.000 25.000 25.000 100.000 62.935 0.000
Kahuta
Approval Date 12/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 18%
District and Tehsil Rawalpindi

670 61 Name of the Scheme Rehabilitation of Water Supply 0.000 10.000 0.100 0.000 11.400 0.000 0.000 0.000 11.400 11.400 0.000 0.000 0.000
Scheme Chak Baili Khan
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

671 62 Name of the Scheme Replacement of Outlived / Old 0.000 66.434 33.194 0.000 15.000 0.000 0.000 0.000 15.000 15.000 28.205 0.000 0.000
Damaged Pipe Lines Pothohar
Town Rawalpindi.(2 Revised)
Approval Date 29-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 63%
District and Tehsil Rawalpindi

672 63 Name of the Scheme Replacement of Outlived/Old 0.000 141.609 75.251 0.000 20.000 0.000 0.000 0.000 20.000 20.000 67.599 0.000 0.000
Damaged Pipe Lines R.Y.Khan
Approval Date 21.03.09
Major Components T/well, P/house,Labortary, R.Main
Distributin system and OHR.Replacement
of outlived pipe lines etc.
Major Targets 58%
District and Tehsil Rahim Yar Khan

223
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

673 64 Name of the Scheme Rehabilitation of main Water 0.000 10.112 11.000 0.000 0.629 0.000 0.000 0.000 0.629 0.629 0.000 0.000 0.000
Works (Canal Source)Urban Water
Supply Scheme, Liaquatpur
Approval Date 24.09.08
Major Components T/well, P/house,Labortary, R.Main
Distributin system and OHR.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Liaquatpur

674 65 Name of the Scheme Replacement of Outlived/Old 0.000 13.194 8.162 0.000 3.701 0.000 0.000 0.000 3.701 3.701 0.000 0.000 0.000
Damaged Pipe Lines Rajanpur
Approval Date 25.05.2009
Major Components Replacement of out lived pipe
lines,D/system,House Connections,
Water Testing Laboratory etc.
Major Targets 78%
District and Tehsil Rajanpur

675 66 Name of the Scheme Ext. Urban Water Supply Scheme 0.000 126.120 89.926 0.000 15.000 0.000 0.000 0.000 15.000 15.000 40.112 0.000 0.000
Sheikhupura (Revised)
Approval Date 8/11/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Sheikhupura

676 67 Name of the Scheme Urban Water Supply Scheme 0.000 40.528 35.737 0.000 10.452 0.000 0.000 0.000 10.452 10.452 0.000 0.000 0.000
Ferozewala
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 99%
District and Tehsil Sheikhupura

677 68 Name of the Scheme Urban Water Supply Scheme Kot 0.000 56.524 43.204 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Abdul Malik (Revised)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 97%
District and Tehsil Sheikhupura

224
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

678 69 Name of the Scheme Urban Water Supply Scheme 0.000 68.694 48.100 0.000 10.000 0.000 0.000 0.000 10.000 10.000 20.898 0.000 0.000
Manawala
Approval Date 8/11/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 74%
District and Tehsil Sheikhupura

679 70 Name of the Scheme Urban Water Supply Scheme 0.000 27.481 10.000 0.000 17.000 0.000 0.000 0.000 17.000 17.000 0.000 0.000 0.000
Safdarabad (Amended)
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 85%
District and Tehsil Sheikhupura , Safdarabad

680 71 Name of the Scheme Urban Water Supply Scheme 0.000 30.781 20.000 0.000 15.398 0.000 0.000 0.000 15.398 15.398 0.000 0.000 0.000
Khan Qah Dogran (Amended)
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sheikhupura , Safdarabad

681 72 Name of the Scheme Replacement of Outlived / Old 0.000 16.819 12.190 0.000 7.152 0.000 0.000 0.000 7.152 7.152 0.000 0.000 0.000
Damaged Pipe Lines Sheikhupura
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sheikhupura

682 73 Name of the Scheme Replacement of Outlived / Old 0.000 61.410 53.560 0.000 17.061 0.000 0.000 0.000 17.061 17.061 0.000 0.000 0.000
Damaged Pipe Lines Sargodha
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

225
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

683 74 Name of the Scheme PC-II Conducting Study for 0.000 8.000 0.500 0.000 8.000 0.000 0.000 0.000 8.000 8.000 0.000 0.000 0.000
Designing of Water Supply
Sewerage / System along with
Treatment Plant of Sargodha City
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 92%
District and Tehsil Sargodha

684 75 Name of the Scheme Urban Water Supply Scheme 0.000 48.665 5.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 35.965 0.000 0.000
Bhalwal City
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 36%
District and Tehsil Sargodha , Bhalwal

685 76 Name of the Scheme Urban Water Supply Scheme 0.000 51.626 47.881 0.000 11.212 0.000 0.000 0.000 11.212 11.212 0.000 0.000 0.000
Samberial Phase-I
Approval Date 24-07-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

686 77 Name of the Scheme Replacement of Outlived / Old 0.000 123.970 88.818 0.000 20.000 0.000 0.000 0.000 20.000 20.000 33.748 0.000 0.000
Damaged Pipe Lines Sialkot (2-
Revised)
Approval Date 6/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 76%
District and Tehsil Sialkot

226
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

687 78 Name of the Scheme Replacement of Outlived/Old 0.000 85.034 75.816 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Damaged Pipe Lines Sahiwal
Approval Date 24.12.08
Major Components T/well,Pump House,Machinery,R.mian
and Distribution System etc.
Major Targets 98%
District and Tehsil Sahiwal

688 79 Name of the Scheme Replacement of Outlived/Old 0.000 33.278 23.160 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Damaged Pipe Lines T.T.Singh
Approval Date 24.12.08
Major Components T/well,Pump House,Machinery,R.mian
and Distribution System etc.
Major Targets 113%
District and Tehsil Toba Tek Singh

689 80 Name of the Scheme Provision of Water Supply 0.000 2.162 2.162 0.000 0.324 0.000 0.000 0.000 0.324 0.324 0.000 0.000 0.000
Scheme Mohallah Katchi Basti
Bilal Gunj, Gulbehar Colony,
Amertesar and Mohallah
Islampura, Kamalia.
Approval Date 19.03.09
Major Components T/well,Pump House,Machinery,R.mian
and Distribution System etc.
Major Targets 100%
District and Tehsil Toba Tek Singh , Kamalia

690 81 Name of the Scheme Replacement of Outlived/Old 0.000 42.182 32.167 0.000 8.000 0.000 0.000 0.000 8.000 8.000 0.000 0.000 0.000
Damaged Pipe Lines Vehari
Approval Date 24.12.08
Major Components Replacement of outlived
T/well,P/House,Labortary,R.Main,D/syste
m OHR etc.
Major Targets 83%
District and Tehsil Vehari

227
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

691 82 Name of the Scheme Urban Water Supply Scheme, 0.000 75.318 10.000 0.000 25.000 0.000 0.000 0.000 25.000 25.000 51.616 0.000 0.000
Burewala
Approval Date 27.1.09
Major Components T/well,P/House,R.Main,D/system OHR
etc.
Major Targets 40%
District and Tehsil Vehari , Burewala

Sub-Total: Urban Water Supply 0.000 10,703.913 2,618.338 0.000 1,118.930 0.000 0.000 0.000 1,118.930 1,118.930 4,040.455 3,670.544 30.000

Urban Sewerage Drainage


692 83 Name of the Scheme Urban Drainage Scheme Attock 0.000 34.196 19.090 0.000 20.235 0.000 0.000 0.000 20.235 20.235 0.000 0.000 0.000
City
Approval Date 4/9/2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

693 84 Name of the Scheme Construction of Sewer Nullah 0.000 12.667 12.667 0.000 1.900 0.000 0.000 0.000 1.900 1.900 0.000 0.000 0.000
from Masjid Chah Jamali Mohallah
Malkan Wala to Goreha Nashaib
length 937 Rft. Bhakkar city.
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Bhakkar

694 85 Name of the Scheme Urban Sewerage / Drainage 0.000 25.000 1.222 0.000 1.000 0.000 0.000 0.000 1.000 1.000 26.528 0.000 0.000
Scheme, Jandanwala, Tehsil
Kallur Kot, Distt. Bhakkar
Approval Date 01.06.2009
Major Components Sewer System and disposal work etc.
Major Targets 8%
District and Tehsil Bhakkar , Kalur Kot

228
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

695 86 Name of the Scheme Comprehensive Sewerage 0.000 182.066 10.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 50.000 134.376 0.000
Scheme Haroonabad,
Approval Date 04.04.09
Major Components Sewer system/Drains and other allied
works etc.
Major Targets 12%
District and Tehsil Bahawalnagar , Haroonabad,

696 87 Name of the Scheme Comprehensive Sewerage 0.000 192.212 10.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 50.000 141.044 0.000
Scheme Bahawalnagar.
Approval Date 04.04.09
Major Components Sewer system/Drains and other allied
works etc.
Major Targets 14%
District and Tehsil Bahawalnagar

697 88 Name of the Scheme Providing and Laying RCC Sewer 0.000 2.613 2.500 0.000 0.505 0.000 0.000 0.000 0.505 0.505 0.000 0.000 0.000
Line in UC No.6 Muslim Colony
Approval Date 2.2.09
Major Components Sewer system/Drains and other allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

698 89 Name of the Scheme Construction of Street Pavement 0.000 4.804 1.000 0.000 4.525 0.000 0.000 0.000 4.525 4.525 0.000 0.000 0.000
and Sewerage in Lala Zar Colony
Ahmedpur.
Approval Date Approved
Major Components Sewer system/Drains and other allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur

699 90 Name of the Scheme Urban Sewerage Scheme 0.000 57.257 12.128 0.000 10.000 0.000 0.000 0.000 10.000 10.000 43.718 0.000 0.000
Talagang City (Revised)
Approval Date 3/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 34%
District and Tehsil Chakwal

229
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

700 91 Name of the Scheme Urban Sewerage Scheme Chakwal 0.000 185.459 50.854 0.000 24.000 0.000 0.000 0.000 24.000 24.000 50.000 88.424 0.000
City
Approval Date 5/3/2007
Major Components Sewer System and disposal work etc.
Major Targets 35%
District and Tehsil Chakwal

701 92 Name of the Scheme Extension and Improvement of 0.000 604.079 10.000 0.000 32.372 0.000 0.000 0.000 32.372 32.372 125.000 527.319 0.000
Urban Sewerage Scheme
D.G.Khan.
Approval Date 29.11.08
Major Components Sewer lines,Disposal Stations Forced
main,Sullage Carrier,Generating sets.etc.
Major Targets 6%
District and Tehsil Dera Ghazi Khan

702 93 Name of the Scheme Ext.Sewerage Scheme, Jaranwala. 0.000 65.687 50.849 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Approval Date 12.04.06
Major Components Sewer lines,Disposal Stations Forced
main,Sullage Carrier,Generating sets.etc.
Major Targets 94%
District and Tehsil Faisalabad , jaranwala

703 94 Name of the Scheme Urban Sewerage 0.000 114.084 10.000 0.000 40.000 0.000 0.000 0.000 40.000 40.000 50.000 31.197 0.000
Scheme,Sammundari
Approval Date 27.1.09
Major Components Sewer lines,Disposal Stations Forced
main,Sullage Carrier,Generating sets.etc.
Major Targets 38%
District and Tehsil Faisalabad , Sammundri

704 95 Name of the Scheme Construction of PCC in Qila Dedar 0.000 29.596 7.531 0.000 6.500 0.000 0.000 0.000 6.500 6.500 20.004 0.000 0.000
Singh
Approval Date 13-4-2007
Major Components Sewer System and disposal work etc.
Major Targets 41%
District and Tehsil Gujranwala

230
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

705 96 Name of the Scheme Sewerage System & Franchisabad 0.000 9.932 6.461 0.000 4.961 0.000 0.000 0.000 4.961 4.961 0.000 0.000 0.000
Approval Date 17-10-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

706 97 Name of the Scheme Urban Sewerage/Drainage 0.000 248.575 40.000 0.000 40.000 0.000 0.000 0.000 40.000 40.000 50.000 155.861 0.000
Scheme Kamoke
Approval Date 26-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 28%
District and Tehsil Gujranwala

707 98 Name of the Scheme Urban Sewerage/Drainage 0.000 45.628 10.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 32.472 0.000 0.000
Scheme and Provision of PCC
pavements in Mohallah
Karimabad Ghakhar,
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 38%
District and Tehsil Gujranwala , Kamoke

708 99 Name of the Scheme Urban Sewerage/Drainage 0.000 100.455 5.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 50.000 45.523 0.000
Scheme Wazirabad
Approval Date 4/4/2009
Major Components Sewer System and disposal work etc.
Major Targets 17%
District and Tehsil Gujranwala , Wazirabad

709 100 Name of the Scheme Urban Sewerage Scheme Kullowal 0.000 50.000 2.000 0.000 2.350 0.000 0.000 0.000 2.350 2.350 45.650 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 5%
District and Tehsil Gujranwala

231
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

710 101 Name of the Scheme Urban Drainage Scheme & PCC at 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000

UC 187
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala , Wazirabad

711 102 Name of the Scheme Urban Drainage Scheme & PCC at 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000

UC 188/2
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala , Wazirabad

712 103 Name of the Scheme Construction of PCC in Qila Dedar 0.000 29.953 7.663 0.000 5.000 0.000 0.000 0.000 5.000 5.000 21.783 0.000 0.000
Ladhewala Warraich
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 37%
District and Tehsil Gujranwala

713 104 Name of the Scheme Construction of Storm Water 0.000 6.654 6.652 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
Drain on both side of Railway
Track Extended Upto Jhatoakal
and Dera Kunjahian
Approval Date 8/8/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujrat

232
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

714 105 Name of the Scheme Extension Sewerage Scheme 0.000 68.280 62.477 0.000 16.045 0.000 0.000 0.000 16.045 16.045 0.000 0.000 0.000
Gujrat for Areas of Ghari
Ahmedabad,Ghori Shahdaula and
Kalupura i/c augmentation of
Kalra disposal and sewers in
deficient
areas.
(Revised)
Approval Date 18-10-2005
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujrat

715 106 Name of the Scheme Rehabilitation of Kalra Drain from 0.000 128.998 104.995 0.000 10.000 0.000 0.000 0.000 10.000 10.000 33.353 0.000 0.000
Ram Talai Chowk upto Irrigation
drain
Approval Date 30-05-2005
Major Components Sewer System and disposal work etc.
Major Targets 78%
District and Tehsil Gujrat

716 107 Name of the Scheme Extension of Sewerage / Drainage 0.000 137.326 83.554 0.000 10.000 0.000 0.000 0.000 10.000 10.000 64.371 0.000 0.000
Scheme along Jalalpur Jattan
Road Gujrat City
Approval Date 23-04-2006
Major Components Sewer System and disposal work etc.
Major Targets 59%
District and Tehsil Gujrat

717 108 Name of the Scheme Construction of Storm Water 0.000 140.664 75.130 0.000 10.000 0.000 0.000 0.000 10.000 10.000 76.634 0.000 0.000
Channel along G.T.Road upto
River Chenab (North-East side of
G.T.Road) (Revised)
Approval Date 23-04-2006
Major Components Sewer System and disposal work etc.
Major Targets 53%
District and Tehsil Gujrat

233
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

718 109 Name of the Scheme Sewerage Scheme along 0.000 29.998 20.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Sargodha Road and Amar Colony
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 87%
District and Tehsil Gujrat

719 110 Name of the Scheme Sewerage/Drainage Scheme along 0.000 29.910 20.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Mohallah Chah Tarang Industrial
Area and Palace Colony.
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 87%
District and Tehsil Gujrat

720 111 Name of the Scheme Construction of Drains Type-II and 0.000 3.971 2.265 0.000 2.302 0.000 0.000 0.000 2.302 2.302 0.000 0.000 0.000
PCC in Mohallah Ali Abad (UC-50)
Approval Date 7/12/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujrat

721 112 Name of the Scheme Sewerage Drainage Scheme along 0.000 88.442 15.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 76.708 0.000 0.000
Shah Jahangir road and
Shahdullah road and Al-Nabi
Colony (Amended)
Approval Date 26-03-2009
Major Components Sewer System and disposal work etc.
Major Targets 25%
District and Tehsil Gujrat

722 113 Name of the Scheme Sewerage Drainage Scheme 0.000 86.465 15.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 20.000 54.435 0.000
Mohallah Shah Hussain
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 25%
District and Tehsil Gujrat

234
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

723 114 Name of the Scheme Provision of Sewerage at Sarai 0.000 58.132 15.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 20.000 21.852 0.000
Alam Gir
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 37%
District and Tehsil Gujrat

724 115 Name of the Scheme Extension Urban Sewerage 0.000 12.380 12.500 0.000 1.737 0.000 0.000 0.000 1.737 1.737 0.000 0.000 0.000
Scheme Pindi Bhattian (Left Over
Area)
Approval Date 20-06-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

725 116 Name of the Scheme Urban Sewerage Scheme 0.000 57.595 22.685 0.000 15.000 0.000 0.000 0.000 15.000 15.000 28.549 0.000 0.000
P.D.Khan (Revised)
Approval Date 27-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 57%
District and Tehsil Jhelum

726 117 Name of the Scheme Urban Drainage Scheme Sohawa 0.000 13.156 9.875 0.000 5.254 0.000 0.000 0.000 5.254 5.254 0.000 0.000 0.000
Approval Date 17-11-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

727 118 Name of the Scheme Urban Sewerage Scheme Kot 0.000 74.722 31.351 0.000 25.000 0.000 0.000 0.000 25.000 25.000 29.579 0.000 0.000
Radha Kishan (Revised)
Approval Date 28-03-2009
Major Components Sewer System and disposal work etc.
Major Targets 66%
District and Tehsil Kasur

235
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

728 119 Name of the Scheme Kasur Environmental 0.000 2,272.769 34.251 0.000 100.000 0.000 0.000 0.000 100.000 100.000 719.163 1,560.270 200.000
Improvement Project
Approval Date 5/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 5%
District and Tehsil Kasur

729 120 Name of the Scheme PC-II for Consultancy Service of 0.000 9.099 5.749 0.000 4.715 0.000 0.000 0.000 4.715 4.715 0.000 0.000 0.000
Rehabilitation of existing
Sewerage System and
Remodelling of Rohi Nullah,
Kasur.
Approval Date 6/9/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

730 121 Name of the Scheme Urban Sewerage / Drainage 0.000 19.970 11.338 0.000 11.628 0.000 0.000 0.000 11.628 11.628 0.000 0.000 0.000
Scheme Noor Pur Thal
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khushab

731 122 Name of the Scheme Urban Sewerage Scheme, Sarai 0.000 5.397 3.973 0.000 2.234 0.000 0.000 0.000 2.234 2.234 0.000 0.000 0.000
Siddu
Approval Date 14.12.2006
Major Components Sewer lines,Disposal Stations Forced
main,Sullage Carrier,Generating sets.etc.
Major Targets 100%
District and Tehsil Khanewal , Mian Chunnu

732 123 Name of the Scheme Drainage Scheme of Azeemabad 0.000 5.384 3.000 0.000 3.192 0.000 0.000 0.000 3.192 3.192 0.000 0.000 0.000
& Barketpura (2 Amended)
Approval Date 24-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Lahore

236
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

733 124 Name of the Scheme Urban Sewerage/Drainage 0.000 156.156 30.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 60.000 39.579 0.000
Scheme Raiwind (Amended)
Approval Date 24-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Lahore

734 125 Name of the Scheme Urban Sewerage Scheme, Chowk 0.000 74.367 19.000 0.000 25.000 0.000 0.000 0.000 25.000 25.000 41.522 0.000 0.000
Azim
Approval Date 21.8.08
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 51%
District and Tehsil Layyah

735 126 Name of the Scheme Urban Sewerage Scheme for Kot 0.000 52.795 10.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 30.714 0.000 0.000
Sultan
Approval Date 24.02.09
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 49%
District and Tehsil Layyah

736 127 Name of the Scheme Extension and Improvement of 0.000 27.667 8.000 0.000 23.817 0.000 0.000 0.000 23.817 23.817 0.000 0.000 0.000
Sewerage Scheme, Karor Lal
Easan
Approval Date 24.02.09
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Layyah , Karor Lal Easan

737 128 Name of the Scheme Urban Sewerage Scheme Lawyers 0.000 10.000 2.000 0.000 9.500 0.000 0.000 0.000 9.500 9.500 0.000 0.000 0.000
Colony, City Layyah
Approval Date Approved
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Layyah

237
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

738 129 Name of the Scheme Sewerage / Drainage Scheme 0.000 14.924 16.553 0.000 0.610 0.000 0.000 0.000 0.610 0.610 0.000 0.000 0.000
Piplan
Approval Date 6/10/2005
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

739 130 Name of the Scheme Sewerage Scheme, Muzaffargarh 0.000 103.462 85.750 0.000 10.000 0.000 0.000 0.000 10.000 10.000 23.231 0.000 0.000
(Rev.)
Approval Date 28.11.07
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 80%
District and Tehsil Muzaffargarh

740 131 Name of the Scheme Construction of Drains and Brick 0.000 5.000 4.000 0.000 1.750 0.000 0.000 0.000 1.750 1.750 0.000 0.000 0.000
tuff tiles and sullage carrier Basti
Ghulam Muhammad Mouza
Gugray wali mad wala
Approval Date Approved
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Muzaffargarh , Ali Pur

741 132 Name of the Scheme Urban Sewerage Scheme Sangla 0.000 57.600 44.500 0.000 21.740 0.000 0.000 0.000 21.740 21.740 0.000 0.000 0.000
Hill (Revised)
Approval Date 13-05-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Nankana Sahib

742 133 Name of the Scheme Disposal of Storm Water of 0.000 47.610 26.349 0.000 11.919 0.000 0.000 0.000 11.919 11.919 0.000 0.000 0.000
Nankana Sahib (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 70%
District and Tehsil Nankana Sahib

238
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

743 134 Name of the Scheme Construction of PCC, RCC, 0.000 5.000 2.500 0.000 3.250 0.000 0.000 0.000 3.250 3.250 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each union
Council (UC No.2 & 3).
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

744 135 Name of the Scheme Construction of PCC, RCC, 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each Union
Council (UC No.20 & 21)
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

745 136 Name of the Scheme Construction of PCC, RCC, 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each Union
Council (UC No.5 & 3)
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

239
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

746 137 Name of the Scheme Construction of PCC, RCC, 0.000 5.000 2.500 0.000 3.250 0.000 0.000 0.000 3.250 3.250 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each Union
Council (UC No.1,2 & 4
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

747 138 Name of the Scheme Construction of PCC, RCC, 0.000 5.000 2.500 0.000 3.250 0.000 0.000 0.000 3.250 3.250 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each Union
Council (UC No.19 & 26)
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

748 139 Name of the Scheme Construction of PCC, RCC, 0.000 5.000 3.000 0.000 2.750 0.000 0.000 0.000 2.750 2.750 0.000 0.000 0.000
Sewerage Drainage in Streets and
Water Supply and Water
Purification Plant in each Union
Council (UC No.22,23 & 24)
Approval Date Approved
Major Components Construction of PCC,RCC,Sew.Drainage
in Streets and Water Supply &
Purification Plant.
Major Targets 100%
District and Tehsil Pakpattan

749 140 Name of the Scheme Urban Sewerage / Drainage 0.000 48.108 17.916 0.000 32.000 0.000 0.000 0.000 32.000 32.000 0.000 0.000 0.000
Scheme Kahuta
Approval Date 5/5/2007
Major Components Sewer System and disposal work etc.
Major Targets 90%
District and Tehsil Rawalpindi

240
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

750 141 Name of the Scheme Sewerage Scheme for R.Y.Khan 0.000 2,009.018 877.880 0.000 450.000 0.000 0.000 0.000 450.000 450.000 982.491 0.000 0.000
City with treatment Plant
(Revised)
Approval Date 18.8.08
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets,Treatment Plants etc.
Major Targets 57%
District and Tehsil Rahim Yar Khan

751 142 Name of the Scheme Providing lateral Sewers in Left 0.000 124.015 62.050 0.000 20.000 0.000 0.000 0.000 20.000 20.000 60.567 0.000 0.000
Over Area Sewerage scheme
R.Y.Khan (Revised)
Approval Date 27.8.08
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 58%
District and Tehsil Rahim Yar Khan

752 143 Name of the Scheme Urban Drainage and Sewerage 0.000 9.647 9.138 0.000 1.956 0.000 0.000 0.000 1.956 1.956 0.000 0.000 0.000
Scheme Allah Abad, Tehsil
Liaqatpur, Dsitt: R.Y.Khan.
Approval Date 20.02.09
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Liaqatpur

753 144 Name of the Scheme Completion of Remaining work of 0.000 17.903 18.500 0.000 2.088 0.000 0.000 0.000 2.088 2.088 0.000 0.000 0.000
comprehensive Sewerage Scheme
Phase-I, City Sadiqabad
Approval Date 18.08.07
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Sadiqabad

241
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

754 145 Name of the Scheme Provision / Rehabilitation of 0.000 10.000 10.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Sewerage System City Sadiqabad
Phase-I.
Approval Date 06.02.09
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Sadiqabad

755 146 Name of the Scheme Laying of RCC Sewer from 0.000 47.323 36.884 0.000 12.000 0.000 0.000 0.000 12.000 12.000 0.000 0.000 0.000
Sillanwali Road Disposal Works to
Mona Seepage Drain, Sargodha
City
Approval Date 17-11-2006
Major Components Sewer System and disposal work etc.
Major Targets 90%
District and Tehsil Sargodha

756 147 Name of the Scheme Comprehensive Urban Sewerage 0.000 78.168 41.487 0.000 25.000 0.000 0.000 0.000 25.000 25.000 23.406 0.000 0.000
& Drainage Scheme Kot Momin.
Approval Date 24-09-2008
Major Components Sewer System and disposal work etc.
Major Targets 74%
District and Tehsil Sargodha

757 148 Name of the Scheme Urban Drainage Scheme Miani 0.000 10.263 9.745 0.000 2.057 0.000 0.000 0.000 2.057 2.057 0.000 0.000 0.000
(Revised)
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

758 149 Name of the Scheme Comprehensive Sewerage 0.000 221.426 10.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 70.000 164.640 0.000
Scheme Bhalwal Colonies
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 8%
District and Tehsil Sargodha , Bhalwal

242
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

759 150 Name of the Scheme Revised Urban Sewerage / 0.000 93.782 83.824 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Drainage Scheme Kot Abdul Malik
Approval Date 6/1/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

760 151 Name of the Scheme Urban Sewerage Scheme 0.000 130.790 114.200 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
Sheikhupura (Phase-II) (Revised)
Approval Date 8/11/2007
Major Components Sewer System and disposal work etc.
Major Targets 86%
District and Tehsil Sheikhupura

761 152 Name of the Scheme Urban Drainage Scheme, 0.000 2.875 2.933 0.000 0.373 0.000 0.000 0.000 0.373 0.373 0.000 0.000 0.000
Manawala UC-100, Sheikhupura
Approval Date 13-11-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

762 153 Name of the Scheme Urban Drainage Scheme, Mohalla 0.000 3.450 3.390 0.000 0.578 0.000 0.000 0.000 0.578 0.578 0.000 0.000 0.000
Bambanwala, Jewanpura UC-57
including remaining abadies.
Approval Date 13-11-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

763 154 Name of the Scheme Comprehensive Sewerage & 0.000 154.704 20.000 0.000 39.000 0.000 0.000 0.000 39.000 39.000 50.000 68.910 0.000
Drainage Scheme at Sheikhupura
city Sheikhupura
Approval Date 3/12/2008
Major Components Sewer System and disposal work etc.
Major Targets 25%
District and Tehsil Sheikhupura

243
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

764 155 Name of the Scheme Urban PCC and Drainage Scheme 0.000 68.745 20.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 44.057 0.000 0.000
in Streets of City Sheikhupura
Approval Date 3/12/2008
Major Components Sewer System and disposal work etc.
Major Targets 44%
District and Tehsil Sheikhupura

765 156 Name of the Scheme Urban Drainage, PCC Schemes at 0.000 137.597 20.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 128.237 0.000 0.000
Kot Abdul Malik & Ferozewala
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 19%
District and Tehsil Sheikhupura , Ferozewala

766 157 Name of the Scheme Urban Sewerage / Drainage 0.000 90.829 20.470 0.000 10.000 0.000 0.000 0.000 10.000 10.000 73.983 0.000 0.000
Scheme Shariqpur (Revised)
Approval Date 26-03-2009
Major Components Sewer System and disposal work etc.
Major Targets 29%
District and Tehsil Sheikhupura

767 158 Name of the Scheme Rehabilitation of Urban Sewerage/ 0.000 199.734 10.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 50.000 149.694 0.000
Drainage / Sanitation Scheme
Wandala Dial Singh UC 30-31
Approval Date 9/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 13%
District and Tehsil Sheikhupura

768 159 Name of the Scheme Comprehensive Sewerage / 0.000 99.973 89.401 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Drainage Scheme (Renovation &
Extension) Daska
Approval Date 20-10-2004
Major Components Sewer System and disposal work etc.
Major Targets 86%
District and Tehsil Sialkot

244
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

769 160 Name of the Scheme Urban Sewerage Scheme 0.000 47.630 47.186 0.000 2.000 0.000 0.000 0.000 2.000 2.000 0.000 0.000 0.000
Chawinda
Approval Date 13-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 90%
District and Tehsil Sialkot

770 161 Name of the Scheme Comprehensive Package for 0.000 91.380 88.800 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
Pasrur City for pavement of streets
Approval Date 13-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 89%
District and Tehsil Sialkot

771 162 Name of the Scheme Sewerage / Drainage Scheme for 0.000 79.798 72.507 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Sambrial City
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 90%
District and Tehsil Sialkot

772 163 Name of the Scheme Lining of Bhed Nullah Sialkot City 0.000 72.054 1.500 0.000 20.000 0.000 0.000 0.000 20.000 20.000 40.000 21.362 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 26%
District and Tehsil Sialkot

773 164 Name of the Scheme Extension Urban Sewerage 0.000 102.404 98.673 0.000 19.092 0.000 0.000 0.000 19.092 19.092 0.000 0.000 0.000
Scheme, Sahiwal(Rev.)
Approval Date 5.5.07
Major Components RCC Sewer,P/Machinery etc.
Major Targets 100%
District and Tehsil Sahiwal

245
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

774 165 Name of the Scheme Improvement of Sewerage 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Scheme Mohallah Rajpura,
Sahiwal
Approval Date Approved
Major Components AC/PVC Pipe
Major Targets 100%
District and Tehsil Sahiwal

775 166 Name of the Scheme Sewerage Sabir Colony katchi 0.000 0.700 0.700 0.000 0.105 0.000 0.000 0.000 0.105 0.105 0.000 0.000 0.000
Packi Road, Sahiwal.
Approval Date Approved
Major Components AC/PVC Pipe
Major Targets 100%
District and Tehsil Sahiwal

776 167 Name of the Scheme Sewerage Dastgir colony, Railway 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Station Road, Opp: GPO Sahiwal.
Approval Date Approved
Major Components AC/PVC Pipe
Major Targets 100%
District and Tehsil Sahiwal

777 168 Name of the Scheme Repair & Desilting of Sullage 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Carrier along with Noor shah
Road Kot Khadim ali Shah
Sahiwal.
Approval Date 6.02.09
Major Components AC/PVC Pipe
Major Targets 100%
District and Tehsil Sahiwal

778 169 Name of the Scheme Provision of Machinery & 0.000 7.000 7.000 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Equipment for Solid waste
Management TMA Sahiwal.
Approval Date 6.02.09
Major Components AC/PVC Pipe and Machinery etc.
Major Targets 100%
District and Tehsil Sahiwal

246
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

779 170 Name of the Scheme Construction of Sewerage System 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
DCO House to Kothi Sheikh
Ehtishsam canal Road, T.T.Singh
Approval Date 19.3.09
Major Components Construction of Sewer system etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

780 171 Name of the Scheme Urban Sewerage Scheme, 0.000 173.990 10.000 0.000 25.000 0.000 0.000 0.000 25.000 25.000 55.000 110.089 0.000
Burewala Ph-II.
Approval Date 27.1.09
Major Components Sewer System, Disposal etc.
Major Targets 17%
District and Tehsil Vehari , Burewala

Sub-Total: Urban Sewerage Drainage 0.000 9,958.062 2,896.196 0.000 1,498.829 0.000 0.000 0.000 1,498.829 1,498.829 3,416.721 3,314.574 200.000

Rural Water Supply


781 172 Name of the Scheme Rural Water Supply Scheme 0.000 7.639 7.084 0.000 1.701 0.000 0.000 0.000 1.701 1.701 0.000 0.000 0.000
Attock Cantt
Approval Date 2/12/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

782 173 Name of the Scheme Rural Water Supply Scheme Qabla 0.000 4.694 4.479 0.000 0.919 0.000 0.000 0.000 0.919 0.919 0.000 0.000 0.000
Bandi
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

783 174 Name of the Scheme Rural Water Supply Scheme Ghar 0.000 3.764 2.748 0.000 1.581 0.000 0.000 0.000 1.581 1.581 0.000 0.000 0.000
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

247
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

784 175 Name of the Scheme Rural Water Supply Scheme 0.000 7.466 5.056 0.000 3.530 0.000 0.000 0.000 3.530 3.530 0.000 0.000 0.000
Dhoke Manata
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

785 176 Name of the Scheme Rural Water Supply Scheme 0.000 3.439 3.854 0.000 0.101 0.000 0.000 0.000 0.101 0.101 0.000 0.000 0.000
Bhadian
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

786 177 Name of the Scheme Rehabilitation of Water Supply 0.000 5.193 5.218 0.000 0.754 0.000 0.000 0.000 0.754 0.754 0.000 0.000 0.000
Scheme Malowala
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

787 178 Name of the Scheme Rehabilitation of Water Supply 0.000 3.660 2.718 0.000 1.491 0.000 0.000 0.000 1.491 1.491 0.000 0.000 0.000
Scheme Ratwal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

788 179 Name of the Scheme Rehabilitation of Water Supply 0.000 11.564 8.470 0.000 4.829 0.000 0.000 0.000 4.829 4.829 0.000 0.000 0.000
Scheme Kot Fateh Khan
Approval Date 2-12-206
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

248
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

789 180 Name of the Scheme Rehabilitation of Water Supply 0.000 2.155 2.144 0.000 0.334 0.000 0.000 0.000 0.334 0.334 0.000 0.000 0.000
Scheme Dhurnal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

790 181 Name of the Scheme Rehabilitation of Rural Water 0.000 5.862 3.183 0.000 1.500 0.000 0.000 0.000 1.500 1.500 2.058 0.000 0.000
Supply Scheme Chab
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 69%
District and Tehsil Attock

791 182 Name of the Scheme Rehabilitation of Rural Water 0.000 4.355 3.018 0.000 1.990 0.000 0.000 0.000 1.990 1.990 0.000 0.000 0.000
Supply Scheme Nukkah Afghan
Approval Date 29-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

792 183 Name of the Scheme Rehabilitation of Rural Water 0.000 5.141 0.207 0.000 2.500 0.000 0.000 0.000 2.500 2.500 3.205 0.000 0.000
Supply Scheme Injra Afghan.
Approval Date 2/12/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 46%
District and Tehsil Attock

793 184 Name of the Scheme Rehabilitation of Rural Water 0.000 10.000 3.474 0.000 3.000 0.000 0.000 0.000 3.000 3.000 5.026 0.000 0.000
Supply Kasran
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 56%
District and Tehsil Attock

249
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

794 185 Name of the Scheme Rehabilitation of Rural Water 0.000 49.319 35.427 0.000 21.290 0.000 0.000 0.000 21.290 21.290 0.000 0.000 0.000
Supply Khour
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

795 186 Name of the Scheme Rural Water Supply Jangla, Khudi 0.000 12.438 12.688 0.000 1.616 0.000 0.000 0.000 1.616 1.616 0.000 0.000 0.000
Deri & Gulga Khroan
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

796 187 Name of the Scheme Rural Water Supply scheme 0.000 8.000 8.646 0.000 0.554 0.000 0.000 0.000 0.554 0.554 0.000 0.000 0.000
Ghreeb Wal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

797 188 Name of the Scheme Rural Water Supply Scheme 0.000 5.000 4.885 0.000 0.865 0.000 0.000 0.000 0.865 0.865 0.000 0.000 0.000
Dhoke Jabar Wal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

798 189 Name of the Scheme Rural Water Supply scheme 0.000 8.000 3.870 0.000 2.500 0.000 0.000 0.000 2.500 2.500 2.830 0.000 0.000
Sukhwal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 69%
District and Tehsil Attock

250
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

799 190 Name of the Scheme Rural Water Supply Dharal 0.000 7.000 2.701 0.000 2.500 0.000 0.000 0.000 2.500 2.500 2.849 0.000 0.000
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 65%
District and Tehsil Attock

800 191 Name of the Scheme Rehabilitation of Rural Water 0.000 9.815 3.455 0.000 3.500 0.000 0.000 0.000 3.500 3.500 4.332 0.000 0.000
Supply Scheme Naka Khurd
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 62%
District and Tehsil Attock

801 192 Name of the Scheme Reh: of Rural Water Supply 0.000 5.373 3.900 0.000 2.279 0.000 0.000 0.000 2.279 2.279 0.000 0.000 0.000
Scheme Shaheen Bagh
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

802 193 Name of the Scheme Reh: of Rural Water Supply 0.000 9.564 5.850 0.000 5.149 0.000 0.000 0.000 5.149 5.149 0.000 0.000 0.000
Scheme Jassian
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

803 194 Name of the Scheme Reh: of Rural Water Supply 0.000 13.502 4.600 0.000 5.000 0.000 0.000 0.000 5.000 5.000 5.927 0.000 0.000
Scheme Attock Khurd and Mullan
Mansoor
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 62%
District and Tehsil Attock

251
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

804 195 Name of the Scheme Reh: of Rural Water Supply 0.000 1.410 1.319 0.000 0.303 0.000 0.000 0.000 0.303 0.303 0.000 0.000 0.000
Scheme Nathial & Rawal
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

805 196 Name of the Scheme Reh: of Rural Water Supply 0.000 4.349 2.970 0.000 2.031 0.000 0.000 0.000 2.031 2.031 0.000 0.000 0.000
Scheme Dhulian
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

806 197 Name of the Scheme Reh: of Rural Water Supply 0.000 4.711 3.581 0.000 1.837 0.000 0.000 0.000 1.837 1.837 0.000 0.000 0.000
Scheme Pind
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

807 198 Name of the Scheme Reh: of Rural Water Supply 0.000 2.404 2.130 0.000 0.635 0.000 0.000 0.000 0.635 0.635 0.000 0.000 0.000
Scheme Sapial
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

808 199 Name of the Scheme Reh: of Rural Water Supply 0.000 4.262 3.100 0.000 1.801 0.000 0.000 0.000 1.801 1.801 0.000 0.000 0.000
Scheme Maryala
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

252
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

809 200 Name of the Scheme Reh: of Rural Water Supply 0.000 6.323 3.400 0.000 2.031 0.000 0.000 0.000 2.031 2.031 1.840 0.000 0.000
Scheme Jaba
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 75%
District and Tehsil Attock

810 201 Name of the Scheme Reh: of Rural Water Supply 0.000 3.500 3.500 0.000 0.525 0.000 0.000 0.000 0.525 0.525 0.000 0.000 0.000
Scheme Chauntara
Approval Date 27-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

811 202 Name of the Scheme Rural Water Supply Scheme 0.000 5.736 4.656 0.000 1.940 0.000 0.000 0.000 1.940 1.940 0.000 0.000 0.000
Akhori
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

812 203 Name of the Scheme Urban Water Supply Scheme for 0.000 6.728 7.175 0.000 0.562 0.000 0.000 0.000 0.562 0.562 0.000 0.000 0.000
Dhoke Maskeen & Baba Wali
Chandar Hasanabdal City
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Attock

813 204 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 8.094 7.802 0.000 1.506 0.000 0.000 0.000 1.506 1.506 0.000 0.000 0.000
No.59/4-R
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

253
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

814 205 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.639 4.335 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
No.92/6-R
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

815 206 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.070 3.944 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
No.211/9-R
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

816 207 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 3.269 2.936 0.000 0.823 0.000 0.000 0.000 0.823 0.823 0.000 0.000 0.000
No.301/HR
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

817 208 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 5.465 4.383 0.000 1.902 0.000 0.000 0.000 1.902 1.902 0.000 0.000 0.000

No.188/7-R
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

818 209 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 6.202 5.224 0.000 1.900 0.000 0.000 0.000 1.900 1.900 0.000 0.000 0.000

No.185/7-R
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

254
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

819 210 Name of the Scheme Rehabilitation of Water Supply 0.000 10.024 6.600 0.000 4.388 0.000 0.000 0.000 4.388 4.388 0.000 0.000 0.000
Scheme Parbatiwala, Chak
Jamoon Rehomonka and Wasandi.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 95%
District and Tehsil Bahawalnagar , Minchan abad

820 211 Name of the Scheme Rehabilitation of Water Supply 0.000 4.194 2.456 0.000 2.367 0.000 0.000 0.000 2.367 2.367 0.000 0.000 0.000
Scheme Azafi Basti Darbar Shakar
Ganj.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

821 212 Name of the Scheme Rehabilitation of Water Supply 0.000 4.546 4.546 0.000 0.682 0.000 0.000 0.000 0.682 0.682 0.000 0.000 0.000
Scheme Dhab Sucha Singh.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

822 213 Name of the Scheme Rehabilitation of Water Supply 0.000 3.842 3.842 0.000 0.576 0.000 0.000 0.000 0.576 0.576 0.000 0.000 0.000
Scheme Noorpur Arain.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

823 214 Name of the Scheme Rural Water supply scheme 0.000 3.349 1.200 0.000 2.651 0.000 0.000 0.000 2.651 2.651 0.000 0.000 0.000
Haranwala.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Minchan abad

255
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

824 215 Name of the Scheme Rehabilitation Extension Rural 0.000 23.102 2.490 0.000 1.000 0.000 0.000 0.000 1.000 1.000 23.077 0.000 0.000
Water Supply Scheme Chak
No.9/FW to 11/FW & 54/F
(Bukhshan Khan),
Approval Date 27.05.2009
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 13%
District and Tehsil Bahawalnagar , Chistian

825 216 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 10.073 5.992 0.000 2.500 0.000 0.000 0.000 2.500 2.500 3.092 0.000 0.000
No. 105/ Fateh.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 73%
District and Tehsil Bahawalnagar , Chistian

826 217 Name of the Scheme Reh: Extension Water Supply 0.000 1.930 1.930 0.000 0.290 0.000 0.000 0.000 0.290 0.290 0.000 0.000 0.000
Scheme Chak No. 48/3R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

827 218 Name of the Scheme Reh: Extension Water Supply 0.000 4.373 3.090 0.000 1.939 0.000 0.000 0.000 1.939 1.939 0.000 0.000 0.000
Scheme Chak No. 108/F (Azafi
Basti.)
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

256
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

828 219 Name of the Scheme Reh: Extension Water Supply 0.000 4.373 2.827 0.000 2.202 0.000 0.000 0.000 2.202 2.202 0.000 0.000 0.000
Scheme Chak No.5/Fordwah
(Azafi Basti.)
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

829 220 Name of the Scheme Reh: Extension Water Supply 0.000 1.369 0.898 0.000 0.676 0.000 0.000 0.000 0.676 0.676 0.000 0.000 0.000
Scheme Chak No.4/Fordwah
(Azafi Basti.)
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

830 221 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 3.218 1.988 0.000 1.713 0.000 0.000 0.000 1.713 1.713 0.000 0.000 0.000
No. 126/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

831 222 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 3.394 2.349 0.000 1.554 0.000 0.000 0.000 1.554 1.554 0.000 0.000 0.000
No. 118/ M.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

832 223 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 14.205 4.000 0.000 2.974 0.000 0.000 0.000 2.974 2.974 9.362 0.000 0.000
No. 201-205/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 43%
District and Tehsil Bahawalnagar , Chistian

257
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

833 224 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 5.231 2.627 0.000 1.600 0.000 0.000 0.000 1.600 1.600 1.789 0.000 0.000
No. 172/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 70%
District and Tehsil Bahawalnagar , Chistian

834 225 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 7.450 4.631 0.000 1.700 0.000 0.000 0.000 1.700 1.700 2.237 0.000 0.000
No. 167/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 74%
District and Tehsil Bahawalnagar , Chistian

835 226 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 3.412 1.957 0.000 1.967 0.000 0.000 0.000 1.967 1.967 0.000 0.000 0.000
No. 176/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

836 227 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 4.567 3.238 0.000 2.014 0.000 0.000 0.000 2.014 2.014 0.000 0.000 0.000
No.129/ Murad (B).
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chistian

837 228 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 5.209 3.897 0.000 2.093 0.000 0.000 0.000 2.093 2.093 0.000 0.000 0.000
No 114/ 6R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

258
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

838 229 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 2.424 0.986 0.000 1.802 0.000 0.000 0.000 1.802 1.802 0.000 0.000 0.000
No 33/ 3R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

839 230 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 5.496 2.993 0.000 2.935 0.000 0.000 0.000 2.935 2.935 0.392 0.000 0.000
No.173/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 94%
District and Tehsil Bahawalnagar , Haroonabad

840 231 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 2.946 1.900 0.000 1.488 0.000 0.000 0.000 1.488 1.488 0.000 0.000 0.000
No.111/ Murad.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chishtian

841 232 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 2.995 1.181 0.000 2.263 0.000 0.000 0.000 2.263 2.263 0.000 0.000 0.000
No 77-79/ 1L.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

842 233 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 3.485 1.500 0.000 2.508 0.000 0.000 0.000 2.508 2.508 0.000 0.000 0.000
No.133/ 6R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

259
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

843 234 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 1.610 0.221 0.000 1.631 0.000 0.000 0.000 1.631 1.631 0.000 0.000 0.000
No. 78/ 1L..
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

844 235 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 4.526 3.415 0.000 1.790 0.000 0.000 0.000 1.790 1.790 0.000 0.000 0.000
No 75/ 4R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

845 236 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 4.858 2.228 0.000 1.600 0.000 0.000 0.000 1.600 1.600 1.759 0.000 0.000
No 192/ 7R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 69%
District and Tehsil Bahawalnagar , Haroonabad

846 237 Name of the Scheme Reh: Water Supply Scheme Chak 0.000 1.609 0.315 0.000 1.535 0.000 0.000 0.000 1.535 1.535 0.000 0.000 0.000
No 90/ 5R.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Haroonabad

260
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

847 238 Name of the Scheme Rehabilitation of Rural Water 0.000 2.819 1.378 0.000 1.864 0.000 0.000 0.000 1.864 1.864 0.000 0.000 0.000
Supply Scheme Chak Najeebabad,
Expendation of Machinery and
Pipe Line, Tehsil & Distt.
Bahawalnagar.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

848 239 Name of the Scheme Rehabilitation of Rural Water 0.000 2.837 2.157 0.000 1.106 0.000 0.000 0.000 1.106 1.106 0.000 0.000 0.000
Supply Scheme Chak
Dholeywala,Tehsil & Distt.
Bahawalnagar.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

849 240 Name of the Scheme Rehabilitation of Rural Water 0.000 3.197 1.650 0.000 2.027 0.000 0.000 0.000 2.027 2.027 0.000 0.000 0.000
Supply Scheme of Daddu Mamuka
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

850 241 Name of the Scheme Rehabilitation of Rural Water 0.000 2.315 1.869 0.000 0.793 0.000 0.000 0.000 0.793 0.793 0.000 0.000 0.000
Supply Scheme Chak Kishan
Garh,Tehsil & Distt. Bahawalnagar.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

261
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

851 242 Name of the Scheme Rehabilitation of Rural Water 0.000 3.988 3.274 0.000 1.312 0.000 0.000 0.000 1.312 1.312 0.000 0.000 0.000
Supply Scheme Chak Nathewala,
Tehsil & Distt. Bahawalnagar.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

852 243 Name of the Scheme Rehabilitation of Rural Water 0.000 2.641 1.599 0.000 1.438 0.000 0.000 0.000 1.438 1.438 0.000 0.000 0.000
Supply Scheme Mohib Ali
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

853 244 Name of the Scheme Rehabilitation of Rural Water 0.000 3.191 1.423 0.000 2.247 0.000 0.000 0.000 2.247 2.247 0.000 0.000 0.000
Supply Scheme Nathu Dhaka
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

854 245 Name of the Scheme Rehabilitation of Rural Water 0.000 2.423 1.506 0.000 1.280 0.000 0.000 0.000 1.280 1.280 0.000 0.000 0.000
Supply Scheme Sundar Wali
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

855 246 Name of the Scheme Rehabilitation of Rural Water 0.000 2.602 1.370 0.000 1.622 0.000 0.000 0.000 1.622 1.622 0.000 0.000 0.000
Supply Scheme Dhani Muhammad
Yar Chishti
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

262
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

856 247 Name of the Scheme Rehabilitation of Rural Water 0.000 1.446 0.750 0.000 0.913 0.000 0.000 0.000 0.913 0.913 0.000 0.000 0.000
Supply Scheme Punj Kossi
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

857 248 Name of the Scheme Rehabilitation of Rural Water 0.000 2.224 0.783 0.000 1.775 0.000 0.000 0.000 1.775 1.775 0.000 0.000 0.000
Supply Scheme,Kehven Singh
Akkan Wali and Ganga Singh.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

858 249 Name of the Scheme Rehabilitation of Rural Water 0.000 2.855 0.660 0.000 2.623 0.000 0.000 0.000 2.623 2.623 0.000 0.000 0.000
Supply Scheme Nanak Chand and
Nihalka
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

859 250 Name of the Scheme Rehabilitation of Rural Water 0.000 2.567 1.210 0.000 1.742 0.000 0.000 0.000 1.742 1.742 0.000 0.000 0.000
Supply Scheme Hazoor Singh
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

860 251 Name of the Scheme Rehabilitation of Water Supply 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Scheme Chak Hotiana.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

263
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

861 252 Name of the Scheme Rehabilitation of Water Supply 0.000 3.500 3.500 0.000 0.525 0.000 0.000 0.000 0.525 0.525 0.000 0.000 0.000
Scheme Adda Basti Molanwala
Galla.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

862 253 Name of the Scheme Rehabilitation of Water Supply 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Scheme Khem Ghar.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

863 254 Name of the Scheme Ext. of Water Supply Scheme 0.000 0.965 0.400 0.000 0.600 0.000 0.000 0.000 0.600 0.600 0.000 0.000 0.000
Azafi Basti Ganga Singh.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 90%
District and Tehsil Bahawalnagar

864 255 Name of the Scheme Ext. of Water Supply Scheme 0.000 1.800 1.800 0.000 0.270 0.000 0.000 0.000 0.270 0.270 0.000 0.000 0.000
Basti Nadir Shah.
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

865 256 Name of the Scheme Rehabilitation of Water Supply 0.000 1.218 0.500 0.000 0.901 0.000 0.000 0.000 0.901 0.901 0.000 0.000 0.000
Scheme in Chak Bakhu Shah.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

264
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

866 257 Name of the Scheme Rehabilitation of Water Supply 0.000 1.458 0.400 0.000 1.277 0.000 0.000 0.000 1.277 1.277 0.000 0.000 0.000
Scheme in Chak Mani Sabooka.
Approval Date 02.02.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

867 258 Name of the Scheme Rehabilitation of Water Supply 0.000 2.970 2.500 0.000 0.916 0.000 0.000 0.000 0.916 0.916 0.000 0.000 0.000
Scheme with Generator in Doonga
Boonga
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

868 259 Name of the Scheme Rehabilitation of Water Supply 0.000 3.343 2.500 0.000 1.344 0.000 0.000 0.000 1.344 1.344 0.000 0.000 0.000
Scheme in Chak Kot Dial Singh.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

869 260 Name of the Scheme Rehabilitation of Water Supply 0.000 1.335 0.500 0.000 1.035 0.000 0.000 0.000 1.035 1.035 0.000 0.000 0.000
Scheme in Chak Gulab Ali.
Approval Date 2.2.09
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar

870 261 Name of the Scheme Rural Water Supply Scheme 0.000 5.000 1.000 0.000 2.300 0.000 0.000 0.000 2.300 2.300 2.450 0.000 0.000
Maouza Rab Nawaz Pura
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 57%
District and Tehsil Bahawalnagar

265
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

871 262 Name of the Scheme Reh. Of Rural Water Supply 0.000 25.742 5.029 0.000 2.300 0.000 0.000 0.000 2.300 2.300 22.274 0.000 0.000
Scheme Chak No.208-209/Murad,
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 25%
District and Tehsil Bahawalnagar , Chishtain

872 263 Name of the Scheme Reh. Of Rural Water Supply 0.000 3.316 1.860 0.000 2.300 0.000 0.000 0.000 2.300 2.300 0.000 0.000 0.000
Scheme Chak No.121/Murad
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 109%
District and Tehsil Bahawalnagar , Chishtain

873 264 Name of the Scheme Reh. Of Rural Water Supply 0.000 4.110 2.110 0.000 2.617 0.000 0.000 0.000 2.617 2.617 0.000 0.000 0.000
Scheme Chak No.29/3-R,
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalnagar , Chishtain

874 265 Name of the Scheme Water Disposal Scheme, Meclod 0.000 0.492 0.100 0.000 0.392 0.000 0.000 0.000 0.392 0.392 0.000 0.000 0.000
Gunj
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 87%
District and Tehsil Bahawalnagar

875 266 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 7.445 7.605 0.000 0.957 0.000 0.000 0.000 0.957 0.957 0.000 0.000 0.000
No.68/DB Jujjawali
Approval Date 31.01.07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur , Yazman

266
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

876 267 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 5.155 5.717 0.000 0.211 0.000 0.000 0.000 0.211 0.211 0.000 0.000 0.000
No.88/DB
Approval Date 03.08.05
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur , Yazman

877 268 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 12.379 12.324 0.000 1.912 0.000 0.000 0.000 1.912 1.912 0.000 0.000 0.000
No.14/BC
Approval Date 18.05.07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur

878 269 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 14.389 9.000 0.000 2.600 0.000 0.000 0.000 2.600 2.600 4.947 0.000 0.000
No.138/DB
Approval Date 10.11.08
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 70%
District and Tehsil Bahawalpur , Yazman

879 270 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 5.786 3.000 0.000 1.300 0.000 0.000 0.000 1.300 1.300 2.354 0.000 0.000
No.49/DB(East)
Approval Date 10.11.08
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 65%
District and Tehsil Bahawalpur , Yazman

880 271 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 9.272 5.005 0.000 2.500 0.000 0.000 0.000 2.500 2.500 3.158 0.000 0.000
No.49/DB(West)
Approval Date 10.11.08
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 70%
District and Tehsil Bahawalpur , Yazman

267
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

881 272 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 10.481 5.005 0.000 3.500 0.000 0.000 0.000 3.500 3.500 3.548 0.000 0.000
No.102/DB
Approval Date 10.11.08
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 71%
District and Tehsil Bahawalpur , Yazman

882 273 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 13.746 7.525 0.000 4.100 0.000 0.000 0.000 4.100 4.100 4.183 0.000 0.000
No.13/BC
Approval Date 10.11.08
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 74%
District and Tehsil Bahawalpur , Yazman

883 274 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.500 4.217 0.000 0.958 0.000 0.000 0.000 0.958 0.958 0.000 0.000 0.000
No.36/DNB
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur

884 275 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 6.061 5.513 0.000 1.457 0.000 0.000 0.000 1.457 1.457 0.000 0.000 0.000
No.16/DNB Manzoorabad Azafi
Abadi Chak No.106-107/DNB
Approval Date 2006-07
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 100%
District and Tehsil Bahawalpur

885 276 Name of the Scheme Water Supply Scheme for Mauza 0.000 11.607 3.000 0.000 3.100 0.000 0.000 0.000 3.100 3.100 7.248 0.000 0.000
Goth Mehrab and Coty Goyh
Mehrab UC Goth Mehrab.
Approval Date 25.05.2009
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 46%
District and Tehsil Bahawalpur

268
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

886 277 Name of the Scheme Water Supply Mauza Sui Wahar 0.000 11.520 3.000 0.000 4.100 0.000 0.000 0.000 4.100 4.100 6.148 0.000 0.000
Gullan Ilatti Uc Jindo Missan
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 54%
District and Tehsil Bahawalpur

887 278 Name of the Scheme Rural Water Supply at Chak 0.000 11.505 3.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.231 0.000 0.000
No.105/DB
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 30%
District and Tehsil Bahawalpur

888 279 Name of the Scheme Rural Water Supply at Chak 0.000 10.845 3.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 8.472 0.000 0.000
No.68/DB (Bangla Wali)
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 32%
District and Tehsil Bahawalpur

889 280 Name of the Scheme Separtion of Rising Main Water 0.000 6.866 4.311 0.000 1.000 0.000 0.000 0.000 1.000 1.000 2.585 0.000 0.000
Supply Scheme of Chak No.153/M
Approval Date Approved
Major Components T.Well,R.Main, D.System and allied
works etc.
Major Targets 67%
District and Tehsil Bahawalpur

890 281 Name of the Scheme Rehabilitation of Water Supply 0.000 11.118 12.520 0.000 0.266 0.000 0.000 0.000 0.266 0.266 0.000 0.000 0.000
Scheme Mureed
Approval Date 22-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

269
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

891 282 Name of the Scheme Rehabilitation of Water Supply 0.000 2.763 2.938 0.000 0.239 0.000 0.000 0.000 0.239 0.239 0.000 0.000 0.000
Scheme Dab Kalan
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

892 283 Name of the Scheme Rehabilitation of Water Supply 0.000 3.856 4.234 0.000 0.200 0.000 0.000 0.000 0.200 0.200 0.000 0.000 0.000
Scheme Chak Naurang
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

893 284 Name of the Scheme Rehabilitation of Water Supply 0.000 4.213 3.999 0.000 0.846 0.000 0.000 0.000 0.846 0.846 0.000 0.000 0.000
Scheme Singwala (Revised
Approval Date 23-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

894 285 Name of the Scheme Rehabilitation of Water Supply 0.000 7.533 7.717 0.000 0.946 0.000 0.000 0.000 0.946 0.946 0.000 0.000 0.000
Scheme Chawli
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

895 286 Name of the Scheme Rehabilitation of Water Supply 0.000 3.990 4.305 0.000 0.284 0.000 0.000 0.000 0.284 0.284 0.000 0.000 0.000
Scheme Pira Jangla
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

270
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

896 287 Name of the Scheme Rehabilitation of Water Supply 0.000 2.824 2.953 0.000 0.295 0.000 0.000 0.000 0.295 0.295 0.000 0.000 0.000
Scheme Pinwal
Approval Date 23-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

897 288 Name of the Scheme Rehabilitation of Water Supply 0.000 4.576 4.934 0.000 0.328 0.000 0.000 0.000 0.328 0.328 0.000 0.000 0.000
Scheme Dhab Pari
Approval Date 23-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

898 289 Name of the Scheme Rehabilitation of Water Supply 0.000 3.334 3.418 0.000 0.416 0.000 0.000 0.000 0.416 0.416 0.000 0.000 0.000
Scheme Mari
Approval Date 22-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

899 290 Name of the Scheme Rehabilitation of Water Supply 0.000 2.104 2.216 0.000 0.204 0.000 0.000 0.000 0.204 0.204 0.000 0.000 0.000
Scheme Nachindi
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

900 291 Name of the Scheme Provision of Water Supply 0.000 8.005 1.700 0.000 3.590 0.000 0.000 0.000 3.590 3.590 3.916 0.000 0.000
Scheme Dhoke Ban Amir Khatoon
District Chakwal.
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 57%
District and Tehsil Chakwal

271
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

901 292 Name of the Scheme Rehabilitation of Rural Water 0.000 3.592 1.361 0.000 2.770 0.000 0.000 0.000 2.770 2.770 0.000 0.000 0.000
Supply Scheme Doray, Chakwal
(Amended)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

902 293 Name of the Scheme Rehabilitation of Rural Water 0.000 5.197 2.625 0.000 3.352 0.000 0.000 0.000 3.352 3.352 0.000 0.000 0.000
Supply Scheme Kot Iqbal, Chakwal
Approval Date 11/8/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

903 294 Name of the Scheme Extension & Improvement of 0.000 10.990 11.425 0.000 1.214 0.000 0.000 0.000 1.214 1.214 0.000 0.000 0.000
Water Supply Scheme Buchal
Kalan.(Revised)
Approval Date 11/8/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

904 295 Name of the Scheme Water Suppply & Sanitation 0.000 20.429 11.000 0.000 5.700 0.000 0.000 0.000 5.700 5.700 6.793 0.000 0.000
Scheme Dhoke Khour
Approval Date 24-09-2005
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 71%
District and Tehsil Chakwal

905 296 Name of the Scheme Water Suppply Scheme Bigial 0.000 6.311 4.637 0.000 2.621 0.000 0.000 0.000 2.621 2.621 0.000 0.000 0.000
Approval Date 23-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

272
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

906 297 Name of the Scheme Water Supply Dhoke Sooba Khan 0.000 0.545 0.200 0.000 0.427 0.000 0.000 0.000 0.427 0.427 0.000 0.000 0.000
Talyala Village Sethi Tehsil Kallar
Khar, District Chakwal.
Approval Date 23-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

907 298 Name of the Scheme Reh: of Rural Water Supply 0.000 2.534 2.472 0.000 0.442 0.000 0.000 0.000 0.442 0.442 0.000 0.000 0.000
Scheme Sakriala (Amended)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

908 299 Name of the Scheme Reh: of Rural Water Supply 0.000 1.409 1.409 0.000 0.211 0.000 0.000 0.000 0.211 0.211 0.000 0.000 0.000
Scheme Kotlay
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

909 300 Name of the Scheme Reh: of Rural Water Supply 0.000 2.648 2.432 0.000 0.613 0.000 0.000 0.000 0.613 0.613 0.000 0.000 0.000
Scheme Khinger (Amended)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

910 301 Name of the Scheme Reh: of Rural Water Supply 0.000 2.504 2.443 0.000 0.437 0.000 0.000 0.000 0.437 0.437 0.000 0.000 0.000
Scheme Latifal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

273
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

911 302 Name of the Scheme Reh: of Rural Water Supply 0.000 2.832 2.701 0.000 0.556 0.000 0.000 0.000 0.556 0.556 0.000 0.000 0.000
Scheme Munara
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

912 303 Name of the Scheme Reh: of Rural Water Supply 0.000 2.017 2.017 0.000 0.303 0.000 0.000 0.000 0.303 0.303 0.000 0.000 0.000
Scheme Khwala (Dakhli Sathi)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

913 304 Name of the Scheme Reh: of Rural Water Supply 0.000 1.984 1.984 0.000 0.298 0.000 0.000 0.000 0.298 0.298 0.000 0.000 0.000
Scheme Makhal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

914 305 Name of the Scheme Reh: of Rural Water Supply 0.000 2.085 2.085 0.000 0.313 0.000 0.000 0.000 0.313 0.313 0.000 0.000 0.000
Scheme Wahali Bala
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

915 306 Name of the Scheme Water Supply Scheme Tamman 0.000 7.393 4.000 0.000 2.300 0.000 0.000 0.000 2.300 2.300 2.202 0.000 0.000
UC Tamman Tehsil Talagang
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 74%
District and Tehsil Chakwal

274
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

916 307 Name of the Scheme Water Supply Scheme Qadir Pur 0.000 3.336 3.336 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
UC Bhilomar Tehsil Talagang
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Chakwal

917 308 Name of the Scheme Rural Water Supply Scheme,Goroo 0.000 4.540 4.513 0.000 0.708 0.000 0.000 0.000 0.708 0.708 0.000 0.000 0.000
Approval Date 17.01.07
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

918 309 Name of the Scheme Rural Water Supply 0.000 8.329 7.832 0.000 1.746 0.000 0.000 0.000 1.746 1.746 0.000 0.000 0.000
Scheme,Wadoor
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan

919 310 Name of the Scheme Rural Water Supply Scheme,Basti 0.000 11.862 5.401 0.000 4.100 0.000 0.000 0.000 4.100 4.100 4.140 0.000 0.000
Bathi
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 70%
District and Tehsil Dera Ghazi Khan , Taunsa

275
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

920 311 Name of the Scheme Rural Water Supply Scheme, 0.000 6.056 4.184 0.000 2.780 0.000 0.000 0.000 2.780 2.780 0.000 0.000 0.000
Bangal & adj. abadies
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

921 312 Name of the Scheme Rural Water Supply Scheme, 0.000 7.068 3.466 0.000 2.300 0.000 0.000 0.000 2.300 2.300 2.362 0.000 0.000
Bajha(North)
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 71%
District and Tehsil Dera Ghazi Khan , Taunsa

922 313 Name of the Scheme Rural Water Supply Scheme, 0.000 9.068 4.066 0.000 3.100 0.000 0.000 0.000 3.100 3.100 3.262 0.000 0.000
Bajha(South)
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 69%
District and Tehsil Dera Ghazi Khan , Taunsa

923 314 Name of the Scheme Reh. of Rural Water Supply 0.000 7.395 3.570 0.000 2.400 0.000 0.000 0.000 2.400 2.400 2.534 0.000 0.000
Scheme, Basti Dhamaani
Approval Date 10.11.08
Major Components T/Well,R.Main, D/system,P/Machinery,
P/Houses,LLRes.
Major Targets 70%
District and Tehsil Dera Ghazi Khan , Taunsa

276
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

924 315 Name of the Scheme Rural Water Supply 0.000 0.500 0.504 0.000 0.071 0.000 0.000 0.000 0.071 0.071 0.000 0.000 0.000
Scheme,Jhoke Bodo.
Approval Date 2006-7
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

925 316 Name of the Scheme Reh. of Rural Water Supply 0.000 2.379 2.414 0.000 0.322 0.000 0.000 0.000 0.322 0.322 0.000 0.000 0.000
Scheme, Mundrani
Approval Date 2006-07
Major Components T/Well,R.Main, D/system,P/Machinery,
P/Houses,LLRes.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

926 317 Name of the Scheme Reh. of Rural Water Supply 0.000 4.063 2.989 0.000 1.683 0.000 0.000 0.000 1.683 1.683 0.000 0.000 0.000
Scheme, Buglani
Approval Date 2006-07
Major Components T/Well,R.Main, D/system,P/Machinery,
P/Houses,LLRes.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

927 318 Name of the Scheme Rural Water Supply Scheme, Basti 0.000 1.800 1.816 0.000 0.254 0.000 0.000 0.000 0.254 0.254 0.000 0.000 0.000
Sarfraz.
Approval Date 2006-07
Major Components T/Well,R.Main, D/system,P/Machinery,
P/Houses,LLRes.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

277
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

928 319 Name of the Scheme Ext.& Improvement of Rural Water 0.000 29.403 5.300 0.000 12.900 0.000 0.000 0.000 12.900 12.900 15.613 0.000 0.000
Supply Scheme,Kot Qaisrani
U.C.Kot Qasrani
Approval Date 20.10.08
Major Components T/Well,R.Main, D/system,GSTs,
OHRs,P/Machinery, P/Houses
Generating sets.etc.
Major Targets 54%
District and Tehsil Dera Ghazi Khan , Taunsa

929 320 Name of the Scheme WSS Basti Janwar to Wajan UC 0.000 2.678 0.500 0.000 2.580 0.000 0.000 0.000 2.580 2.580 0.000 0.000 0.000
Lakhani
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

930 321 Name of the Scheme WSS Dagar wali and Adjoining 0.000 8.206 0.500 0.000 4.500 0.000 0.000 0.000 4.500 4.500 4.437 0.000 0.000
Abadies UC Vehova
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 53%
District and Tehsil Dera Ghazi Khan , Taunsa

931 322 Name of the Scheme WSS Basti Janwar to Bughian 0.000 4.142 0.500 0.000 2.500 0.000 0.000 0.000 2.500 2.500 1.763 0.000 0.000
Sharqi UC Lakhani.
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 63%
District and Tehsil Dera Ghazi Khan , Taunsa

932 323 Name of the Scheme WSS Basti janwar to Ganje wali 0.000 5.798 0.500 0.000 4.100 0.000 0.000 0.000 4.100 4.100 2.068 0.000 0.000
UC Lakhani
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 69%
District and Tehsil Dera Ghazi Khan , Taunsa

278
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

933 324 Name of the Scheme WSS Basti Malha UC Tibbi 0.000 5.351 0.500 0.000 3.200 0.000 0.000 0.000 3.200 3.200 2.454 0.000 0.000
Qaisrani
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 60%
District and Tehsil Dera Ghazi Khan , Taunsa

934 325 Name of the Scheme WSS Basti Balchani UC Tibbi 0.000 4.632 0.500 0.000 4.827 0.000 0.000 0.000 4.827 4.827 0.000 0.000 0.000
Qaisrani
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

935 326 Name of the Scheme WSS Phuglo UC Tumman Qaisrani 0.000 3.984 0.600 0.000 3.982 0.000 0.000 0.000 3.982 3.982 0.000 0.000 0.000
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

936 327 Name of the Scheme WSS Basti Marha UC Lakhani 0.000 4.812 0.500 0.000 2.800 0.000 0.000 0.000 2.800 2.800 2.234 0.000 0.000
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 60%
District and Tehsil Dera Ghazi Khan , Taunsa

937 328 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 3.965 1.100 0.000 3.460 0.000 0.000 0.000 3.460 3.460 0.000 0.000 0.000
Badit Dalana UC Wadoor
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

938 329 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 4.962 1.100 0.000 2.600 0.000 0.000 0.000 2.600 2.600 2.006 0.000 0.000
Gaddai Gharbi UC Gaddai
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 65%
District and Tehsil Dera Ghazi Khan , Taunsa

279
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

939 330 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 3.286 1.100 0.000 2.679 0.000 0.000 0.000 2.679 2.679 0.000 0.000 0.000
Gaddai Sharqi UC Gaddai
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

940 331 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 3.121 1.200 0.000 2.389 0.000 0.000 0.000 2.389 2.389 0.000 0.000 0.000
Kot Haibat UC Kot Habib
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

941 332 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 12.103 1.200 0.000 6.500 0.000 0.000 0.000 6.500 6.500 6.218 0.000 0.000
Patti Zai UC Wadoor
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 55%
District and Tehsil Dera Ghazi Khan , Taunsa

942 333 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 5.866 1.100 0.000 3.000 0.000 0.000 0.000 3.000 3.000 2.646 0.000 0.000
Sadiqabad UC Kot Haibat
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 61%
District and Tehsil Dera Ghazi Khan , Taunsa

943 334 Name of the Scheme Reh. Of Water Supply Scheme at 0.000 8.915 1.200 0.000 5.000 0.000 0.000 0.000 5.000 5.000 4.052 0.000 0.000
Tommi wala UC Wadoor
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 60%
District and Tehsil Dera Ghazi Khan , Taunsa

280
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

944 335 Name of the Scheme Water Supply Scheme Kot 0.000 8.581 7.690 0.000 2.178 0.000 0.000 0.000 2.178 2.178 0.000 0.000 0.000
Qaisrani
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

945 336 Name of the Scheme Water Supply Scheme Sokar 0.000 7.955 7.023 0.000 2.125 0.000 0.000 0.000 2.125 2.125 0.000 0.000 0.000
Approval Date 24.02.09
Major Components R.Main,D/system,etc.
Major Targets 100%
District and Tehsil Dera Ghazi Khan , Taunsa

946 337 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 5.194 5.137 0.000 0.836 0.000 0.000 0.000 0.836 0.836 0.000 0.000 0.000
No.171/GB
Approval Date 11.01.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

947 338 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.784 4.422 0.000 1.080 0.000 0.000 0.000 1.080 1.080 0.000 0.000 0.000
No.173/GB
Approval Date 12.12.06
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

948 339 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 9.536 9.165 0.000 1.801 0.000 0.000 0.000 1.801 1.801 0.000 0.000 0.000
No.170/GB
Approval Date 11.01.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

281
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

949 340 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 3.493 3.580 0.000 0.437 0.000 0.000 0.000 0.437 0.437 0.000 0.000 0.000
No.230/GB
Approval Date 11.01.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

950 341 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 3.559 3.614 0.000 0.479 0.000 0.000 0.000 0.479 0.479 0.000 0.000 0.000
No.231/GB
Approval Date 11.01.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

951 342 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 6.886 7.045 0.000 0.874 0.000 0.000 0.000 0.874 0.874 0.000 0.000 0.000
No.439/GB
Approval Date 18.05.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

952 343 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.644 5.263 0.000 0.078 0.000 0.000 0.000 0.078 0.078 0.000 0.000 0.000
No.466/GB
Approval Date 17.01.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

953 344 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 6.951 7.263 0.000 0.731 0.000 0.000 0.000 0.731 0.731 0.000 0.000 0.000
No.189/RB
Approval Date 05.03.07
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Chak Jumra

282
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

954 345 Name of the Scheme Reh.of Rural Water Supply & 0.000 4.674 2.500 0.000 2.875 0.000 0.000 0.000 2.875 2.875 0.000 0.000 0.000
Drainage Scheme,Chak
No.62/JB(Gastro Case)
Approval Date 3.12.08
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad

955 346 Name of the Scheme Rural Water Supply Scheme Chak 0.000 5.998 5.740 0.000 1.158 0.000 0.000 0.000 1.158 1.158 0.000 0.000 0.000
No. 102/JB (BurJ Mandi).
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Chak Jhumra

956 347 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.897 2.350 0.000 0.982 0.000 0.000 0.000 0.982 0.982 0.000 0.000 0.000
No. 102/JB (Burj Village).
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Chak Jhumra

957 348 Name of the Scheme Rural Water Supply Scheme Chak 0.000 5.217 1.828 0.000 2.100 0.000 0.000 0.000 2.100 2.100 2.072 0.000 0.000
No. 656/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 65%
District and Tehsil Faisalabad , jaranwala

958 349 Name of the Scheme Rural Water Supply Scheme Chak 0.000 0.873 0.127 0.000 0.877 0.000 0.000 0.000 0.877 0.877 0.000 0.000 0.000
No. 94,96 & 97/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , jaranwala

283
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

959 350 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.148 0.408 0.000 0.912 0.000 0.000 0.000 0.912 0.912 0.000 0.000 0.000
No. 58/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , jaranwala

960 351 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.028 2.287 0.000 1.195 0.000 0.000 0.000 1.195 1.195 0.000 0.000 0.000
No. 591/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , jaranwala

961 352 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.479 1.522 0.000 1.329 0.000 0.000 0.000 1.329 1.329 0.000 0.000 0.000
No. 98/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , jaranwala

962 353 Name of the Scheme Rural Water Supply Scheme Chak 0.000 10.251 8.470 0.000 3.319 0.000 0.000 0.000 3.319 3.319 0.000 0.000 0.000
No. 650/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Tainlianwala

963 354 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.921 2.029 0.000 1.330 0.000 0.000 0.000 1.330 1.330 0.000 0.000 0.000
No. 48/GB (Malo Wal).
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

284
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

964 355 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.199 2.014 0.000 1.665 0.000 0.000 0.000 1.665 1.665 0.000 0.000 0.000
No. 49/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

965 356 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.697 1.000 0.000 0.952 0.000 0.000 0.000 0.952 0.952 0.000 0.000 0.000
No. 47/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

966 357 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.711 3.216 0.000 1.052 0.000 0.000 0.000 1.052 1.052 0.000 0.000 0.000
No. 45/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

967 358 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.011 1.843 0.000 0.470 0.000 0.000 0.000 0.470 0.470 0.000 0.000 0.000
No. 50/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

968 359 Name of the Scheme Rehabilitation of Rural Water 0.000 1.037 0.203 0.000 0.990 0.000 0.000 0.000 0.990 0.990 0.000 0.000 0.000
Supply Scheme Chak No. 137/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

285
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

969 360 Name of the Scheme Rehabilitation of Rural Water 0.000 2.528 1.693 0.000 1.214 0.000 0.000 0.000 1.214 1.214 0.000 0.000 0.000
Supply Scheme Chak No. 136/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

970 361 Name of the Scheme Rehabilitation of Rural Water 0.000 4.554 2.500 0.000 2.737 0.000 0.000 0.000 2.737 2.737 0.000 0.000 0.000
Supply Scheme Chak No. 463/GB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad , Sammundri

971 362 Name of the Scheme Rural Water Supply Scheme Chak 0.000 14.327 8.500 0.000 4.000 0.000 0.000 0.000 4.000 4.000 3.976 0.000 0.000
No. 215/RB.
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 76%
District and Tehsil Faisalabad

972 363 Name of the Scheme Rural Water Supply Scheme Chak 0.000 7.389 6.194 0.000 2.303 0.000 0.000 0.000 2.303 2.303 0.000 0.000 0.000
No. 100/JB .
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad

973 364 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.930 2.154 0.000 1.216 0.000 0.000 0.000 1.216 1.216 0.000 0.000 0.000
No. 8/JB .
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 100%
District and Tehsil Faisalabad

286
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

974 365 Name of the Scheme Reh. / Improvement of Rural Water 0.000 6.504 2.000 0.000 2.500 0.000 0.000 0.000 2.500 2.500 2.980 0.000 0.000
Supply Scheme Chak No.452/GB .
Approval Date 9.2.09
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 60%
District and Tehsil Faisalabad , Tandlianwala

975 366 Name of the Scheme Rural Water Supply Scheme Chak 0.000 7.963 2.500 0.000 1.500 0.000 0.000 0.000 1.500 1.500 5.157 0.000 0.000
No. 67/JB .
Approval Date Approved
Major Components Source, Main Pipe Distribution&
Machineryetc.
Major Targets 44%
District and Tehsil Faisalabad

976 367 Name of the Scheme Provision of Water Supply 0.000 18.400 3.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 24.953 0.000 0.000
Scheme at Satiana
Approval Date 22.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 17%
District and Tehsil Fasisalabad , Faisalabad

977 368 Name of the Scheme Rural Water Supply and Sewerage 0.000 29.897 19.117 0.000 5.072 0.000 0.000 0.000 5.072 5.072 10.193 0.000 0.000
/ Drainage Scheme, Talwandi
Khajoorwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 70%
District and Tehsil Gujranwala

978 369 Name of the Scheme Rural Water Supply Scheme 0.000 18.781 9.428 0.000 4.600 0.000 0.000 0.000 4.600 4.600 7.570 0.000 0.000
Nokhar
Approval Date 6/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 65%
District and Tehsil Gujranwala

287
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

979 370 Name of the Scheme Rural Water Supply Scheme 0.000 8.498 7.409 0.000 2.364 0.000 0.000 0.000 2.364 2.364 0.000 0.000 0.000
Hardo Saharan
Approval Date 6/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

980 371 Name of the Scheme Reh: of Rural Water Supply 0.000 11.759 9.660 0.000 3.863 0.000 0.000 0.000 3.863 3.863 0.000 0.000 0.000
Scheme Dillanwali More
Eimanabad
Approval Date 12/12/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

981 372 Name of the Scheme Reh: of Rural Water Supply 0.000 8.729 8.591 0.000 1.447 0.000 0.000 0.000 1.447 1.447 0.000 0.000 0.000
Scheme Rasul Nagar
Approval Date 12/12/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

982 373 Name of the Scheme Rural Water Supply Scheme 0.000 23.673 0.100 0.000 8.500 0.000 0.000 0.000 8.500 8.500 18.737 0.000 0.000
Gondlanwala (Gujranwala)
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 32%
District and Tehsil Gujranwala

983 374 Name of the Scheme Rural Water Supply Scheme 0.000 16.312 8.958 0.000 4.500 0.000 0.000 0.000 4.500 4.500 5.301 0.000 0.000
Kohluwala
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Gujranwala

288
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

984 375 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Vitnerary Hospital Wazirabad
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

985 376 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Lalzar Colony Wazirabad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

986 377 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Guru Kotha Wazirabad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

987 378 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Nizamabad Wazirabad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

988 379 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Allahabad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

289
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

989 380 Name of the Scheme Const: of Water Filtration Plant at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Talwara
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

990 381 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Sohdra
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

991 382 Name of the Scheme Const: of Water Filtration Plant in 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Dhounkal
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

992 383 Name of the Scheme Rural Water Supply and Drainage 0.000 7.209 4.000 0.000 2.100 0.000 0.000 0.000 2.100 2.100 2.190 0.000 0.000
Scheme Bugha
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 74%
District and Tehsil Gujranwala

993 384 Name of the Scheme Rural Water Supply and Drainage 0.000 10.228 4.000 0.000 3.800 0.000 0.000 0.000 3.800 3.800 3.962 0.000 0.000
Scheme Kurlkey
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 66%
District and Tehsil Gujranwala

290
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

994 385 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant Qilla Dedar Singh
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

995 386 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant Botala Janda Singh
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

996 387 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant Kot Bowanidas
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

997 388 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Mandiala Warraich
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

998 389 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Govt. Girls College
Rwhwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

291
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

999 390 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Gondlanwala
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1000 391 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Jattan Wala Rahwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1001 392 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at new Ambalvi Masjid
Rahwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1002 393 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Darbar Jatti Shah Jamal
Rahwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1003 394 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Bhagat Garh
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

292
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1004 395 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Raj Kot
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1005 396 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Kushi Town Rahwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1006 397 Name of the Scheme Installation of water Filtration 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Plant at Zahid Colony,
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1007 398 Name of the Scheme Installation of water Filtration 0.000 6.292 0.200 0.000 5.036 0.000 0.000 0.000 5.036 5.036 2.000 0.000 0.000
Plant at PCC Baddoke Gussinian
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Gujranwala

1008 399 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Papular Narsury
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

293
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1009 400 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Ratta Bajwa
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1010 401 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Line par Ghakhar
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1011 402 Name of the Scheme Mohallah haidery Mian Jann 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Muhammad Ladhewala Warriach
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1012 403 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at C.O Unit Tanki Ladhey
wala Warraich
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1013 404 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Mohallah Telephone
Exchange Kot Ishaq
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

294
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1014 405 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Madu Khalil
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1015 406 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Bangla Abadi Ghakhar
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1016 407 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Old Kot Noora Road
Ghakhar
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1017 408 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Karima Abad Ghakhar
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1018 409 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Qila Dedar Singh C.O
Unit Office
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

295
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1019 410 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at BarkatPura Road Qila
Dedar
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1020 411 Name of the Scheme Installation of water Filtration 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Plant at Uggo Chak
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1021 412 Name of the Scheme Water Supply for Village Khattana 0.000 5.967 4.071 0.000 2.791 0.000 0.000 0.000 2.791 2.791 0.000 0.000 0.000
Approval Date 10/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1022 413 Name of the Scheme Rural Water Supply & Extension 0.000 16.719 15.119 0.000 4.108 0.000 0.000 0.000 4.108 4.108 0.000 0.000 0.000
Drainage Scheme Jheeranwali
Approval Date 1/6/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1023 414 Name of the Scheme Water Supply Scheme Jamoo 0.000 3.822 3.085 0.000 1.310 0.000 0.000 0.000 1.310 1.310 0.000 0.000 0.000
Boja, U/C 19, Ghakhara Kalan
Approval Date 9/5/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

296
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1024 415 Name of the Scheme Water Supply Scheme Trikha, 0.000 5.326 4.740 0.000 1.385 0.000 0.000 0.000 1.385 1.385 0.000 0.000 0.000
Kana
Approval Date 11/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1025 416 Name of the Scheme Water Supply Scheme Majra 0.000 5.931 4.431 0.000 2.390 0.000 0.000 0.000 2.390 2.390 0.000 0.000 0.000
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1026 417 Name of the Scheme Rural Water Supply Scheme 0.000 4.552 4.361 0.000 0.874 0.000 0.000 0.000 0.874 0.874 0.000 0.000 0.000
Rajake
Approval Date 21-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1027 418 Name of the Scheme Rural Water Supply Scheme 0.000 3.252 2.840 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Nasowali Sohal Khurd
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1028 419 Name of the Scheme Rural Water Supply Scheme Musa 0.000 3.252 2.440 0.000 1.300 0.000 0.000 0.000 1.300 1.300 0.000 0.000 0.000
Khatana
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

297
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1029 420 Name of the Scheme Rural Water Supply Scheme 0.000 4.740 4.619 0.000 0.832 0.000 0.000 0.000 0.832 0.832 0.000 0.000 0.000
Ramke Behalpur
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1030 421 Name of the Scheme Rural Water Supply Kot Allah 0.000 3.443 2.459 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Bakish
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1031 422 Name of the Scheme Rural Water Supply Scheme 0.000 4.135 4.492 0.000 0.263 0.000 0.000 0.000 0.263 0.263 0.000 0.000 0.000
Wains Dhool
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1032 423 Name of the Scheme Rural Water Supply Scheme 0.000 2.966 2.511 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Khunan Gharbi
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1033 424 Name of the Scheme Rural Water Supply Scheme 0.000 8.752 5.928 0.000 2.100 0.000 0.000 0.000 2.100 2.100 2.037 0.000 0.000
Golayke
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 80%
District and Tehsil Gujrat

298
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1034 425 Name of the Scheme Rural Water Supply Scheme 0.000 10.348 8.334 0.000 3.566 0.000 0.000 0.000 3.566 3.566 0.000 0.000 0.000
Sheikhpur
Approval Date 4/4/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1035 426 Name of the Scheme Rural Water Supply Makwal 0.000 6.847 5.052 0.000 2.822 0.000 0.000 0.000 2.822 2.822 0.000 0.000 0.000
Approval Date 21-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1036 427 Name of the Scheme Rural Water Supply Tootha Rai 0.000 4.695 3.090 0.000 2.309 0.000 0.000 0.000 2.309 2.309 0.000 0.000 0.000
Bahadar
Approval Date 21-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1037 428 Name of the Scheme Rural Water Supply Nauteh 0.000 5.571 5.496 0.000 0.911 0.000 0.000 0.000 0.911 0.911 0.000 0.000 0.000
Approval Date 21-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1038 429 Name of the Scheme Rural Water Supply Mair 0.000 4.949 4.885 0.000 0.806 0.000 0.000 0.000 0.806 0.806 0.000 0.000 0.000
Approval Date 21-08-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

299
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1039 430 Name of the Scheme Installation of Tubewell Village 0.000 2.128 1.893 0.000 0.554 0.000 0.000 0.000 0.554 0.554 0.000 0.000 0.000
Bhalasier
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1040 431 Name of the Scheme Water Supply Scheme Mararian 0.000 5.000 5.000 0.000 0.750 0.000 0.000 0.000 0.750 0.750 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1041 432 Name of the Scheme Installation of Tubewell at 0.000 2.162 1.397 0.000 1.089 0.000 0.000 0.000 1.089 1.089 0.000 0.000 0.000
Domallan Chowk J.P.Jattan
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1042 433 Name of the Scheme Rural Water Supply Scheme 0.000 15.095 15.155 0.000 2.204 0.000 0.000 0.000 2.204 2.204 0.000 0.000 0.000
Pinanwal (Revised)
Approval Date 16-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1043 434 Name of the Scheme Water Supply Scheme Village 0.000 2.099 2.384 0.000 0.030 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000
Padhrala
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

300
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1044 435 Name of the Scheme Water Supply Scheme Village 0.000 3.080 3.284 0.000 0.258 0.000 0.000 0.000 0.258 0.258 0.000 0.000 0.000
Kohali
Approval Date 31-05-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1045 436 Name of the Scheme Rehabilitation of Rural Water 0.000 3.950 4.372 0.000 0.171 0.000 0.000 0.000 0.171 0.171 0.000 0.000 0.000
Supply Scheme Haranpur
Approval Date 31-05-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1046 437 Name of the Scheme Rehabilitation of Rural Water 0.000 1.454 1.513 0.000 0.159 0.000 0.000 0.000 0.159 0.159 0.000 0.000 0.000
Supply Scheme Chak Danayal.
Approval Date 31-05-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1047 438 Name of the Scheme Rural Water Supply Tibbi Saidan 0.000 7.200 6.426 0.000 1.854 0.000 0.000 0.000 1.854 1.854 0.000 0.000 0.000
Approval Date 18-05-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1048 439 Name of the Scheme Rehabilitation of Rural Water 0.000 6.200 2.529 0.000 4.601 0.000 0.000 0.000 4.601 4.601 0.000 0.000 0.000
Supply Scheme Sugial
Approval Date 18-05-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

301
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1049 440 Name of the Scheme Water Suppply Scheme Mehsian 0.000 12.543 9.549 0.000 4.875 0.000 0.000 0.000 4.875 4.875 0.000 0.000 0.000
Approval Date 11/5/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1050 441 Name of the Scheme Reh: of Rural Water Supply 0.000 4.086 1.500 0.000 3.199 0.000 0.000 0.000 3.199 3.199 0.000 0.000 0.000
Scheme Salial (Amended)
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1051 442 Name of the Scheme Reh: of Rural Water Supply 0.000 3.100 3.100 0.000 0.465 0.000 0.000 0.000 0.465 0.465 0.000 0.000 0.000
Scheme Gurah Amung
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1052 443 Name of the Scheme Reh: of Rural Water Supply 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Scheme Ruper Ramadial
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1053 444 Name of the Scheme Rural Water Supply Scheme 0.000 8.944 7.700 0.000 2.586 0.000 0.000 0.000 2.586 2.586 0.000 0.000 0.000
Dhoke Peero (New Scheme)
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

302
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1054 445 Name of the Scheme Rural Water Supply Scheme 0.000 6.281 4.500 0.000 2.723 0.000 0.000 0.000 2.723 2.723 0.000 0.000 0.000
Bagrian (New scheme)
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1055 446 Name of the Scheme Urban Water Supply Scheme Dina 0.000 10.000 10.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1056 447 Name of the Scheme Reh: & Aug: of Rural Water 0.000 3.500 3.500 0.000 0.525 0.000 0.000 0.000 0.525 0.525 0.000 0.000 0.000
Supply Scheme Kotal Kund
Approval Date 31-03-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1057 448 Name of the Scheme Rural Water Supply Scheme 0.000 10.829 10.470 0.000 1.983 0.000 0.000 0.000 1.983 1.983 0.000 0.000 0.000
Chamkon Valley Hattar Khair
Chanud, Tehsil P.D.Khan
(Rs.10.829)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1058 449 Name of the Scheme Provision of Pipelines and 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Machinery Water Supply
Schemes, Jalalpur Sharif
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

303
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1059 450 Name of the Scheme Provision of Pipelines Water 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Supply Schemes Golepur and its
drainage
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1060 451 Name of the Scheme Provision of Pipelines Water 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Supply Scheme Wara Phaphra
Sammanwal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1061 452 Name of the Scheme Water Supply Scheme Khewra 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1062 453 Name of the Scheme Drainage and Water Supply 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Scheme for Ahmad Abad
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1063 454 Name of the Scheme Water Supply Pipe Mouza Kundwal 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

304
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1064 455 Name of the Scheme Rehabilitation of Well and Pond 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Thill.
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1065 456 Name of the Scheme Rural Water Supply scheme 0.000 5.600 0.034 0.000 1.272 0.000 0.000 0.000 1.272 1.272 5.134 0.000 0.000
Gadari
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 20%
District and Tehsil Jhelum

1066 457 Name of the Scheme Provision of Water Supply in 0.000 19.200 10.200 0.000 6.500 0.000 0.000 0.000 6.500 6.500 5.380 0.000 0.000
Sukheke Town
Approval Date 16-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 76%
District and Tehsil Hafizabad

1067 458 Name of the Scheme Extension Water Supply Scheme 0.000 25.872 14.524 0.000 7.300 0.000 0.000 0.000 7.300 7.300 7.929 0.000 0.000
in Town Kanganpur
Approval Date 13-11-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 73%
District and Tehsil Kasur

1068 459 Name of the Scheme Rural Water Supply Scheme 0.000 61.320 26.598 0.000 18.500 0.000 0.000 0.000 18.500 18.500 25.420 0.000 0.000
Theing More (Ellahabad)
Approval Date 26-02-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 64%
District and Tehsil Kasur

305
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1069 460 Name of the Scheme Rural Water Supply Scheme 0.000 3.729 3.982 0.000 0.306 0.000 0.000 0.000 0.306 0.306 0.000 0.000 0.000
Dolaywala Pull.
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1070 461 Name of the Scheme Rural Water Supply Todepur. 0.000 4.125 4.449 0.000 0.295 0.000 0.000 0.000 0.295 0.295 0.000 0.000 0.000
Approval Date 23-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1071 462 Name of the Scheme Rural water supply Scheme Jabo 0.000 7.085 5.653 0.000 2.495 0.000 0.000 0.000 2.495 2.495 0.000 0.000 0.000
Mail
Approval Date 23-08-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1072 463 Name of the Scheme Rural water supply Scheme 0.000 6.700 7.458 0.000 0.247 0.000 0.000 0.000 0.247 0.247 0.000 0.000 0.000
Gaggar
Approval Date 21-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1073 464 Name of the Scheme Rural water supply Scheme Athil 0.000 7.332 7.696 0.000 0.736 0.000 0.000 0.000 0.736 0.736 0.000 0.000 0.000
pur (Amended)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

306
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1074 465 Name of the Scheme Rural Water Supply Scheme 0.000 16.817 9.400 0.000 4.500 0.000 0.000 0.000 4.500 4.500 5.440 0.000 0.000
Cheena Arla
Approval Date 25-10-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Kasur

1075 466 Name of the Scheme Rural Water Supply & Drainage 0.000 9.214 7.601 0.000 2.995 0.000 0.000 0.000 2.995 2.995 0.000 0.000 0.000
Scheme Mirali Ottar
Approval Date 25-10-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1076 467 Name of the Scheme Water Suppply Scheme Khankey 0.000 12.258 4.922 0.000 4.500 0.000 0.000 0.000 4.500 4.500 4.675 0.000 0.000
More
Approval Date 4/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 67%
District and Tehsil Kasur

1077 468 Name of the Scheme Water Suppply Scheme Rasool 0.000 7.876 6.250 0.000 2.807 0.000 0.000 0.000 2.807 2.807 0.000 0.000 0.000
Nagar
Approval Date 4/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1078 469 Name of the Scheme Water Suppply & Sanitation 0.000 6.739 4.000 0.000 3.750 0.000 0.000 0.000 3.750 3.750 0.000 0.000 0.000
Scheme Mian Wala
Approval Date 12/9/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

307
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1079 470 Name of the Scheme Water Suppply Scheme Said Pur 0.000 9.043 5.450 0.000 2.400 0.000 0.000 0.000 2.400 2.400 2.549 0.000 0.000
Approval Date 12/9/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 75%
District and Tehsil Kasur

1080 471 Name of the Scheme Water Suppply & Sanitation 0.000 15.530 11.004 0.000 6.856 0.000 0.000 0.000 6.856 6.856 0.000 0.000 0.000
Scheme Dhing Shah (Revised)
Approval Date 3/12/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1081 472 Name of the Scheme Water Suppply & Sanitation 0.000 7.700 7.501 0.000 1.354 0.000 0.000 0.000 1.354 1.354 0.000 0.000 0.000
Scheme Saracer Hithar
Approval Date 12/4/2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1082 473 Name of the Scheme Rural Water Supply & 0.000 57.922 10.000 0.000 23.751 0.000 0.000 0.000 23.751 23.751 32.859 0.000 0.000
Sewerage/Drainage Scheme
Jamber Kalan & Khurd
Approval Date 12/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 51%
District and Tehsil Kasur

1083 474 Name of the Scheme Reh: of Water Supply Scheme 0.000 10.967 10.967 0.000 1.645 0.000 0.000 0.000 1.645 1.645 0.000 0.000 0.000
Khara
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

308
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1084 475 Name of the Scheme Reh: of Water Supply Scheme 0.000 13.015 5.000 0.000 4.600 0.000 0.000 0.000 4.600 4.600 5.367 0.000 0.000
Hallar Key Pemar
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 64%
District and Tehsil Kasur

1085 476 Name of the Scheme Reh: & Augumentation Water 0.000 10.184 3.616 0.000 4.400 0.000 0.000 0.000 4.400 4.400 3.696 0.000 0.000
Supply Scheme Sheikhum
Approval Date 9/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 68%
District and Tehsil Kasur

1086 477 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.361 3.316 0.000 3.999 0.000 0.000 0.000 3.999 3.999 0.000 0.000 0.000
Rasool Pur
Approval Date 9/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1087 478 Name of the Scheme Reh: of Water Supply Scheme 0.000 9.067 4.466 0.000 2.700 0.000 0.000 0.000 2.700 2.700 3.261 0.000 0.000
Joura
Approval Date 9/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 69%
District and Tehsil Kasur

1088 479 Name of the Scheme Reh: of Water Supply Scheme 0.000 12.013 12.013 0.000 1.802 0.000 0.000 0.000 1.802 1.802 0.000 0.000 0.000
Dholan Chak No. 7
Approval Date 22.11.2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

309
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1089 480 Name of the Scheme Construction of Oxidation Pond, 0.000 13.373 1.377 0.000 6.500 0.000 0.000 0.000 6.500 6.500 7.502 0.000 0.000
Sullage Carrier, Pump House
installation of Centrifugal Pump
etc. in Khai Hithar
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 51%
District and Tehsil Kasur

1090 481 Name of the Scheme Rural Water Supply Scheme 0.000 24.803 14.057 0.000 6.500 0.000 0.000 0.000 6.500 6.500 7.966 0.000 0.000
Katcha Pacca
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Kasur

1091 482 Name of the Scheme Rural Water Supply Scheme Qila 0.000 22.624 15.117 0.000 5.100 0.000 0.000 0.000 5.100 5.100 5.801 0.000 0.000
Ganjay
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 78%
District and Tehsil Kasur

1092 483 Name of the Scheme Rural Water Supply Scheme 0.000 33.576 23.613 0.000 14.999 0.000 0.000 0.000 14.999 14.999 0.000 0.000 0.000
Harike Naul
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1093 484 Name of the Scheme Rural Water Supply Scheme Kotla 0.000 17.743 15.682 0.000 4.722 0.000 0.000 0.000 4.722 4.722 0.000 0.000 0.000
Sheikh Natha
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

310
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1094 485 Name of the Scheme Rural Water Supply Scheme & 0.000 91.258 38.336 0.000 30.000 0.000 0.000 0.000 30.000 30.000 36.611 0.000 0.000
Drainage Scheme Chah Arror and
Adjoining villages in UC Hardo
Sahari
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 65%
District and Tehsil Kasur

1095 486 Name of the Scheme Rural Water Supply and Drainage 0.000 23.614 25.650 0.000 1.506 0.000 0.000 0.000 1.506 1.506 0.000 0.000 0.000
Scheme Haveli Budda Singh
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1096 487 Name of the Scheme Rural Water Supply and Drainage 0.000 22.480 7.420 0.000 9.000 0.000 0.000 0.000 9.000 9.000 9.432 0.000 0.000
Scheme Bulandi Otar
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 64%
District and Tehsil Kasur

1097 488 Name of the Scheme Rural Water Supply and Drainage 0.000 20.291 18.682 0.000 4.653 0.000 0.000 0.000 4.653 4.653 0.000 0.000 0.000
Scheme Bugry
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Kasur

1098 489 Name of the Scheme Rural Water Supply & Drainage 0.000 27.262 15.723 0.000 7.000 0.000 0.000 0.000 7.000 7.000 8.628 0.000 0.000
Scheme Gohar Hittar
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 72%
District and Tehsil Kasur

311
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1099 490 Name of the Scheme Rural Water Supply & Drainage 0.000 25.246 15.126 0.000 7.000 0.000 0.000 0.000 7.000 7.000 6.907 0.000 0.000
Scheme Fatehpur
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 76%
District and Tehsil Kasur

1100 491 Name of the Scheme Comprehensive Rural Water 0.000 59.146 15.000 0.000 17.500 0.000 0.000 0.000 17.500 17.500 35.518 0.000 0.000
Supply/ Drainage/Sewerage &
PCC Streets at Rao Khan Wala
Approval Date 24-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 48%
District and Tehsil Kasur

1101 492 Name of the Scheme Rural Water Supply & Drainage 0.000 50.380 15.000 0.000 14.500 0.000 0.000 0.000 14.500 14.500 28.437 0.000 0.000
Scheme Kanween Jhoke Mallian
Approval Date 4/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 51%
District and Tehsil Kasur

1102 493 Name of the Scheme Rural Water Supply & Drainage 0.000 16.017 14.570 0.000 3.850 0.000 0.000 0.000 3.850 3.850 0.000 0.000 0.000
Scheme Bhalla
Approval Date 24-03-2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1103 494 Name of the Scheme Rural Water Supply & Drainage 0.000 25.697 14.904 0.000 3.000 0.000 0.000 0.000 3.000 3.000 11.648 0.000 0.000
Scheme Bheela
Approval Date 15-01-2008
Major Components Sewer System and disposal work etc.
Major Targets 61%
District and Tehsil Kasur

312
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1104 495 Name of the Scheme Rural Water Supply & Drainage 0.000 42.550 18.974 0.000 3.000 0.000 0.000 0.000 3.000 3.000 26.959 0.000 0.000
Scheme Kotli Rai Abu Bakkar
Approval Date 28-03-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Kasur

1105 496 Name of the Scheme Rural Water Supply & Drainage 0.000 17.138 2.300 0.000 3.000 0.000 0.000 0.000 3.000 3.000 14.409 0.000 0.000
Scheme Kaisar Garh (Amended)
Approval Date 3/12/2009
Major Components Sewer System and disposal work etc.
Major Targets 27%
District and Tehsil Kasur

1106 497 Name of the Scheme Water Supply Scheme Rakh 0.000 2.500 0.200 0.000 1.000 0.000 0.000 0.000 1.000 1.000 1.675 0.000 0.000
Chunian UC City one Chunian
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 42%
District and Tehsil Kasur

1107 498 Name of the Scheme Water Supply Scheme Wah 0.000 2.500 0.200 0.000 1.000 0.000 0.000 0.000 1.000 1.000 1.675 0.000 0.000
kharan UC Wah Kharan
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 42%
District and Tehsil Kasur

1108 499 Name of the Scheme Extension Water Supply Scheme 0.000 12.091 9.588 0.000 4.317 0.000 0.000 0.000 4.317 4.317 0.000 0.000 0.000
Padhrar & Muqam
Approval Date 24-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

313
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1109 500 Name of the Scheme Rural Water Supply Scheme Uttra 0.000 10.230 9.853 0.000 1.912 0.000 0.000 0.000 1.912 1.912 0.000 0.000 0.000
Approval Date 1/9/2005
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1110 501 Name of the Scheme Rural Water Supply Scheme and 0.000 41.604 10.753 0.000 16.000 0.000 0.000 0.000 16.000 16.000 21.092 0.000 0.000
New Sewerage Drainage Scheme
Gunjial
Approval Date 12/10/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 56%
District and Tehsil Khushab

1111 502 Name of the Scheme Rural Water Supply Scheme 0.000 7.755 7.600 0.000 1.318 0.000 0.000 0.000 1.318 1.318 0.000 0.000 0.000
Khagli Sheikhu
Approval Date 12/3/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1112 503 Name of the Scheme Water Supply Scheme Jaba (Rehb) 0.000 16.568 5.480 0.000 2.000 0.000 0.000 0.000 2.000 2.000 11.573 0.000 0.000
Approval Date 12/3/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 39%
District and Tehsil Khushab

1113 504 Name of the Scheme Reh: of Rural Water Supply 0.000 4.614 4.700 0.000 0.606 0.000 0.000 0.000 0.606 0.606 0.000 0.000 0.000
Scheme Khaliqabad
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

314
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1114 505 Name of the Scheme Imp: & Ext: & Reh: of Rural Water 0.000 3.916 4.000 0.000 0.503 0.000 0.000 0.000 0.503 0.503 0.000 0.000 0.000
Supply Scheme Khabaki (Derajat)
Dhok Maken
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1115 506 Name of the Scheme Reh: of Rural Water Supply 0.000 2.767 2.857 0.000 0.325 0.000 0.000 0.000 0.325 0.325 0.000 0.000 0.000
Scheme Jasowal (Derajat)
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1116 507 Name of the Scheme Reh: of Rural Water Supply 0.000 5.055 5.150 0.000 0.663 0.000 0.000 0.000 0.663 0.663 0.000 0.000 0.000
Scheme Dhamman
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1117 508 Name of the Scheme Reh: of Rural Water Supply 0.000 3.842 3.900 0.000 0.518 0.000 0.000 0.000 0.518 0.518 0.000 0.000 0.000
Scheme Chowi
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1118 509 Name of the Scheme Reh: of Rural Water Supply 0.000 4.986 5.000 0.000 0.734 0.000 0.000 0.000 0.734 0.734 0.000 0.000 0.000
Scheme Nali
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

315
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1119 510 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 2.810 2.837 0.000 0.395 0.000 0.000 0.000 0.395 0.395 0.000 0.000 0.000
Scheme Warcha
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1120 511 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 8.143 8.000 0.000 1.364 0.000 0.000 0.000 1.364 1.364 0.000 0.000 0.000
Scheme Bandial
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1121 512 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 2.408 2.500 0.000 0.269 0.000 0.000 0.000 0.269 0.269 0.000 0.000 0.000
Scheme Okhali Mohla
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1122 513 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 4.473 4.500 0.000 0.644 0.000 0.000 0.000 0.644 0.644 0.000 0.000 0.000
Scheme Chowa
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1123 514 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 4.905 5.000 0.000 0.641 0.000 0.000 0.000 0.641 0.641 0.000 0.000 0.000
Scheme Chak No. 5-TDA
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

316
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1124 515 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 9.685 4.000 0.000 5.138 0.000 0.000 0.000 5.138 5.138 2.000 0.000 0.000
Scheme Quaidabad
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 82%
District and Tehsil Khushab

1125 516 Name of the Scheme Reh: of Rural Water Supply 0.000 6.395 6.500 0.000 0.854 0.000 0.000 0.000 0.854 0.854 0.000 0.000 0.000
Scheme Joyia
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1126 517 Name of the Scheme Reh: of Rural Water Supply 0.000 5.213 5.300 0.000 0.695 0.000 0.000 0.000 0.695 0.695 0.000 0.000 0.000
Scheme Sarfraz Colony,
Jauharabad
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1127 518 Name of the Scheme Reh: of Rural Water Supply 0.000 2.120 2.200 0.000 0.238 0.000 0.000 0.000 0.238 0.238 0.000 0.000 0.000
Scheme Namewali & Thathi Kalrani
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1128 519 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 20.000 12.790 0.000 5.100 0.000 0.000 0.000 5.100 5.100 5.110 0.000 0.000
Scheme Rangpur Baghoor
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 78%
District and Tehsil Khushab

317
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1129 520 Name of the Scheme Reh:/Imp: of Rural Water Supply 0.000 3.644 3.700 0.000 0.491 0.000 0.000 0.000 0.491 0.491 0.000 0.000 0.000
Scheme Adhi Kot
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Khushab

1130 521 Name of the Scheme Rehabilitation Rural Water Supply 0.000 4.993 3.300 0.000 2.442 0.000 0.000 0.000 2.442 2.442 0.000 0.000 0.000
Scheme Kukkar Hatta
Approval Date 16.1.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of OHR etc.
Major Targets 100%
District and Tehsil Khanewal , Kabirwala

1131 522 Name of the Scheme Rehabilitation Rural Water Supply 0.000 4.469 2.200 0.000 2.939 0.000 0.000 0.000 2.939 2.939 0.000 0.000 0.000
Scheme Shamkot
Approval Date 16.1.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of OHR etc.
Major Targets 100%
District and Tehsil Khanewal

1132 523 Name of the Scheme Rehabilitation Rural Water Supply 0.000 8.290 8.290 0.000 1.244 0.000 0.000 0.000 1.244 1.244 0.000 0.000 0.000
Scheme, Chak No.125/15-L
Approval Date 3.12.08
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of OHR etc.
Major Targets 100%
District and Tehsil Khanewal , M/channu.

318
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1133 524 Name of the Scheme Rehabilitation Rural Water Supply 0.000 7.349 7.349 0.000 1.102 0.000 0.000 0.000 1.102 1.102 0.000 0.000 0.000
Scheme, Chak No.80/10-R
Approval Date 16.1.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of OHR etc.
Major Targets 100%
District and Tehsil Khanewal

1134 525 Name of the Scheme Rehabilitation Rural Water Supply 0.000 3.514 3.514 0.000 0.527 0.000 0.000 0.000 0.527 0.527 0.000 0.000 0.000
Scheme, Chak No.7/8-AR Satt
karmaliwala
Approval Date 16.1.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of OHR etc.
Major Targets 100%
District and Tehsil Khanewal , M/channu.

1135 526 Name of the Scheme Rehabilitation Rural Water Supply 0.000 7.144 2.000 0.000 6.216 0.000 0.000 0.000 6.216 6.216 0.000 0.000 0.000
Scheme, Chak No.6-AH/7V
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
of other works etc.
Major Targets 100%
District and Tehsil Khanewal

1136 527 Name of the Scheme Rehabilitation Rural Water Supply 0.000 2.672 2.672 0.000 0.401 0.000 0.000 0.000 0.401 0.401 0.000 0.000 0.000
Scheme, Chak No.19/9-R (East)
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
ofother works etc.
Major Targets 100%
District and Tehsil Khanewal

319
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1137 528 Name of the Scheme Rehabilitation Rural Water Supply 0.000 2.915 2.000 0.000 1.352 0.000 0.000 0.000 1.352 1.352 0.000 0.000 0.000
Scheme, Chak No.19/9-R (West)
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
ofother works etc.
Major Targets 100%
District and Tehsil Khanewal

1138 529 Name of the Scheme Rehabilitation Rural Water Supply 0.000 1.440 1.300 0.000 0.356 0.000 0.000 0.000 0.356 0.356 0.000 0.000 0.000
Scheme, Chak No.15/8-R
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
ofother works etc.
Major Targets 100%
District and Tehsil Khanewal

1139 530 Name of the Scheme Rehabilitation Rural Water Supply 0.000 18.841 5.000 0.000 7.200 0.000 0.000 0.000 7.200 7.200 9.467 0.000 0.000
Scheme, Thatta Sadiqabad
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
ofother works etc.
Major Targets 56%
District and Tehsil Khanewal , Jahanian

1140 531 Name of the Scheme Rural Water Supply & Drainage 0.000 21.422 2.000 0.000 9.100 0.000 0.000 0.000 9.100 9.100 13.535 0.000 0.000
Scheme,Chak No.54/15-L
Approval Date 16.02.09
Major Components Repair of B/wall,repair of
P.Machinery,Repair of P/House, Repair
ofother works etc.
Major Targets 45%
District and Tehsil Khanewal , M/channu.

320
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1141 532 Name of the Scheme Urban Water Supply & Sewerage / 0.000 18.100 9.500 0.000 11.315 0.000 0.000 0.000 11.315 11.315 0.000 0.000 0.000
Drainage Scheme, Sultan Town
(Revised)
Approval Date 9/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

1142 533 Name of the Scheme Rural Water Supply Scheme 0.000 6.734 6.774 0.000 0.970 0.000 0.000 0.000 0.970 0.970 0.000 0.000 0.000
Kamahan
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

1143 534 Name of the Scheme Rural Water Supply Scheme Satto 0.000 9.994 9.930 0.000 1.563 0.000 0.000 0.000 1.563 1.563 0.000 0.000 0.000
Katla
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

1144 535 Name of the Scheme Ext. Urban Water Supply Scheme 0.000 7.000 6.835 0.000 1.215 0.000 0.000 0.000 1.215 1.215 0.000 0.000 0.000
Raiwind
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Lahore

1145 536 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 7.368 6.385 0.000 2.088 0.000 0.000 0.000 2.088 2.088 0.000 0.000 0.000
No.251/WB
Approval Date May,07
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran , dunya pur

321
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1146 537 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 8.230 7.796 0.000 1.669 0.000 0.000 0.000 1.669 1.669 0.000 0.000 0.000
No.301/WB
Approval Date April,2007
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran , dunya pur

1147 538 Name of the Scheme Reh: Water Supply Scheme Bohar 0.000 8.861 3.500 0.000 6.690 0.000 0.000 0.000 6.690 6.690 0.000 0.000 0.000
Bogay Shah
Approval Date 6.12.08
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran

1148 539 Name of the Scheme Water Supply Scheme Chak 0.000 5.046 4.600 0.000 1.203 0.000 0.000 0.000 1.203 1.203 0.000 0.000 0.000
No.54/M
Approval Date 6.12.08
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran

1149 540 Name of the Scheme Water Supply Scheme Chak 0.000 8.520 4.700 0.000 5.098 0.000 0.000 0.000 5.098 5.098 0.000 0.000 0.000
No.51/M
Approval Date 6.12.08
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran

1150 541 Name of the Scheme Rural Water Supply Scheme Chak 0.000 15.917 5.000 0.000 6.000 0.000 0.000 0.000 6.000 6.000 7.305 0.000 0.000
No.343/WB
Approval Date 21.3.2009
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 60%
District and Tehsil Lodhran , dunya pur

322
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1151 542 Name of the Scheme Rural Water Supply Scheme Chak 0.000 11.793 5.000 0.000 8.562 0.000 0.000 0.000 8.562 8.562 0.000 0.000 0.000
No.279/WB
Approval Date 21.3.2009
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran , dunya pur

1152 543 Name of the Scheme Rural Water Supply Scheme Chak 0.000 13.945 6.423 0.000 9.614 0.000 0.000 0.000 9.614 9.614 0.000 0.000 0.000
No.233/WB
Approval Date 21.3.2009
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 100%
District and Tehsil Lodhran , dunya pur

1153 544 Name of the Scheme Ext: & Reh: of Rural Water Supply 0.000 30.000 6.950 0.000 5.000 0.000 0.000 0.000 5.000 5.000 22.550 0.000 0.000
Scheme Jalla Arrian
Approval Date Approved
Major Components T.well,P.Machinery,House, R.Main & D
and OHR etc.
Major Targets 35%
District and Tehsil Lodhran , dunya pur

1154 545 Name of the Scheme Provision of water filtration plant 0.000 2.250 2.250 0.000 0.338 0.000 0.000 0.000 0.338 0.338 0.000 0.000 0.000
in Pindi Bhauddin Mojianwala and
Rakh Baloch (3 Nos.)
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

1155 546 Name of the Scheme Provision of water filtration plant 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
in Shaheedanwali Chillianwala
Station
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

323
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1156 547 Name of the Scheme Pilot Project for supply of 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Safe/Clean Drinking water through
Deep Bored Hand Pumps in
selected villages
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

1157 548 Name of the Scheme Water Supply/Sewerage/PCC 0.000 4.000 4.000 0.000 0.600 0.000 0.000 0.000 0.600 0.600 0.000 0.000 0.000
Streets & Drains Mandi Bahauddin
City
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

1158 549 Name of the Scheme Provision of Water Filtration 0.000 2.200 2.200 0.000 0.330 0.000 0.000 0.000 0.330 0.330 0.000 0.000 0.000
Plants in Sohawa Bolani, Jumlani
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

1159 550 Name of the Scheme Rural Water Supply & Drainage 0.000 23.280 16.777 0.000 9.995 0.000 0.000 0.000 9.995 9.995 0.000 0.000 0.000
Scheme Chimmo, District M.B.Din.
(Revised)
Approval Date 27-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mandi Bahauddin

324
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1160 551 Name of the Scheme Rural Water Supply & Sewerage / 0.000 18.890 0.500 0.000 5.000 0.000 0.000 0.000 5.000 5.000 16.224 0.000 0.000
Drainage Scheme Harria
Approval Date 19-09-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 25%
District and Tehsil Mandi Bahauddin

1161 552 Name of the Scheme Rehabilitation of Rural Water 0.000 3.639 3.492 0.000 0.693 0.000 0.000 0.000 0.693 0.693 0.000 0.000 0.000
Supply Scheme Dedowal Karandi
Approval Date 26-02-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1162 553 Name of the Scheme Rehabilitation of Rural Water 0.000 6.742 3.969 0.000 3.784 0.000 0.000 0.000 3.784 3.784 0.000 0.000 0.000
Supply Scheme Chidroo (Revised)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1163 554 Name of the Scheme Rural Water Supply Scheme , 0.000 6.078 5.469 0.000 1.521 0.000 0.000 0.000 1.521 1.521 0.000 0.000 0.000
Wandha Karak.
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1164 555 Name of the Scheme Rural Water Supply Scheme , 0.000 4.287 3.133 0.000 1.797 0.000 0.000 0.000 1.797 1.797 0.000 0.000 0.000
Qataal Khel, Isa Khel.
Approval Date 20-08-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

325
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1165 556 Name of the Scheme Reh: of Water Supply Scheme 0.000 4.896 4.876 0.000 0.754 0.000 0.000 0.000 0.754 0.754 0.000 0.000 0.000
Tabbisar (Mesaranwala)
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1166 557 Name of the Scheme Reh: of Water Supply Scheme 0.000 4.986 4.998 0.000 0.736 0.000 0.000 0.000 0.736 0.736 0.000 0.000 0.000
Tola Bhangikhel
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1167 558 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.026 3.030 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Behu Sayyanda
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1168 559 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.045 3.045 0.000 0.457 0.000 0.000 0.000 0.457 0.457 0.000 0.000 0.000
Chappri/Chappri Thal
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1169 560 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.939 3.937 0.000 0.593 0.000 0.000 0.000 0.593 0.593 0.000 0.000 0.000
Sultankhel Sharqi/Gharbi i/c City
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

326
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1170 561 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.500 3.500 0.000 0.525 0.000 0.000 0.000 0.525 0.525 0.000 0.000 0.000
Kaloor surrounding Abadies
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1171 562 Name of the Scheme Reh: of Water Supply Scheme 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Nawan
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1172 563 Name of the Scheme Reh: of Water Supply Scheme 0.000 2.550 2.550 0.000 0.383 0.000 0.000 0.000 0.383 0.383 0.000 0.000 0.000
Dhok Peera
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1173 564 Name of the Scheme Reh: of Water Supply Scheme 0.000 2.550 2.550 0.000 0.383 0.000 0.000 0.000 0.383 0.383 0.000 0.000 0.000
Dhoke Miani
Approval Date 11/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1174 565 Name of the Scheme Reh: of Water Supply Scheme 0.000 1.200 1.200 0.000 0.180 0.000 0.000 0.000 0.180 0.180 0.000 0.000 0.000
Thamey Wali
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

327
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1175 566 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.000 6.000 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Thathi Miana
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1176 567 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.500 3.500 0.000 0.525 0.000 0.000 0.000 0.525 0.525 0.000 0.000 0.000
Bhariunwala
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1177 568 Name of the Scheme Reh: of Water Supply Scheme 0.000 0.800 0.800 0.000 0.120 0.000 0.000 0.000 0.120 0.120 0.000 0.000 0.000
Rokhari (Extension)
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1178 569 Name of the Scheme Reh: of Water Supply Scheme 0.000 2.244 2.244 0.000 0.337 0.000 0.000 0.000 0.337 0.337 0.000 0.000 0.000
Dhoke Shatala
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1179 570 Name of the Scheme Rehabilitation of Water Supply 0.000 3.517 3.517 0.000 0.528 0.000 0.000 0.000 0.528 0.528 0.000 0.000 0.000
Scheme Samandi Wala U.C.Abbad
Khel
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

328
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1180 571 Name of the Scheme Rehabilitation of Water Supply 0.000 3.191 3.191 0.000 0.479 0.000 0.000 0.000 0.479 0.479 0.000 0.000 0.000
Scheme Sarwar Chowk with other
allied Dera Jats
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1181 572 Name of the Scheme Rehabilitation of Water Supply 0.000 3.550 3.550 0.000 0.533 0.000 0.000 0.000 0.533 0.533 0.000 0.000 0.000
Scheme Ali Haider Noor
U.C.Chidroo
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1182 573 Name of the Scheme Rehabilitation of Water Supply 0.000 2.014 2.014 0.000 0.302 0.000 0.000 0.000 0.302 0.302 0.000 0.000 0.000
Scheme Lalu Khel, U.C.Chidroo
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1183 574 Name of the Scheme Rehabilitation of Water Supply 0.000 2.089 2.089 0.000 0.313 0.000 0.000 0.000 0.313 0.313 0.000 0.000 0.000
Scheme Lalu Khel, UC Abbaa Khel
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1184 575 Name of the Scheme Rural Water Supply Scheme Chak 0.000 57.398 41.773 0.000 4.811 0.000 0.000 0.000 4.811 4.811 19.424 0.000 0.000
No.7/MR, 9/MR, 12/MR, 13/MR,
14/MR & Khanpur Marral
Approval Date 03.04.2007
Major Components T/Well, Machinery, R/Main & D/System
Major Targets 71%
District and Tehsil Multan

329
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1185 576 Name of the Scheme Rural Water Supply Scheme Basti 0.000 7.041 5.985 0.000 2.112 0.000 0.000 0.000 2.112 2.112 0.000 0.000 0.000
Khuro Wala Khu Basti Lilheer,
Basti Sairwala, Basti Nawab, Basti
Phaore, UC Alipur Saddat
Approval Date 03.04.07
Major Components T/Well, Machinery, R/Main & D/System
Major Targets 100%
District and Tehsil Multan

1186 577 Name of the Scheme Rehabilitation Rural Water Supply 0.000 6.892 2.000 0.000 3.926 0.000 0.000 0.000 3.926 3.926 2.000 0.000 0.000
Scheme Gulzarpur Jumanwali
Approval Date 19.02.2009
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 75%
District and Tehsil Multan

1187 578 Name of the Scheme Construction of Water Supply 0.000 8.300 2.000 0.000 4.500 0.000 0.000 0.000 4.500 4.500 3.045 0.000 0.000
Scheme, in Chak No.15/F & Azafi
Abadi.
Approval Date Approved
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 68%
District and Tehsil Multan

1188 579 Name of the Scheme Rehabilitation Rural Water Supply 0.000 4.300 2.000 0.000 2.945 0.000 0.000 0.000 2.945 2.945 0.000 0.000 0.000
Scheme Sikandarabad
Approval Date 19.02.09
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

330
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1189 580 Name of the Scheme Rehabilitation of Rural Water 0.000 4.190 4.190 0.000 0.629 0.000 0.000 0.000 0.629 0.629 0.000 0.000 0.000
Supply Scheme Koti Nijabat
Approval Date Approved
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

1190 581 Name of the Scheme New Rural Water Supply Scheme 0.000 7.760 7.760 0.000 1.164 0.000 0.000 0.000 1.164 1.164 0.000 0.000 0.000
Hayyat Khan Wala UC Basti Mithu
Approval Date Approved
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

1191 582 Name of the Scheme New Rural Water Supply Scheme 0.000 8.160 8.160 0.000 1.224 0.000 0.000 0.000 1.224 1.224 0.000 0.000 0.000
at Jalal Pur Road to Choki Canal
Gajju Hatta
Approval Date Approved
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

1192 583 Name of the Scheme Rehabilitation of Rural Water 0.000 1.080 1.080 0.000 0.162 0.000 0.000 0.000 0.162 0.162 0.000 0.000 0.000
Supply scheme Rasulpur
Approval Date Approved
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

331
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1193 584 Name of the Scheme Rural Water Supply scheme Lutaf 0.000 13.224 4.000 0.000 4.208 0.000 0.000 0.000 4.208 4.208 7.000 0.000 0.000
Pur
Approval Date 19.02.09
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 54%
District and Tehsil Multan

1194 585 Name of the Scheme Ext: Rural Water Supply scheme 0.000 2.061 2.061 0.000 0.309 0.000 0.000 0.000 0.309 0.309 0.000 0.000 0.000
That Ghalwan
Approval Date 24.03.09
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

1195 586 Name of the Scheme Rehabilitation Rural Water Supply 0.000 3.710 3.920 0.000 0.588 0.000 0.000 0.000 0.588 0.588 0.000 0.000 0.000
Scheme Chak No.63/M & 69/M
Approval Date 22.04.2009
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 106%
District and Tehsil Multan , JalalpurPirwala

1196 587 Name of the Scheme Rehabilitation Rural Water Supply 0.000 6.172 3.416 0.000 3.682 0.000 0.000 0.000 3.682 3.682 0.000 0.000 0.000
Scheme Chak No.65/M,70/M,71/M
Jalalpur Pirwala
Approval Date 19.02.09
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan , JalalpurPirwala

332
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1197 588 Name of the Scheme Rehabilitation Rural Water Supply 0.000 3.355 3.355 0.000 1.500 0.000 0.000 0.000 1.500 1.500 0.000 0.000 0.000
Scheme Chak No.77/M
Approval Date 19.02.09
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 126%
District and Tehsil Multan , JalalpurPirwala

1198 589 Name of the Scheme Rehabilitation Rural Water Supply 0.000 2.280 1.080 0.000 1.542 0.000 0.000 0.000 1.542 1.542 0.000 0.000 0.000
Scheme Munirabad Rasulpur
Approval Date 19.02.2009
Major Components Repair of Machinery,Electric
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan , Sadiqabad abad

1199 590 Name of the Scheme Ext.& Improvement of Rural Water 0.000 10.000 2.000 0.000 3.500 0.000 0.000 0.000 3.500 3.500 6.000 0.000 0.000
Supply Scheme Makdoom
Rasheed Phase-I
Approval Date 19.2.09
Major Components Repair of Machinery,Electric
Connection,R.Main and Distribution
system.
Major Targets 48%
District and Tehsil Multan , Sadiqabad abad

1200 591 Name of the Scheme Rehabilitation Rural Water Supply 0.000 8.000 2.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 5.700 0.000 0.000
Scheme Jehangirabad
Approval Date Approved
Major Components Repair of Machinery,Electric
Connection,R.Main and Distribution
system.
Major Targets 38%
District and Tehsil Multan

333
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1201 592 Name of the Scheme Rehabilitation Rural Water Supply 0.000 0.300 0.095 0.000 0.250 0.000 0.000 0.000 0.250 0.250 0.000 0.000 0.000
Scheme Ailampur
Approval Date Approved
Major Components Repair of Machinery,Electric
Connection,R.Main and Distribution
system.
Major Targets 100%
District and Tehsil Multan

1202 593 Name of the Scheme Purification Plants 3 Nos. 0.000 6.628 6.628 0.000 0.994 0.000 0.000 0.000 0.994 0.994 0.000 0.000 0.000
alongwith 1 No. turbine & Rising
Main of Multan Darwaza City & UC
No95 & 96 Tehsil Shujaabad
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1203 594 Name of the Scheme Purification Plant 2 Nos. in UC 110 0.000 2.100 2.100 0.000 0.315 0.000 0.000 0.000 0.315 0.315 0.000 0.000 0.000
(Gardezpur)
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1204 595 Name of the Scheme Purification Plants UC 100 Shah 0.000 1.051 1.051 0.000 0.158 0.000 0.000 0.000 0.158 0.158 0.000 0.000 0.000
Pur
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1205 596 Name of the Scheme Purification Plants UC 101 Gajju 0.000 0.951 0.951 0.000 0.143 0.000 0.000 0.000 0.143 0.143 0.000 0.000 0.000
Hattu
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

334
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1206 597 Name of the Scheme Purification Plants UC 102 Basti 0.000 1.051 1.051 0.000 0.158 0.000 0.000 0.000 0.158 0.158 0.000 0.000 0.000
Mithu
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1207 598 Name of the Scheme Purification Plants UC 103 Raja 0.000 1.051 1.051 0.000 0.158 0.000 0.000 0.000 0.158 0.158 0.000 0.000 0.000
Ram
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1208 599 Name of the Scheme Purification Plants UC 104 Kotli 0.000 1.051 1.051 0.000 0.158 0.000 0.000 0.000 0.158 0.158 0.000 0.000 0.000
Nija bat
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1209 600 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Durana Langhana UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1210 601 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Shor Kot UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

335
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1211 602 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Haji Pur UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1212 603 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Shari Pura UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1213 604 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Mansoor Nagar 5 Marlan
Scheme Mati Tal UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1214 605 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti 5 Marla Scheme Multan
Public School Road Multan UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1215 606 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Mustafa Abad Mouza Boa
Pur, UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

336
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1216 607 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Bahawalpur UC-56
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1217 608 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Rajapur, UC-57
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1218 609 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Khalique Pura, UC-57
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1219 610 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Qadirabad UC-57
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1220 611 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Ameer Abad, UC-58
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

337
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1221 612 Name of the Scheme Installation of Purification Plant 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
in Shah Town, UC-58
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1222 613 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Graiy Wala UC-59
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1223 614 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Muhammad Pura UC-59
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1224 615 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Dheriban UC-59
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1225 616 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Tajpur Sandila UC-59
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

338
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1226 617 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Nawab Pur Khas, UC-60
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1227 618 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Chak Mahni UC-60
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1228 619 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Salehmhey UC-61
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1229 620 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Nandla UC-61
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1230 621 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Noo, UC-61
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

339
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1231 622 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Bahawalpur / Labar UC-61
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1232 623 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Sadiq Abad UC-62
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1233 624 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Yaara Wala UC-62
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1234 625 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Sardar Pur UC-62
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1235 626 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Tahir Pur UC-62
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

340
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1236 627 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Anayat Pur UC-63
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1237 628 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Pakay Wala UC-63
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1238 629 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Bosan Otar UC-64
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1239 630 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Jhok Wains Parli, UC-64
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1240 631 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Matay Hatti UC-64
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

341
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1241 632 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Jhok Wains Warali, Uc-64
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1242 633 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Alim Pur UC-65
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1243 634 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Rasool Pur, UC-65
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1244 635 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Khdal UC-65
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1245 636 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Chawan, UC-65
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

342
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1246 637 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Jal Wala UC-67
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1247 638 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Syed Wala, UC-67
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1248 639 Name of the Scheme Installation of Purification Plant in 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Basti Mattital, UC-67
Approval Date 26.05.2009
Major Components Civil Works & Machinery etc
Major Targets 100%
District and Tehsil Multan

1249 640 Name of the Scheme Rural Water Supply Scheme, Shah 0.000 31.985 28.199 0.000 8.584 0.000 0.000 0.000 8.584 8.584 0.000 0.000 0.000
Jamal (Revised)
Approval Date 27.8.08
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 100%
District and Tehsil Muzaffargarh

1250 641 Name of the Scheme Rural Water Supply Scheme, Chak 0.000 7.693 6.500 0.000 2.347 0.000 0.000 0.000 2.347 2.347 0.000 0.000 0.000
No.132-133/ML
Approval Date 25.06.06
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

343
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1251 642 Name of the Scheme Rural Water Supply 0.000 26.296 22.931 0.000 7.309 0.000 0.000 0.000 7.309 7.309 0.000 0.000 0.000
Scheme,Khanpur Shumali,
Approval Date 4.9.07
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 100%
District and Tehsil Muzaffargarh

1252 643 Name of the Scheme Provision of Water Supply at Poli 0.000 10.667 4.700 0.000 5.867 0.000 0.000 0.000 5.867 5.867 1.700 0.000 0.000
UC Fateh Pur
Approval Date 24.02.09
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 86%
District and Tehsil Muzaffargarh

1253 644 Name of the Scheme Rural Water Supply Scheme 0.000 4.819 4.819 0.000 0.700 0.000 0.000 0.000 0.700 0.700 0.000 0.000 0.000
Bhemaywala
Approval Date Approved
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 100%
District and Tehsil Muzaffargarh

1254 645 Name of the Scheme Construction of Water Filtration 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Plant Mouza Hassan Pur Tarund
UC Manka Phulta Identified by
Sardar Hashim Khan Bhutta
Approval Date 30.05.2009
Major Components T/well, Rising Main,D/system, OHR, P/M ,
Pump Houses etc.
Major Targets 100%
District and Tehsil Muzaffargarh

1255 646 Name of the Scheme Rural Water Supply Scheme Saraj 0.000 5.935 5.781 0.000 1.044 0.000 0.000 0.000 1.044 1.044 0.000 0.000 0.000
Approval Date 31-01-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

344
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1256 647 Name of the Scheme Ext: Rural Water Supply Scheme 0.000 7.926 5.216 0.000 0.900 0.000 0.000 0.000 0.900 0.900 2.999 0.000 0.000
Nonar (Revised)
Approval Date 19-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 67%
District and Tehsil Narowal

1257 648 Name of the Scheme Rural Water Supply Maddo 0.000 6.220 4.830 0.000 2.323 0.000 0.000 0.000 2.323 2.323 0.000 0.000 0.000
Kahlwan & Shamshair Pur (NA-
117)
Approval Date 6/11/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1258 649 Name of the Scheme Rural Water Supply Rayya Khas 0.000 5.243 3.513 0.000 2.516 0.000 0.000 0.000 2.516 2.516 0.000 0.000 0.000

(NA-117)
Approval Date 6/11/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1259 650 Name of the Scheme Rural Water Supply Scheme 0.000 9.076 8.273 0.000 2.164 0.000 0.000 0.000 2.164 2.164 0.000 0.000 0.000
Boobak Murali
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1260 651 Name of the Scheme Rural Water Supply Scheme Lalah 0.000 5.320 5.299 0.000 0.819 0.000 0.000 0.000 0.819 0.819 0.000 0.000 0.000
Approval Date 17-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

345
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1261 652 Name of the Scheme Rural Water Supply Scheme 0.000 5.816 4.385 0.000 2.303 0.000 0.000 0.000 2.303 2.303 0.000 0.000 0.000
Tapiala
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1262 653 Name of the Scheme Rural Water Supply Scheme 0.000 5.008 4.353 0.000 1.406 0.000 0.000 0.000 1.406 1.406 0.000 0.000 0.000
Sangial
Approval Date 17-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1263 654 Name of the Scheme Rural Water Supply Scheme 0.000 4.692 3.448 0.000 1.948 0.000 0.000 0.000 1.948 1.948 0.000 0.000 0.000
Chahal Sarjal
Approval Date 1/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Narowal

1264 655 Name of the Scheme Rural Water Supply Scheme 0.000 6.324 5.315 0.000 0.341 0.000 0.000 0.000 0.341 0.341 1.617 0.000 0.000
Chahar Bhatti Virk (Revised)
Approval Date 19-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 78%
District and Tehsil Narowal

1265 656 Name of the Scheme Rural Water Supply Scheme 0.000 9.729 4.000 0.000 5.188 0.000 0.000 0.000 5.188 5.188 2.000 0.000 0.000
Paijowali Auranabad
Approval Date 10/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 82%
District and Tehsil Narowal

346
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1266 657 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Classwali
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1267 658 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Kotli Nawian
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1268 659 Name of the Scheme Installation of Water Purification 0.000 1.000 0.350 0.000 0.800 0.000 0.000 0.000 0.800 0.800 0.000 0.000 0.000
Plant Mouza Bathanwali
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1269 660 Name of the Scheme Installation of Water Purification 0.000 1.000 0.350 0.000 0.800 0.000 0.000 0.000 0.800 0.800 0.000 0.000 0.000
Plant Mouza Chandarke Rajputan
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1270 661 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Mujahid
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

347
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1271 662 Name of the Scheme Installation of Water Purification 0.000 0.902 0.350 0.000 0.687 0.000 0.000 0.000 0.687 0.687 0.000 0.000 0.000
Plant Mouza Dadayala
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1272 663 Name of the Scheme Installation of Water Purification 0.000 1.000 0.350 0.000 0.800 0.000 0.000 0.000 0.800 0.800 0.000 0.000 0.000
Plant Mouza Nawan Pindi Bado
Mehli
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1273 664 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Nangal Machani
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1274 665 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Mangowal
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1275 666 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Agrian
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

348
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1276 667 Name of the Scheme Installation of Water Purification 0.000 0.902 0.350 0.000 0.687 0.000 0.000 0.000 0.687 0.687 0.000 0.000 0.000
Plant Mouza Gadian
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1277 668 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Manzoorpura
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1278 669 Name of the Scheme Installation of Water Purification 0.000 0.705 0.350 0.000 0.461 0.000 0.000 0.000 0.461 0.461 0.000 0.000 0.000
Plant Mouza Mathkey
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1279 670 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Pindi Sainiyan
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1280 671 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Bamboo
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

349
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1281 672 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Chak Amro
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1282 673 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Bagga
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1283 674 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Gumtala
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1284 675 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Dussri
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1285 676 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Pandori Dhunda
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

350
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1286 677 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Fatwal Sulehrian
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1287 678 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Chhamal
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1288 679 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Masroor
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1289 680 Name of the Scheme Water Purification Plant Village 0.000 0.902 0.300 0.000 0.737 0.000 0.000 0.000 0.737 0.737 0.000 0.000 0.000
Sikho Chak
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1290 681 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Majra
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

351
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1291 682 Name of the Scheme Water Purification Plant Village 0.000 0.705 0.300 0.000 0.511 0.000 0.000 0.000 0.511 0.511 0.000 0.000 0.000
Jalalpur
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1292 683 Name of the Scheme Filtration Plant UC Talvandi 0.000 1.705 1.130 0.000 0.831 0.000 0.000 0.000 0.831 0.831 0.000 0.000 0.000
Bahandran Ali Akbar Bagh,
Mohallah Usmenpura
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1293 684 Name of the Scheme Filtration Plant UC Sankhatra, 0.000 1.840 1.130 0.000 0.986 0.000 0.000 0.000 0.986 0.986 0.000 0.000 0.000
Bolar Kaka Kalas
Approval Date 19-05-2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1294 685 Name of the Scheme Filtration Plant UC Talvandi 0.000 1.130 1.130 0.000 0.170 0.000 0.000 0.000 0.170 0.170 0.000 0.000 0.000
Bindran Dhora Chandoke
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1295 686 Name of the Scheme Filtration Plant U/C Lala Village 0.000 1.130 1.130 0.000 0.170 0.000 0.000 0.000 0.170 0.170 0.000 0.000 0.000
Kot Ramzani & Gill Kalan.
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

352
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1296 687 Name of the Scheme Filtration Plant UC Fleespur Daher 0.000 1.130 1.130 0.000 0.170 0.000 0.000 0.000 0.170 0.170 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1297 688 Name of the Scheme Filtration Plant at Village Dhodhi 0.000 1.130 1.130 0.000 0.170 0.000 0.000 0.000 0.170 0.170 0.000 0.000 0.000
Malhian
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1298 689 Name of the Scheme Filtration Plant UC Dahamthal 0.000 1.410 1.130 0.000 0.492 0.000 0.000 0.000 0.492 0.492 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1299 690 Name of the Scheme Filtration Plant UC Langar Key, 0.000 2.115 1.130 0.000 1.302 0.000 0.000 0.000 1.302 1.302 0.000 0.000 0.000
Romal Dotial
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1300 691 Name of the Scheme Filtration Plant UC Halowal Dheli 0.000 1.130 1.130 0.000 0.170 0.000 0.000 0.000 0.170 0.170 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

1301 692 Name of the Scheme Filtration Plant UC Mehwala Sirjal 0.000 2.760 1.130 0.000 2.044 0.000 0.000 0.000 2.044 2.044 0.000 0.000 0.000
Ainowali
Approval Date 7/2/2009
Major Components i) Source ii) Filteration plant
Major Targets 100%
District and Tehsil Narowal

353
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1302 693 Name of the Scheme Rural Wate Supply Scheme Bhojo 0.000 7.200 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.280 0.000 0.000
Dhensa Jeon key Merkpur Ghus
Approval Date Approved
Major Components i) Source ii) Filteration plant
Major Targets 48%
District and Tehsil Narowal

1303 694 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.950 1.950 0.000 0.293 0.000 0.000 0.000 0.293 0.293 0.000 0.000 0.000
No. 117/RB, Chahoor Kothly
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1304 695 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.400 1.400 0.000 0.210 0.000 0.000 0.000 0.210 0.210 0.000 0.000 0.000
No. 43/RB
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1305 696 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
No. 112/RB, Alia Abad
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1306 697 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
No. 113/RB Badhumalhi
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

354
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1307 698 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
No. 28/RB Langowal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1308 699 Name of the Scheme Rural Water Supply Scheme 0.000 4.650 4.650 0.000 0.698 0.000 0.000 0.000 0.698 0.698 0.000 0.000 0.000
Bhalike
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1309 700 Name of the Scheme Rural Water Supply Scheme 0.000 2.850 2.850 0.000 0.428 0.000 0.000 0.000 0.428 0.428 0.000 0.000 0.000
Phularwan
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1310 701 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.896 1.896 0.000 0.284 0.000 0.000 0.000 0.284 0.284 0.000 0.000 0.000
No. 11/GB
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1311 702 Name of the Scheme Rural Water Supply Scheme Chak 0.000 4.000 4.000 0.000 0.600 0.000 0.000 0.000 0.600 0.600 0.000 0.000 0.000
No. 18/GB
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

355
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1312 703 Name of the Scheme Rural Water Supply Scheme 0.000 7.280 7.280 0.000 1.092 0.000 0.000 0.000 1.092 1.092 0.000 0.000 0.000
Mandi Faizabad
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1313 704 Name of the Scheme Rural Water Supply Scheme Chak 0.000 6.910 6.013 0.000 1.934 0.000 0.000 0.000 1.934 1.934 0.000 0.000 0.000
No. 638/GB Watwan
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1314 705 Name of the Scheme Water Supply Scheme More 0.000 5.184 4.219 0.000 1.743 0.000 0.000 0.000 1.743 1.743 0.000 0.000 0.000
Khunda
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1315 706 Name of the Scheme Drainage and Water Supply 0.000 11.239 0.010 0.000 5.082 0.000 0.000 0.000 5.082 5.082 7.833 0.000 0.000
Scheme at Dara Bazi Gran
Shamolah Chak No.18/RB
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 39%
District and Tehsil Nankana Sahib

1316 707 Name of the Scheme Drainage and Water Supply 0.000 4.428 0.010 0.000 5.082 0.000 0.000 0.000 5.082 5.082 0.000 0.000 0.000
Scheme at Chak No.26/RB
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

356
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1317 708 Name of the Scheme Drainage and Water Supply 0.000 5.527 0.010 0.000 6.346 0.000 0.000 0.000 6.346 6.346 0.000 0.000 0.000
Scheme at Moran Chak No.48/RB
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1318 709 Name of the Scheme Drainage and Water Supply 0.000 5.527 0.010 0.000 3.020 0.000 0.000 0.000 3.020 3.020 3.326 0.000 0.000
Scheme at Chak No.112/RB Ali
Abad
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 48%
District and Tehsil Nankana Sahib

1319 710 Name of the Scheme Drainage and Water Supply 0.000 6.014 0.010 0.000 6.906 0.000 0.000 0.000 6.906 6.906 0.000 0.000 0.000
Scheme at Kotla Khurd Chak
No.43/RB
Approval Date 25-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Nankana Sahib

1320 711 Name of the Scheme Drainage and Water Supply 0.000 6.014 0.010 0.000 5.082 0.000 0.000 0.000 5.082 5.082 1.824 0.000 0.000
Scheme at Pakhariwali Chak
No.32/RB
Approval Date 25.04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 74%
District and Tehsil Nankana Sahib

357
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1321 712 Name of the Scheme Rural Water Supply Schme 0.000 4.607 4.128 0.000 1.170 0.000 0.000 0.000 1.170 1.170 0.000 0.000 0.000
Salhowal.
Approval Date 20-1-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1322 713 Name of the Scheme Rural Water Supply Schame 0.000 8.038 8.941 0.000 0.303 0.000 0.000 0.000 0.303 0.303 0.000 0.000 0.000
Dharmawala
Approval Date 13-04-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1323 714 Name of the Scheme Water Supply / Drainage Scheme 0.000 7.559 8.485 0.000 0.208 0.000 0.000 0.000 0.208 0.208 0.000 0.000 0.000
New Rajgarh
Approval Date 5/9/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1324 715 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.297 6.397 0.000 0.845 0.000 0.000 0.000 0.845 0.845 0.000 0.000 0.000
Chak No. 2/1-AL Renala Khurd
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1325 716 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.372 3.382 0.000 0.496 0.000 0.000 0.000 0.496 0.496 0.000 0.000 0.000
Chak No 10/AL-Renala Khurd
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

358
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1326 717 Name of the Scheme Rural Water Supply Scheme Chak 0.000 15.575 11.163 0.000 6.748 0.000 0.000 0.000 6.748 6.748 0.000 0.000 0.000
No. 8-9/1-L Renala Khurd
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1327 718 Name of the Scheme Rural Water Supply Scheme Chak 0.000 0.526 0.526 0.000 0.079 0.000 0.000 0.000 0.079 0.079 0.000 0.000 0.000
No. 1/SP Wasaway Wala Depalpur
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1328 719 Name of the Scheme Rural Water Supply Scheme Ali 0.000 0.630 0.630 0.000 0.095 0.000 0.000 0.000 0.095 0.095 0.000 0.000 0.000
Key Rohila Jamal Kot Basti
Bahadar Wala Depalpur
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1329 720 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.080 0.540 0.000 0.702 0.000 0.000 0.000 0.702 0.702 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Mehar Colony Okara
city
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

359
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1330 721 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.700 1.700 0.000 0.255 0.000 0.000 0.000 0.255 0.255 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Fareed Town Fateh
Noor Town, Sabri Colony in Okara
city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1331 722 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Pak Colony,
Mehboob Town in Okara city
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1332 723 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.475 1.475 0.000 0.221 0.000 0.000 0.000 0.221 0.221 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Peoples Colony,
Bhayyan Wala Karkhana in Okara
city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1333 724 Name of the Scheme Rehabilitation of Streets (Water 0.000 2.300 2.300 0.000 0.345 0.000 0.000 0.000 0.345 0.345 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Model Town,
Government Colony, Quddos
Town in Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

360
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1334 725 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.200 1.200 0.000 0.180 0.000 0.000 0.000 0.180 0.180 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Azeez Yaqoob Town
in Okara City
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1335 726 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.500 0.850 0.000 0.875 0.000 0.000 0.000 0.875 0.875 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) E-Line Dubai Town,
in Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1336 727 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.450 1.450 0.000 0.218 0.000 0.000 0.000 0.218 0.218 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Kot Jan Muhammad,
Muzaffar Colony Chak No. 4/5-L
Shamas Town Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1337 728 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.200 0.600 0.000 0.780 0.000 0.000 0.000 0.780 0.780 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Wazeer Colony,
Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

361
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1338 729 Name of the Scheme Rehabilitation of Streets (Water 0.000 0.912 0.912 0.000 0.137 0.000 0.000 0.000 0.137 0.137 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Aziz Housing
Scheme Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1339 730 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.600 1.600 0.000 0.240 0.000 0.000 0.000 0.240 0.240 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) at Mohallah
Ahmadabad Okara
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1340 731 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.250 0.000 0.900 0.000 0.000 0.000 0.900 0.900 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Chak No. 54/2-L
Okara
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1341 732 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.150 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Chak No. 55/2-L
Okara
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

362
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1342 733 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.100 1.100 0.000 0.165 0.000 0.000 0.000 0.165 0.165 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Chak No. 53/2-L
Okara
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1343 734 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.100 1.100 0.000 0.165 0.000 0.000 0.000 0.165 0.165 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Seth Colony Okara
city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1344 735 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.500 0.000 0.650 0.000 0.000 0.000 0.650 0.650 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Chak No. 2/4-L Okara
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1345 736 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.650 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Kot Ghulam
Muhammad, Jalal Town, Ashraf
Block, Rafi Floor Mills, Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

363
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1346 737 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.850 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Firdous Town,
Makka Madina Town, Yaqoob
Abad, Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1347 738 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 0.650 0.000 0.500 0.000 0.000 0.000 0.500 0.500 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Muslim Colony, Fire
Brigade Colony in Okara city
Approval Date 6/2/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1348 739 Name of the Scheme Rehabilitation of Streets (Water 0.000 0.800 0.800 0.000 0.120 0.000 0.000 0.000 0.120 0.120 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc)Kanal Park Rana
Nurery, Okara
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1349 740 Name of the Scheme Rehabilitation of Streets (Water 0.000 0.540 0.540 0.000 0.081 0.000 0.000 0.000 0.081 0.081 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Ameer Colony,
Okara
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

364
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1350 741 Name of the Scheme Rehabilitation of Streets (Water 0.000 0.400 0.400 0.000 0.060 0.000 0.000 0.000 0.060 0.060 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Lala Zar Colony
Okara
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1351 742 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc)Mehboob Town and
Khalid Town, Okara
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1352 743 Name of the Scheme Rehabilitation of Streets (Water 0.000 1.600 1.600 0.000 0.240 0.000 0.000 0.000 0.240 0.240 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc) Azeem Housing
Basti Town, Okara
Approval Date 20-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1353 744 Name of the Scheme Rehabilitation of Streets (Water 0.000 0.400 0.400 0.000 0.060 0.000 0.000 0.000 0.060 0.060 0.000 0.000 0.000
Supply, Drainage, Sewerage,
Resoling etc)Basti Mehar Din
Okara
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

365
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1354 745 Name of the Scheme Rehabilitation / Improvement of 0.000 0.400 0.400 0.000 0.060 0.000 0.000 0.000 0.060 0.060 0.000 0.000 0.000
Streets Allah Dad Colony, Okara
City
Approval Date 2/3/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Okara

1355 746 Name of the Scheme Rehabilitation of Rural Water 0.000 5.416 1.780 0.000 4.448 0.000 0.000 0.000 4.448 4.448 0.000 0.000 0.000
Supply Scheme, Chak No.19/SP.
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1356 747 Name of the Scheme Rehabilitation of Rural Water 0.000 4.808 2.110 0.000 3.419 0.000 0.000 0.000 3.419 3.419 0.000 0.000 0.000
Supply Scheme, Ferozpur
Chistian.
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1357 748 Name of the Scheme Rehabilitation of Rural Water 0.000 5.664 3.000 0.000 3.514 0.000 0.000 0.000 3.514 3.514 0.000 0.000 0.000
Supply Scheme,Kalyana.
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1358 749 Name of the Scheme Augmentation of Water Supply & 0.000 14.796 4.814 0.000 12.201 0.000 0.000 0.000 12.201 12.201 0.000 0.000 0.000
Drainange Scheme, Malka Hans.
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

366
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1359 750 Name of the Scheme Rehabilitation of Rural Water 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Supply Scheme,Jeween Shah
Approval Date 29.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1360 751 Name of the Scheme Rehabilitation of Rural Water 0.000 4.293 1.986 0.000 2.951 0.000 0.000 0.000 2.951 2.951 0.000 0.000 0.000
Supply Scheme, Chak No.29/SP.
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1361 752 Name of the Scheme Rural Water Supply Scheme, 0.000 8.605 3.000 0.000 6.896 0.000 0.000 0.000 6.896 6.896 0.000 0.000 0.000
Chak No.89/EB(Bahu Wala).
Approval Date 20.12.08
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1362 753 Name of the Scheme Rehabilitation of Rural Water 0.000 3.182 2.845 0.000 0.814 0.000 0.000 0.000 0.814 0.814 0.000 0.000 0.000
Supply Scheme, Chak No.27/SP.
Approval Date 6.2.09
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1363 754 Name of the Scheme Rehabilitation of Rural Water 0.000 1.106 0.880 0.000 0.392 0.000 0.000 0.000 0.392 0.392 0.000 0.000 0.000
Supply Scheme, Chak No.11/SP.
Approval Date 6.02.09
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

367
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1364 755 Name of the Scheme Rehabilitation of Rural Water 0.000 1.932 1.685 0.000 0.537 0.000 0.000 0.000 0.537 0.537 0.000 0.000 0.000
Supply Scheme, Pir Ghani
Approval Date 6.02.09
Major Components T/well, R.Main,D/system,P/House,OHR,
Electrification,P.Machinery etc.
Major Targets 100%
District and Tehsil Pakpattan

1365 756 Name of the Scheme Construction of Filtration Plant at 0.000 1.861 1.861 0.000 0.279 0.000 0.000 0.000 0.279 0.279 0.000 0.000 0.000
Chak No.17/EB
Approval Date 6.02.09
Major Components Filteration Plant complete.
Major Targets 100%
District and Tehsil Pakpattan , Arifwala

1366 757 Name of the Scheme Construction of Filtration Plant at 0.000 1.861 1.861 0.000 0.279 0.000 0.000 0.000 0.279 0.279 0.000 0.000 0.000
Chak No.77/EB
Approval Date 6.02.09
Major Components Filteration Plant complete.
Major Targets 100%
District and Tehsil Pakpattan , Arifwala

1367 758 Name of the Scheme Rural Water Supply Scheme 0.000 10.580 9.222 0.000 2.945 0.000 0.000 0.000 2.945 2.945 0.000 0.000 0.000
Mazar Colony
Approval Date 29-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1368 759 Name of the Scheme Improvement/ Extension Rural 0.000 12.840 12.987 0.000 1.779 0.000 0.000 0.000 1.779 1.779 0.000 0.000 0.000
Water Supply Scheme Munir Abad
and Asif Abad
Approval Date 29-03-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

368
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1369 760 Name of the Scheme Rehabilitation of Rural Water 0.000 14.560 5.726 0.000 3.725 0.000 0.000 0.000 3.725 3.725 7.293 0.000 0.000
supply Scheme Thatha Khalil
Approval Date 24-4-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 56%
District and Tehsil Rawalpindi

1370 761 Name of the Scheme Rehabilitation of Rural Water 0.000 7.240 2.993 0.000 5.333 0.000 0.000 0.000 5.333 5.333 0.000 0.000 0.000
Supply Scheme Adwal
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1371 762 Name of the Scheme Water Suppply Scheme Dhaman 0.000 138.233 21.000 0.000 29.583 0.000 0.000 0.000 29.583 29.583 40.000 68.385 0.000
Syedan (Amended)
Approval Date 3/12/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 32%
District and Tehsil Rawalpindi

1372 763 Name of the Scheme Water Suppply Scheme Mohra 0.000 8.600 6.400 0.000 3.490 0.000 0.000 0.000 3.490 3.490 0.000 0.000 0.000
Sheran
Approval Date 12/12/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1373 764 Name of the Scheme Reh: of Water Supply Scheme 0.000 8.195 8.181 0.000 1.243 0.000 0.000 0.000 1.243 1.243 0.000 0.000 0.000
Numb Murree
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

369
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1374 765 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.156 1.571 0.000 5.508 0.000 0.000 0.000 5.508 5.508 0.000 0.000 0.000
Dewal Murree
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1375 766 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.990 3.954 0.000 0.635 0.000 0.000 0.000 0.635 0.635 0.000 0.000 0.000
Jondala Murree
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1376 767 Name of the Scheme Reh: of Water Supply Scheme 0.000 0.410 0.410 0.000 0.062 0.000 0.000 0.000 0.062 0.062 0.000 0.000 0.000
Dhoke Omlat Murree
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1377 768 Name of the Scheme Reh: of Water Supply Scheme 0.000 1.167 1.167 0.000 0.175 0.000 0.000 0.000 0.175 0.175 0.000 0.000 0.000
Perhayan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1378 769 Name of the Scheme Water Supply Scheme Manga 0.000 4.600 4.600 0.000 0.690 0.000 0.000 0.000 0.690 0.690 0.000 0.000 0.000
Village UC Tret
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

370
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1379 770 Name of the Scheme Water Supply Scheme Bewery to 0.000 3.264 3.250 0.000 0.504 0.000 0.000 0.000 0.504 0.504 0.000 0.000 0.000
Mallot UC Sarwar Lodge
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1380 771 Name of the Scheme Water Supply Scheme Nallah 0.000 0.300 0.300 0.000 0.045 0.000 0.000 0.000 0.045 0.045 0.000 0.000 0.000
Muslimana UC Nallah Muslimana
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1381 772 Name of the Scheme Water Supply Scheme Dhoke 0.000 0.200 0.200 0.000 0.030 0.000 0.000 0.000 0.030 0.030 0.000 0.000 0.000
Subedar Qurban UC Deberan
Kallan
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1382 773 Name of the Scheme Water Supply Scheme Narar 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1383 774 Name of the Scheme Rehabilitation of Rural Water 0.000 0.300 0.300 0.000 0.045 0.000 0.000 0.000 0.045 0.045 0.000 0.000 0.000
Supply Scheme Village Sumbal
UC Sumbal District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

371
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1384 775 Name of the Scheme Reh: of Water Supply Scheme 0.000 1.700 1.700 0.000 0.255 0.000 0.000 0.000 0.255 0.255 0.000 0.000 0.000
Mankialia Bharahmana Gujar
Khan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1385 776 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.950 4.000 0.000 3.993 0.000 0.000 0.000 3.993 3.993 0.000 0.000 0.000
Qazian Gujar Khan
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1386 777 Name of the Scheme Reh: of Water Supply Scheme 0.000 6.537 4.000 0.000 3.518 0.000 0.000 0.000 3.518 3.518 0.000 0.000 0.000
Islampura Jabar Gujar Khan
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1387 778 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.773 3.750 0.000 0.589 0.000 0.000 0.000 0.589 0.589 0.000 0.000 0.000
Narali Kaswal Gujrar Khan
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1388 779 Name of the Scheme Reh: of Water Supply Scheme 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Shadhana Gujar Khan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

372
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1389 780 Name of the Scheme Reh: of Water Supply Scheme 0.000 2.750 2.750 0.000 0.413 0.000 0.000 0.000 0.413 0.413 0.000 0.000 0.000
Phliana Gujar Khan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1390 781 Name of the Scheme Reh: of Water Supply Scheme 0.000 3.700 3.700 0.000 0.555 0.000 0.000 0.000 0.555 0.555 0.000 0.000 0.000
Kantrila Gujar Khan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1391 782 Name of the Scheme Water Supply Scheme Dhoke Kala 0.000 5.101 4.811 0.000 1.055 0.000 0.000 0.000 1.055 1.055 0.000 0.000 0.000
Khan District Rawalpindi
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1392 783 Name of the Scheme Water Supply Scheme Dhoke 0.000 10.418 5.293 0.000 6.688 0.000 0.000 0.000 6.688 6.688 0.000 0.000 0.000
Hafiz Shah
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1393 784 Name of the Scheme Water Supply Scheme Morgah 0.000 10.000 5.000 0.000 6.500 0.000 0.000 0.000 6.500 6.500 0.000 0.000 0.000
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

373
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1394 785 Name of the Scheme Reh: of Rural Water Supply 0.000 2.230 2.230 0.000 0.335 0.000 0.000 0.000 0.335 0.335 0.000 0.000 0.000
Scheme Jattal
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1395 786 Name of the Scheme Rural Water Supply Scheme 0.000 7.076 4.230 0.000 3.907 0.000 0.000 0.000 3.907 3.907 0.000 0.000 0.000
Noorani
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1396 787 Name of the Scheme Reh: of Rural Water Supply 0.000 6.110 6.110 0.000 0.917 0.000 0.000 0.000 0.917 0.917 0.000 0.000 0.000
Scheme Dhoke Choudhrian
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1397 788 Name of the Scheme Reh: of Rural Water Supply 0.000 2.130 2.130 0.000 0.320 0.000 0.000 0.000 0.320 0.320 0.000 0.000 0.000
Scheme Dhoke Chodhrian Phase-II
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1398 789 Name of the Scheme Reh: of Rural Water Supply 0.000 11.416 4.000 0.000 9.128 0.000 0.000 0.000 9.128 9.128 0.000 0.000 0.000
Scheme Balawal
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

374
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1399 790 Name of the Scheme Reh: of Rural Water Supply 0.000 13.109 0.577 0.000 7.000 0.000 0.000 0.000 7.000 7.000 7.498 0.000 0.000
Scheme Chakri RWP
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 50%
District and Tehsil Rawalpindi

1400 791 Name of the Scheme Reh: of Rural Water Supply 0.000 4.023 4.023 0.000 0.603 0.000 0.000 0.000 0.603 0.603 0.000 0.000 0.000
Scheme Mial
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1401 792 Name of the Scheme Reh: of Rural Water Supply 0.000 15.959 4.000 0.000 7.000 0.000 0.000 0.000 7.000 7.000 7.353 0.000 0.000
Scheme Maira Khurd Mira Kalan
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 60%
District and Tehsil Rawalpindi

1402 793 Name of the Scheme Reh: of Rural Water Supply 0.000 6.570 4.000 0.000 3.556 0.000 0.000 0.000 3.556 3.556 0.000 0.000 0.000
Scheme Karai
Approval Date 31-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1403 794 Name of the Scheme Reh: of Rural Water Supply 0.000 12.000 4.000 0.000 7.800 0.000 0.000 0.000 7.800 7.800 2.000 0.000 0.000
Scheme Safair
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 86%
District and Tehsil Rawalpindi

375
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1404 795 Name of the Scheme Rural Water Supply Scheme 0.000 8.532 2.500 0.000 7.312 0.000 0.000 0.000 7.312 7.312 0.000 0.000 0.000
Dhoke Sadu Ban bola
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1405 796 Name of the Scheme Rural Water Supply Scheme Jalala 0.000 2.851 1.800 0.000 1.479 0.000 0.000 0.000 1.479 1.479 0.000 0.000 0.000
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1406 797 Name of the Scheme Rehabilitation of Rural Water 0.000 2.915 2.760 0.000 0.592 0.000 0.000 0.000 0.592 0.592 0.000 0.000 0.000
Supply Scheme Lab Thatho
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1407 798 Name of the Scheme Rehabilitation of Rural Water 0.000 7.314 4.000 0.000 4.411 0.000 0.000 0.000 4.411 4.411 0.000 0.000 0.000
Supply Scheme Wah Garden
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1408 799 Name of the Scheme Rural Water Supply Scheme Ghazi 0.000 8.790 1.320 0.000 8.788 0.000 0.000 0.000 8.788 8.788 0.000 0.000 0.000
Koli
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

376
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1409 800 Name of the Scheme Rehabilitation of Rural Water 0.000 2.544 1.916 0.000 1.010 0.000 0.000 0.000 1.010 1.010 0.000 0.000 0.000
Supply Scheme Godho Summo
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1410 801 Name of the Scheme Rural Water Supply Scheme at 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Bhatta
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1411 802 Name of the Scheme Rehab. Of Rural Water Supply 0.000 4.208 3.750 0.000 1.089 0.000 0.000 0.000 1.089 1.089 0.000 0.000 0.000
Scheme Taveen Tehsil Gujar
Khan District Rawalpindi
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1412 803 Name of the Scheme Rehab. Of Rural Water Supply 0.000 5.585 3.500 0.000 2.923 0.000 0.000 0.000 2.923 2.923 0.000 0.000 0.000
Scheme Punjgran Kalan, Tehsil
Gujar Khan District Rawalpindi
Approval Date 11/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1413 804 Name of the Scheme Rural Water Supply Scheme at 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Wasala Bangial
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

377
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1414 805 Name of the Scheme Rural Water Supply Scheme at 0.000 4.250 4.250 0.000 0.638 0.000 0.000 0.000 0.638 0.638 0.000 0.000 0.000
Banth
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1415 806 Name of the Scheme Rural Water Supply Scheme at 0.000 4.700 4.700 0.000 0.705 0.000 0.000 0.000 0.705 0.705 0.000 0.000 0.000
Buch Mandra I/C Chehari
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1416 807 Name of the Scheme Repair & Renovation of Rest 0.000 7.531 5.364 0.000 3.297 0.000 0.000 0.000 3.297 3.297 0.000 0.000 0.000
House at Donga Gali, Tehsil
Murree (Revised)
Approval Date 14-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1417 808 Name of the Scheme Rural Water Supply Scheme Hoon 0.000 4.056 4.255 0.000 0.409 0.000 0.000 0.000 0.409 0.409 0.000 0.000 0.000
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

1418 809 Name of the Scheme Rehabilitation of Water Supply 0.000 6.233 2.000 0.000 5.168 0.000 0.000 0.000 5.168 5.168 0.000 0.000 0.000
Scheme Choa Khalsa Tehsil Kalar
Syedan
Approval Date 2/4/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi

378
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1419 810 Name of the Scheme Rural Water Supply Scheme Gola 0.000 3.000 1.500 0.000 1.950 0.000 0.000 0.000 1.950 1.950 0.000 0.000 0.000
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rawalpindi , Kotli Sattian

1420 811 Name of the Scheme Rural Water Supply & Drainage 0.000 14.730 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 15.940 0.000 0.000
Scheme Parial Sharki Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 7%
District and Tehsil Rawalpindi

1421 812 Name of the Scheme Rural Water Supply & Drainage 0.000 15.302 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 16.597 0.000 0.000
Scheme Kurar Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 7%
District and Tehsil Rawalpindi

1422 813 Name of the Scheme Reh. Of Water Supply & Drainage 0.000 4.882 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.614 0.000 0.000
Scheme Shabrian Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 20%
District and Tehsil Rawalpindi

379
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1423 814 Name of the Scheme Rural Water Supply & Drainage 0.000 7.280 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 7.372 0.000 0.000
Scheme Hunjrial (Punjgran) Tehsil
& District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 14%
District and Tehsil Rawalpindi

1424 815 Name of the Scheme Rural Water Supply & Drainage 0.000 4.950 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.693 0.000 0.000
Scheme Abn-Chak Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 20%
District and Tehsil Rawalpindi

1425 816 Name of the Scheme Reh. Of Rural Water Supply & 0.000 6.600 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.590 0.000 0.000
Drainage Scheme Arazi Budhi
Tehsil Kallar Syedian & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Rawalpindi , Kallar Ghar

1426 817 Name of the Scheme Reh. of Rural Water Supply & 0.000 8.972 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.318 0.000 0.000
Drainage Scheme Arazi Khas
Tehsil District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Rawalpindi , Kallar Ghar

380
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1427 818 Name of the Scheme Rural Water Supply & Drainage 0.000 6.718 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.726 0.000 0.000
Scheme Basanta Tehsil District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Rawalpindi , Kallar Ghar

1428 819 Name of the Scheme Rural Water Supply & Drainage 0.000 7.211 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 7.293 0.000 0.000
Scheme Nothia Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 14%
District and Tehsil Rawalpindi , Kallar Ghar

1429 820 Name of the Scheme Rural Water Supply & Drainage 0.000 5.794 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 5.663 0.000 0.000
Scheme Chinan Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 17%
District and Tehsil Rawalpindi , Kallar Ghar

1430 821 Name of the Scheme Rural Water Supply & Drainage 0.000 6.610 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.602 0.000 0.000
Scheme Mohara Bakhtau Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Rawalpindi , Kallar Ghar

381
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1431 822 Name of the Scheme Rural Water Supply & Drainage 0.000 12.221 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 13.054 0.000 0.000
Scheme Dera Khalsa Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 8%
District and Tehsil Rawalpindi , Kallar Ghar

1432 823 Name of the Scheme Rural Water Supply & Drainage 0.000 6.641 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.637 0.000 0.000
Scheme Guft Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Rawalpindi , Kallar Ghar

1433 824 Name of the Scheme Rural Water Supply & Drainage 0.000 6.386 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.344 0.000 0.000
Scheme Chappur Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 16%
District and Tehsil Rawalpindi , Kallar Ghar

1434 825 Name of the Scheme Rural Water Supply & Drainage 0.000 24.147 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 25.769 0.000 0.000
Scheme Darkali Hemori Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 8%
District and Tehsil Rawalpindi , Kallar Ghar

382
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1435 826 Name of the Scheme Rural Water Supply & Drainage 0.000 8.315 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 7.562 0.000 0.000
Scheme Darkali Shair Shahi
Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 24%
District and Tehsil Rawalpindi , Kallar Ghar

1436 827 Name of the Scheme Rural Water Supply & Drainage 0.000 8.765 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.080 0.000 0.000
Scheme Mangal Tehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Rawalpindi , Kallar Ghar

1437 828 Name of the Scheme Rural Water Supply & Drainage 0.000 6.395 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.354 0.000 0.000
Scheme Manglora Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 16%
District and Tehsil Rawalpindi , Kallar Ghar

1438 829 Name of the Scheme Rural Water Supply & Drainage 0.000 8.972 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.318 0.000 0.000
Scheme Ghareeba Tehsil &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Rawalpindi , Kallar Ghar

383
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1439 830 Name of the Scheme Rehabilitation of Rural Water 0.000 16.920 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 17.458 0.000 0.000
Supply Scheme Shakrial
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 12%
District and Tehsil Rawalpindi

1440 831 Name of the Scheme Rehabilitation of Rural Water 0.000 9.360 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 8.764 0.000 0.000
Supply Scheme Pial
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 21%
District and Tehsil Rawalpindi

1441 832 Name of the Scheme Rehabilitation of Rural Water 0.000 7.740 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.901 0.000 0.000
Supply Scheme Dhoke Budhal
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 26%
District and Tehsil Rawalpindi

1442 833 Name of the Scheme Rehabilitation of Rural Water 0.000 20.010 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 21.012 0.000 0.000
Supply Scheme Basali
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 10%
District and Tehsil Rawalpindi

1443 834 Name of the Scheme Rehabilitation of Rural Water 0.000 11.050 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 10.708 0.000 0.000
Supply Scheme Gurah Gujaran
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 18%
District and Tehsil Rawalpindi

384
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1444 835 Name of the Scheme Rehabilitation of Rural Water 0.000 60.707 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 67.813 0.000 0.000
Supply Scheme Kalar Syedan
Tehsil Kalar Syedan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 3%
District and Tehsil Rawalpindi

1445 836 Name of the Scheme Rehabilitation of Rural Water 0.000 4.898 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.633 0.000 0.000
Supply Scheme Jattal ehsil Kalar
Syedan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 41%
District and Tehsil Rawalpindi

1446 837 Name of the Scheme Rehab. Of Rural Water Supply 0.000 12.750 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 11.663 0.000 0.000
Scheme Khurmab Kaswal &
Jhangi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 116%
District and Tehsil Rawalpindi , Gujar Khan

1447 838 Name of the Scheme Rural Water Supply Scheme Chak 0.000 23.940 1.000 0.000 2.500 0.000 0.000 0.000 2.500 2.500 24.031 0.000 0.000
Beli Khan
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 110%
District and Tehsil Rawalpindi

1448 839 Name of the Scheme Rural Water Supply Scheme Sagri 0.000 20.200 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 20.230 0.000 0.000
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 110%
District and Tehsil Rawalpindi

385
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1449 840 Name of the Scheme Rural Water Supply Scheme 0.000 31.416 1.000 0.000 2.500 0.000 0.000 0.000 2.500 2.500 32.628 0.000 0.000
Dhamial
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 108%
District and Tehsil Rawalpindi

1450 841 Name of the Scheme Reh. Of Rural Water Supply 0.000 10.353 1.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.906 0.000 0.000
SchemeMairakalan Matra Khurd
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 110%
District and Tehsil Rawalpindi

1451 842 Name of the Scheme Rural Water Supply Scheme 0.000 40.000 1.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 42.000 0.000 0.000
Jewan Colony, Dhoke Layal,
Dhoke Thatta Left over area of
Lala Rukh
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 108%
District and Tehsil Rawalpindi

1452 843 Name of the Scheme Rural Water Supply Scheme Chak 0.000 26.570 1.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 28.056 0.000 0.000
Jalal Din
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 106%
District and Tehsil Rawalpindi

1453 844 Name of the Scheme Water Supply Scheme 0.000 24.210 1.000 0.000 1.500 0.000 0.000 0.000 1.500 1.500 25.342 0.000 0.000
Rehmatabad
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 106%
District and Tehsil Rawalpindi

386
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1454 845 Name of the Scheme Water Supply Scheme Bhatt 0.000 19.250 1.000 0.000 2.200 0.000 0.000 0.000 2.200 2.200 18.938 0.000 0.000
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 111%
District and Tehsil Rawalpindi

1455 846 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 4.498 4.650 0.000 0.523 0.000 0.000 0.000 0.523 0.523 0.000 0.000 0.000
No.111-112/1-L
Approval Date 2006-07
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rahim Yar Khan

1456 847 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 10.127 4.000 0.000 7.646 0.000 0.000 0.000 7.646 7.646 0.000 0.000 0.000
No.127/P
Approval Date 10.11.08
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

1457 848 Name of the Scheme Rehabilitation of Rural Water 0.000 6.481 5.474 0.000 1.979 0.000 0.000 0.000 1.979 1.979 0.000 0.000 0.000
Supply Scheme Chak No.88/P,
R.Y.Khan.
Approval Date 20.02.09
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rahim Yar Khan

1458 849 Name of the Scheme Water Supply Scheme Jhelumi 0.000 3.952 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 2.245 0.000 0.000
Subedar Malik Manzoor Ahmad,
Tehsil Liaqatpur.
Approval Date 25.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 51%
District and Tehsil Rahim Yar Khan , Liaqatpur

387
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1459 850 Name of the Scheme Improvement / Rehab. Of Water 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Supply Scheme Bandoor
Abbaasian SDK
Approval Date 22.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rahim Yar Khan

1460 851 Name of the Scheme Construction of Water Supply 0.000 8.000 4.000 0.000 5.200 0.000 0.000 0.000 5.200 5.200 0.000 0.000 0.000
Scheme Chak No.116/1-L
Approval Date 30.05.2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khan Pur

1461 852 Name of the Scheme Rural Water Supply Scheme Basti 0.000 2.058 1.160 0.000 1.207 0.000 0.000 0.000 1.207 1.207 0.000 0.000 0.000
Shamsabad / Jattan.
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1462 853 Name of the Scheme Rural Water Supply Scheme 0.000 1.588 1.200 0.000 0.626 0.000 0.000 0.000 0.626 0.626 0.000 0.000 0.000
Ozman (Old)
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1463 854 Name of the Scheme Rural Water Supply Scheme 0.000 1.897 1.400 0.000 0.782 0.000 0.000 0.000 0.782 0.782 0.000 0.000 0.000
Ozman (New)
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

388
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1464 855 Name of the Scheme Rural Water Supply Scheme 0.000 2.010 1.500 0.000 0.812 0.000 0.000 0.000 0.812 0.812 0.000 0.000 0.000
Phulan Khalti
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1465 856 Name of the Scheme Rural Water Supply Scheme Kot 0.000 2.098 1.500 0.000 0.913 0.000 0.000 0.000 0.913 0.913 0.000 0.000 0.000
Khewali
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1466 857 Name of the Scheme Rural Water Supply Scheme Shah 0.000 0.825 0.500 0.000 0.449 0.000 0.000 0.000 0.449 0.449 0.000 0.000 0.000
Wali
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1467 858 Name of the Scheme Rural Water Supply Scheme Sakhi 0.000 2.090 1.500 0.000 0.904 0.000 0.000 0.000 0.904 0.904 0.000 0.000 0.000
Rindan
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1468 859 Name of the Scheme Rural Water Supply Scheme 0.000 1.949 1.500 0.000 0.741 0.000 0.000 0.000 0.741 0.741 0.000 0.000 0.000
Meeran Pur
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

389
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1469 860 Name of the Scheme Rural Water Supply Scheme Rakh 0.000 1.599 1.290 0.000 0.549 0.000 0.000 0.000 0.549 0.549 0.000 0.000 0.000
Qadra
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

1470 861 Name of the Scheme Rural Water Supply Scheme Fateh 0.000 2.037 1.020 0.000 1.323 0.000 0.000 0.000 1.323 1.323 0.000 0.000 0.000
Pur
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1471 862 Name of the Scheme Rural Water Supply Scheme 0.000 2.068 1.520 0.000 0.858 0.000 0.000 0.000 0.858 0.858 0.000 0.000 0.000
Muhammad Pur Gum Wala
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1472 863 Name of the Scheme Rural Water Supply Scheme 0.000 2.061 1.500 0.000 0.870 0.000 0.000 0.000 0.870 0.870 0.000 0.000 0.000
Jahanpur
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1473 864 Name of the Scheme Rural Water Supply Scheme 0.000 7.882 8.064 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
Ahmadani
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

390
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1474 865 Name of the Scheme Rural Water Supply Scheme Shah 0.000 2.093 0.970 0.000 1.437 0.000 0.000 0.000 1.437 1.437 0.000 0.000 0.000
Pur
Approval Date 6.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1475 866 Name of the Scheme Rural Water Supply Scheme Tufki 0.000 5.043 1.975 0.000 3.824 0.000 0.000 0.000 3.824 3.824 0.000 0.000 0.000
Meh Qasab
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1476 867 Name of the Scheme Rural Water Supply Scheme Tibi 0.000 0.900 0.700 0.000 0.335 0.000 0.000 0.000 0.335 0.335 0.000 0.000 0.000
Lundan
Approval Date 5.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1477 868 Name of the Scheme Rural Water Supply Scheme 0.000 1.887 1.400 0.000 0.770 0.000 0.000 0.000 0.770 0.770 0.000 0.000 0.000
Harrand
Approval Date 5.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1478 869 Name of the Scheme Rural Water Supply Scheme 0.000 2.231 0.519 0.000 2.047 0.000 0.000 0.000 2.047 2.047 0.000 0.000 0.000
Ruqba Lundan
Approval Date 5.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

391
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1479 870 Name of the Scheme Rural Water Supply Scheme 0.000 0.887 0.650 0.000 0.370 0.000 0.000 0.000 0.370 0.370 0.000 0.000 0.000
Naushara Gharbi
Approval Date 5.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1480 871 Name of the Scheme Rural Water Supply Scheme Basti 0.000 3.545 1.500 0.000 2.577 0.000 0.000 0.000 2.577 2.577 0.000 0.000 0.000
Hambi
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1481 872 Name of the Scheme Rural Water Supply Scheme Glory 0.000 3.911 2.502 0.000 1.996 0.000 0.000 0.000 1.996 1.996 0.000 0.000 0.000
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1482 873 Name of the Scheme Rural Water Supply Scheme 0.000 5.223 2.866 0.000 3.140 0.000 0.000 0.000 3.140 3.140 0.000 0.000 0.000
Bhahar Pur, Mud Novel.
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1483 874 Name of the Scheme Rural Water Supply Scheme 0.000 2.391 0.718 0.000 2.032 0.000 0.000 0.000 2.032 2.032 0.000 0.000 0.000
Bumbly
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

392
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1484 875 Name of the Scheme Rural Water Supply Scheme 0.000 2.243 0.908 0.000 1.671 0.000 0.000 0.000 1.671 1.671 0.000 0.000 0.000
Barkatoo
Approval Date 5.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1485 876 Name of the Scheme Rural Water Supply Scheme Lundi 0.000 11.535 5.000 0.000 8.265 0.000 0.000 0.000 8.265 8.265 0.000 0.000 0.000
Saydan
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1486 877 Name of the Scheme Rural Water Supply Scheme Lal 0.000 9.361 5.000 0.000 5.765 0.000 0.000 0.000 5.765 5.765 0.000 0.000 0.000
Garah
Approval Date 3.12.08
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Jampur

1487 878 Name of the Scheme Ext. in Water Supply Scheme Matt 0.000 17.584 4.000 0.000 7.100 0.000 0.000 0.000 7.100 7.100 9.122 0.000 0.000
Wah (1&2).
Approval Date 24.02.09
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 55%
District and Tehsil Rajanpur , Rojhan

1488 879 Name of the Scheme Water Supply Scheme Mz.Dera 0.000 7.328 4.000 0.000 4.427 0.000 0.000 0.000 4.427 4.427 0.000 0.000 0.000
Dildar Uc Meeranpur.
Approval Date 24.02.09
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur , Rojhan

393
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1489 880 Name of the Scheme Ext.of Rural Water Supply 0.000 2.800 2.070 0.000 1.150 0.000 0.000 0.000 1.150 1.150 0.000 0.000 0.000
Scheme, Nawan Shehar.
Approval Date 2006-07
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1490 881 Name of the Scheme Rural Water Supply Scheme,Gul 0.000 5.100 5.300 0.000 0.565 0.000 0.000 0.000 0.565 0.565 0.000 0.000 0.000
Muhammad Dasti.
Approval Date 2006-07
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1491 882 Name of the Scheme Reh. Of Rural Water Supply 0.000 2.900 1.440 0.000 1.895 0.000 0.000 0.000 1.895 1.895 0.000 0.000 0.000
Scheme, Mud Rindan.
Approval Date 2006-07
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1492 883 Name of the Scheme Rural Rural Water Supply 0.000 2.400 0.204 0.000 2.556 0.000 0.000 0.000 2.556 2.556 0.000 0.000 0.000
Scheme, Drigri.
Approval Date 2006-07
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1493 884 Name of the Scheme Rural Rural Water Supply 0.000 2.400 0.204 0.000 2.556 0.000 0.000 0.000 2.556 2.556 0.000 0.000 0.000
Scheme, Kotla Ahmad
Approval Date 2006-07
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

394
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1494 885 Name of the Scheme Rural Water Supply Scheme Basti 0.000 8.546 1.000 0.000 3.500 0.000 0.000 0.000 3.500 3.500 5.563 0.000 0.000
Fiaz Hussain Khosa
Approval Date 25.05.2009
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 45%
District and Tehsil Rajanpur

1495 886 Name of the Scheme Ext. of Pipe line from Kotla Naseer 0.000 3.385 1.000 0.000 2.893 0.000 0.000 0.000 2.893 2.893 0.000 0.000 0.000
to Khaji wala Basti Mustafa, Ali
Muhammad and Basti Khursheed
Ahmad, Anwar & Asghar mouza
Ghazi abad 4000 to 5000 feet Ext.
Water Supply Scheme mouza
kotla Ahmad from shop khadium
Hussain khan Darishak to ba
Approval Date 25.05.2009
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1496 887 Name of the Scheme Repair of Water Supply Scheme 0.000 3.856 1.000 0.000 3.600 0.000 0.000 0.000 3.600 3.600 0.000 0.000 0.000
Null mouza Sahan wala
Approval Date 25.05.2009
Major Components T/well, Rising Main,P/M,P/House,
LLRes.etc.
Major Targets 100%
District and Tehsil Rajanpur

1497 888 Name of the Scheme Rural Water Supply & Drainage 0.000 10.610 12.196 0.000 0.005 0.000 0.000 0.000 0.005 0.005 0.000 0.000 0.000
Scheme Chak No.82/NB (Revised)
Approval Date 12.4.06
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

395
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1498 889 Name of the Scheme Water Supply Scheme Mouza Jora 0.000 6.284 9.193 0.000 0.100 0.000 0.000 0.000 0.100 0.100 0.000 0.000 0.000
Skasar
Approval Date 11/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 129%
District and Tehsil Sargodha

1499 890 Name of the Scheme Rural Water Supply Scheme Chak 0.000 19.455 14.934 0.000 7.439 0.000 0.000 0.000 7.439 7.439 0.000 0.000 0.000
No. 47/NB
Approval Date 8/5/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1500 891 Name of the Scheme Rural Water Supply Scheme 46/SB 0.000 19.562 19.790 0.000 2.706 0.000 0.000 0.000 2.706 2.706 0.000 0.000 0.000
Approval Date 8/5/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1501 892 Name of the Scheme Rural Water Supply Scheme Chak 0.000 13.612 7.532 0.000 8.122 0.000 0.000 0.000 8.122 8.122 0.000 0.000 0.000
No.100/NB (Sargodha) (Amended)
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1502 893 Name of the Scheme Rural Water Supply Scheme Chak 0.000 10.026 5.437 0.000 6.093 0.000 0.000 0.000 6.093 6.093 0.000 0.000 0.000
No.85/NB (Sargodha) (Amended)
Approval Date 4/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

396
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1503 894 Name of the Scheme Rural Water Supply Scheme Ajnala 0.000 2.766 0.510 0.000 2.671 0.000 0.000 0.000 2.671 2.671 0.000 0.000 0.000
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1504 895 Name of the Scheme Rural Water Supply Scheme Chak 0.000 1.920 1.920 0.000 0.288 0.000 0.000 0.000 0.288 0.288 0.000 0.000 0.000
No. 13/ASB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1505 896 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.553 2.621 0.000 0.315 0.000 0.000 0.000 0.315 0.315 0.000 0.000 0.000
No. 60/NB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1506 897 Name of the Scheme Rural Water Supply Scheme Chak 0.000 5.920 5.988 0.000 0.820 0.000 0.000 0.000 0.820 0.820 0.000 0.000 0.000
No. 16/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1507 898 Name of the Scheme Rural Water Supply Scheme 0.000 6.314 6.382 0.000 0.879 0.000 0.000 0.000 0.879 0.879 0.000 0.000 0.000
Deawol
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

397
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1508 899 Name of the Scheme Rural Water Supply Scheme Chak 0.000 6.031 4.000 0.000 2.936 0.000 0.000 0.000 2.936 2.936 0.000 0.000 0.000
No. 9/ML
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1509 900 Name of the Scheme Rural Water Supply Scheme 0.000 7.500 7.500 0.000 1.125 0.000 0.000 0.000 1.125 1.125 0.000 0.000 0.000
Bhabra (Bashir Colony) Minhaas
Bhabra
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1510 901 Name of the Scheme Rural Water Supply Scheme 0.000 9.908 7.400 0.000 3.994 0.000 0.000 0.000 3.994 3.994 0.000 0.000 0.000
Ishtaqlalabad
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1511 902 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
No. 82/NB
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1512 903 Name of the Scheme Rural Water Supply Scheme Chak 0.000 3.547 3.615 0.000 0.464 0.000 0.000 0.000 0.464 0.464 0.000 0.000 0.000
No. 48/NB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

398
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1513 904 Name of the Scheme Rural Water Supply Scheme Chak 0.000 18.692 6.360 0.000 7.000 0.000 0.000 0.000 7.000 7.000 8.136 0.000 0.000
No. 50/NB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 62%
District and Tehsil Sargodha

1514 905 Name of the Scheme Rural Water Supply Scheme Chak 0.000 2.762 2.833 0.000 0.343 0.000 0.000 0.000 0.343 0.343 0.000 0.000 0.000
No. 107/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1515 906 Name of the Scheme Rural Water Supply Scheme Chak 0.000 4.300 4.370 0.000 0.575 0.000 0.000 0.000 0.575 0.575 0.000 0.000 0.000
No. 113/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1516 907 Name of the Scheme Rural Water Supply Scheme Chak 0.000 5.556 2.000 0.000 4.389 0.000 0.000 0.000 4.389 4.389 0.000 0.000 0.000
No. 115/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1517 908 Name of the Scheme Reh: of Rural Water Supply 0.000 4.388 4.388 0.000 0.658 0.000 0.000 0.000 0.658 0.658 0.000 0.000 0.000
Scheme Chak No. 126/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

399
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1518 909 Name of the Scheme Reh: of Rural Water Supply 0.000 5.832 5.901 0.000 0.806 0.000 0.000 0.000 0.806 0.806 0.000 0.000 0.000
Scheme Chgak No. 125/SB
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1519 910 Name of the Scheme Rural Water Supply Scheme Sial 0.000 6.408 6.408 0.000 0.961 0.000 0.000 0.000 0.961 0.961 0.000 0.000 0.000
Sharif
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1520 911 Name of the Scheme Rural Water Supply Scheme 0.000 4.120 0.760 0.000 3.978 0.000 0.000 0.000 3.978 3.978 0.000 0.000 0.000
Nehang
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1521 912 Name of the Scheme Rural Water Supply Scheme 0.000 3.764 1.053 0.000 3.276 0.000 0.000 0.000 3.276 3.276 0.000 0.000 0.000
Manowal
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1522 913 Name of the Scheme Rural Water Supply Scheme Ali 0.000 10.332 10.400 0.000 1.482 0.000 0.000 0.000 1.482 1.482 0.000 0.000 0.000
Pur Syedan
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

400
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1523 914 Name of the Scheme Reh: of Rural Water Supply 0.000 2.616 2.616 0.000 0.392 0.000 0.000 0.000 0.392 0.392 0.000 0.000 0.000
Scheme Nawab Pur
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1524 915 Name of the Scheme Reh: of Rural Water Supply 0.000 4.442 4.442 0.000 0.666 0.000 0.000 0.000 0.666 0.666 0.000 0.000 0.000
Scheme Kalra
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1525 916 Name of the Scheme Rural Drainage Scheme village 0.000 7.500 7.500 0.000 1.125 0.000 0.000 0.000 1.125 1.125 0.000 0.000 0.000
Dodha
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1526 917 Name of the Scheme Installation of water filtration plant 0.000 2.000 1.000 0.000 1.300 0.000 0.000 0.000 1.300 1.300 0.000 0.000 0.000
at Rahawali Sharqi
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1527 918 Name of the Scheme Installation of water filtration plant 0.000 2.000 1.000 0.000 1.300 0.000 0.000 0.000 1.300 1.300 0.000 0.000 0.000
at Bhatti Bhango
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

401
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1528 919 Name of the Scheme Installation of water filtration plant 0.000 1.000 0.500 0.000 0.650 0.000 0.000 0.000 0.650 0.650 0.000 0.000 0.000
at village Trigri
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1529 920 Name of the Scheme Installation of water filtration plant 0.000 2.300 1.000 0.000 1.645 0.000 0.000 0.000 1.645 1.645 0.000 0.000 0.000
at Aroop
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sargodha

1530 921 Name of the Scheme Water Supply Scheme Mouza 0.000 2.608 2.552 0.000 0.447 0.000 0.000 0.000 0.447 0.447 0.000 0.000 0.000
Kulla Virkan (Revised)
Approval Date 5/11/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sheikhupura

1531 922 Name of the Scheme Rural Water Supply & Drainage 0.000 19.836 6.000 0.000 8.100 0.000 0.000 0.000 8.100 8.100 8.711 0.000 0.000
Scheme at Shamke and Amanpura
Approval Date 10/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 62%
District and Tehsil Sheikhupura

1532 923 Name of the Scheme Rural Water Supply & Drainage 0.000 51.773 10.000 0.000 14.000 0.000 0.000 0.000 14.000 14.000 20.000 15.539 0.000
Scheme at Kot Pindi Das
Approval Date 10/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 40%
District and Tehsil Sheikhupura

402
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1533 924 Name of the Scheme Rural Water Supply & Drainage 0.000 17.726 6.000 0.000 7.000 0.000 0.000 0.000 7.000 7.000 7.385 0.000 0.000
Scheme at Sakhum
Approval Date 10/11/2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 64%
District and Tehsil Sheikhupura

1534 925 Name of the Scheme Reh: of Water Supply & Sanitation 0.000 19.937 9.137 0.000 11.791 0.000 0.000 0.000 11.791 11.791 2.000 0.000 0.000
Scheme Kharianwala (Revised)
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 91%
District and Tehsil Sheikhupura

1535 926 Name of the Scheme Drains & Water Supply Scheme 0.000 13.070 3.000 0.000 6.000 0.000 0.000 0.000 6.000 6.000 6.031 0.000 0.000
Fatuwala
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 60%
District and Tehsil Sheikhupura

1536 927 Name of the Scheme Rehabilitation of Water Supply 0.000 14.892 7.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 5.126 0.000 0.000
Scheme Dhakumpura
Approval Date 23-12-2008
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 70%
District and Tehsil Sheikhupura

1537 928 Name of the Scheme Rehabilitation of Water Supply 0.000 37.270 5.000 0.000 6.700 0.000 0.000 0.000 6.700 6.700 21.452 0.000 0.000
and Sanitation Scheme Joyanwala
and Adjoing abadies
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets
District and Tehsil Sheikhupura

403
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1538 929 Name of the Scheme Rural Water Supply & Drainage 0.000 8.516 8.500 0.000 1.293 0.000 0.000 0.000 1.293 1.293 0.000 0.000 0.000
Scheme Galotian Kalan
Approval Date 13-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1539 930 Name of the Scheme Rural Water Supply & Drainage 0.000 26.550 9.998 0.000 14.305 0.000 0.000 0.000 14.305 14.305 6.230 0.000 0.000
Scheme Rab Nawaz Colony
Approval Date 10/10/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 80%
District and Tehsil Sialkot

1540 931 Name of the Scheme Rural Water Supply & Drainage 0.000 16.400 8.979 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Scheme Jamke Cheema
Approval Date 10/10/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 101%
District and Tehsil Sialkot

1541 932 Name of the Scheme Rural Water Supply & Drainage 0.000 4.438 4.704 0.000 0.400 0.000 0.000 0.000 0.400 0.400 0.000 0.000 0.000
Scheme Dadu Basara
Approval Date 13-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1542 933 Name of the Scheme Rural Water Supply Scheme 0.000 6.485 7.133 0.000 0.325 0.000 0.000 0.000 0.325 0.325 0.000 0.000 0.000
Othian
Approval Date 13-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

404
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1543 934 Name of the Scheme Rural Water Supply & Drainage 0.000 9.607 7.068 0.000 3.980 0.000 0.000 0.000 3.980 3.980 0.000 0.000 0.000
Scheme Galotian Khurd
Approval Date 13-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1544 935 Name of the Scheme Rural Water Supply & Drainage 0.000 3.846 3.851 0.000 0.572 0.000 0.000 0.000 0.572 0.572 0.000 0.000 0.000
Scheme Viram
Approval Date 13-09-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1545 936 Name of the Scheme Rural Water Supply & Drainage 0.000 18.364 9.888 0.000 8.231 0.000 0.000 0.000 8.231 8.231 3.000 0.000 0.000
Scheme Roras
Approval Date 10/10/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 86%
District and Tehsil Sialkot

1546 937 Name of the Scheme Rural Water Supply Scheme Book 0.000 4.605 5.066 0.000 0.230 0.000 0.000 0.000 0.230 0.230 0.000 0.000 0.000
Garha
Approval Date 6/3/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1547 938 Name of the Scheme Rural Water Supply Scheme 0.000 5.200 4.661 0.000 1.319 0.000 0.000 0.000 1.319 1.319 0.000 0.000 0.000
Ghopal Pur Kais
Approval Date 6/3/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

405
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1548 939 Name of the Scheme Rural Water Supply Scheme 0.000 3.540 2.695 0.000 1.376 0.000 0.000 0.000 1.376 1.376 0.000 0.000 0.000
Pathanwali
Approval Date 6/3/2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1549 940 Name of the Scheme Rural Water Supply Scheme 0.000 7.900 7.036 0.000 2.049 0.000 0.000 0.000 2.049 2.049 0.000 0.000 0.000
Chobara
Approval Date 18-05-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1550 941 Name of the Scheme Rural Water Supply Scheme 0.000 6.852 7.269 0.000 0.611 0.000 0.000 0.000 0.611 0.611 0.000 0.000 0.000
Bhuda Goraya
Approval Date 31-01-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1551 942 Name of the Scheme Water Suppply Scheme Bharokay 0.000 6.352 5.689 0.000 1.616 0.000 0.000 0.000 1.616 1.616 0.000 0.000 0.000
Approval Date 31-01-2007
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1552 943 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Mulagar Pura
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

406
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1553 944 Name of the Scheme Water Filtration Plant village Pindi 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Mandlayaan
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1554 945 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Najwal
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1555 946 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Dalowali
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1556 947 Name of the Scheme Water Filtration Plant village Gujral 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1557 948 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Rawaal
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

407
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1558 949 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Nandpur
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1559 950 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Sarogpur
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1560 951 Name of the Scheme Water Filtration Plant village Harna 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1561 952 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Sarhali
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1562 953 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Kakowal
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

408
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1563 954 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Machrala
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1564 955 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Chakrala
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1565 956 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Sadariwal
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1566 957 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Munawar Pur
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1567 958 Name of the Scheme Water Filtration Plant village 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Choor Chak
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

409
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1568 959 Name of the Scheme Water Filtration Plant village Jogo 0.000 0.693 0.300 0.000 0.497 0.000 0.000 0.000 0.497 0.497 0.000 0.000 0.000
Chak
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1569 960 Name of the Scheme Installation of water supply 0.000 5.795 0.430 0.000 6.234 0.000 0.000 0.000 6.234 6.234 0.000 0.000 0.000
tubewell alongwith Distribution
Jodaywali Kalan UC Pindi Arian
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1570 961 Name of the Scheme Installation of Water Supply 0.000 5.185 4.000 0.000 1.963 0.000 0.000 0.000 1.963 1.963 0.000 0.000 0.000
Tubewell along with Distribution
Kakaywali UC Talwara Mughlan
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1571 962 Name of the Scheme Provision of Water Supply Mast 0.000 7.834 4.000 0.000 5.009 0.000 0.000 0.000 5.009 5.009 0.000 0.000 0.000
Malanay
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1572 963 Name of the Scheme Water Supply U/C Model Town 0.000 2.400 2.400 0.000 0.360 0.000 0.000 0.000 0.360 0.360 0.000 0.000 0.000
Daska
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

410
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1573 964 Name of the Scheme Water Supply Scheme Chahar 0.000 7.368 7.482 0.000 0.991 0.000 0.000 0.000 0.991 0.991 0.000 0.000 0.000
Bhular Baba Colony
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1574 965 Name of the Scheme Installation of Water Supply with 0.000 4.300 2.652 0.000 2.293 0.000 0.000 0.000 2.293 2.293 0.000 0.000 0.000
Tubewell alongwith Distribution
Jodaywali Kalan UC Pindi Ariyan
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1575 966 Name of the Scheme Rural Water Supply & Drainage 0.000 10.533 4.000 0.000 8.113 0.000 0.000 0.000 8.113 8.113 0.000 0.000 0.000
Scheme Dugri Harian (UC Dulham
Kahlwan)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1576 967 Name of the Scheme Rural Water Supply & Drainage 0.000 6.539 4.000 0.000 3.520 0.000 0.000 0.000 3.520 3.520 0.000 0.000 0.000
Scheme Nar Singh (UC Pindi
Bhago)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

411
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1577 968 Name of the Scheme Rural Water Supply & drainage 0.000 9.882 4.000 0.000 7.364 0.000 0.000 0.000 7.364 7.364 0.000 0.000 0.000
Scheme Bajra Garhi & Mahal Data
(UC Bajra Garhi)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1578 969 Name of the Scheme Rural Water Supply & Drainage 0.000 6.702 4.000 0.000 3.707 0.000 0.000 0.000 3.707 3.707 0.000 0.000 0.000
Scheme, Jamal Jand & Sohal (UC
Mirajke)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1579 970 Name of the Scheme Rural Water Supply & Drainage 0.000 7.459 4.000 0.000 4.578 0.000 0.000 0.000 4.578 4.578 0.000 0.000 0.000
Scheme, Raja Harpal (UC
Rasoolpur Bhallian)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1580 971 Name of the Scheme Rural Water Supply & Drainage 0.000 8.880 4.000 0.000 6.212 0.000 0.000 0.000 6.212 6.212 0.000 0.000 0.000
Scheme Vinjal & Nidoke and
Bhooni (UC Syedanwali)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

412
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1581 972 Name of the Scheme Rural Water Supply Kuthiala 0.000 4.816 4.151 0.000 1.387 0.000 0.000 0.000 1.387 1.387 0.000 0.000 0.000
Approval Date 2007-08
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1582 973 Name of the Scheme Rural Water Supply Scheme 0.000 10.190 9.218 0.000 2.501 0.000 0.000 0.000 2.501 2.501 0.000 0.000 0.000
Kharota Syedan (Revised)
Approval Date 2007-08
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1583 974 Name of the Scheme Provision of Water Supply 0.000 9.260 8.300 0.000 2.349 0.000 0.000 0.000 2.349 2.349 0.000 0.000 0.000
Scheme Village Harar UC Bhagwal
Approval Date 4/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1584 975 Name of the Scheme Water Filtration Plant Jatheikay 0.000 5.850 5.850 0.000 0.878 0.000 0.000 0.000 0.878 0.878 0.000 0.000 0.000
Approval Date 21-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

1585 976 Name of the Scheme Rural Water Supply Scheme, Chak 0.000 5.741 5.054 0.000 1.548 0.000 0.000 0.000 1.548 1.548 0.000 0.000 0.000
No. 138/9-L (Ehsan Wala)
Approval Date 6.02.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

413
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1586 977 Name of the Scheme Rehabilitation of Rural Water 0.000 5.741 5.054 0.000 1.548 0.000 0.000 0.000 1.548 1.548 0.000 0.000 0.000
Supply Scheme, Chak No. 78/5-R
Approval Date 6.02.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1587 978 Name of the Scheme Rehabilitation of Rural Water 0.000 15.000 7.500 0.000 2.445 0.000 0.000 0.000 2.445 2.445 7.305 0.000 0.000
Supply Scheme, Harappa City.
Approval Date Approved
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 58%
District and Tehsil Sahiwal

1588 979 Name of the Scheme Rehabilitation of Rural Water 0.000 4.882 4.909 0.000 0.705 0.000 0.000 0.000 0.705 0.705 0.000 0.000 0.000
Supply Scheme, Chak No.142/9-L.
Approval Date 6.02.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1589 980 Name of the Scheme Rehabilitation of Rural Water 0.000 11.772 6.774 0.000 6.764 0.000 0.000 0.000 6.764 6.764 0.000 0.000 0.000
Supply Scheme, Chak No. 160/9-L.
Approval Date 02.03.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal , Chichawatni

1590 981 Name of the Scheme Rehabilitation of Rural Water 0.000 5.345 3.459 0.000 2.688 0.000 0.000 0.000 2.688 2.688 0.000 0.000 0.000
Supply Scheme, Chak No. 8/11-L.
Approval Date 6.02.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal , Chichawatni

414
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1591 982 Name of the Scheme Rehabilitation of Rural Water 0.000 4.967 2.667 0.000 3.045 0.000 0.000 0.000 3.045 3.045 0.000 0.000 0.000
Supply Scheme, Chak No. 182/9-L.
Approval Date 02.03.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal , Chichawatni

1592 983 Name of the Scheme Rehabilitation of Rural Water 0.000 5.620 5.516 0.000 0.947 0.000 0.000 0.000 0.947 0.947 0.000 0.000 0.000
Supply Scheme, Chak No. 111/9-L.
Approval Date 6.2.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1593 984 Name of the Scheme Rehabilitation of Rural Water 0.000 18.000 5.037 0.000 15.663 0.000 0.000 0.000 15.663 15.663 0.000 0.000 0.000
Supply Scheme, Noor Shah
Approval Date 02.03.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1594 985 Name of the Scheme Rehabilitation of Rural Water 0.000 3.092 2.647 0.000 0.909 0.000 0.000 0.000 0.909 0.909 0.000 0.000 0.000
Supply Scheme, Chak No. 61/4-R.
Approval Date 6.2.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1595 986 Name of the Scheme Rehabilitation of Rural Water 0.000 6.879 6.879 0.000 1.032 0.000 0.000 0.000 1.032 1.032 0.000 0.000 0.000
Supply Scheme, Chak No. 115/9-L.
Approval Date 6.2.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

415
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1596 987 Name of the Scheme Rehabilitation of Rural Water 0.000 4.725 3.879 0.000 1.555 0.000 0.000 0.000 1.555 1.555 0.000 0.000 0.000
Supply Scheme, Chak No. 86/9-L.
Approval Date 6.02.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

1597 988 Name of the Scheme Rehabilitation of Rural Water 0.000 11.739 1.742 0.000 5.200 0.000 0.000 0.000 5.200 5.200 6.558 0.000 0.000
Supply Scheme, Chak No. 45/12-L.
Approval Date 02.03.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 51%
District and Tehsil Sahiwal , Chichawatni

1598 989 Name of the Scheme Rehabilitation of Rural Water 0.000 2.082 1.989 0.000 0.405 0.000 0.000 0.000 0.405 0.405 0.000 0.000 0.000
Supply Scheme, Kassowal.
Approval Date 6.2.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal , Chichawatni

1599 990 Name of the Scheme Comprehensive Rural Water 0.000 10.000 2.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 6.500 0.000 0.000
Supply Scheme, Chak No. 40/12-L
Approval Date Approved
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 43%
District and Tehsil Sahiwal

1600 991 Name of the Scheme Water Supply Scheme Chak 0.000 5.234 3.000 0.000 3.019 0.000 0.000 0.000 3.019 3.019 0.000 0.000 0.000
No.112/9-L Budhu Dakhu
Approval Date 6.2.09
Major Components T/well,P.House,P.Machinery, AC/PVC
pipe etc.
Major Targets 100%
District and Tehsil Sahiwal

416
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1601 992 Name of the Scheme Water Supply Scheme Chak 0.000 78.916 3.879 0.000 11.221 0.000 0.000 0.000 11.221 11.221 75.653 0.000 0.000
No.120/9-L Kameer
Approval Date 27.05.2009
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 17%
District and Tehsil Sahiwal

1602 993 Name of the Scheme Rural Water Supply & Drainage 0.000 15.000 2.000 0.000 7.200 0.000 0.000 0.000 7.200 7.200 8.050 0.000 0.000
Scheme Chak No.85/5-L
Approval Date Approved
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 53%
District and Tehsil Sahiwal

1603 994 Name of the Scheme Rural Water Supply Scheme, Chak 0.000 12.569 11.383 0.000 3.071 0.000 0.000 0.000 3.071 3.071 0.000 0.000 0.000
No.367/JB
Approval Date 31.01.07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1604 995 Name of the Scheme Rural Water Supply Scheme Chak 0.000 8.889 7.989 0.000 2.233 0.000 0.000 0.000 2.233 2.233 0.000 0.000 0.000
No.158/GB
Approval Date 31.01.07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1605 996 Name of the Scheme Rural Water Supply Scheme Chak 0.000 30.156 31.610 0.000 3.069 0.000 0.000 0.000 3.069 3.069 0.000 0.000 0.000
No.288& 289 & 339/GB(Kalan &
Khurd)
Approval Date 12.12.07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

417
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1606 997 Name of the Scheme Rural Water Supply Scheme Chak 0.000 20.795 22.936 0.000 0.978 0.000 0.000 0.000 0.978 0.978 0.000 0.000 0.000
No.408/JB & 305/GB
Approval Date 06.02.07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1607 998 Name of the Scheme Rural Water Supply Scheme Chak 0.000 14.349 16.490 0.000 0.011 0.000 0.000 0.000 0.011 0.011 0.000 0.000 0.000
No.314 & 315/GB
Approval Date 12.12.07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1608 999 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 13.051 11.500 0.000 3.509 0.000 0.000 0.000 3.509 3.509 0.000 0.000 0.000
No.302/GB Bhatti Chak
Approval Date 21.8.08
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1609 1000 Name of the Scheme Rural Water Supply Scheme,Chak 0.000 6.948 5.821 0.000 2.169 0.000 0.000 0.000 2.169 2.169 0.000 0.000 0.000
No.312/GB
Approval Date 2006-07
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1610 1001 Name of the Scheme Rehabilitation of Rural Water 0.000 10.805 8.498 0.000 3.928 0.000 0.000 0.000 3.928 3.928 0.000 0.000 0.000
Supply Scheme, 324/JB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

418
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1611 1002 Name of the Scheme Rehabilitation of Rural Water 0.000 4.917 3.936 0.000 1.719 0.000 0.000 0.000 1.719 1.719 0.000 0.000 0.000
Supply Scheme, 247/JB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1612 1003 Name of the Scheme Rehabilitation of Rural Water 0.000 2.171 1.252 0.000 1.245 0.000 0.000 0.000 1.245 1.245 0.000 0.000 0.000
Supply Scheme, 287/GB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1613 1004 Name of the Scheme Rehabilitation of Rural Water 0.000 5.199 4.467 0.000 1.512 0.000 0.000 0.000 1.512 1.512 0.000 0.000 0.000
Supply Scheme, 184/JB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1614 1005 Name of the Scheme Rehabilitation of Rural Water 0.000 10.175 7.967 0.000 3.734 0.000 0.000 0.000 3.734 3.734 0.000 0.000 0.000
Supply Scheme, Chak No. 691/33-
GB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh , Kamalia

1615 1006 Name of the Scheme Rehabilitation of Rural Water 0.000 10.607 8.200 0.000 3.998 0.000 0.000 0.000 3.998 3.998 0.000 0.000 0.000
Supply Scheme,Zeshan Colony
Kamalia
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh , Kamalia

419
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1616 1007 Name of the Scheme Rehabilitation of Rural Water 0.000 7.658 6.380 0.000 2.427 0.000 0.000 0.000 2.427 2.427 0.000 0.000 0.000
Supply Scheme, 700/42-GB.
Approval Date 9.2.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh , Kamalia

1617 1008 Name of the Scheme P.Laying Water Supply Pipeline i.e 0.000 3.698 3.698 0.000 0.555 0.000 0.000 0.000 0.555 0.555 0.000 0.000 0.000
Turbine at Chak No.318/JB
Approval Date 19.309
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1618 1009 Name of the Scheme P.Laying Water Supply Pipeline i.e 0.000 1.736 1.000 0.000 0.996 0.000 0.000 0.000 0.996 0.996 0.000 0.000 0.000
Turbine at Chak No.392/JB Gurd
Chitala
Approval Date 19.3.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1619 1010 Name of the Scheme P.Laying Water Supply Pipeline i.e 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Turbine at Chak No.327/JB Bhalair
Nai Abadi
Approval Date 19.309
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1620 1011 Name of the Scheme Rehabilitation of Rural Water 0.000 2.389 2.145 0.000 0.602 0.000 0.000 0.000 0.602 0.602 0.000 0.000 0.000
Supply Scheme Chak No.334/GB
Rajuwal (Phase-I).
Approval Date 19.3.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

420
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1621 1012 Name of the Scheme Rehabilitation of Rural Water 0.000 2.119 2.000 0.000 0.437 0.000 0.000 0.000 0.437 0.437 0.000 0.000 0.000
Supply Scheme Chak No.334/GB
Rajuwal (Phase-II).
Approval Date 19.3.09
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

1622 1013 Name of the Scheme Water Supply and Sewerage 0.000 28.188 21.019 0.000 9.248 0.000 0.000 0.000 9.248 9.248 0.000 0.000 0.000
Scheme,Chak No.187/EB(Gaggu)
Approval Date 21.8.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 93%
District and Tehsil Vehari , Burewala

1623 1014 Name of the Scheme Rehabilitation of Rural Water 0.000 1.944 1.944 0.000 0.292 0.000 0.000 0.000 0.292 0.292 0.000 0.000 0.000
Supply Scheme Chak No. 375/EB.
Approval Date Approved
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1624 1015 Name of the Scheme Rehabilitation of Rural Water 0.000 6.937 5.501 0.000 2.477 0.000 0.000 0.000 2.477 2.477 0.000 0.000 0.000
Supply Scheme Chak No. 199/EB
Approval Date 19.2.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1625 1016 Name of the Scheme Rehabilitation of Rural Water 0.000 1.605 1.605 0.000 0.241 0.000 0.000 0.000 0.241 0.241 0.000 0.000 0.000
Supply Scheme Chak No. 419/EB.
Approval Date Approved
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

421
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1626 1017 Name of the Scheme Rehabilitation of Rural Water 0.000 4.072 3.541 0.000 1.142 0.000 0.000 0.000 1.142 1.142 0.000 0.000 0.000
Supply Scheme Chak No. 325/EB.
Approval Date 19.2.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1627 1018 Name of the Scheme Rehabilitation of Rural Water 0.000 5.088 4.770 0.000 1.081 0.000 0.000 0.000 1.081 1.081 0.000 0.000 0.000
Supply Scheme Chak No.435 /EB.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1628 1019 Name of the Scheme Rehabilitation of Rural Water 0.000 3.090 3.090 0.000 0.464 0.000 0.000 0.000 0.464 0.464 0.000 0.000 0.000
Supply Scheme Dad kamera.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1629 1020 Name of the Scheme Rehabilitation of Rural Water 0.000 3.786 3.120 0.000 1.234 0.000 0.000 0.000 1.234 1.234 0.000 0.000 0.000
Supply Scheme, Doulatabad.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1630 1021 Name of the Scheme Rehabilitation of Rural Water 0.000 3.604 2.770 0.000 1.375 0.000 0.000 0.000 1.375 1.375 0.000 0.000 0.000
Supply Scheme, Sahuka.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

422
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1631 1022 Name of the Scheme Rehabilitation of Rural water 0.000 5.540 4.084 0.000 2.287 0.000 0.000 0.000 2.287 2.287 0.000 0.000 0.000
Supply Scheme Chak No. 497/EB.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari

1632 1023 Name of the Scheme Rehabilitation of Rural water 0.000 4.830 4.318 0.000 1.237 0.000 0.000 0.000 1.237 1.237 0.000 0.000 0.000
Supply Scheme Chak No. 537/EB.
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari

1633 1024 Name of the Scheme Rehabilitation of Rural water 0.000 5.531 4.996 0.000 1.365 0.000 0.000 0.000 1.365 1.365 0.000 0.000 0.000
Supply Scheme Chak No. 46/WB.
Approval Date 19.2.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari

1634 1025 Name of the Scheme Rehabilitation of Rural water 0.000 3.761 3.385 0.000 0.940 0.000 0.000 0.000 0.940 0.940 0.000 0.000 0.000
Supply Scheme Chak No. 76/WB.
Approval Date 19.2.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari

1635 1026 Name of the Scheme Rehabilitation of Rural water 0.000 6.595 6.595 0.000 0.989 0.000 0.000 0.000 0.989 0.989 0.000 0.000 0.000
Supply Scheme Umar Khichi
Approval Date 19.02.09
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

423
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1636 1027 Name of the Scheme Rural Water Supply and Drainage 0.000 6.521 6.521 0.000 0.978 0.000 0.000 0.000 0.978 0.978 0.000 0.000 0.000
Scheme Chak No.247/EB.
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1637 1028 Name of the Scheme Rural Water Supply and Drainage 0.000 32.180 11.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 16.007 0.000 0.000
Scheme Chak No.175/EB & 365/EB
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 57%
District and Tehsil Vehari , Burewala

1638 1029 Name of the Scheme Rural Water Supply and Drainage 0.000 4.257 4.257 0.000 0.639 0.000 0.000 0.000 0.639 0.639 0.000 0.000 0.000
Scheme Chak No.375/EB.
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

1639 1030 Name of the Scheme Rural Water Supply and Drainage 0.000 17.520 7.700 0.000 6.200 0.000 0.000 0.000 6.200 6.200 6.248 0.000 0.000
Scheme Chak No.377/EB.
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 69%
District and Tehsil Vehari , Burewala

1640 1031 Name of the Scheme Rural Water Supply and Drainage 0.000 5.423 5.423 0.000 0.813 0.000 0.000 0.000 0.813 0.813 0.000 0.000 0.000
Scheme Chak No.401/EB.
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

424
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1641 1032 Name of the Scheme Rural Water Supply and Drainage 0.000 5.099 5.099 0.000 0.765 0.000 0.000 0.000 0.765 0.765 0.000 0.000 0.000
Scheme Chak No.407/EB.
Approval Date 12.12.08
Major Components T.well,P.House,D/system,OHR etc.
Major Targets 100%
District and Tehsil Vehari , Burewala

Sub-Total: Rural Water Supply 0.000 5,892.163 3,210.915 0.000 1,875.863 0.000 0.000 0.000 1,875.863 1,875.863 1,608.754 83.924 0.000

Rural Sewerage Drainage


1642 1033 Name of the Scheme Rural Drainage Scheme Kamrial 0.000 40.220 34.193 0.000 4.000 0.000 0.000 0.000 4.000 4.000 8.060 0.000 0.000
(Revised)
Approval Date 26-01-2008
Major Components Sewer System and disposal work etc.
Major Targets 85%
District and Tehsil Attock

1643 1034 Name of the Scheme Rural Drainage Scheme Formali 0.000 15.630 17.288 0.000 0.686 0.000 0.000 0.000 0.686 0.686 0.000 0.000 0.000
Approval Date 5/3/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1644 1035 Name of the Scheme Rural Drainage Scheme Malowala 0.000 9.083 8.975 0.000 1.470 0.000 0.000 0.000 1.470 1.470 0.000 0.000 0.000
(Revised)
Approval Date 5/3/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1645 1036 Name of the Scheme Rural Drainage Scheme Malak 0.000 9.970 6.150 0.000 5.316 0.000 0.000 0.000 5.316 5.316 0.000 0.000 0.000
Mala
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

425
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1646 1037 Name of the Scheme Rural Drainage Scheme Sheinka 0.000 29.900 21.273 0.000 4.000 0.000 0.000 0.000 4.000 4.000 9.112 0.000 0.000
(Revised)
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 74%
District and Tehsil Attock

1647 1038 Name of the Scheme Rural Drainage Scheme Jalalia 0.000 12.348 6.474 0.000 4.000 0.000 0.000 0.000 4.000 4.000 3.726 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 81%
District and Tehsil Attock

1648 1039 Name of the Scheme Rural Drainage Scheme Moman 0.000 9.899 4.377 0.000 5.000 0.000 0.000 0.000 5.000 5.000 2.007 0.000 0.000
Pur
Approval Date 13-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 82%
District and Tehsil Attock

1649 1040 Name of the Scheme Sewerage Scheme Pindi Gheb 0.000 28.432 7.500 0.000 6.000 0.000 0.000 0.000 6.000 6.000 19.197 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 41%
District and Tehsil Attock

1650 1041 Name of the Scheme Rural Drainage Scheme Dhoke 0.000 8.250 6.820 0.000 2.668 0.000 0.000 0.000 2.668 2.668 0.000 0.000 0.000
Sukhwal
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1651 1042 Name of the Scheme Rural Drainage Scheme Ahmdal 0.000 11.320 10.700 0.000 2.318 0.000 0.000 0.000 2.318 2.318 0.000 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

426
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1652 1043 Name of the Scheme Rural Drainage Scheme 0.000 15.000 5.699 0.000 4.000 0.000 0.000 0.000 4.000 4.000 7.551 0.000 0.000
Ghurghushti
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 56%
District and Tehsil Attock

1653 1044 Name of the Scheme Rural Drainage Scheme Sirka 0.000 9.377 5.699 0.000 3.000 0.000 0.000 0.000 3.000 3.000 2.085 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 81%
District and Tehsil Attock

1654 1045 Name of the Scheme Rural Drainage Scheme Shadi 0.000 7.860 6.481 0.000 3.500 0.000 0.000 0.000 3.500 3.500 0.000 0.000 0.000
Khan
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 110%
District and Tehsil Attock

1655 1046 Name of the Scheme Rural Drainage Scheme Waisa 0.000 14.590 6.299 0.000 5.000 0.000 0.000 0.000 5.000 5.000 5.480 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 67%
District and Tehsil Attock

1656 1047 Name of the Scheme Rural Drainage Scheme Kamalpur 0.000 7.134 7.199 0.000 1.005 0.000 0.000 0.000 1.005 1.005 0.000 0.000 0.000
Musa
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1657 1048 Name of the Scheme Rural Drainage Scheme Pithi Pirzai 0.000 8.738 6.220 0.000 3.829 0.000 0.000 0.000 3.829 3.829 0.000 0.000 0.000
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

427
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1658 1049 Name of the Scheme Rural Drainage Scheme Saleem 0.000 2.023 2.023 0.000 0.303 0.000 0.000 0.000 0.303 0.303 0.000 0.000 0.000
Khan, Tehsil Hazro
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1659 1050 Name of the Scheme Rural Drainage Scheme Muraaria 0.000 2.031 2.031 0.000 0.305 0.000 0.000 0.000 0.305 0.305 0.000 0.000 0.000
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1660 1051 Name of the Scheme Rural Drainage Scheme Randak 0.000 0.949 0.949 0.000 0.142 0.000 0.000 0.000 0.142 0.142 0.000 0.000 0.000
Tehsil Hazro
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1661 1052 Name of the Scheme Rural Drainage Scheme Haroon i/c 0.000 8.788 3.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.106 0.000 0.000
Ada Pzai, Ababakar, Daman,
Kamal Pur Alam, Mullan Kalan
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 59%
District and Tehsil Attock

1662 1053 Name of the Scheme Rural Drainage Scheme Yasin i/c 0.000 6.621 3.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.614 0.000 0.000
Village Asghar
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 66%
District and Tehsil Attock

428
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1663 1054 Name of the Scheme Rural Drainage Scheme Khura 0.000 6.116 3.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.033 0.000 0.000
Khel, i/c village Ghari Matani,
Tehsil Hazro, Distt. Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 71%
District and Tehsil Attock

1664 1055 Name of the Scheme Rural Drainage Scheme Tajak, i/c 0.000 14.480 3.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 11.652 0.000 0.000
Lundi Awan Abad Noor Pur,
Rangoo Tehsil Hazro, Distt: Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Attock

1665 1056 Name of the Scheme Rural Drainage Scheme Shamas 0.000 8.164 3.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 3.389 0.000 0.000
Abad, i/c Village Shah Taja Baja
Weru, Saba Kamala, Tehsil Hazro,
Distt. Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 64%
District and Tehsil Attock

1666 1057 Name of the Scheme Rural Drainage Scheme Kalu 0.000 4.600 3.000 0.000 2.290 0.000 0.000 0.000 2.290 2.290 0.000 0.000 0.000
Kotha, i/c village Basia, Tehsil
Hazro, Distt. Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Attock

1667 1058 Name of the Scheme Rural Drainage Scheme Hameed, 0.000 12.567 3.000 0.000 2.300 0.000 0.000 0.000 2.300 2.300 9.152 0.000 0.000
Tehsil Hazo Distt. Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 37%
District and Tehsil Attock

429
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1668 1059 Name of the Scheme Rural Drainage Scheme Musa, i/c 0.000 14.480 3.000 0.000 3.900 0.000 0.000 0.000 3.900 3.900 9.752 0.000 0.000
village Musa Kudlathi, Chachian
(P), Tehsil, Hazro Distt: Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 41%
District and Tehsil Attock

1669 1060 Name of the Scheme Rural Drainage Scheme Bahadur 0.000 7.038 3.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 2.094 0.000 0.000
Khan, i/c village Jatial Chachian,
TehsilHazro, Distt. Attock
Approval Date 11/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 74%
District and Tehsil Attock

1670 1061 Name of the Scheme Construction of PCC & Drain Type- 0.000 1.884 1.884 0.000 0.283 0.000 0.000 0.000 0.283 0.283 0.000 0.000 0.000
I in Mohallah Islam Nagar, Tehsil
Darya Khan
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Bhakkar

1671 1062 Name of the Scheme Construction of Soling & Drain at 0.000 2.550 2.550 0.000 0.383 0.000 0.000 0.000 0.383 0.383 0.000 0.000 0.000
Hetoo, Tehsil Kallurkot
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Bhakkar

1672 1063 Name of the Scheme Soling & Drains in left over area in 0.000 3.451 3.451 0.000 0.518 0.000 0.000 0.000 0.518 0.518 0.000 0.000 0.000
Dully Wala, Tehsil Darya Khan
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Bhakkar

430
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1673 1064 Name of the Scheme Soling & Drains in left over area in 0.000 3.017 3.017 0.000 0.453 0.000 0.000 0.000 0.453 0.453 0.000 0.000 0.000
Jandan Wala Tehsil Kallurkot
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Bhakkar

1674 1065 Name of the Scheme Rural Drainage Scheme Bekhan 0.000 5.726 1.112 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.473 0.000 0.000
Bodla.
Approval Date 2.2.09
Major Components T.Well,R.Main,D.System and allied works
etc.
Major Targets 47%
District and Tehsil Bahawalnagar , minchan abad

1675 1066 Name of the Scheme Construction of Drainage Scheme, 0.000 1.200 0.700 0.000 0.680 0.000 0.000 0.000 0.680 0.680 0.000 0.000 0.000
Bhindi Noor Sial.
Approval Date 2006-07
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur

1676 1067 Name of the Scheme Rural Drainage Scheme,Chak 0.000 3.348 3.033 0.000 0.817 0.000 0.000 0.000 0.817 0.817 0.000 0.000 0.000
No.33/DNB
Approval Date 2006-07
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur

1677 1068 Name of the Scheme Rural Drainage Scheme, 0.000 0.600 0.400 0.000 0.290 0.000 0.000 0.000 0.290 0.290 0.000 0.000 0.000
Manzoorabad Mouza Qaimpur
Approval Date 2006-07
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur

431
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1678 1069 Name of the Scheme Rural Drainage Scheme,Chak 0.000 5.970 3.975 0.000 2.891 0.000 0.000 0.000 2.891 2.891 0.000 0.000 0.000
No.48/DB
Approval Date 05.03.07
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur , Yazman

1679 1070 Name of the Scheme Rural Drainage Scheme,Chak 0.000 5.740 4.874 0.000 1.727 0.000 0.000 0.000 1.727 1.727 0.000 0.000 0.000
No.116/DNB
Approval Date 03.08.05
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur , Yazman

1680 1071 Name of the Scheme Rural Drainage Scheme,Chak 0.000 4.222 3.975 0.000 0.880 0.000 0.000 0.000 0.880 0.880 0.000 0.000 0.000
No.58/DB
Approval Date 08.03.07
Major Components Drains,Disposal work and other works.
Major Targets 100%
District and Tehsil Bahawalpur , Yazman

1681 1072 Name of the Scheme Construction of Streets, Soling 0.000 3.500 0.992 0.000 3.033 0.000 0.000 0.000 3.033 3.033 0.000 0.000 0.000
and Drains in Union Council Chak
Ramdas
Approval Date 31-01-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1682 1073 Name of the Scheme Construction of Streets, Soling 0.000 9.859 2.961 0.000 1.064 0.000 0.000 0.000 1.064 1.064 7.313 0.000 0.000
and Drains in Union Council
Dhensar Pain (Revised)
Approval Date 27-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 36%
District and Tehsil Gujranwala

432
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1683 1074 Name of the Scheme Construction of PCC Streets & 0.000 22.686 2.731 0.000 1.510 0.000 0.000 0.000 1.510 1.510 21.848 0.000 0.000
Drain Shanke (Revised)
Approval Date 7/3/2007
Major Components Sewer System and disposal work etc.
Major Targets 16%
District and Tehsil Gujranwala

1684 1075 Name of the Scheme Construction of Streets and 0.000 64.207 20.192 0.000 2.000 0.000 0.000 0.000 2.000 2.000 51.646 0.000 0.000
drains at Linepar Tibba Kamoke
(Revised)
Approval Date 27-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Gujranwala

1685 1076 Name of the Scheme Rural Drainage Scheme Union 0.000 7.365 0.826 0.000 0.899 0.000 0.000 0.000 0.899 0.899 6.745 0.000 0.000
Council Ferozewala, Chak Joyia &
Pandoo Pur (Revised)
Approval Date 27-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 20%
District and Tehsil Gujranwala

1686 1077 Name of the Scheme Rural Drainage Scheme Union 0.000 3.500 3.515 0.000 0.510 0.000 0.000 0.000 0.510 0.510 0.000 0.000 0.000
Council Kali Suba including
Thatha Rao, Panama Kala
Bootawali Nath, Ladher, Sahib,
Tawang Up / Bucha.
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

433
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1687 1078 Name of the Scheme Rural Drainage Scheme Union 0.000 1.500 1.567 0.000 0.158 0.000 0.000 0.000 0.158 0.158 0.000 0.000 0.000
Council Gunaour including
Gunaour, Pull Shah Dohalla &
Rujhan Wali
Approval Date 16-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1688 1079 Name of the Scheme Rural Drainage Scheme Union 0.000 3.000 3.021 0.000 0.429 0.000 0.000 0.000 0.429 0.429 0.000 0.000 0.000
Council Sohawa Dhiluwan
including Sohawa & Jabo,
Sahiboke Dhandian, Kulo Kalan &
Khurd, Kotli Maqbara & Shahdi
Mata, Ghari, Rustampur, Dhera
Jamuian & Gorali
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1689 1080 Name of the Scheme Rural Drainage Scheme Mauza 0.000 6.000 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.400 0.000 0.000
Gondlanwala
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 65%
District and Tehsil Gujranwala

1690 1081 Name of the Scheme Construction of Sewerage, 0.000 57.074 16.169 0.000 1.000 0.000 0.000 0.000 1.000 1.000 48.466 0.000 0.000
Drainage & Soling at Kalaske
(Revised)
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 26%
District and Tehsil Gujranwala

434
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1691 1082 Name of the Scheme Ext: Rural Drainage Scheme 0.000 19.375 5.710 0.000 1.525 0.000 0.000 0.000 1.525 1.525 15.046 0.000 0.000
Nokhar (Revised)
Approval Date 11/12/2006
Major Components Sewer System and disposal work etc.
Major Targets 32%
District and Tehsil Gujranwala

1692 1083 Name of the Scheme Const: of Nullah both sides Bazar 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
No. 4 Gulberg Colony
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1693 1084 Name of the Scheme Const: of PCC Sewerage Main 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Baza Qila Sunder Singh including
branches
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1694 1085 Name of the Scheme Const: of PCC Sewerage Bazar 0.000 1.800 1.800 0.000 0.270 0.000 0.000 0.000 0.270 0.270 0.000 0.000 0.000
Captain Anwar Wala Abu Bakkar
Park
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1695 1086 Name of the Scheme Const: of PCC Sewerage Bazar 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Gogay Numberdar Wala Khiali
Shahpur
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

435
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1696 1087 Name of the Scheme Const: of PCC Sewerage Gali 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Shafi School Mohallah Pir Qasim
Ali Shah
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1697 1088 Name of the Scheme Const: of PCC Sewerage Bazar 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
No. 1 Ajmal Town
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1698 1089 Name of the Scheme Const: of PCC Sewerage Gallah 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Bhabey Patwari Wala, Gulberg
Colony Noshera Road
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1699 1090 Name of the Scheme Laying of Sewerage line near 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Thana Jinnah Road Ibrahim Park
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1700 1091 Name of the Scheme Const: of Sewerage More 0.000 10.000 5.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.500 0.000 0.000
Aminabad Gazni
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 61%
District and Tehsil Gujranwala

436
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1701 1092 Name of the Scheme Rural Drainage Scheme 0.000 5.540 4.000 0.000 2.371 0.000 0.000 0.000 2.371 2.371 0.000 0.000 0.000
Hambokey and Make Wali
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1702 1093 Name of the Scheme Rural Drainage Scheme Nitherkey 0.000 3.236 3.241 0.000 0.480 0.000 0.000 0.000 0.480 0.480 0.000 0.000 0.000
and Adjoining Abadies
Approval Date 7/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Gujranwala

1703 1094 Name of the Scheme Construction of Sewerage 18" dia 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Qazafi Road, Garjakh
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1704 1095 Name of the Scheme Construction of Sewerage 12" dia 0.000 0.567 0.500 0.000 0.152 0.000 0.000 0.000 0.152 0.152 0.000 0.000 0.000
Galu Mehar Shehzad to Chowk
Juma Dukandar Garjakh
Approval Date 18-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1705 1096 Name of the Scheme Construction of PCC and 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Sewerage Riaz Bhatti Chouncillor
Road Afzal Abad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

437
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1706 1097 Name of the Scheme Construction of PCC and 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Sewerage Azam Chowk Ratty
Road Dhullay Sauued Pak Bazar
to Chowk Hameed Shaheen
Approval Date 18-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1707 1098 Name of the Scheme Sewerage of Liaqat road to Khota 0.000 8.000 8.000 0.000 1.200 0.000 0.000 0.000 1.200 1.200 0.000 0.000 0.000
Pully Jinnah Road Gujranwala
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1708 1099 Name of the Scheme Construction of Sewerage 18" dia 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
with Islam Wala Gallah Gorjakh
Approval Date 18-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1709 1100 Name of the Scheme Cnstruction of Seweage , 0.000 47.600 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 48.740 0.000 0.000
Drainage, PCC Streets Madokhalil
Bhakerewali Kalan Khurd
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Gujranwala

438
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1710 1101 Name of the Scheme Cnstruction of Seweage , 0.000 40.147 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 41.169 0.000 0.000
Drainage, PCC Streets Uggo Chak
Haiger Deorian
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Gujranwala

1711 1102 Name of the Scheme Cnstruction of Seweage , 0.000 53.008 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 53.459 0.000 0.000
Drainage, PCC Streets
ManJhugian Khabeke Kotli
Raitwali Peero Kot
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 12%
District and Tehsil Gujranwala

1712 1103 Name of the Scheme Cnstruction of Seweage , 0.000 47.779 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 49.346 0.000 0.000
Drainage, PCC Streets Botala
Janda Singh Khaliqpur Bajomill
Nat sill Behladpur
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 10%
District and Tehsil Gujranwala

1713 1104 Name of the Scheme Cnstruction of Seweage , 0.000 39.783 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 40.550 0.000 0.000
Drainage, PCC Streets
Bhawanedas Landha Tarugha
Dhendsay Nawan Pind
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 11%
District and Tehsil Gujranwala

439
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1714 1105 Name of the Scheme Rehab:/Imp: & Extension of 0.000 40.766 19.098 0.000 2.865 0.000 0.000 0.000 2.865 2.865 24.918 0.000 0.000
Drainage Scheme Talwandi Musa
Khan
Approval Date 27-04-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 47%
District and Tehsil Gujranwala

1715 1106 Name of the Scheme Sewerage Scheme Deganwali 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Dullay
Approval Date 18-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1716 1107 Name of the Scheme Sewerage/Drainage Scheme 0.000 4.467 4.467 0.000 0.670 0.000 0.000 0.000 0.670 0.670 0.000 0.000 0.000
Mohallah Kangni Wala
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1717 1108 Name of the Scheme Sewerage/Drainage Scheme 0.000 4.490 4.490 0.000 0.674 0.000 0.000 0.000 0.674 0.674 0.000 0.000 0.000
Shahbaz Colony
Approval Date 7/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1718 1109 Name of the Scheme Construction of Nullah Grave Yard 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
G.T Road to Master Tiles Chianwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

440
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1719 1110 Name of the Scheme Construction of Rural Drainage 0.000 4.000 3.000 0.000 1.600 0.000 0.000 0.000 1.600 1.600 0.000 0.000 0.000
Scheme Faiz Town and Sharif
Pura Kamoke
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1720 1111 Name of the Scheme Construction of Rural Drainage 0.000 4.000 2.800 0.000 1.800 0.000 0.000 0.000 1.800 1.800 0.000 0.000 0.000
Scheme Salamat Pura Rasool
Nagar Kamoke
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1721 1112 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Tatlay Wali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1722 1113 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Baddo Ratta
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1723 1114 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Baigpur
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

441
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1724 1115 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Germula Virkan
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1725 1116 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Ghumman Wala
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1726 1117 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
MattoBlaike
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1727 1118 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Daburgi Virkan
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1728 1119 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Mohar Qasim Pur
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

442
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1729 1120 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Marri Bhindran
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1730 1121 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Bhadday
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1731 1122 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Karyal Kalan
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1732 1123 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Khan Musliman
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1733 1124 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Abid Abad
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

443
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1734 1125 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Pilthi Pur
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1735 1126 Name of the Scheme Rural Drainage Scheme & PCC at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Challay Key
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1736 1127 Name of the Scheme Rural Drainage Scheme Noshera 0.000 2.000 0.300 0.000 2.000 0.000 0.000 0.000 2.000 2.000 0.000 0.000 0.000
Virkan
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1737 1128 Name of the Scheme Rural Drainage Scheme Jagu Wala 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1738 1129 Name of the Scheme Rural Drainage Scheme Gamuwala 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

444
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1739 1130 Name of the Scheme Rural Drainage Scheme Buduratta 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1740 1131 Name of the Scheme Rural Drainage Scheme Budha 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Gorayya
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1741 1132 Name of the Scheme Rural Drainage Scheme Naiwala 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1742 1133 Name of the Scheme Rural Drainage Scheme Noiwala 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1743 1134 Name of the Scheme Rural Drainage Scheme 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Sadmanwali
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

445
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1744 1135 Name of the Scheme Rural Drainage Scheme 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Ghumanwala
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1745 1136 Name of the Scheme Rural Drainage Scheme Marikhrd 0.000 1.000 0.200 0.000 0.950 0.000 0.000 0.000 0.950 0.950 0.000 0.000 0.000
Approval Date 7/5/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujranwala

1746 1137 Name of the Scheme Ext Rural Drainage Scheme 0.000 4.776 1.904 0.000 3.588 0.000 0.000 0.000 3.588 3.588 0.000 0.000 0.000
Langay
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1747 1138 Name of the Scheme Rural Drainage Scheme 0.000 3.986 1.765 0.000 2.819 0.000 0.000 0.000 2.819 2.819 0.000 0.000 0.000
Kojianwala
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

446
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1748 1139 Name of the Scheme Construction of Storm Water drain 0.000 117.430 90.823 0.000 4.000 0.000 0.000 0.000 4.000 4.000 15.000 25.222 0.000
along both sides of G.T.Road from
Service More to Sargodha Road
Chowk and from Sargodha Road
Chowk to Village Khatala (South
West side of G.T.Road)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 70%
District and Tehsil Gujrat

1749 1140 Name of the Scheme Rehabilitation of Nullah Shah 0.000 51.629 45.386 0.000 3.000 0.000 0.000 0.000 3.000 3.000 10.987 0.000 0.000
Hussain and Nullah Chah Tarang
upto Ram Talai Chowk (Revised)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 81%
District and Tehsil Gujrat

1750 1141 Name of the Scheme RDS Mandeer, Malikpur Jandawala 0.000 1.017 0.262 0.000 0.908 0.000 0.000 0.000 0.908 0.908 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Gujrat

1751 1142 Name of the Scheme Rural Sewerage Scheme Chak 0.000 5.649 5.645 0.000 0.851 0.000 0.000 0.000 0.851 0.851 0.000 0.000 0.000
Bhatti
Approval Date 16-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

447
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1752 1143 Name of the Scheme Extension Rural Drainage Scheme 0.000 11.782 10.500 0.000 3.049 0.000 0.000 0.000 3.049 3.049 0.000 0.000 0.000
Badar Ali
Approval Date 16-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1753 1144 Name of the Scheme Rural Drainage Scheme Hinduana 0.000 11.586 10.000 0.000 3.324 0.000 0.000 0.000 3.324 3.324 0.000 0.000 0.000
Approval Date 16-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1754 1145 Name of the Scheme Rural Drainage Scheme 0.000 13.939 13.999 0.000 2.031 0.000 0.000 0.000 2.031 2.031 0.000 0.000 0.000
Alaoudinke
Approval Date 19-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1755 1146 Name of the Scheme Uraban Drainage Scheme Pindi 0.000 30.000 30.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.500 0.000 0.000
Bhattian
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 93%
District and Tehsil Hafizabad

1756 1147 Name of the Scheme Urban Drainage Scheme Sukheke 0.000 20.000 20.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 0.000 0.000 0.000
Town
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

448
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1757 1148 Name of the Scheme Construction of Nullah and 0.000 5.300 5.300 0.000 0.795 0.000 0.000 0.000 0.795 0.795 0.000 0.000 0.000
Sewerage Mangot Road Hafizabad
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1758 1149 Name of the Scheme Construction of fully covered 0.000 7.000 4.550 0.000 3.500 0.000 0.000 0.000 3.500 3.500 0.000 0.000 0.000
Nullah alongwith Mangtan Wala
Road Jalalpur Bhattian
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1759 1150 Name of the Scheme Construction of Nullah From 0.000 2.982 2.982 0.000 0.447 0.000 0.000 0.000 0.447 0.447 0.000 0.000 0.000
Kassesay Road by-pass to Naya
Adda Jalalpur
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1760 1151 Name of the Scheme Construction of Nullah Do-Abna 0.000 0.800 0.010 0.000 0.910 0.000 0.000 0.000 0.910 0.910 0.000 0.000 0.000
Rice Mills to Saim Nullah Near
EDO(H) Office, Hafizabad
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1761 1152 Name of the Scheme Rural Drainage Scheme Bhoon 0.000 5.000 0.010 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.740 0.000 0.000
Khurd
Approval Date Approved
Major Components Drainage System etc.
Major Targets 18%
District and Tehsil Hafizabad

449
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1762 1153 Name of the Scheme Construction of Nullah, Village 0.000 0.300 0.010 0.000 0.335 0.000 0.000 0.000 0.335 0.335 0.000 0.000 0.000
Pindi Wala
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1763 1154 Name of the Scheme Construction of Nullah, Ghanian 0.000 0.400 0.010 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Wala
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1764 1155 Name of the Scheme Construction of Nullah, Wachoki 0.000 0.400 0.010 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Khurd
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1765 1156 Name of the Scheme Construction of Nullah, Muhhala 0.000 0.400 0.010 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Kareem Pur, Hafizabad
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

1766 1157 Name of the Scheme Construction of Nullah and 0.000 0.200 0.010 0.000 0.220 0.000 0.000 0.000 0.220 0.220 0.000 0.000 0.000
Sewerage Hussain Town,
Hafizabad
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Hafizabad

450
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1767 1158 Name of the Scheme Rural Drainage Scheme Pinanwal 0.000 7.417 7.345 0.000 1.185 0.000 0.000 0.000 1.185 1.185 0.000 0.000 0.000
Approval Date 21-05-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1768 1159 Name of the Scheme Rural Drainage Scheme Kala Dave 0.000 3.212 3.478 0.000 0.216 0.000 0.000 0.000 0.216 0.216 0.000 0.000 0.000
Approval Date 16-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1769 1160 Name of the Scheme Rural Drainage Scheme Mohra 0.000 3.205 3.486 0.000 0.200 0.000 0.000 0.000 0.200 0.200 0.000 0.000 0.000
Roshan
Approval Date 16-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1770 1161 Name of the Scheme Rural Drainage Scheme Surg Dhan 0.000 2.306 2.424 0.000 0.228 0.000 0.000 0.000 0.228 0.228 0.000 0.000 0.000
Approval Date 16-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1771 1162 Name of the Scheme Rural Drainage Scheme Diali 0.000 6.732 7.346 0.000 0.396 0.000 0.000 0.000 0.396 0.396 0.000 0.000 0.000
Langer, Bakhral Rakha, Dhamail
Approval Date 18-05-007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1772 1163 Name of the Scheme Rural Drainage Scheme Guraha 0.000 1.957 2.160 0.000 0.091 0.000 0.000 0.000 0.091 0.091 0.000 0.000 0.000
Utam Singh
Approval Date 18-05-007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

451
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1773 1164 Name of the Scheme Rural Drainage Scheme Domeli 0.000 2.100 2.246 0.000 0.169 0.000 0.000 0.000 0.169 0.169 0.000 0.000 0.000
Approval Date 18-05-007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Jhelum

1774 1165 Name of the Scheme Rural Drainage Scheme Dharyala 0.000 5.276 2.410 0.000 2.000 0.000 0.000 0.000 2.000 2.000 1.657 0.000 0.000
Jalip
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 73%
District and Tehsil Jhelum

1775 1166 Name of the Scheme Drainage Scheme Mouza Jala Pur 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Sharif
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1776 1167 Name of the Scheme Drainage Scheme Pindi Said Pur 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1777 1168 Name of the Scheme Soling from Dera Raja Lehrasib 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Khan to Dera Hayat Khan Raja
Pinawal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

452
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1778 1169 Name of the Scheme Drainage Scheme Darayala Jalip 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1779 1170 Name of the Scheme Drainage Scheme Mouza Saroba 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
(Graveyard Street)
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1780 1171 Name of the Scheme Drainage Scheme Mouza Toba 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1781 1172 Name of the Scheme Drainage for Dhudi Phaphra 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Gharibwal and Samanwal
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

1782 1173 Name of the Scheme Drainage Scheme for Mouza Lilla 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
and Street Asad Bashir Ullah
Approval Date Approved
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Jhelum

453
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1783 1174 Name of the Scheme Rural Drainage Scheme Khara 0.000 21.764 10.301 0.000 1.500 0.000 0.000 0.000 1.500 1.500 13.228 0.000 0.000
(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 47%
District and Tehsil Kasur

1784 1175 Name of the Scheme Rural Drainage Scheme Adjoining 0.000 8.569 8.353 0.000 1.501 0.000 0.000 0.000 1.501 1.501 0.000 0.000 0.000
Abadies Bhambah
Approval Date 25-11-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1785 1176 Name of the Scheme Extension Sewerage / Drainage 0.000 67.600 25.978 0.000 3.000 0.000 0.000 0.000 3.000 3.000 15.000 33.762 0.000
Scheme Theing More (Ellahabad)
Approval Date 26-02-2007
Major Components Sewer System and disposal work etc.
Major Targets 37%
District and Tehsil Kasur

1786 1177 Name of the Scheme Rural Drainage Scheme Saad 0.000 22.000 10.732 0.000 1.317 0.000 0.000 0.000 1.317 1.317 13.251 0.000 0.000
(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 48%
District and Tehsil Kasur

1787 1178 Name of the Scheme Rural Drainage Scheme Gaggar 0.000 29.000 8.735 0.000 3.000 0.000 0.000 0.000 3.000 3.000 21.615 0.000 0.000
(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 35%
District and Tehsil Kasur

454
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1788 1179 Name of the Scheme Construction of Drains and PCC 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Street between Dhodhoo Chak
and Soodan
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1789 1180 Name of the Scheme Construction of Drains and PCC 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Street in Maingra UC Tola
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1790 1181 Name of the Scheme Construction of Drains and PCC 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Street Walipur Boora Graveyard
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1791 1182 Name of the Scheme Construction of Drains and PCC 0.000 0.800 0.100 0.000 0.820 0.000 0.000 0.000 0.820 0.820 0.000 0.000 0.000
Street Motey (Northren Side), UC
Gumtala
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1792 1183 Name of the Scheme Construction of Nullah and 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Sanitation Abad kot Manga Kot
Massu UC Mundaki
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

455
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1793 1184 Name of the Scheme Construction of Nullah and 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Sanitation Atari Karam Singh UC
Mola Pur
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1794 1185 Name of the Scheme Construction of Nullah and 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Sanitation Moqam UC Mojoki
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1795 1186 Name of the Scheme Construction of Nullah and 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Sanitation Darbar Sheikh Ilam Din
UC Jamsher Khurd
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1796 1187 Name of the Scheme Construction of Nullah and 0.000 1.000 0.100 0.000 1.050 0.000 0.000 0.000 1.050 1.050 0.000 0.000 0.000
Sanitation Arzani Pur UC
Bhaqewal
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1797 1188 Name of the Scheme Rural Drainage Scheme Sarhali 0.000 2.200 2.200 0.000 0.329 0.000 0.000 0.000 0.329 0.329 0.000 0.000 0.000
Khurd
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

456
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1798 1189 Name of the Scheme Rural Drainage Scheme 0.000 2.200 2.200 0.000 0.329 0.000 0.000 0.000 0.329 0.329 0.000 0.000 0.000
Chatianwala
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1799 1190 Name of the Scheme Rural Drainage Scheme Aroda 0.000 2.200 2.200 0.000 0.329 0.000 0.000 0.000 0.329 0.329 0.000 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1800 1191 Name of the Scheme Rural Drainage Scheme 0.000 2.200 2.200 0.000 0.329 0.000 0.000 0.000 0.329 0.329 0.000 0.000 0.000
Rayekalaan
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1801 1192 Name of the Scheme Rural Drainage Scheme Daftu 0.000 2.167 2.167 0.000 0.329 0.000 0.000 0.000 0.329 0.329 0.000 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Kasur

1802 1193 Name of the Scheme Rural Drainage Scheme Zafar Key 0.000 6.683 5.000 0.000 1.683 0.000 0.000 0.000 1.683 1.683 0.000 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 87%
District and Tehsil Kasur , Chunian

1803 1194 Name of the Scheme Rural Draiange Scheme Chak 0.000 8.300 5.785 0.000 2.000 0.000 0.000 0.000 2.000 2.000 1.760 0.000 0.000
No.67/15-L Distt: Khanewal.
Approval Date 16.1.09
Major Components Sewer System and disposal work etc.
Major Targets 82%
District and Tehsil Khanewal , Mian channu.

457
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1804 1195 Name of the Scheme Rural Drainage Scheme,Chak 0.000 21.118 2.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 19.286 0.000 0.000
No.80/10-R
Approval Date 16.2.09
Major Components Sewer System and disposal work etc.
Major Targets 21%
District and Tehsil Khanewal

1805 1196 Name of the Scheme Laying of Sewerage in Gali Bahai 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Arif Wali Faisal Town and Street
of Mr. Abdul Waheed Rubbaini
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1806 1197 Name of the Scheme Sewerage / Soling remaining 0.000 1.300 1.300 0.000 0.195 0.000 0.000 0.000 0.195 0.195 0.000 0.000 0.000
Street Mushtaq Colony Street of
Dr. Iqbal Faizabad Colony.
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1807 1198 Name of the Scheme Sewerage / Soling / Drains in 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Street of Shumai Basti
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1808 1199 Name of the Scheme Sewerage / Soling / Drains in 0.000 1.100 1.100 0.000 0.165 0.000 0.000 0.000 0.165 0.165 0.000 0.000 0.000
Abdullah Town & Ali Town
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

458
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1809 1200 Name of the Scheme Sewerage /Gali No.7 Ilam Din 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Colony
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1810 1201 Name of the Scheme Seweragen and PCC Link Street of 0.000 0.700 0.700 0.000 0.105 0.000 0.000 0.000 0.105 0.105 0.000 0.000 0.000
Khursheed Town and Shamspura
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1811 1202 Name of the Scheme Sewerage and Soling in Street of 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Sabzi Mandi Road
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1812 1203 Name of the Scheme Drains / Sewerage Chak No. 93/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1813 1204 Name of the Scheme Drains / Sewerage Chak No. 57/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

459
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1814 1205 Name of the Scheme Drains / Sewerage Chak No. 48/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1815 1206 Name of the Scheme Drains / Sewerage Chak No. 41- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
A/15-L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1816 1207 Name of the Scheme Drains / Sewerage Chak No. 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
127/15-L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1817 1208 Name of the Scheme Drains / Sewerage Allah Rakha 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Colony Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1818 1209 Name of the Scheme Drains / Sewerage Chak No. 45/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

460
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1819 1210 Name of the Scheme Drains / Sewerage Chak No. 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
121/15-L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1820 1211 Name of the Scheme Drains / Sewerage Chak No. 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
114/15-L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1821 1212 Name of the Scheme Drains / Sewerage Chak No. 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
117/15-L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1822 1213 Name of the Scheme Drains / Sewerage Chak No. 51/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1823 1214 Name of the Scheme Drains / Sewerage Chak No.94/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

461
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1824 1215 Name of the Scheme Drains / Sewerage Chak No. 53/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1825 1216 Name of the Scheme Drains / Sewerage Chak No. 56/15- 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
L Mian Channu
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Khanewal

1826 1217 Name of the Scheme Rural Drainage Scheme Manawan 0.000 15.000 7.000 0.000 4.500 0.000 0.000 0.000 4.500 4.500 5.750 0.000 0.000
G.T. Road Lahore
Approval Date 20-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 67%
District and Tehsil Lahore

1827 1218 Name of the Scheme Rural Drainage Scheme Lakho Dair 0.000 15.000 6.000 0.000 2.250 0.000 0.000 0.000 2.250 2.250 9.000 0.000 0.000
Approval Date 20-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 48%
District and Tehsil Lahore

1828 1219 Name of the Scheme Rural Drainage Scheme Rampura 0.000 10.000 7.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 0.000 0.000 0.000
Approval Date 20-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 87%
District and Tehsil Lahore

1829 1220 Name of the Scheme Rural Drainage Scheme Attoki 0.000 10.000 7.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 0.000 0.000 0.000
Awan
Approval Date 20-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 87%
District and Tehsil Lahore

462
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1830 1221 Name of the Scheme Rehabilitation & Improvement of 0.000 4.953 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.696 0.000 0.000
Sewerage Scheme Attoki Awan
Approval Date 28-08-2008
Major Components Sewer System and disposal work etc.
Major Targets 53%
District and Tehsil Lahore

1831 1222 Name of the Scheme Construction of Drainage Scheme 0.000 1.800 1.800 0.000 0.270 0.000 0.000 0.000 0.270 0.270 0.000 0.000 0.000
in Basti Lodhran Chak No.116-
A/TDA
Approval Date 24.02.09
Major Components RCC Sewer,Disposal Works, Force Main,
Drains,B/Pavements.etc
Major Targets 100%
District and Tehsil Layyah , Karor

1832 1223 Name of the Scheme Sewerage Drainage Scheme in 0.000 4.092 4.000 0.000 0.706 0.000 0.000 0.000 0.706 0.706 0.000 0.000 0.000
Rana Nagar.
Approval Date 24.02.09
Major Components RCC Sewer,Disposal Works, Force Main,
Drains,B/Pavements.etc
Major Targets 100%
District and Tehsil Layyah , Karor

1833 1224 Name of the Scheme Rural Sewerage Scheme,Lawyers 0.000 9.562 5.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 2.996 0.000 0.000
Colony, City Layyah.
Approval Date Approved
Major Components RCC Sewer,Disposal Works, Force Main,
Drains,B/Pavements.etc
Major Targets 73%
District and Tehsil Layyah

1834 1225 Name of the Scheme Sewerage Drainage Scheme in 0.000 8.593 8.000 0.000 1.882 0.000 0.000 0.000 1.882 1.882 0.000 0.000 0.000
Jaman Shah Fazal Shaheed and
Purana Jaman Shah.
Approval Date 24.02.09
Major Components RCC Sewer,Disposal Works, Force Main,
Drains,B/Pavements.etc
Major Targets 100%
District and Tehsil Layyah

463
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1835 1226 Name of the Scheme Sewerage Scheme for Pahar Pur 0.000 11.860 3.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 7.639 0.000 0.000
Scop: RCC Sewer, Disposal
Works, Pumping Machinery
Sullage Carrier and OHT Line)
Approval Date 24.02.09
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 44%
District and Tehsil Layyah

1836 1227 Name of the Scheme Sewerage /Drainage Scheme 0.000 45.421 5.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 15.000 28.234 0.000
Fateh Pur Town, Tehsil Karor,
Approval Date Approved
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 17%
District and Tehsil Layyah , Karor

1837 1228 Name of the Scheme Sewerage /Drainage Scheme Chak 0.000 10.232 5.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.767 0.000 0.000
Tibba Kalan, Tehsil Karor,
Approval Date Approved
Major Components Sewer lines, D/Stations,Sullage
Carrier,G.Sets etc.
Major Targets 59%
District and Tehsil Layyah , Karor

1838 1229 Name of the Scheme Construction of Drain & PCC Slab 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Talagang Road to Col. Anwar
House Muse Khel.
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1839 1230 Name of the Scheme Construction of Slab and Drain 0.000 5.000 2.095 0.000 2.000 0.000 0.000 0.000 2.000 2.000 1.655 0.000 0.000
Chah Miana,
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 71%
District and Tehsil Mianwali

464
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1840 1231 Name of the Scheme Construction of PCC Slab Mujahid 0.000 0.999 0.999 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Town alongwith Railway Line U.C.
Watta Khel.
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1841 1232 Name of the Scheme Construction of Drain & PCC Slab 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Dera Suian Wala Chavary
U.C.Wan Bachran.
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1842 1233 Name of the Scheme Construction of Sewerage & PCC 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Slab in Officer Colony , Mianwali.
Approval Date 11/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1843 1234 Name of the Scheme Construction of Slab in Yaroo 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Khel U.C.18
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1844 1235 Name of the Scheme Construction of Slab YQIS press 0.000 0.988 0.988 0.000 0.148 0.000 0.000 0.000 0.148 0.148 0.000 0.000 0.000
Street New Abadi Mianwali City.
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

465
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1845 1236 Name of the Scheme Construction of Drain & PCC Slab 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Street No.9 Mohallah Qadir Abad
U.C.16.
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1846 1237 Name of the Scheme Construction of Drain / Nallah 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Mohallah Yateem Khanaa Mosque
to Faiz Chowk Gali Mohallah
Yateem Khana
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1847 1238 Name of the Scheme Construction of Tuff Tiles soling 0.000 1.020 0.200 0.000 0.973 0.000 0.000 0.000 0.973 0.973 0.000 0.000 0.000
in Main Bazar Street Mianwali City
Approval Date 30-01-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1848 1239 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.467 0.010 0.000 0.527 0.000 0.000 0.000 0.527 0.527 0.000 0.000 0.000
at Gulmiri
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1849 1240 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.810 0.010 0.000 0.922 0.000 0.000 0.000 0.922 0.922 0.000 0.000 0.000
UC Abba Khel
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

466
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1850 1241 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.389 0.010 0.000 0.437 0.000 0.000 0.000 0.437 0.437 0.000 0.000 0.000
Qurban Khan Samandi Wala
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1851 1242 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.120 0.010 0.000 0.128 0.000 0.000 0.000 0.128 0.128 0.000 0.000 0.000
in Jamal Nasir Street UC No.15
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1852 1243 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.435 0.010 0.000 0.490 0.000 0.000 0.000 0.490 0.490 0.000 0.000 0.000
in Mohallah Ramzan Abad
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1853 1244 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.510 0.010 0.000 0.576 0.000 0.000 0.000 0.576 0.576 0.000 0.000 0.000
Aslam Khan Hathi Khel
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1854 1245 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.555 0.010 0.000 0.628 0.000 0.000 0.000 0.628 0.628 0.000 0.000 0.000
Hayat Abad UC 20 Yarcoo Khel
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

467
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1855 1246 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.398 0.010 0.000 0.448 0.000 0.000 0.000 0.448 0.448 0.000 0.000 0.000
Galli Mehr Khan Truck Adda
Mianwali
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1856 1247 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.512 0.010 0.000 0.579 0.000 0.000 0.000 0.579 0.579 0.000 0.000 0.000
Zia Ullah Master Shaheen Town
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1857 1248 Name of the Scheme Construction of Drain / PCC Slab 0.000 0.638 0.010 0.000 0.724 0.000 0.000 0.000 0.724 0.724 0.000 0.000 0.000
Galli Hafiz Mumtaz Musa Khel
Approval Date 6/5/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1858 1249 Name of the Scheme Construction of PCC Slab Dera 0.000 0.500 0.500 0.000 0.100 0.000 0.000 0.000 0.100 0.100 0.000 0.000 0.000
Sultan Wala Chandni UC Wan
Cachran
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 104%
District and Tehsil Mianwali

1859 1250 Name of the Scheme Construction of Slab Yaroo Khel 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
UC No.19
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

468
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1860 1251 Name of the Scheme Construction of Slab in near 0.000 0.923 0.923 0.000 0.138 0.000 0.000 0.000 0.138 0.138 0.000 0.000 0.000
Faizzn-e-Madina new Abadi UC 15
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mianwali

1861 1252 Name of the Scheme Construction of Drain / Nullah 0.000 0.500 0.500 0.000 0.100 0.000 0.000 0.000 0.100 0.100 0.000 0.000 0.000
Mohallah Yateem Khana UC 17
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 104%
District and Tehsil Mianwali

1862 1253 Name of the Scheme Reh: of Sewerage Scheme 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Dilaywali
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1863 1254 Name of the Scheme Reh: of Sewerage Scheme 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Daudkhel
Approval Date 11/2/2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Mianwali

1864 1255 Name of the Scheme Rural Drainage Scheme Lasori 0.000 5.274 3.644 0.000 2.421 0.000 0.000 0.000 2.421 2.421 0.000 0.000 0.000
Kalan (Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin , Phalia

469
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1865 1256 Name of the Scheme Extension Rural Drainage Scheme 0.000 12.450 3.356 0.000 3.000 0.000 0.000 0.000 3.000 3.000 7.962 0.000 0.000
Pindi Kalu (Revised)
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 44%
District and Tehsil Mandi Bahauddin

1866 1257 Name of the Scheme Extension Rural Drainage Scheme 0.000 14.295 4.700 0.000 3.000 0.000 0.000 0.000 3.000 3.000 8.739 0.000 0.000
Lala Pindi (Revised)
Approval Date 26-02-2007
Major Components Sewer System and disposal work etc.
Major Targets 47%
District and Tehsil Mandi Bahauddin

1867 1258 Name of the Scheme Extension Rural Drainage Scheme 0.000 14.019 1.786 0.000 3.000 0.000 0.000 0.000 3.000 3.000 11.336 0.000 0.000
Maiken (Revised)
Approval Date 28-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Mandi Bahauddin

1868 1259 Name of the Scheme Extension of Rural Drainage / 0.000 9.818 2.419 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.872 0.000 0.000
Sewerage Scheme Dherekan
Kalan (Revised)
Approval Date 30-05-2006
Major Components Sewer System and disposal work etc.
Major Targets 39%
District and Tehsil Mandi Bahauddin

1869 1260 Name of the Scheme Extension of Rural Drainage 0.000 5.451 3.136 0.000 3.133 0.000 0.000 0.000 3.133 3.133 0.000 0.000 0.000
Scheme Charanwala (Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin , Phalia

470
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1870 1261 Name of the Scheme Extension / Renovation Rural 0.000 9.541 6.946 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.026 0.000 0.000
Drainage Scheme Pahrianwali
with Abadies (Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 82%
District and Tehsil Mandi Bahauddin , Phalia

1871 1262 Name of the Scheme Extension of Rural Drainage 0.000 3.890 3.082 0.000 1.392 0.000 0.000 0.000 1.392 1.392 0.000 0.000 0.000
Scheme Khoosar, Dhudra with
Abadies(Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin , Phalia

1872 1263 Name of the Scheme Extension of Rural Drainage 0.000 8.628 3.889 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.033 0.000 0.000
Scheme Jhanda Chohan, Chak
Jeewan & Sandhanwala (Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 59%
District and Tehsil Mandi Bahauddin , Phalia

1873 1264 Name of the Scheme Extension of Rural Drainage 0.000 9.998 5.921 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.577 0.000 0.000
Scheme Dshaul, Ledhar, Chak
Mirak with Abadies. (Revised)
Approval Date 2/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 69%
District and Tehsil Mandi Bahauddin , Phalia

1874 1265 Name of the Scheme Construction of Nullah from drain 0.000 7.796 3.000 0.000 5.965 0.000 0.000 0.000 5.965 5.965 0.000 0.000 0.000
Sohawa Bullani Jumlani
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

471
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1875 1266 Name of the Scheme Construction of PCC/Drainage 0.000 4.000 4.000 0.000 0.600 0.000 0.000 0.000 0.600 0.600 0.000 0.000 0.000
Scheme Pindi Bahaudin Part-II
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1876 1267 Name of the Scheme Drainage System village Dhaboola 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1877 1268 Name of the Scheme Drainage System village Noor 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Jamal
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1878 1269 Name of the Scheme Drainage System Village Ranmal 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1879 1270 Name of the Scheme Drainage System Village Madhray 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1880 1271 Name of the Scheme Const: of Streets & Drainage and 0.000 3.067 1.000 0.000 2.527 0.000 0.000 0.000 2.527 2.527 0.000 0.000 0.000
Sewerage Adda Gojra
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

472
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1881 1272 Name of the Scheme Const: of PCC Streets & Drains 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Mohallah Sabri Malakwal
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1882 1273 Name of the Scheme Const: of PCC Streets & Drains 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
UC No. 50 Malakwal
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1883 1274 Name of the Scheme Const: of PCC Streets & 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Drains/Drainage Ajjowal including
Mukhtar Colony Ajjowal
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1884 1275 Name of the Scheme Const: of PCC Streets & 0.000 1.000 0.500 0.000 0.650 0.000 0.000 0.000 0.650 0.650 0.000 0.000 0.000
Drains/Drainage Waryait
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1885 1276 Name of the Scheme Const: of PCC Streets & Drains/ 0.000 1.000 0.500 0.000 0.650 0.000 0.000 0.000 0.650 0.650 0.000 0.000 0.000
Sewerage Colony Khan Baig
Bukhan
Approval Date 702-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

473
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1886 1277 Name of the Scheme Const: of PCC Streets & Drains/ 0.000 1.500 1.000 0.000 0.725 0.000 0.000 0.000 0.725 0.725 0.000 0.000 0.000
Sewerage Chak No. 9 including
Abadies
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1887 1278 Name of the Scheme Const: of PCC Streets & Drains/ 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Sewerage Chak No. 29
Approval Date 7/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1888 1279 Name of the Scheme Const: of PCC Streets & Drains & 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Soling Chak No. 16
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Mandi Bahauddin

1889 1280 Name of the Scheme Rehabilitation Sewerage Scheme 0.000 3.000 1.500 0.000 1.950 0.000 0.000 0.000 1.950 1.950 0.000 0.000 0.000
Dograna / Budhla Sant
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Multan

1890 1281 Name of the Scheme Rural Drainage Scheme Javed 0.000 1.607 1.000 0.000 0.848 0.000 0.000 0.000 0.848 0.848 0.000 0.000 0.000
Town
Approval Date 16.04.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Multan

474
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1891 1282 Name of the Scheme Rural Drainage Scheme Sajjad 0.000 1.994 1.000 0.000 1.293 0.000 0.000 0.000 1.293 1.293 0.000 0.000 0.000
Town
Approval Date 10.4.09
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Multan

1892 1283 Name of the Scheme Rural Drainage Scheme Al-Fateh 0.000 1.195 1.195 0.000 0.179 0.000 0.000 0.000 0.179 0.179 0.000 0.000 0.000
Approval Date 16.04.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Multan

1893 1284 Name of the Scheme Rehabilitation Rural Sewerage / 0.000 15.446 5.168 0.000 2.000 0.000 0.000 0.000 2.000 2.000 10.595 0.000 0.000
Drainage Scheme Qasba Maral
Approval Date 19.02.2009
Major Components Repair of Machinery,Electrict
Connection,R.Main and Distribution
system.
Major Targets 40%
District and Tehsil Multan

1894 1285 Name of the Scheme Brick Pavement from Chah Wasli 0.000 1.300 0.407 0.000 1.088 0.000 0.000 0.000 1.088 1.088 0.000 0.000 0.000
Wala to Shah Wala
Approval Date 10.4.09
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Multan

1895 1286 Name of the Scheme Rural Drainage Scheme,Kashif 0.000 17.685 5.365 0.000 2.000 0.000 0.000 0.000 2.000 2.000 12.973 0.000 0.000
Abad Khar Sharqi (Revised)
Approval Date 27.8.08
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 36%
District and Tehsil Muzaffargarh , Kot Addu

475
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1896 1287 Name of the Scheme Construction of Sewerage and 0.000 24.207 7.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 18.338 0.000 0.000
Water Supply at Town Murad Abad
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 34%
District and Tehsil Muzaffargarh

1897 1288 Name of the Scheme Provision of Sanitation Facility at 0.000 2.310 1.155 0.000 1.502 0.000 0.000 0.000 1.502 1.502 0.000 0.000 0.000
Qasba Gujrat.
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1898 1289 Name of the Scheme Construction of Drains and Brick 0.000 0.514 0.500 0.000 0.091 0.000 0.000 0.000 0.091 0.091 0.000 0.000 0.000
pavement at Basti Jindoo Wala.
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1899 1290 Name of the Scheme Construction of Drains and Brick 0.000 0.843 0.800 0.000 0.169 0.000 0.000 0.000 0.169 0.169 0.000 0.000 0.000
pavement UC Ghazi Ghat
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1900 1291 Name of the Scheme Construction of Drains and Brick 0.000 1.039 1.000 0.000 0.195 0.000 0.000 0.000 0.195 0.195 0.000 0.000 0.000
Pavement at Basti Ghani Wala
Mauza Daya Chocka Western
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

476
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1901 1292 Name of the Scheme Construction of Sewerage and 0.000 4.149 2.700 0.000 2.071 0.000 0.000 0.000 2.071 2.071 0.000 0.000 0.000
Brick Pavement at Gurmmani
Adda
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1902 1293 Name of the Scheme Construction of Drains and Brick 0.000 0.528 0.500 0.000 0.107 0.000 0.000 0.000 0.107 0.107 0.000 0.000 0.000
Pavement at Basti Nawan Korai
Wala
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1903 1294 Name of the Scheme Construction of Sewerage and 0.000 1.599 1.500 0.000 0.339 0.000 0.000 0.000 0.339 0.339 0.000 0.000 0.000
Brick Pavement at UC Gujrat
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1904 1295 Name of the Scheme Rural Drainage Scheme Basti 0.000 4.000 2.000 0.000 2.600 0.000 0.000 0.000 2.600 2.600 0.000 0.000 0.000
Meer Hazar Khan
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1905 1296 Name of the Scheme Rural Drainage Scheme Qasba 0.000 4.000 2.000 0.000 2.600 0.000 0.000 0.000 2.600 2.600 0.000 0.000 0.000
Basti Allah Bukhsh & Bailaywala
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

477
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1906 1297 Name of the Scheme Rural Drainage Scheme Qasba 0.000 2.000 1.000 0.000 1.300 0.000 0.000 0.000 1.300 1.300 0.000 0.000 0.000
Bait Hazari
Approval Date 24.02.09
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh , Kot Addu

1907 1298 Name of the Scheme Construction of Open Drain and 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
PCC Slab Mouza Kamal Pur
Identified by Ghulam Fakhar-ud-
Din
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1908 1299 Name of the Scheme Construction of Drain and PCC 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Slab Basti Jhoke Mouza Nohan
Wali Identified by Master Munir
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1909 1300 Name of the Scheme Construction of Drain and PCC 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Slab Basti Kan Wala Mouza Lang
Identified by Malik Iqbal Lang
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

478
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1910 1301 Name of the Scheme Construction of Soling Drain 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Culverts inside UC Shah Jamal
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1911 1302 Name of the Scheme Construction of Soling Drain 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Culverts inside UC Aloday Wali
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1912 1303 Name of the Scheme Construction of Soling Drain 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Culverts inside UC Manak Pur
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1913 1304 Name of the Scheme Construction of Soling Drain 0.000 5.000 5.000 0.000 0.750 0.000 0.000 0.000 0.750 0.750 0.000 0.000 0.000
Culverts inside UC Mahra Sharqi
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1914 1305 Name of the Scheme Construction of Soling Drain 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Culverts inside UC Dainrien
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

479
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1915 1306 Name of the Scheme Construction of Soling Drain 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Culverts inside UC Usman Koria
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1916 1307 Name of the Scheme Construction of Soling Drain 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
inside Basti Rawali UC Usman
Koria
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1917 1308 Name of the Scheme Construction of Soling Drain 0.000 4.500 4.500 0.000 0.675 0.000 0.000 0.000 0.675 0.675 0.000 0.000 0.000
Culverts inside UC Utra Sandila
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1918 1309 Name of the Scheme Construction of Soling Drain 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Culverts inside UC Manka Bhutta
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1919 1310 Name of the Scheme Construction of Soling Drain 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Culverts inside UC Ahmad Mohana
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

480
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1920 1311 Name of the Scheme Construction of Tuff Tile inside 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
City Muzaffargarh
Approval Date 30.05.2009
Major Components RCC Sewer, Disposal Works, Force
Main,Drains, B/Pavement
Major Targets 100%
District and Tehsil Muzaffargarh

1921 1312 Name of the Scheme Rural Sewerage Scheme Mandi 0.000 26.430 22.937 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.147 0.000 0.000
Faizabad (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 82%
District and Tehsil Nankana Sahib

1922 1313 Name of the Scheme Rural Sewerage Scheme Syed 0.000 8.780 7.518 0.000 2.579 0.000 0.000 0.000 2.579 2.579 0.000 0.000 0.000
Wala (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Nankana Sahib

1923 1314 Name of the Scheme Rural Drainage Scheme Maili Burji 0.000 5.565 0.010 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.390 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 31%
District and Tehsil Nankana Sahib

1924 1315 Name of the Scheme Rural Drainage Scheme Nawan 0.000 9.228 0.010 0.000 2.998 0.000 0.000 0.000 2.998 2.998 7.604 0.000 0.000
Kot (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 28%
District and Tehsil Nankana Sahib

481
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1925 1316 Name of the Scheme Rural Drainage Scheme Nizam 0.000 6.189 0.010 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.107 0.000 0.000
Pura
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 28%
District and Tehsil Nankana Sahib

1926 1317 Name of the Scheme Rural Drainage Scheme Dera Jaat 0.000 3.124 0.010 0.000 3.583 0.000 0.000 0.000 3.583 3.583 0.000 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Nankana Sahib

1927 1318 Name of the Scheme Rural Drainage Scheme Hanjil 0.000 6.189 0.010 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.107 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 28%
District and Tehsil Nankana Sahib

1928 1319 Name of the Scheme Rural Drainage Scheme Sirranwali 0.000 5.854 0.010 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.722 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Nankana Sahib

1929 1320 Name of the Scheme Rural Drainage Scheme Chahbour 0.000 3.765 0.010 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.320 0.000 0.000
Mugailian
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 46%
District and Tehsil Nankana Sahib

1930 1321 Name of the Scheme Rural Drainage Scheme Jhugian 0.000 6.640 0.010 0.000 1.800 0.000 0.000 0.000 1.800 1.800 5.826 0.000 0.000
Karnalian / Odan Shamola Wali
Pur Bura Chak No.175/RB
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 24%
District and Tehsil Nankana Sahib

482
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1931 1322 Name of the Scheme Drainage / Rehabilitation Schemes 0.000 8.290 9.274 0.000 0.260 0.000 0.000 0.000 0.260 0.260 0.000 0.000 0.000
for Villages Hallowal & Dheli,
Union Council Halowal
Approval Date 11/12/2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1932 1323 Name of the Scheme Construction of Soling / Drain of 0.000 2.080 2.194 0.000 0.198 0.000 0.000 0.000 0.198 0.198 0.000 0.000 0.000
Model Village Saidu Data - Ratta
Sankhatra, U/C Sankhatra
Approval Date 31.5.2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1933 1324 Name of the Scheme Construction of Soling / Drain of 0.000 2.075 2.194 0.000 0.192 0.000 0.000 0.000 0.192 0.192 0.000 0.000 0.000
Model Village Ahloo Lal Klan &
Ahloo Lal Khund - Shahabdikay,
U/C Khan khasa,
Approval Date 31.5.2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1934 1325 Name of the Scheme Construction of Soling / Drain of 0.000 1.000 1.102 0.000 0.048 0.000 0.000 0.000 0.048 0.048 0.000 0.000 0.000
Model Village Khara Dewan
Approval Date 31.5.2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1935 1326 Name of the Scheme Rural Drainage Scheme for Village 0.000 2.065 2.100 0.000 0.275 0.000 0.000 0.000 0.275 0.275 0.000 0.000 0.000
Kalkhana Bahadur Pura Dherg
Niena
Approval Date 31.12.2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

483
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1936 1327 Name of the Scheme Rural Drainage Scheme for Village 0.000 2.045 2.121 0.000 0.231 0.000 0.000 0.000 0.231 0.231 0.000 0.000 0.000
Mahais
Approval Date 31.12.2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1937 1328 Name of the Scheme Rural Drainage Scheme for Village 0.000 2.078 2.161 0.000 0.229 0.000 0.000 0.000 0.229 0.229 0.000 0.000 0.000
Rattian Bhala Pind
Approval Date 31.5.2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1938 1329 Name of the Scheme Rural Drainage Scheme for Village 0.000 1.551 1.518 0.000 0.266 0.000 0.000 0.000 0.266 0.266 0.000 0.000 0.000
Gullah Khana Mianwali
Approval Date 17-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1939 1330 Name of the Scheme Rural Drainage Scheme Spanwal, 0.000 5.200 3.295 0.000 2.685 0.000 0.000 0.000 2.685 2.685 0.000 0.000 0.000
Chala, Chakwala
Approval Date 20-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1940 1331 Name of the Scheme Rural Drainage Scheme Bhojo 0.000 5.550 4.715 0.000 1.668 0.000 0.000 0.000 1.668 1.668 0.000 0.000 0.000
Chak Jhalli
Approval Date 20-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

484
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1941 1332 Name of the Scheme Rural Drainage Scheme Rasinwali 0.000 10.522 7.800 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.300 0.000 0.000
Approval Date 27-08-2008
Major Components Sewer System and disposal work etc.
Major Targets 81%
District and Tehsil Narowal

1942 1333 Name of the Scheme Construction of Soling / Drain of 0.000 1.115 0.496 0.000 0.786 0.000 0.000 0.000 0.786 0.786 0.000 0.000 0.000
Model Village Bhogwal & Jabal to
Dholee Dhalla U/C Dhadu Chak
Approval Date 2007-08
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1943 1334 Name of the Scheme Ext. Rural Drainage Scheme 0.000 5.638 1.590 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.894 0.000 0.000
Fattowal Salahrian
Approval Date 2007-08
Major Components Sewer System and disposal work etc.
Major Targets 55%
District and Tehsil Narowal

1944 1335 Name of the Scheme Rural Drainage Scheme Natlan 0.000 8.273 4.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.514 0.000 0.000
Kalan Deria
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 63%
District and Tehsil Narowal

1945 1336 Name of the Scheme Rural Drainage Scheme Behlol 0.000 4.589 4.000 0.000 1.277 0.000 0.000 0.000 1.277 1.277 0.000 0.000 0.000
Pur, Muthi Chakwal Sulehrian
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

485
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1946 1337 Name of the Scheme Rural Drainage Scheme Jhumian 0.000 5.381 4.000 0.000 2.188 0.000 0.000 0.000 2.188 2.188 0.000 0.000 0.000
Kalan & Khurd, Chak Sawera
Chakwal
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1947 1338 Name of the Scheme Rural Drainage Scheme Kothay, 0.000 4.200 4.000 0.000 0.830 0.000 0.000 0.000 0.830 0.830 0.000 0.000 0.000
Chak Amru, Chani, Timber Chak
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1948 1339 Name of the Scheme Rural Drainage Scheme Hawalian, 0.000 20.660 6.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 15.759 0.000 0.000
Peela Gujran, Dongran, Tola,
Surryia Gujran, Shehzad Pur,
Maingra
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 34%
District and Tehsil Narowal

1949 1340 Name of the Scheme Rural Drainage Scheme Chichra, 0.000 5.575 5.575 0.000 0.836 0.000 0.000 0.000 0.836 0.836 0.000 0.000 0.000
Lakhnour, Ghalor, Fatehpur Kalan
and Khurd, Saidpur Khanna UC
Chatrana
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1950 1341 Name of the Scheme Rural Drainage Scheme Chammal, 0.000 6.833 5.425 0.000 2.433 0.000 0.000 0.000 2.433 2.433 0.000 0.000 0.000
Handal, Rotu Chak, Changrawan
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

486
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1951 1342 Name of the Scheme Rural Drainage Scheme Gholo 0.000 14.783 4.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 11.000 0.000 0.000
Mehlo, Alipur Kohlian, Lalian,
Anyat Pur
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 35%
District and Tehsil Narowal

1952 1343 Name of the Scheme Rural Drainage Scheme Chanda, 0.000 5.119 3.000 0.000 2.887 0.000 0.000 0.000 2.887 2.887 0.000 0.000 0.000
Danwal, Rigala
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1953 1344 Name of the Scheme Rural Drainage Scheme 0.000 7.363 5.000 0.000 3.467 0.000 0.000 0.000 3.467 3.467 0.000 0.000 0.000
Bhopalpur, Chigla, Manjla,
Tugalpur, Poran, Khaira, Kharal
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Narowal

1954 1345 Name of the Scheme Rural Drainage Scheme Kaian 0.000 9.923 5.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.411 0.000 0.000
Bajar, Bharwal, Kotly, Behlolpur
Approval Date 20-12-2009
Major Components Sewer System and disposal work etc.
Major Targets 61%
District and Tehsil Narowal

1955 1346 Name of the Scheme Rural Drainage Scheme Village 0.000 7.000 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.050 0.000 0.000
Shahbazpur, Krail Baran, Natla
Khurd UC Baran.
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 50%
District and Tehsil Narowal , Shakargarh

487
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1956 1347 Name of the Scheme Rural Drainage SchemeVillage 0.000 7.800 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.970 0.000 0.000
Japolota Pindi Sanian,, Chatrana,
Taira Gujran, Shapur Chanjora UC
Chatrana
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Narowal , Shakargarh

1957 1348 Name of the Scheme Rural Drainage Scheme Brumana, 0.000 8.900 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.735 0.000 0.000
Chijwana, Jatwal, Phalwari UC
Phalwari
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 44%
District and Tehsil Narowal , Shakargarh

1958 1349 Name of the Scheme Rural Drainage Scheme Village 0.000 26.147 2.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 24.569 0.000 0.000
Khandrian Dalial Antowall,
Afzalpur UC Phalwari
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 18%
District and Tehsil Narowal , Shakargarh

1959 1350 Name of the Scheme Rural Drainage Scheme Village 0.000 13.200 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 10.680 0.000 0.000
Dhodo Chak Kholian, Sood
Gujran, Ladial, Mewandey khothey
UC Dhodo Cha
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Narowal , Shakargarh

488
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1960 1351 Name of the Scheme Rural Drainage SchemeVillage 0.000 7.400 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.510 0.000 0.000
Sher Pura, Sohawa Bussari,
Bamboo UC Sarjal & Raiba
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 47%
District and Tehsil Narowal , Shakargarh

1961 1352 Name of the Scheme Rural Drainage Scheme Soling 0.000 8.700 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.505 0.000 0.000
Lasser to Dera Haji Shafi, Village
Badwal to Graveyard, Village Bara
Pind Road to Village Wada and
Wadah Kothay UC Ramberi
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Narowal , Shakargarh

1962 1353 Name of the Scheme Rural Drainage Scheme Village 0.000 9.300 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.195 0.000 0.000
Manka Gumtala Gumtali Chora,
Sultanpura UC Gumtala
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 42%
District and Tehsil Narowal , Shakargarh

1963 1354 Name of the Scheme Rural Drainage Scheme Village 0.000 9.800 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.770 0.000 0.000
Sngran, Majwal, Channi Hndal,
Shahpur Bhango including
Pandori, Culvert at Chamal to
ChanniHandal UC Sukho Chak
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 40%
District and Tehsil Narowal , Shakargarh

489
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1964 1355 Name of the Scheme Rural Drainage Scheme Village 0.000 9.950 2.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.943 0.000 0.000
Patto Chak, Gorsial, Bhadwal,
Bhatti Afghana, Ordra Kial &
Banial UC Phagwari
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 39%
District and Tehsil Narowal , Shakargarh

1965 1356 Name of the Scheme village Chakra, Hamrial, Terah, 0.000 8.527 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.806 0.000 0.000
Harrar Kalan & Khurd Gjgal UC
Sarjal
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 41%
District and Tehsil Narowal , Shakargarh

1966 1357 Name of the Scheme Construction of Streets & Drain in 0.000 6.001 0.500 0.000 2.500 0.000 0.000 0.000 2.500 2.500 3.901 0.000 0.000
Village yousaf Pur Kuthi UC Ghona
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 43%
District and Tehsil Narowal

1967 1358 Name of the Scheme Construction of Streets & Drain in 0.000 7.850 0.500 0.000 2.900 0.000 0.000 0.000 2.900 2.900 5.628 0.000 0.000
Village Ghona UC Ghona
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 38%
District and Tehsil Narowal

1968 1359 Name of the Scheme Construction of Streets & Drain in 0.000 6.550 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 3.533 0.000 0.000
Village Khudai Pur UC Ghona
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 53%
District and Tehsil Narowal

490
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1969 1360 Name of the Scheme Construction of Streets & Drain in 0.000 6.200 0.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 3.630 0.000 0.000
Village Kadiala UC Ghona
Approval Date 19-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 49%
District and Tehsil Narowal

1970 1361 Name of the Scheme Construction of Streets & Drain in 0.000 5.640 0.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.986 0.000 0.000
Village Fatwal UC Mallah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 39%
District and Tehsil Narowal

1971 1362 Name of the Scheme Construction of Streets & Drain in 0.000 7.120 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 4.188 0.000 0.000
Village Mallah UC Mallah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 49%
District and Tehsil Narowal

1972 1363 Name of the Scheme Construction of Streets & Drain in 0.000 7.000 0.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.550 0.000 0.000
Village Malik Afghanan UC Langah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 43%
District and Tehsil Narowal

1973 1364 Name of the Scheme Construction of Streets & Drain in 0.000 6.450 0.500 0.000 2.500 0.000 0.000 0.000 2.500 2.500 4.418 0.000 0.000
Village Jhandy Langh UC Langah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 40%
District and Tehsil Narowal

491
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1974 1365 Name of the Scheme Construction of Streets & Drain in 0.000 5.150 0.500 0.000 2.500 0.000 0.000 0.000 2.500 2.500 2.923 0.000 0.000
Village Sattowal Misiriwal UC
Langah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 51%
District and Tehsil Narowal

1975 1366 Name of the Scheme Construction of Streets & Drain in 0.000 4.814 0.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.036 0.000 0.000
Village Kot Harsai UC Langah
Approval Date 19-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Narowal

1976 1367 Name of the Scheme Construction of Streets & Drain in 0.000 7.140 0.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.711 0.000 0.000
Village Manzoorpura Kot, Lotli
Soodkan
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 43%
District and Tehsil Narowal

1977 1368 Name of the Scheme Construction of Streets & Drain in 0.000 6.450 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 3.418 0.000 0.000
Village Samrai Pabra UC Mallah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 54%
District and Tehsil Narowal

1978 1369 Name of the Scheme Construction of Streets & Drain in 0.000 5.640 0.500 0.000 2.600 0.000 0.000 0.000 2.600 2.600 3.386 0.000 0.000
Village Chak hakeem UC Wali Pur
Bora
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 48%
District and Tehsil Narowal

492
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1979 1370 Name of the Scheme Construction of Streets & Drain in 0.000 6.950 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 3.993 0.000 0.000
Village Ghool UC Wali Pur Bora
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 50%
District and Tehsil Narowal

1980 1371 Name of the Scheme Construction of Streets & Drain in 0.000 7.140 0.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.711 0.000 0.000
Village Langh, Eisa Ghazi UC
Langah
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 43%
District and Tehsil Narowal

1981 1372 Name of the Scheme Construction of Streets & Drain in 0.000 8.000 0.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.700 0.000 0.000
Village Sheenay Nagal UC Kanjrur
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 27%
District and Tehsil Narowal

1982 1373 Name of the Scheme Construction of Streets & Drain in 0.000 7.450 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 4.568 0.000 0.000
Village Aikeke Kaka Wali UC
Ghona
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 47%
District and Tehsil Narowal

1983 1374 Name of the Scheme Construction of Streets & Drain in 0.000 6.550 0.500 0.000 3.100 0.000 0.000 0.000 3.100 3.100 3.933 0.000 0.000
Village Cheema Kalair, Natt UC
Ghona
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 48%
District and Tehsil Narowal

493
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1984 1375 Name of the Scheme Construction of Streets & Drain in 0.000 7.110 0.500 0.000 2.500 0.000 0.000 0.000 2.500 2.500 5.177 0.000 0.000
Village Mallowal UC Gorala
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 37%
District and Tehsil Narowal

1985 1376 Name of the Scheme Construction of Streets & Drain in 0.000 7.810 0.500 0.000 3.500 0.000 0.000 0.000 3.500 3.500 4.982 0.000 0.000
Village Sultan Pur Kothri Kothey
UC Langh
Approval Date 18-05-2009
Major Components Sewer System and disposal work etc.
Major Targets 45%
District and Tehsil Narowal

1986 1377 Name of the Scheme Rural Drainage Scheme of UC 0.000 9.748 5.000 0.000 0.750 0.000 0.000 0.000 0.750 0.750 5.460 0.000 0.000
Akhlas Pur including Village
Kanwal and Saanpur
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1987 1378 Name of the Scheme Rural Drainage Scheme of UC 0.000 7.816 5.000 0.000 0.750 0.000 0.000 0.000 0.750 0.750 3.238 0.000 0.000
Bheri including VillageTarpi Bheri
and Danoors Donori
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1988 1379 Name of the Scheme Rural Drainage Scheme of Village 0.000 5.000 5.000 0.000 0.743 0.000 0.000 0.000 0.743 0.743 0.000 0.000 0.000
Chun Lidder Cheema Kalair and
Kundaipur UC Ghona
Approval Date 18-05-2009
Major Components
Major Targets
District and Tehsil Narowal

494
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1989 1380 Name of the Scheme Rural Drainage Scheme of 0.000 5.000 5.000 0.000 0.750 0.000 0.000 0.000 0.750 0.750 0.000 0.000 0.000
Fazalpur Bajrie Nangal and Village
Ferowal
Approval Date 18-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1990 1381 Name of the Scheme Rural Drainage Scheme of Village 0.000 4.515 2.300 0.000 0.750 0.000 0.000 0.000 0.750 0.750 0.000 0.000 0.000
Khanpur Achli of UC Kallah
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1991 1382 Name of the Scheme Rural Drainage Scheme 0.000 1.595 0.800 0.000 1.034 0.000 0.000 0.000 1.034 1.034 0.000 0.000 0.000
Construction of Brick pavement of
Village Mottay to Nothern Side to
main Passage UC Gumtala Tehsil
Shakargarh
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1992 1383 Name of the Scheme Rural Drainage Scheme 0.000 0.965 0.965 0.000 0.145 0.000 0.000 0.000 0.145 0.145 0.000 0.000 0.000
Construction of Brick pavement of
Village Maingra UC Tola, Tehsil
Shakargarh
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

495
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1993 1384 Name of the Scheme Rural Drainage Scheme 0.000 0.767 0.767 0.000 0.115 0.000 0.000 0.000 0.115 0.115 0.000 0.000 0.000
Construction of Brick pavement of
Village Dudhu Chak to Village
Soodan Tehsil Shakargarh
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1994 1385 Name of the Scheme Rural Drainage Scheme 0.000 1.336 1.000 0.000 0.536 0.000 0.000 0.000 0.536 0.536 0.000 0.000 0.000
Construction of Brick pavement of
Village Wali Pur Bura UC WaliPur
Bura Tehsil Shakargarh
Approval Date 19-05-2009
Major Components
Major Targets
District and Tehsil Narowal

1995 1386 Name of the Scheme Sewerage / Drainage Scheme 0.000 17.731 18.519 0.000 1.872 0.000 0.000 0.000 1.872 1.872 0.000 0.000 0.000
18/GD, District Okara
Approval Date 10/3/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

1996 1387 Name of the Scheme Rural Sewerage / Drainage 0.000 10.510 1.200 0.000 1.000 0.000 0.000 0.000 1.000 1.000 9.887 0.000 0.000
Scheme Madu Chak No.16/GD
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 18%
District and Tehsil Okara

1997 1388 Name of the Scheme Construction of Soling / Drains 0.000 2.500 2.500 0.000 0.375 0.000 0.000 0.000 0.375 0.375 0.000 0.000 0.000
Adda Gamber, Kausar Colony
Chak No. 52/5-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

496
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

1998 1389 Name of the Scheme Construction of Soling / Drains 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Chak No.37/4-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

1999 1390 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.32/2-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2000 1391 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.51/2-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2001 1392 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.50/2-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2002 1393 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.45/2-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

497
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2003 1394 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.25/4-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2004 1395 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.24/4-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2005 1396 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.52/4-R
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2006 1397 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.47/3-R
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2007 1398 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.36/4-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

498
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2008 1399 Name of the Scheme Construction of Soling / Drains 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Chak No.38/4-L
Approval Date 30.05.2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Okara

2009 1400 Name of the Scheme Rural Drainage Scheme Chak 0.000 0.700 0.700 0.000 0.105 0.000 0.000 0.000 0.105 0.105 0.000 0.000 0.000
No.17/SP
Approval Date 31.03.09
Major Components Drains,B/pavement etc.
Major Targets 100%
District and Tehsil Pakpattan

2010 1401 Name of the Scheme Rural Drainage Scheme Chak 0.000 10.122 1.000 0.000 2.700 0.000 0.000 0.000 2.700 2.700 7.940 0.000 0.000
No.95/EB
Approval Date 20.12.08
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 32%
District and Tehsil Pakpattan , Arifwala

2011 1402 Name of the Scheme Rural Drainage Scheme Chak 0.000 1.300 1.300 0.000 0.195 0.000 0.000 0.000 0.195 0.195 0.000 0.000 0.000
No.79/EB
Approval Date 20.12.08
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 100%
District and Tehsil Pakpattan , Arifwala

2012 1403 Name of the Scheme Rural Drainage Scheme Chak 0.000 8.202 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.432 0.000 0.000
No.25/EB
Approval Date 20.12.08
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 32%
District and Tehsil Pakpattan , Arifwala

499
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2013 1404 Name of the Scheme Rural Drainage Scheme Chak 0.000 8.605 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 6.896 0.000 0.000
No.81/EB
Approval Date 20.12.08
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 30%
District and Tehsil Pakpattan , Arifwala

2014 1405 Name of the Scheme Rural Drainage Scheme Chak 0.000 5.655 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.503 0.000 0.000
No.41/EB
Approval Date 20.12.08
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 46%
District and Tehsil Pakpattan , Arifwala

2015 1406 Name of the Scheme Drainage Scheme in Left Area in 0.000 3.700 1.000 0.000 3.255 0.000 0.000 0.000 3.255 3.255 0.000 0.000 0.000
Chak No.88/EB
Approval Date Approved
Major Components Drain-1,II, Soling, Sullage Carrier
Major Targets 100%
District and Tehsil Pakpattan , Arifwala

2016 1407 Name of the Scheme Construction of Drainage Ghazi 0.000 2.185 2.161 0.000 0.352 0.000 0.000 0.000 0.352 0.352 0.000 0.000 0.000
Pur Khanpur
Approval Date 2.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

2017 1408 Name of the Scheme Construction of Sewerage Basti 0.000 1.011 1.000 0.000 0.163 0.000 0.000 0.000 0.163 0.163 0.000 0.000 0.000
Kahi Khair Shah.
Approval Date 2.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

500
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2018 1409 Name of the Scheme Construction of Sewerage Mari 0.000 1.760 1.783 0.000 0.241 0.000 0.000 0.000 0.241 0.241 0.000 0.000 0.000
Allaha Bachaya.
Approval Date 2.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

2019 1410 Name of the Scheme Construction of Sewerage Basti 0.000 1.454 1.454 0.000 0.218 0.000 0.000 0.000 0.218 0.218 0.000 0.000 0.000
Nawan kot Mouza Noor Wah.
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

2020 1411 Name of the Scheme Construction of Sewerage Chak 0.000 1.468 1.453 0.000 0.235 0.000 0.000 0.000 0.235 0.235 0.000 0.000 0.000
No. 67/P Basti Ali Akhtar Ch.
Approval Date 2.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Khanpur

2021 1412 Name of the Scheme Rural Sewerage/Drainage 0.000 4.996 4.407 0.000 1.338 0.000 0.000 0.000 1.338 1.338 0.000 0.000 0.000
Scheme, Nawan Kot.
Approval Date 05.03.07
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , R,Y,Khan

2022 1413 Name of the Scheme Rural Draiane and Sewerage Chak 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
No.158/P.
Approval Date 6.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Sadiqabad

501
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2023 1414 Name of the Scheme Construction of Sewerage Basti 0.000 0.723 0.723 0.000 0.108 0.000 0.000 0.000 0.108 0.108 0.000 0.000 0.000
Jind Wadda Khan Numberdar
Mauza Mehmood Garh R.Y.Khan
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , R,Y,Khan

2024 1415 Name of the Scheme Construction of Sewerage Basti 0.000 1.305 1.296 0.000 0.205 0.000 0.000 0.000 0.205 0.205 0.000 0.000 0.000
Ijaz Chanar R.Y.Khan
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , R,Y,Khan

2025 1416 Name of the Scheme Construction of Sewerage Basti 0.000 1.553 0.719 0.000 1.067 0.000 0.000 0.000 1.067 1.067 0.000 0.000 0.000
Purani & Sewerage i/c Frashbandi
R.Y.Khan
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , R,Y,Khan

2026 1417 Name of the Scheme Construction of Sewerage Basti 0.000 1.553 1.031 0.000 0.755 0.000 0.000 0.000 0.755 0.755 0.000 0.000 0.000
i/c Frashbandi Mohallah
Makhdoom Altaf Ahmad Hashmi
UC Kot Samaba R.Y.Khan
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

2027 1418 Name of the Scheme Construction of Sewerage Abu 0.000 1.039 0.983 0.000 0.212 0.000 0.000 0.000 0.212 0.212 0.000 0.000 0.000
Zaibi Colony No.2
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

502
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2028 1419 Name of the Scheme Construction of Sewerage Chak 0.000 6.481 1.080 0.000 0.969 0.000 0.000 0.000 0.969 0.969 5.404 0.000 0.000
No.88/P
Approval Date 20.02.09
Major Components Drains,Disposal Work and other works.
Major Targets 27%
District and Tehsil Rahim Yar Khan

2029 1420 Name of the Scheme Sewerage Scheme basti Rindan 0.000 1.018 1.000 0.000 0.171 0.000 0.000 0.000 0.171 0.171 0.000 0.000 0.000
UC Janpur, Tehsil Liaqatpur,
Approval Date 25.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Liaqatpur

2030 1421 Name of the Scheme Sewerage Scheme Thul Hamza, 0.000 4.010 4.000 0.000 0.611 0.000 0.000 0.000 0.611 0.611 0.000 0.000 0.000
Tehsil Liaqatpur,
Approval Date 25.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan , Liaqatpur

2031 1422 Name of the Scheme Improvement / Rehab. Of 0.000 4.000 4.000 0.000 0.600 0.000 0.000 0.000 0.600 0.600 0.000 0.000 0.000
Sewerage Scheme Machka City
SDK
Approval Date 22.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

2032 1423 Name of the Scheme Improvement / Rehab. Of 0.000 3.000 3.000 0.000 0.450 0.000 0.000 0.000 0.450 0.450 0.000 0.000 0.000
Sewerage Scheme Bhong City
Approval Date 22.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

503
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2033 1424 Name of the Scheme Construction of Sewerage, Mild 0.000 0.700 0.700 0.000 0.105 0.000 0.000 0.000 0.105 0.105 0.000 0.000 0.000
Gangoo, Hussainabad
Approval Date 01.06.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

2034 1425 Name of the Scheme Construction of Sewerage, Basti 0.000 0.700 0.700 0.000 0.105 0.000 0.000 0.000 0.105 0.105 0.000 0.000 0.000
Khokhran, UC Tranda Swae Khan
Approval Date 01.06.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

2035 1426 Name of the Scheme Construction of Sewerage, Basti 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Bandoor, UC R.Y.Khan
Approval Date 01.06.2009
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Rahim Yar Khan

2036 1427 Name of the Scheme Drainage and Sewerage Scheme 0.000 36.443 5.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 20.000 14.909 0.000
Hajipur
Approval Date 25.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 17%
District and Tehsil Rajanpur

2037 1428 Name of the Scheme Drainage and Sewerage Scheme 0.000 8.192 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.050 0.000 0.000
Lal Garh
Approval Date 25.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 47%
District and Tehsil Rajanpur

504
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2038 1429 Name of the Scheme Rural Drainage Scheme Adwal 0.000 9.700 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 10.155 0.000 0.000
Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2039 1430 Name of the Scheme Rural Drainage Scheme Misrial 0.000 9.870 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 10.351 0.000 0.000
Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2040 1431 Name of the Scheme Rural Drainage Scheme Dudhar 0.000 3.240 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 2.726 0.000 0.000
Mirza Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2041 1432 Name of the Scheme Rural Drainage Scheme Deer Wala 0.000 4.895 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.629 0.000 0.000
Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2042 1433 Name of the Scheme Rural Drainage Scheme Mohra 0.000 2.630 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 2.025 0.000 0.000
BhattianTehsil & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

505
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2043 1434 Name of the Scheme Rural Drainage Scheme Dudhar 0.000 8.296 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 8.540 0.000 0.000
Najar Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2044 1435 Name of the Scheme Rural Drainage Scheme Chatroo 0.000 6.138 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 6.059 0.000 0.000
Tehsil & District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi

2045 1436 Name of the Scheme Rural Drainage Scheme Razi 0.000 5.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.750 0.000 0.000
Bandi Tehsil Kallar Syedian &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi , Kallar Ghar

2046 1437 Name of the Scheme Rural Drainage Scheme Razi 0.000 5.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.750 0.000 0.000
Khais Tehsil Kallar Syedian &
District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi , Kallar Ghar

506
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2047 1438 Name of the Scheme Rural Drainage Scheme Basanta 0.000 5.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.750 0.000 0.000
Tehsil Kallar Syedian & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi , Kallar Ghar

2048 1439 Name of the Scheme Rural Drainage Scheme Jattian 0.000 5.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.750 0.000 0.000
Nandanian Tehsil Kallar Syedian
& District Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi , Kallar Ghar

2049 1440 Name of the Scheme Rural Drainage Scheme Nothia 0.000 5.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 4.750 0.000 0.000
Tehsil Kallar Syedian & District
Rawalpindi
Approval Date 24-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Rawalpindi , Kallar Ghar

2050 1441 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 8.464 8.704 0.000 1.030 0.000 0.000 0.000 1.030 1.030 0.000 0.000 0.000

127-131/SB
Approval Date 20-10-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2051 1442 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 11.055 10.693 0.000 2.020 0.000 0.000 0.000 2.020 2.020 0.000 0.000 0.000
122-121/SB
Approval Date 20-10-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

507
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2052 1443 Name of the Scheme Rural Drainage Scheme Chak 0.000 13.570 13.000 0.000 2.606 0.000 0.000 0.000 2.606 2.606 0.000 0.000 0.000
No.112-113/NB
Approval Date 20-10-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2053 1444 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 11.873 10.460 0.000 3.194 0.000 0.000 0.000 3.194 3.194 0.000 0.000 0.000
130/NB
Approval Date 20-10-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2054 1445 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 13.616 13.000 0.000 2.658 0.000 0.000 0.000 2.658 2.658 0.000 0.000 0.000
165/NB
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2055 1446 Name of the Scheme Rural Drainage Scheme Chak 0.000 14.072 13.275 0.000 2.908 0.000 0.000 0.000 2.908 2.908 0.000 0.000 0.000
No.161-162/NB
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2056 1447 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 15.498 16.631 0.000 1.192 0.000 0.000 0.000 1.192 1.192 0.000 0.000 0.000
151/NB with three Colonies
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

508
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2057 1448 Name of the Scheme Rural Drainage Scheme Chak 0.000 19.689 16.717 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.925 0.000 0.000
No.170-171/NB
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 83%
District and Tehsil Sargodha

2058 1449 Name of the Scheme Rural Drainage Scheme Chak 0.000 14.499 14.402 0.000 2.272 0.000 0.000 0.000 2.272 2.272 0.000 0.000 0.000
No.169-173/NB
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2059 1450 Name of the Scheme Rural Drainage Scheme Chak 0.000 6.578 6.578 0.000 0.987 0.000 0.000 0.000 0.987 0.987 0.000 0.000 0.000
No.40-42/SB
Approval Date 13-04-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2060 1451 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 10.009 5.409 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.101 0.000 0.000
54/SB
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 64%
District and Tehsil Sargodha

2061 1452 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 7.308 7.790 0.000 0.614 0.000 0.000 0.000 0.614 0.614 0.000 0.000 0.000
111/SB
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

509
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2062 1453 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 12.099 13.875 0.000 0.039 0.000 0.000 0.000 0.039 0.039 0.000 0.000 0.000
50/NB
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2063 1454 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 4.330 4.563 0.000 0.417 0.000 0.000 0.000 0.417 0.417 0.000 0.000 0.000
144-145/NB
Approval Date 31-01-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2064 1455 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 6.886 5.896 0.000 2.023 0.000 0.000 0.000 2.023 2.023 0.000 0.000 0.000
26/SB
Approval Date 31-01-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2065 1456 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 6.216 6.047 0.000 1.101 0.000 0.000 0.000 1.101 1.101 0.000 0.000 0.000
125/SB
Approval Date 31-01-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2066 1457 Name of the Scheme Rural Drainage Scheme Chak 0.000 4.743 5.092 0.000 0.362 0.000 0.000 0.000 0.362 0.362 0.000 0.000 0.000
No.109/SB
Approval Date 17-11-2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

510
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2067 1458 Name of the Scheme Rural Drainage Scheme Chak No. 0.000 8.731 8.670 0.000 1.371 0.000 0.000 0.000 1.371 1.371 0.000 0.000 0.000
23/SB
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2068 1459 Name of the Scheme Rural Drainage Scheme Dhrema 0.000 8.639 9.752 0.000 0.183 0.000 0.000 0.000 0.183 0.183 0.000 0.000 0.000
with Colonies
Approval Date 11/12/2006
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sargodha

2069 1460 Name of the Scheme Extension Rural Drainage Scheme 0.000 3.500 0.100 0.000 2.000 0.000 0.000 0.000 2.000 2.000 1.925 0.000 0.000
Beerball Sharif (Murtazabad)
Approval Date 31-01-2007
Major Components Sewer System and disposal work etc.
Major Targets 52%
District and Tehsil Sargodha

2070 1461 Name of the Scheme Rural Sewerage / Drainage 0.000 17.485 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 16.108 0.000 0.000
Scheme for Village Mateela
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 20%
District and Tehsil Sargodha

2071 1462 Name of the Scheme Sewerage Scheme at Salam 0.000 25.200 2.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 24.980 0.000 0.000
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 35%
District and Tehsil Sargodha

511
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2072 1463 Name of the Scheme Rural Drainage Scheme Mid Ranja 0.000 10.500 1.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 8.575 0.000 0.000
Tehsil Kot Momin
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 35%
District and Tehsil Sargodha

2073 1464 Name of the Scheme Rural Drainage Scheme Gopi Rai 0.000 12.214 12.870 0.000 1.176 0.000 0.000 0.000 1.176 1.176 0.000 0.000 0.000
(Revised)
Approval Date 27-08-2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2074 1465 Name of the Scheme Rural Drainage Scheme Bhikhi, 0.000 6.167 2.942 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.150 0.000 0.000
Sheikhupura (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 70%
District and Tehsil Sheikhupura

2075 1466 Name of the Scheme Rural Drainage Scheme 0.000 19.937 6.400 0.000 0.513 0.000 0.000 0.000 0.513 0.513 16.015 0.000 0.000
Kharianwala i/e abadies,
Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Sheikhupura

2076 1467 Name of the Scheme Rural Drainage Scheme Kudlathi, 0.000 11.651 5.719 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.680 0.000 0.000
Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 65%
District and Tehsil Sheikhupura

512
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2077 1468 Name of the Scheme Rural Drainage Scheme Lagar, 0.000 3.849 3.849 0.000 0.577 0.000 0.000 0.000 0.577 0.577 0.000 0.000 0.000
Sheikhupura
Approval Date 13-11-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2078 1469 Name of the Scheme Rural Drainage Scheme Hathiana 0.000 6.893 3.443 0.000 0.421 0.000 0.000 0.000 0.421 0.421 4.063 0.000 0.000
Dewanwala,
Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 49%
District and Tehsil Sheikhupura

2079 1470 Name of the Scheme Rural Drainage Scheme 0.000 9.228 6.141 0.000 0.759 0.000 0.000 0.000 0.759 0.759 3.712 0.000 0.000
Nawankot, Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 65%
District and Tehsil Sheikhupura

2080 1471 Name of the Scheme Rural Drainage Scheme Mamoon, 0.000 12.433 7.710 0.000 2.148 0.000 0.000 0.000 2.148 2.148 4.440 0.000 0.000
Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 69%
District and Tehsil Sheikhupura

2081 1472 Name of the Scheme Rural Drainage Scheme Dera 0.000 15.192 6.700 0.000 3.000 0.000 0.000 0.000 3.000 3.000 7.771 0.000 0.000
Khojian, Sheikhupura.(Revised)
Approval Date 24-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 56%
District and Tehsil Sheikhupura

513
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2082 1473 Name of the Scheme Rural Drainage 0.000 9.513 5.665 0.000 0.948 0.000 0.000 0.000 0.948 0.948 4.327 0.000 0.000
Scheme UC-
101,Shabdev Singh including
abadies, Sheikhupura. (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 60%
District and Tehsil Sheikhupura

2083 1474 Name of the Scheme Rural Drainage Scheme UC-56 0.000 9.525 6.540 0.000 0.702 0.000 0.000 0.000 0.702 0.702 3.712 0.000 0.000
Bahoman including Derajat,
Sheikhupura.(Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 66%
District and Tehsil Sheikhupura

2084 1475 Name of the Scheme Rural Drainage Scheme UC-55 i/e 0.000 23.250 22.250 0.000 1.969 0.000 0.000 0.000 1.969 1.969 2.519 0.000 0.000
Derajat (Revised)
Approval Date 25-04-2009
Major Components Sewer System and disposal work etc.
Major Targets 91%
District and Tehsil Sheikhupura

2085 1476 Name of the Scheme Rural Drainage Scheme Feroze 0.000 16.995 10.958 0.000 1.000 0.000 0.000 0.000 1.000 1.000 7.586 0.000 0.000
Wattoan (Revised)
Approval Date 25.04.2009
Major Components Sewer System and disposal work etc.
Major Targets 61%
District and Tehsil Sheikhupura

2086 1477 Name of the Scheme Rural Drainage Scheme at Gharyal 0.000 5.013 3.000 0.000 2.765 0.000 0.000 0.000 2.765 2.765 0.000 0.000 0.000
Khurd/Kalan, Bhaiglan
Approval Date 10/11/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

514
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2087 1478 Name of the Scheme Rural Drainage Scheme at 0.000 3.655 2.500 0.000 1.703 0.000 0.000 0.000 1.703 1.703 0.000 0.000 0.000
Gandowal, Bagika, Kot Abdullah
Approval Date 10/11/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura , Ferozewala

2088 1479 Name of the Scheme Rural Drainage Scheme at Nangal 0.000 13.000 4.500 0.000 3.000 0.000 0.000 0.000 3.000 3.000 7.450 0.000 0.000
Kaswala i/c Abadies
Approval Date 10/11/2008
Major Components Sewer System and disposal work etc.
Major Targets 50%
District and Tehsil Sheikhupura

2089 1480 Name of the Scheme Rural Drainage Scheme at Javed 0.000 9.768 5.000 0.000 2.611 0.000 0.000 0.000 2.611 2.611 3.622 0.000 0.000
Nagar,
Approval Date 4/11/2008
Major Components Sewer System and disposal work etc.
Major Targets 68%
District and Tehsil Sheikhupura

2090 1481 Name of the Scheme Rural Drainage Scheme at 0.000 17.984 9.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 8.682 0.000 0.000
Mandialy including Dera Rehmat
Colony, Den Colony and Sad
Colony,
Approval Date 4/11/2008
Major Components Sewer System and disposal work etc.
Major Targets 58%
District and Tehsil Sheikhupura

2091 1482 Name of the Scheme Rural Drainage Scheme Measion 0.000 3.422 3.422 0.000 0.513 0.000 0.000 0.000 0.513 0.513 0.000 0.000 0.000
Approval Date 3/12/2008
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

515
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2092 1483 Name of the Scheme Rural Drainage & Sanitation 0.000 9.322 4.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 3.720 0.000 0.000
Scheme Burj Attari
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 65%
District and Tehsil Sheikhupura

2093 1484 Name of the Scheme Rural Drainage & Sanitation 0.000 11.262 4.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 5.951 0.000 0.000
Scheme Tradewali i/c abadies
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 54%
District and Tehsil Sheikhupura

2094 1485 Name of the Scheme Rural Drainage & Sanitation 0.000 42.653 4.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 20.000 22.051 0.000
Scheme Dhaka Nizampura (UC-32)
(Revised)
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 14%
District and Tehsil Sheikhupura

2095 1486 Name of the Scheme Rural Drainage & Sanitation 0.000 10.050 3.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 5.558 0.000 0.000
Scheme Dhamke i/c abadies
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 52%
District and Tehsil Sheikhupura

2096 1487 Name of the Scheme Rural Drainage Scheme Faizpur 0.000 7.744 3.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.906 0.000 0.000
Khurd i/c abadies
Approval Date 23-12-2008
Major Components Sewer System and disposal work etc.
Major Targets 56%
District and Tehsil Sheikhupura

516
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2097 1488 Name of the Scheme Construction of Soling, Drains 0.000 1.879 1.000 0.000 1.161 0.000 0.000 0.000 1.161 1.161 0.000 0.000 0.000
and Nallah, Mouza Esan
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2098 1489 Name of the Scheme Construction of Soling, Drains 0.000 1.232 0.500 0.000 0.917 0.000 0.000 0.000 0.917 0.917 0.000 0.000 0.000
and Nallah, Mouza Thatha
Rugwaan
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2099 1490 Name of the Scheme Construction of Soling, Drains 0.000 2.301 1.000 0.000 1.646 0.000 0.000 0.000 1.646 1.646 0.000 0.000 0.000
and Nallah, Mouza Kot Mehmood
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2100 1491 Name of the Scheme Construction of Soling, Drains 0.000 4.237 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 1.873 0.000 0.000
and Nallah, Mouza Nazar Lubana
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 62%
District and Tehsil Sheikhupura

2101 1492 Name of the Scheme Construction of Soling, Drains 0.000 1.604 0.500 0.000 1.345 0.000 0.000 0.000 1.345 1.345 0.000 0.000 0.000
and Nallah, Mouza Sagian Moti Fuji
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

517
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2102 1493 Name of the Scheme Construction of Soling, Drains 0.000 2.192 0.500 0.000 2.021 0.000 0.000 0.000 2.021 2.021 0.000 0.000 0.000
and Nallah, Mouza Said Pur
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2103 1494 Name of the Scheme Construction of Soling, Drains 0.000 1.680 0.500 0.000 1.432 0.000 0.000 0.000 1.432 1.432 0.000 0.000 0.000
and Nallah, Mouza Dosair
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2104 1495 Name of the Scheme Construction of Soling, Drains 0.000 0.978 0.500 0.000 0.625 0.000 0.000 0.000 0.625 0.625 0.000 0.000 0.000
and Nallah, Mouza Meerpur
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2105 1496 Name of the Scheme Construction of Soling, Drains 0.000 1.511 0.500 0.000 1.238 0.000 0.000 0.000 1.238 1.238 0.000 0.000 0.000
and Nallah, Mouza Thatha Lungian
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2106 1497 Name of the Scheme Construction of Soling, Drains 0.000 4.153 1.000 0.000 3.776 0.000 0.000 0.000 3.776 3.776 0.000 0.000 0.000
and Nallah, Mouza Sehjowal
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

518
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2107 1498 Name of the Scheme Construction of Soling, Drains 0.000 2.826 0.500 0.000 2.750 0.000 0.000 0.000 2.750 2.750 0.000 0.000 0.000
and Nallah, Mouza Bohaywal
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2108 1499 Name of the Scheme Construction of Soling, Drains 0.000 1.941 0.500 0.000 1.732 0.000 0.000 0.000 1.732 1.732 0.000 0.000 0.000
and Nallah, Mouza Ghazi Pur
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2109 1500 Name of the Scheme Construction of Soling, Drains 0.000 1.700 0.500 0.000 1.455 0.000 0.000 0.000 1.455 1.455 0.000 0.000 0.000
and Nallah, Mousa Purani Bhani
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2110 1501 Name of the Scheme Construction of Soling, Drains 0.000 1.211 0.500 0.000 0.893 0.000 0.000 0.000 0.893 0.893 0.000 0.000 0.000
and Nallah, Mouza Rajhian Arrian
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2111 1502 Name of the Scheme Construction of Soling, Drains 0.000 2.691 0.500 0.000 2.595 0.000 0.000 0.000 2.595 2.595 0.000 0.000 0.000
and Nallah, Mouza Mandian Wala
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

519
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2112 1503 Name of the Scheme Construction of Soling, Drains 0.000 1.483 0.500 0.000 1.205 0.000 0.000 0.000 1.205 1.205 0.000 0.000 0.000
and Nallah, Mouza Khanowal
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2113 1504 Name of the Scheme Construction of Soling, Drains 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
and Nallah, Mouza Matham Pind
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2114 1505 Name of the Scheme Construction of Soling, Drains 0.000 1.390 0.500 0.000 1.099 0.000 0.000 0.000 1.099 1.099 0.000 0.000 0.000
and Nallah, Mouza Rana Bhatti
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2115 1506 Name of the Scheme Construction of Soling, Drains 0.000 1.699 0.500 0.000 1.454 0.000 0.000 0.000 1.454 1.454 0.000 0.000 0.000
and Nallah, Mouza Nawan Pindi
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2116 1507 Name of the Scheme Construction of Soling, Drains 0.000 2.604 1.000 0.000 1.995 0.000 0.000 0.000 1.995 1.995 0.000 0.000 0.000
and Nallah, Mouza Moran Wala
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

520
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2117 1508 Name of the Scheme Construction of Soling, Drains 0.000 1.096 0.500 0.000 0.760 0.000 0.000 0.000 0.760 0.760 0.000 0.000 0.000
and Nallah, Mouza Chak No. 12-UC
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2118 1509 Name of the Scheme Construction of Soling, Drains 0.000 1.366 0.500 0.000 1.071 0.000 0.000 0.000 1.071 1.071 0.000 0.000 0.000
and Nallah, Mouza Pind Piaria
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2119 1510 Name of the Scheme Construction of Soling, Drains 0.000 1.270 0.500 0.000 0.961 0.000 0.000 0.000 0.961 0.961 0.000 0.000 0.000
and Nallah, Mouza Chak No. 17-UC
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2120 1511 Name of the Scheme Construction of Soling, Drains 0.000 2.808 0.500 0.000 2.619 0.000 0.000 0.000 2.619 2.619 0.000 0.000 0.000
and Nallah, Mouza Sagian Kalan
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 97%
District and Tehsil Sheikhupura

2121 1512 Name of the Scheme Construction of Soling, Drains 0.000 1.311 0.500 0.000 1.008 0.000 0.000 0.000 1.008 1.008 0.000 0.000 0.000
and Nallah, Mouza Chak No. 11-UC
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

521
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2122 1513 Name of the Scheme Construction of Soling, Drains 0.000 2.067 1.000 0.000 1.377 0.000 0.000 0.000 1.377 1.377 0.000 0.000 0.000
and Nallah, Mouza Bohala Shah
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2123 1514 Name of the Scheme Construction of Soling, Drain and 0.000 6.822 1.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.845 0.000 0.000
Nallah Mouza Toheed Park UC-30
Wandala Dial Shah, Tibba Rehmat
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 38%
District and Tehsil Sheikhupura

2124 1515 Name of the Scheme Construction of Soling, Drains 0.000 2.228 0.500 0.000 2.062 0.000 0.000 0.000 2.062 2.062 0.000 0.000 0.000
and Nallah, Mouza Waghary
Approval Date 11/1/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sheikhupura

2125 1516 Name of the Scheme Rural Drainage Scheme / PCC / 0.000 6.000 0.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 4.400 0.000 0.000
Soling Scheme, Nizampura,
Farooqabad, District Sheikhupura
Approval Date Approved
Major Components Sewer System and disposal work etc.
Major Targets 36%
District and Tehsil Sheikhupura

2126 1517 Name of the Scheme Construction of Rural PCC and 0.000 31.795 0.500 0.000 5.000 0.000 0.000 0.000 5.000 5.000 31.064 0.000 0.000
Drainage Scheme at UC Noon
Allied Abadies
Approval Date 23-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 15%
District and Tehsil Sheikhupura

522
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2127 1518 Name of the Scheme Rehabilitation of Streets of 0.000 79.696 0.500 0.000 2.000 0.000 0.000 0.000 2.000 2.000 89.150 0.000 0.000
Narang Mandi Town
Approval Date 23-05-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 3%
District and Tehsil Sheikhupura

2128 1519 Name of the Scheme Extension Rural Drainage Scheme 0.000 9.838 8.661 0.000 2.653 0.000 0.000 0.000 2.653 2.653 0.000 0.000 0.000
Miani, Sadra Badra, Suyedanwali,
Kotli Amir
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2129 1520 Name of the Scheme Extension Rural Drainage Scheme 0.000 9.793 7.726 0.000 3.536 0.000 0.000 0.000 3.536 3.536 0.000 0.000 0.000
Saho Chak Badipur, Chahal
Manewali
Approval Date 18-05-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2130 1521 Name of the Scheme Extension Rural Drainage Scheme 0.000 4.995 3.055 0.000 2.690 0.000 0.000 0.000 2.690 2.690 0.000 0.000 0.000
Kakhwanwali
Approval Date 10/10/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2131 1522 Name of the Scheme Rural Drainage Scheme Bhathay, 0.000 8.475 5.668 0.000 4.078 0.000 0.000 0.000 4.078 4.078 0.000 0.000 0.000
Kalan, Sadheray Wahgray Garhi
Karloop
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

523
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2132 1523 Name of the Scheme Rural Drainage Scheme Baghwal 0.000 6.827 5.463 0.000 2.388 0.000 0.000 0.000 2.388 2.388 0.000 0.000 0.000
Awan, Bahoo Bhatti, Shanker Pur
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2133 1524 Name of the Scheme Rural Drainage Scheme 0.000 7.413 5.492 0.000 3.033 0.000 0.000 0.000 3.033 3.033 0.000 0.000 0.000
Partanwali, Gillan Chak Sirajwali,
Aakiwal
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2134 1525 Name of the Scheme Rural Drainage Scheme Badhal 0.000 7.834 6.479 0.000 2.530 0.000 0.000 0.000 2.530 2.530 0.000 0.000 0.000
Channo Mom, Nawan Pind, Akbar
Abad
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2135 1526 Name of the Scheme Rural Drainage Scheme Chak 0.000 9.742 5.991 0.000 3.000 0.000 0.000 0.000 3.000 3.000 2.212 0.000 0.000
Bidia, Tarkalian, Darghanwali,
Sada Chak Baghowal
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 80%
District and Tehsil Sialkot

2136 1527 Name of the Scheme Extension Rural Drainage Scheme 0.000 9.405 6.177 0.000 4.639 0.000 0.000 0.000 4.639 4.639 0.000 0.000 0.000
Aley Wali, Molowal, Chak Baso,
Kotli Joia, Nawan Pind Lopowali,
Kotli Miani, Kotli Channo
Approval Date 19-03-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

524
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2137 1528 Name of the Scheme Extension Rural Drainage Scheme 0.000 10.862 11.948 0.000 0.543 0.000 0.000 0.000 0.543 0.543 0.000 0.000 0.000
Channi Gondal, Laelwali
Approval Date 10/10/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2138 1529 Name of the Scheme Extension Rural Drainage Scheme 0.000 43.905 33.198 0.000 2.000 0.000 0.000 0.000 2.000 2.000 15.293 0.000 0.000
Sohawala
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 70%
District and Tehsil Sialkot

2139 1530 Name of the Scheme Extension Rural Drainage Scheme 0.000 13.136 10.200 0.000 4.906 0.000 0.000 0.000 4.906 4.906 0.000 0.000 0.000
Dhilum Balagon, Kung Chailo
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2140 1531 Name of the Scheme Extension Rural Drainage Scheme 0.000 14.568 10.420 0.000 3.244 0.000 0.000 0.000 3.244 3.244 3.089 0.000 0.000
Kulluwal
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 82%
District and Tehsil Sialkot

2141 1532 Name of the Scheme Extension Rural Drainage Scheme 0.000 9.598 7.282 0.000 3.756 0.000 0.000 0.000 3.756 3.756 0.000 0.000 0.000
Gojra
Approval Date 8/10/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

525
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2142 1533 Name of the Scheme Rural Drainage Scheme Mitranwali 0.000 27.786 8.988 0.000 3.000 0.000 0.000 0.000 3.000 3.000 19.966 0.000 0.000
Approval Date 13-09-2007
Major Components Sewer System and disposal work etc.
Major Targets 38%
District and Tehsil Sialkot

2143 1534 Name of the Scheme Rural Drainage Scheme Habib Pur 0.000 9.350 3.147 0.000 3.000 0.000 0.000 0.000 3.000 3.000 4.606 0.000 0.000
Approval Date 27-08-2007
Major Components Sewer System and disposal work etc.
Major Targets 57%
District and Tehsil Sialkot

2144 1535 Name of the Scheme Rural Drainage Scheme Burj 0.000 7.342 8.076 0.000 0.367 0.000 0.000 0.000 0.367 0.367 0.000 0.000 0.000
Cheema
Approval Date 10/10/2007
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2145 1536 Name of the Scheme Tameer Nullah Jatt Musewala to 0.000 1.500 0.900 0.000 0.825 0.000 0.000 0.000 0.825 0.825 0.000 0.000 0.000
Saim Nala Raja Ghumman
Approval Date 4/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2146 1537 Name of the Scheme Tameer Nullah Sulfkar Rehman 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
House to Afzal Sahi House
Bharoke
Approval Date 4/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

526
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2147 1538 Name of the Scheme Tameer Nullah Abadi Kalan to UC 0.000 0.500 0.500 0.000 0.075 0.000 0.000 0.000 0.075 0.075 0.000 0.000 0.000
Raja Ghumman
Approval Date 4/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2148 1539 Name of the Scheme Tameer Nullah Jmain Nullah Burj 0.000 1.500 1.500 0.000 0.225 0.000 0.000 0.000 0.225 0.225 0.000 0.000 0.000
Arriyan to Saim Nullah
Approval Date 4/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2149 1540 Name of the Scheme Tameer Nullah Fatima Hospital to 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
Civil Chowk Daska
Approval Date 4/2/2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2150 1541 Name of the Scheme Rural Drainage Scheme Baghiari 0.000 2.005 2.000 0.000 0.306 0.000 0.000 0.000 0.306 0.306 0.000 0.000 0.000
(UC Prail)
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

2151 1542 Name of the Scheme Drainage Nullah around Village 0.000 2.000 2.000 0.000 0.300 0.000 0.000 0.000 0.300 0.300 0.000 0.000 0.000
Shahzada UC Chahoor
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

527
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2152 1543 Name of the Scheme Construction of PCC Streets in 0.000 2.020 2.000 0.000 0.323 0.000 0.000 0.000 0.323 0.323 0.000 0.000 0.000
Chawinda Bazar UC Chawinda
Approval Date 14-02-2009
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 100%
District and Tehsil Sialkot

2153 1544 Name of the Scheme Rural Drainage Feasilities for 0.000 4.660 0.200 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.159 0.000 0.000
Village Jassoran Council in NA-
114
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 41%
District and Tehsil Sialkot

2154 1545 Name of the Scheme Rural Drainage Scheme Libbay 0.000 4.144 0.449 0.000 2.000 0.000 0.000 0.000 2.000 2.000 2.317 0.000 0.000
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 51%
District and Tehsil Sialkot

2155 1546 Name of the Scheme Construction of Main Drain for 0.000 0.800 0.300 0.000 0.620 0.000 0.000 0.000 0.620 0.620 0.000 0.000 0.000
proper sewerage system in Village
Rattian Syedan, Union Council
Bounkan, Tehsil & District Sialkot
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2156 1547 Name of the Scheme Construction of Soling & Drain at 0.000 1.500 1.000 0.000 0.725 0.000 0.000 0.000 0.725 0.725 0.000 0.000 0.000
U/C Shehi
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

528
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2157 1548 Name of the Scheme Construction of Soling & Drain at 0.000 1.500 1.000 0.000 0.725 0.000 0.000 0.000 0.725 0.725 0.000 0.000 0.000
U/C Dallowali
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2158 1549 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Kharota Syeddan
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2159 1550 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Kotli Loharan
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2160 1551 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Head Marala
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2161 1552 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Kachhi Maand
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

529
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2162 1553 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Phoklian
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2163 1554 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Gondal
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2164 1555 Name of the Scheme Construction of Soling & Drain at 0.000 1.000 1.000 0.000 0.150 0.000 0.000 0.000 0.150 0.150 0.000 0.000 0.000
U/C Pindi Khokhran
Approval Date 14-02-2009
Major Components Sewer System and disposal work etc.
Major Targets 100%
District and Tehsil Sialkot

2165 1556 Name of the Scheme Rehabilitation Sewerage Scheme 0.000 0.600 0.600 0.000 0.090 0.000 0.000 0.000 0.090 0.090 0.000 0.000 0.000
Chak No.81/5R Resoling etc
Approval Date 6.2.09
Major Components Drains,Disposal Work and other works.
Major Targets 100%
District and Tehsil Sahiwal

2166 1557 Name of the Scheme Rehabilitation Sewerage Scheme 0.000 3.479 2.500 0.000 0.472 0.000 0.000 0.000 0.472 0.472 1.029 0.000 0.000
Chak No.85/6-R
Approval Date 27.05.2009
Major Components Drains,Disposal Work and other works.
Major Targets 74%
District and Tehsil Sahiwal

530
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2167 1558 Name of the Scheme Rural Drainage Scheme Chak 0.000 10.567 5.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 5.152 0.000 0.000
No.24/11-1-L
Approval Date 28.08.08
Major Components Drains,Disposal Work and other works.
Major Targets 58%
District and Tehsil Sahiwal

2168 1559 Name of the Scheme Feasibilities for Low Cost 0.000 11.845 12.000 0.000 1.573 0.000 0.000 0.000 1.573 1.573 0.000 0.000 0.000
Sanitation/Treatment Facility for
medium/large villages in Punjab-
Pilot Sanitation Project in Village
302/GB
Approval Date 27.8.08
Major Components T/well,P.House,P.M, AC/PVC pipe etc.
Major Targets 100%
District and Tehsil Toba Tek Singh

2169 1560 Name of the Scheme Construction of Sullage Carrier 0.000 1.541 1.541 0.000 0.231 0.000 0.000 0.000 0.231 0.231 0.000 0.000 0.000
Oxidation Pound form Chak
No.256/GB Phaloor to Azafi Abadi
Chak No.256/GB
Approval Date 19.3.09
Major Components Construction of Sullage Carrier and
Oxidation Pound etx.
Major Targets 100%
District and Tehsil Toba Tek Singh

2170 1561 Name of the Scheme Sewerage Scheme, Machiwall 0.000 6.062 3.442 0.000 3.529 0.000 0.000 0.000 3.529 3.529 0.000 0.000 0.000
Approval Date 15.03.07
Major Components Sewer,Surface Drain, B/Pavement.
Major Targets 100%
District and Tehsil Vehari , Burewala

2171 1562 Name of the Scheme Rehabilitation of 0.000 16.248 8.300 0.000 2.000 0.000 0.000 0.000 2.000 2.000 8.385 0.000 0.000
Sewerage/Drainage Scheme,Tibba
Sultan Pur.
Approval Date 19.02.09
Major Components Sewer,Surface Drain, B/Pavement.
Major Targets 55%
District and Tehsil Vehari , Burewala

531
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sub-Total: Rural Sewerage Drainage 0.000 3,646.396 1,793.608 0.000 708.398 0.000 0.000 0.000 708.398 708.398 1,544.874 124.178 0.000

Punjab Basis
2172 1563 Name of the Scheme Establishment of PHE Research 0.000 20.000 5.000 0.000 10.385 0.000 0.000 0.000 10.385 10.385 7.615 0.000 0.000
and training Institute
Approval Date 2/8/2006
Major Components Capacity Building of HRM
Major Targets 67%
District and Tehsil Punjab

2173 1564 Name of the Scheme Establishment of PHED PMUs / 0.000 891.031 496.000 0.000 310.000 0.000 0.000 0.000 310.000 310.000 218.686 0.000 0.000
CDUs Staff and Design
Directorates Staff at Provincial
Level for a period of 36-Months
(Including cost of Vehicles) PHED
North Zone (1165 Posts) & South
Zone(987 Posts) Total (1152 Posts)
Approval Date 16-03-2007
Major Components Strengthening and Capacity Building of
PHED
Major Targets 79%
District and Tehsil Punjab

2174 1565 Name of the Scheme Up-gradation of Head Quarter 0.000 72.010 13.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 19.812 0.000 0.000
Office Building at 2-Lake Road,
Lahore.
Approval Date 10/11/2008
Major Components Civil Works and Allied Works
Major Targets 76%
District and Tehsil Punjab

2175 1566 Name of the Scheme Improvement & Extension of 0.000 33.293 12.000 0.000 10.385 0.000 0.000 0.000 10.385 10.385 15.902 0.000 0.000
Water Testing Laboratories
(Phase-I)
Approval Date 31-10-2006
Major Components Improvement in working of PHED
Laboratories
Major Targets 58%
District and Tehsil Punjab

532
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2176 1567 Name of the Scheme Study and preparation of 0.000 76.931 42.833 0.000 30.000 0.000 0.000 0.000 30.000 30.000 15.638 0.000 0.000
comprehensive plan of Urban
Water Supply, Sewerage Scheme
and Sewerage treatment Plant.
Approval Date 24-09-2008
Major Components To engage Consultancy Services for
preparation of master plan of urban areas
in Punjab
Major Targets 82%
District and Tehsil Punjab

2177 1568 Name of the Scheme Public awareness campaign for 0.000 25.000 3.000 0.000 25.750 0.000 0.000 0.000 25.750 25.750 0.000 0.000 0.000
preventing wastage of postable
water and Sanitation practices
through print & electric media &
seminars (Revised)
Approval Date 24-03-2007
Major Components Awareness cmpaign about safe drinking
water and santitation facilities through
electric and print media etc
Major Targets 100%
District and Tehsil Punjab

2178 1569 Name of the Scheme Strengthening and Capacity 0.000 35.600 23.780 0.000 12.160 0.000 0.000 0.000 12.160 12.160 5.000 0.000 0.000
Building of PHED in MIS / ME (PC-
I).(Revised)
Approval Date 7/9/2007
Major Components Establishment linkage among Head
quarter and Field offices with web based
MIS Software
Major Targets 88%
District and Tehsil Punjab

2179 1570 Name of the Scheme Construction of Residential 0.000 10.000 5.200 0.000 6.300 0.000 0.000 0.000 6.300 6.300 0.000 0.000 0.000
Building for Superintending
Engineer / Executive Engineer,
PHE Lahore
Approval Date 25-11-2007
Major Components Civil Works and Allied Works
Major Targets 100%
District and Tehsil Punjab

533
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2180 1571 Name of the Scheme Construction of Residential 0.000 77.987 0.100 0.000 20.000 0.000 0.000 0.000 20.000 20.000 40.000 29.585 0.000
Buildings for officers (BS-16 to 18)
Approval Date 8/5/2009
Major Components Civil Works and Allied Works
Major Targets 22%
District and Tehsil Punjab

2181 1572 Name of the Scheme Establishment of 31 Laboratories 0.000 137.147 16.000 0.000 60.000 0.000 0.000 0.000 60.000 60.000 60.000 21.719 0.000
at Districts H/Q of Punjab at
District Level (Replacement of
Outlived Water Supply lines
Causing Treats of Gastroenteries
& other Borne Disease) for a
period of 01-04.2009 to 30.06.2011
Approval Date 8/5/2009
Major Components Establishment at District Level
Major Targets 48%
District and Tehsil Punjab

Sub-Total: Punjab Basis 0.000 1,378.999 616.913 0.000 534.980 0.000 0.000 0.000 534.980 534.980 382.652 51.304 0.000

Forieign Aided Project


2182 1573 Name of the Scheme Rural Water Supply & Drainage 397.980 486.500 7.248 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Schemes Chashma Right Bank
Canal D.G.Khan(CRBC)ADB
Loan(SF-PK-1146) on the basis of
(86% ADB Loan +14% Punjab
Govt. Share)
Approval Date Approved
Major Components T/Well,D/system,R.Main,Pump
House,Drains and other allied works.
Major Targets
District and Tehsil Dera Ghazi Khan

Sub-Total: Forieign Aided Project 397.980 486.500 7.248 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000

534
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

PSDP
2183 1574 Name of the Scheme Water Supply Schemes for all 0.000 188.781 139.595 0.000 7.795 0.000 0.000 0.000 7.795 7.795 10.000 59.708 0.000
Tehsils Head Quarters of Distt.
Muzaffargarh, Kot Addu.
Approval Date 19.10.07
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,RCC sewer,
P/Machinery,OHTL,Pacca Sullage
Carrier,Diesel Oil Generartor.etc.
Major Targets 68%
District and Tehsil Muzaffargarh , Kot Addu

2184 1575 Name of the Scheme Water Supply Schemes for all 0.000 65.866 31.315 0.000 7.000 0.000 0.000 0.000 7.000 7.000 37.431 0.000 0.000
Tehsils Head Quarters of Distt.
Muzaffargarh, Jatoi.
Approval Date 19.10.07
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,RCC sewer,
P/Machinery,OHTL,Pacca Sullage
Carrier,Diesel Oil Generartor.etc.
Major Targets 51%
District and Tehsil Muzaffargarh , Jatoi

2185 1576 Name of the Scheme Water Supply Schemes for all 0.000 40.088 24.090 0.000 9.505 0.000 0.000 0.000 9.505 9.505 12.506 0.000 0.000
Tehsils Head Quarters of Distt.
Muzaffargarh, Ali Pur.
Approval Date 19.10.07
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,RCC sewer,
P/Machinery,OHTL,Pacca Sullage
Carrier,Diesel Oil Generartor.etc.
Major Targets 73%
District and Tehsil Muzaffargarh , Alipur

2186 1577 Name of the Scheme Urban Water Supply Scheme, 0.000 419.689 40.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 80.000 80.000 0.000
Muzaffargarh (Ammended)
Approval Date 10.11.08
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,RCC sewer,
P/Machinery,OHTL,Pacca Sullage
Carrier,Diesel Oil Generartor.etc.
Major Targets 12%
District and Tehsil Muzaffargarh , M/garh

535
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2187 1578 Name of the Scheme Clean Water Scheme Depalpur 0.000 67.556 59.826 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
City.
Approval Date 18-11-2006
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets
District and Tehsil Okara

2188 1579 Name of the Scheme Urban Water Supply and 0.000 643.061 20.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 100.000 101.000 0.000
Sanitation Scheme,Pakpattan and
Arifwala City.
Approval Date 17.1.09
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,RCC sewer,
P/Machinery,OHTL,Pacca Sullage
Carrier,Diesel Oil Generartor.etc.
Major Targets
District and Tehsil Pakpattan , Pakpattan/Arifwala

2189 1580 Name of the Scheme Urban Water Supply T.T.Singh 0.000 391.000 50.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 0.000 0.000 0.000
Approval Date Approved
Major Components Source,T/Well,P/Machinery,Electrification,
staff Quarter,P/Machinery, D/System etc.
Major Targets
District and Tehsil Toba Tek Singh

2190 1581 Name of the Scheme Drainage Scheme & Sewerage 0.000 54.815 57.639 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
System Okara City (KPP
Programme)
Approval Date 25-10-2007
Major Components Sewer System and disposal work etc.
Major Targets
District and Tehsil Okara

2191 1582 Name of the Scheme Sewerage / Drainage Scheme 0.000 201.959 189.660 0.000 10.000 0.000 0.000 0.000 10.000 10.000 32.593 0.000 0.000
South Disposal Okara City (KPP
Programme)
Approval Date 25-10-2007
Major Components Sewer System and disposal work etc.
Major Targets
District and Tehsil Okara

536
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2192 1583 Name of the Scheme Urban Sewerage / Drainage 0.000 78.850 15.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 55.678 0.000 0.000
Scheme Ferozewala
Approval Date 18.10.2008
Major Components Sewer System and disposal work etc.
Major Targets 39%
District and Tehsil Sheikhupura

2193 1584 Name of the Scheme Urban Sewerage / Drainage 0.000 489.045 25.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 200.000 287.402 0.000
Scheme Muridke
Approval Date 22-11-2008
Major Components Sewer System and disposal work etc.
Major Targets 13%
District and Tehsil Sheikhupura

2194 1585 Name of the Scheme Rural Water Supply / Sewerage & 0.000 1,120.670 0.000 0.000 2.700 0.000 0.000 0.000 2.700 2.700 0.000 0.000 0.000
Drainage Under P.M Package in
Multan (27 No Scheem) :-
Approval Date Approved
Major Components
Major Targets
District and Tehsil multan

Sub-Total: PSDP 0.000 3,761.380 652.125 0.000 243.000 0.000 0.000 0.000 243.000 243.000 528.207 528.110 0.000
Total: ON-GOING SCHEMES 397.980 35,827.413 11,795.343 0.000 6,000.000 0.000 0.000 0.000 6,000.000 6,000.000 11,521.663 7,772.634 230.000

NEW SCHEMES
Urban Water Supply
2195 1586 Name of the Scheme Augmentation of Water Supply 0.000 600.000 0.000 0.000 150.000 0.000 0.000 0.000 150.000 150.000 255.000 285.000 0.000
Scheme, Sargodha
Approval Date Un-approved
Major Components i) Sourceii) Main Pipe Line, Distribution &
Machinery
Major Targets 25%
District and Tehsil Sargodha

537
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2196 1587 Name of the Scheme Ext. Urban Water Supply Scheme 0.000 300.000 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 120.000 150.000 0.000
& Sewerage Nankana Sahib
Approval Date Un-approved
Major Components i) Sourceii) Main Pipe Line, Distribution &
Machinery
Major Targets 25%
District and Tehsil Nankana Sahib

2197 1588 Name of the Scheme Comprehensive water Supply & 0.000 400.000 0.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 170.000 190.000 0.000
Sewearge Scheme Khushab
Approval Date Un-approved
Major Components i) Sourceii) Main Pipe Line, Distribution &
Machinery
Major Targets 25%
District and Tehsil Khushab

2198 1589 Name of the Scheme Comprehensive water supply & 0.000 400.000 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 165.000 220.000 0.000
Sewerage Scheme Mianwali
Approval Date Un-approved
Major Components i) Sourceii) Main Pipe Line, Distribution &
Machinery
Major Targets 18%
District and Tehsil Mianwali

2199 1590 Name of the Scheme Rehabilation of Water Supply 0.000 20.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 20.000 0.000 0.000
Scheme Khewra
Approval Date Un- Approved
Major Components ) Source ii) Main Pipe Distribution &
Machinery
Major Targets 30%
District and Tehsil Jhelum , P. D. Khan

2200 1591 Name of the Scheme Water Supply Scheme Kot Momin 0.000 50.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 40.000 0.000 0.000
Approval Date Un- Approved
Major Components ) Source ii) Main Pipe Distribution &
Major Targets 15%
District and Tehsil Sargodha

Sub-Total: Urban Water Supply 0.000 1,770.000 0.000 0.000 420.000 0.000 0.000 0.000 420.000 420.000 770.000 845.000 0.000

538
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Urban Sewerage Drainage


2201 1592 Name of the Scheme Urban Sewerage Scheme Jhelum 0.000 400.000 0.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 170.000 190.000 0.000
with Treatment Plant
Approval Date Un-approved
Major Components Sewer System and disposal work etc.
Major Targets 25%
District and Tehsil Jhelum

2202 1593 Name of the Scheme Provision of Sewerage System 0.000 20.000 0.000 0.000 10.000 0.000 0.000 0.000 10.000 10.000 10.000 0.000 0.000
Lala Musa
Approval Date Un- Approved
Major Components Sewer System and disposal work etc.
Major Targets 30%
District and Tehsil Gujrat

2203 1594 Name of the Scheme Urban Sewerage Drainage 0.000 125.000 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 70.000 25.000 0.000
Scheme, Pattoki
Approval Date Un-app.
Major Components Drains,Disposal Work and other works.
Major Targets 25%
District and Tehsil Kasur , Pattoki

Sub-Total: Urban Sewerage Drainage 0.000 545.000 0.000 0.000 140.000 0.000 0.000 0.000 140.000 140.000 250.000 215.000 0.000

Rural Water Supply


2204 1595 Name of the Scheme Rehabilitation of Non Functional 0.000 800.000 0.000 0.000 800.000 0.000 0.000 0.000 800.000 800.000 0.000 0.000 0.000
Rural Water Supply Schemes (232)
Approval Date Un- Approved
Major Components Source ii) Main Pipe Distribution &
Major Targets 100%
District and Tehsil Punjab

2205 1596 Name of the Scheme Water Supply and Sanitation 0.000 955.000 0.000 0.000 955.000 0.000 0.000 0.000 955.000 955.000 0.000 0.000 0.000
Schemes
Approval Date Un- Approved
Major Components
Major Targets 100%
District and Tehsil Punjab

Sub-Total: Rural Water Supply 0.000 1,755.000 0.000 0.000 1,755.000 0.000 0.000 0.000 1,755.000 1,755.000 0.000 0.000 0.000
539
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Punjab Basis
2206 1597 Name of the Scheme Establishment of Incubation & 0.000 15.000 0.000 0.000 15.000 0.000 0.000 0.000 15.000 15.000 15.000 0.000 0.000
Facilitation Centers for new
Consultancy in HUD & PHED
Approval Date Un-app.
Major Components
Major Targets 100%
District and Tehsil Punjab

2207 1598 Name of the Scheme Provision of Funds for incomplete 0.000 100.000 0.000 0.000 25.000 0.000 0.000 0.000 25.000 25.000 75.000 0.000 0.000
Schemes Targetted for 2008-09
Approval Date Un-app.
Major Components i) Source ii) Main Pipe Distribution &
Machinery
Major Targets 25%
District and Tehsil Punjab

2208 1599 Name of the Scheme Improvement of Drinking Water 0.000 500.000 0.000 0.000 45.000 0.000 0.000 0.000 45.000 45.000 100.000 200.000 155.000
Quality in all Arsenic Affected
areas of Punjab
Approval Date Un-app.
Major Components To improve the working of the
Department.
Major Targets 9%
District and Tehsil Punjab

2209 1600 Name of the Scheme Digital Mapping of Urban / Rural 0.000 20.000 0.000 0.000 20.000 0.000 0.000 0.000 20.000 20.000 0.000 0.000 0.000
Areas
Approval Date Un-app.
Major Components Identification of Sewerage/Drainage
alternate disposal treatment solid waste
water facilities.
Major Targets 100%
District and Tehsil Punjab

540
WATER SUPPLY & SANITATION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2210 1601 Name of the Scheme Construction of PHED Office 0.000 50.000 0.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 0.000 0.000 0.000
Buildings in Punjab.
Approval Date Un-app.
Major Components Civil and allied works
Major Targets 100%
District and Tehsil Punjab

2211 1602 Name of the Scheme Third Party Validation for Quality 0.000 30.000 0.000 0.000 30.000 0.000 0.000 0.000 30.000 30.000 0.000 0.000 0.000
Control of the New Initiatives
through out Punjab
Approval Date Un-app.
Major Components Checking of Civil Works
Major Targets 100%
District and Tehsil Punjab

Sub-Total: Punjab Basis 0.000 715.000 0.000 0.000 185.000 0.000 0.000 0.000 185.000 185.000 190.000 200.000 155.000
Total: NEW SCHEMES 0.000 4,785.000 0.000 0.000 2,500.000 0.000 0.000 0.000 2,500.000 2,500.000 1,210.000 1,260.000 155.000

Grand Total 397.980 40,612.413 11,795.343 0.000 8,500.000 0.000 0.000 0.000 8,500.000 8,500.000 12,731.663 9,032.634 385.000

541
SOCIAL PROTECTION

542
SOCIAL PROTECTION

VISION

Strive to attain the ultimate objective of welfare state according to collective social and ethical aspirations of people free form exploitation, deprivation
and discrimination.

POLICY

• The major objective in the social protection sector is the creation of welfare facilities and healthy living opportunities of vulnerable groups
including destitute and old age women and Children.
• Gender mainstreaming in Public and Private Setup.
• Impart marketable skills for self employment.
• Eradication of drug menace and rehabilitation of drug addicts.
• Establishment of beggar centre to eradicate menace of beggary from the society.

NEW INITITAIVES

• Establishment of working women hostel at Sahiwal


• Construction of building of shelter home at Attock
• Establishment of welfare home for beggars at Lahore.
• Establishment of Family counseling centres at Lahore & Rawalpindi
• Establishment of one stop crisis centres at the major hospitals of Lahore.
• Socio Economic Development of Destitute & Neglected Children Families under the Head of Child Protection.
• Establishment of 100 Vocational training institutes by Punjab Vocational Training Council and up gradation of 134 Existing VTIS.

543
MTDF 2009-12
Social Protection : Summary
Development Programme 2009-10

(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Social Protection 251.925 633.075 885.000 0.000 885.000 12.000 3.000 15.000 0.000 15.000 263.925 636.075 900.000 0.000 900.000
Total 251.925 633.075 885.000 0.000 885.000 12.000 3.000 15.000 0.000 15.000 263.925 636.075 900.000 0.000 900.000
Number of Schemes 15 6 21
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Social Protection 262.121 625.879 888.000 0.000 888.000 175.350 136.650 312.000 0.000 312.000 437.471 762.529 1,200.000 0.000 1,200.000
Total 262.121 625.879 888.000 0.000 888.000 175.350 136.650 312.000 0.000 312.000 437.471 762.529 1,200.000 0.000 1,200.000
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
Social Protection 540.250 569.750 1,110.000 0.000 1,110.000 198.950 191.050 390.000 0.000 390.000 739.200 760.800 1,500.000 0.000 1,500.000
Total 540.250 569.750 1,110.000 0.000 1,110.000 198.950 191.050 390.000 0.000 390.000 739.200 760.800 1,500.000 0.000 1,500.000
SOCIAL PROTECTION MTDF 2009-12 GRAND TOTAL 3,600.000

544
SOCIAL PROTECTION: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Social Welfare, Women 13 251.925 333.416 0.000 0.000 251.925 333.416 585.341 353.528 0.000
Development & Bait-ul-Maal
Punjab Vocational & 1 0.000 134.870 0.000 0.000 0.000 134.870 134.870 0.000 0.000
Training Council
Child Protection & Welfare 1 0.000 164.789 0.000 0.000 0.000 164.789 164.789 72.351 0.000
Bureau (CPWB)
Total: ON-GOING SCHEMES 15 251.925 633.075 0.000 0.000 251.925 633.075 885.000 425.879 0.000
NEW SCHEMES
Social Welfare, Women 6 12.000 3.000 0.000 0.000 12.000 3.000 15.000 104.000 51.000
Development & Bait-ul-Maal
Total: NEW SCHEMES 6 12.000 3.000 0.000 0.000 12.000 3.000 15.000 104.000 51.000

Grand Total 21 263.925 636.075 0.000 0.000 263.925 636.075 900.000 529.879 51.000

545
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Social Welfare, Women Development & Bait-ul-Maal
2212 1 Name of the Scheme Construction of Building of 0.000 35.144 10.000 25.144 0.000 0.000 0.000 25.144 0.000 25.144 0.000 0.000 0.000
Gehwara at Rawalpindi.
Approval Date Approved 28/08/ 2008
Major Components Construction of building
Major Targets Completion of construction work
District and Tehsil Rawalpindi

2213 2 Name of the Scheme Construction of Building of 0.000 23.990 15.000 8.990 0.000 0.000 0.000 8.990 0.000 8.990 0.000 0.000 0.000
District Industrial Home (Dih) At
Rawalpindi
Approval Date Approved 19/08/ 2008
Major Components Construction of building
Major Targets Completion of construction work
District and Tehsil Rawalpindi

2214 3 Name of the Scheme Establishment of Children Homes 0.000 39.542 16.000 13.719 9.823 0.000 0.000 13.719 9.823 23.542 0.000 0.000 0.000
(Orphanages) at Gujranwala
Approval Date Approved 10/09/08
Major Components Boarding & lodging facility, Medical care,
Technical & Vocational trainning,
Religious education.
Major Targets completion of construction work, finalizing
purchases, Provision of institutional care
to 400 orphan children annually.
District and Tehsil Gujranwala

546
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2215 4 Name of the Scheme Enhancing capacity of existing 0.000 160.710 93.952 66.153 0.912 0.000 0.000 66.153 0.912 67.065 0.000 0.000 0.000
Women Development Centre in
Model Town Extension Lahore
Approval Date Approved 03/07/2008
Major Components Construction of building, including day
care centre, display centre, nursery
classes, gym, library ,staff room &
production centre
Major Targets Completion of construction work,
finalizing purchases & conducting
trainings in 25 different skills & training
10,000 trainees per year.
District and Tehsil Lahore

2216 5 Name of the Scheme Strengthening & upgradation of 0.000 23.207 5.000 0.916 17.291 0.000 0.000 0.916 17.291 18.207 0.000 0.000 0.000
home for disabled persons
(Nasheman)
Approval Date Approved 19/08/ 2008
Major Components Strengthening of existing structure.
provision of machinery equipment&
transport.
Major Targets Strengthening & upgradation of the
institute.
District and Tehsil Lahore

2217 6 Name of the Scheme Strengthening & capacity building 0.000 29.947 3.236 0.000 26.711 0.000 0.000 0.000 26.711 26.711 0.000 0.000 0.000
of Dar-ul-Falah
Approval Date Approved 19/08/ 2008
Major Components Strengthening of existing structure.
provision of machinery equipment &
transport.
Major Targets Strengthening & upgradation of the
institute.
District and Tehsil Lahore

547
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2218 7 Name of the Scheme Establishment of Drug 0.000 52.423 31.768 4.590 16.065 0.000 0.000 4.590 16.065 20.655 0.000 0.000 0.000
Rehabilitation Centre At Multan
Approval Date Approved 27/12/2006
Major Components Detoxification centre,vocational trainning
centre, hostel for detoxified patients&
trainning workshops for them.
Major Targets Detoxfication of 200 addicts annually,
trainning of 200 inmates in 6 different
skills, Job placement.
District and Tehsil Multan

2219 8 Name of the Scheme Implementation of Gender Reform 0.000 605.370 109.304 0.000 148.848 0.000 0.000 0.000 148.848 148.848 353.528 0.000 0.000
Action Plan (GRAP)
Approval Date Approved 18/07/2007
Major Components GRAP targets critcal areas of political,
fiscal, policy & institutional reforms,
women employment & capacity building
in public sector.
Major Targets Establishment of Grap support units all
over punjab * Gender Mainstreaming
units in 8 line departments.
District and Tehsil Punjab

2220 9 Name of the Scheme Establishment of 7 Model Children 0.000 197.952 106.175 29.908 61.869 0.000 0.000 29.908 61.869 91.777 0.000 0.000 0.000
Homes (Orphanages) in 5 districts
of Punjab
Approval Date Approved 19/08/2008
Major Components Boarding & lodging facility, medical care,
technical & vocational trainning, religious
education.
Major Targets completion of construction work, finalizing
purchases, provision of institutional care
to 400 orphan children annually.
District and Tehsil Narowal,Dera Ghazi Khan, Sialkot,
Sargodha, Rawalpindi

548
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2221 10 Name of the Scheme Strengthening and capacity 0.000 129.984 72.129 5.958 51.897 0.000 0.000 5.958 51.897 57.855 0.000 0.000 0.000
building of existing Old Age
Homes And Establishment of 3
more homes in Punjab
Approval Date Approved 19/08/2008
Major Components Refurbishment of existing old age
homes,provision of machinery, equipment
and transport.
Major Targets Completion of construction work,
recruitment of staff, provision of
institutional care to 250 old age people
District and Tehsil Sahiwal, Narowal,Toba Tek Singh,
Rawalpindi,Multan, Lahore

2222 11 Name of the Scheme Construction of building of 0.000 62.445 39.916 22.529 0.000 0.000 0.000 22.529 0.000 22.529 0.000 0.000 0.000
Shelter Homes in 5 districts of
Punjab ( Phase-I)
Approval Date Approved 19/08/2008
Major Components Construction of building of shelter homes
Major Targets completion of consruction work, provision
of shelter facilties to 250 women in
distress
District and Tehsil Jhang, Muzaffargarh, Rajanpur,
Bahawalnagar ,Toba Tek Singh

2223 12 Name of the Scheme Construction of female barracks 0.000 21.563 5.100 16.463 0.000 0.000 0.000 16.463 0.000 16.463 0.000 0.000 0.000
in the central / districts jails of
Rawalpindi & Faisalabad
Approval Date Approved 03/07/2008
Major Components Construction of female barracks in district
jail R/Pindi & central jail F/Bad.
Major Targets Completion of construction work,
provision of accommodation for 400
women prisoners in both jails.
District and Tehsil Rawalpindi,Faisalabad

549
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2224 13 Name of the Scheme Construction of building of 0.000 87.295 29.740 57.555 0.000 0.000 0.000 57.555 0.000 57.555 0.000 0.000 0.000
Shelter Homes in 5 districts of
Punjab (Phase-II)
Approval Date Approved 19/08/ 2008
Major Components Construction of building of shelter homes
Major Targets completion of consruction work, provision
of shelter facilties to 250 women in
distress
District and Tehsil Khushab, Khanewal, Vehari, Sahiwal,
Mianwali

Sub-Total: Social Welfare, Women Development & 0.000 1,469.572 537.320 251.925 333.416 0.000 0.000 251.925 333.416 585.341 353.528 0.000 0.000
Bait-ul-Maal

Punjab Vocational & Training Council


2225 14 Name of the Scheme Establishment of 100 Vocational 0.000 535.100 400.230 0.000 134.870 0.000 0.000 0.000 134.870 134.870 0.000 0.000 0.000
Training Institutes (VTIs) by
Punjab Vocational Training
Council (PVTC) and up gradation
of 134 existing VTIs.
Approval Date 09/02/2008
Major Components Establishment of VTIs and upgradation of
existing VTIs.
Major Targets Establishment of VTIs and upgradation of
existing VTIs.
District and Tehsil Punjab

Sub-Total: Punjab Vocational & Training Council 0.000 535.100 400.230 0.000 134.870 0.000 0.000 0.000 134.870 134.870 0.000 0.000 0.000

Child Protection & Welfare Bureau (CPWB)


2226 15 Name of the Scheme Socio-economic development of 0.000 360.440 123.300 0.000 164.789 0.000 0.000 0.000 164.789 164.789 72.351 0.000 0.000
destitute & neglected children's
families
Approval Date 27/11/07
Major Components Income generation grants, micro-finance,
vocational technical training
Major Targets Income generation grants, micro-finance,
vocational technical training
District and Tehsil Lahore, Gujranwala,Multan,
Faisalabad, Rawalpindi

550
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Sub-Total: Child Protection & Welfare Bureau 0.000 360.440 123.300 0.000 164.789 0.000 0.000 0.000 164.789 164.789 72.351 0.000 0.000
(CPWB)
Total: ON-GOING SCHEMES 0.000 2,365.112 1,060.850 251.925 633.075 0.000 0.000 251.925 633.075 885.000 425.879 0.000 0.000

NEW SCHEMES
Social Welfare, Women Development & Bait-ul-Maal
2227 16 Name of the Scheme Construction of building of 0.000 15.000 0.000 3.000 0.000 0.000 0.000 3.000 0.000 3.000 12.000 0.000 0.000
Shelter Home at Attock
Approval Date Un-Approved
Major Components Construction of building of shelter homes
Major Targets Completion of consruction work, provision
of shelter facilities to 250 women in
distress.
District and Tehsil Attock

2228 17 Name of the Scheme Establishment of Children Home 0.000 45.000 0.000 4.000 0.000 0.000 0.000 4.000 0.000 4.000 30.000 11.000 0.000
(Orphanage) at Faisalabad
Approval Date Un-Approved
Major Components Boarding & lodging facility, medical care,
technical & vocational trainning, religious
education.
Major Targets completion of construction work, finalizing
purchases provision o of institutional care
to 400 orphan children annually.
District and Tehsil Faisalabad

2229 18 Name of the Scheme Establishment of Beggar's Home 0.000 50.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 30.000 19.000 0.000
at Lahore
Approval Date Un-Approved
Major Components Medical treatment, psychological
counselling, vocational trainning &
rehabilitation services of beggars
Major Targets To help beggars earn their own living
through some profession.to minimize the
menance of beggary from the city.
District and Tehsil Lahore

551
SOCIAL PROTECTION (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2230 19 Name of the Scheme Establishment of hostel for 0.000 25.000 0.000 5.000 0.000 0.000 0.000 5.000 0.000 5.000 10.000 5.000 5.000
working women at Sahiwal
Approval Date Un-Approved
Major Components Construction of building of hostel,
purchase of equipment ,recruitment of
staff.
Major Targets To facilitate the 50 working women of
Sahiwal division at one time.
District and Tehsil Sahiwal

2231 20 Name of the Scheme Family Counselling Centres 0.000 60.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 10.000 4.000 45.000
Approval Date Un-Approved
Major Components Psychological therapy, counselling,
rehabilitation services. provision of round
the clock helpline service
Major Targets Strengthening of family institution in the
Community. To provide instant guidance
& counsellig to the client.
District and Tehsil Lahore ,Rawalpindi

2232 21 Name of the Scheme One stop crisis centre for women 0.000 40.000 0.000 0.000 1.000 0.000 0.000 0.000 1.000 1.000 12.000 12.000 15.000
In distress
Approval Date Un-Approved
Major Components Medical treatment, psychological
counselling & rehabilitation services of
women in distress
Major Targets To provide multiple rehabilitative services
to the women in distress.
District and Tehsil Lahore,Rawalpindi,Bahawalpur ,Multan

Sub-Total: Social Welfare, Women Development & 0.000 235.000 0.000 12.000 3.000 0.000 0.000 12.000 3.000 15.000 104.000 51.000 65.000
Bait-ul-Maal
Total: NEW SCHEMES 0.000 235.000 0.000 12.000 3.000 0.000 0.000 12.000 3.000 15.000 104.000 51.000 65.000

Grand Total 0.000 2,600.112 1,060.850 263.925 636.075 0.000 0.000 263.925 636.075 900.000 529.879 51.000 65.000

552
REGIONAL PLANNING

553
REGIONAL PLANNING
VISION

Eliminate regional disparities by bridging the gap between developed and less developed areas and providing equal opportunities of income
generation and growth to all areas in Punjab.

POLICY

• Removal of regional imbalances


• Multi-sectoral integrated development programmes in the less privileged areas i.e. Barani tract, Cholistan Thal and parts of Southern
Punjab.
• Provision of physical and social infrastructure in Cholistan (water, electricity and roads) under Cholistan Development Authority.
• Special focused interventions in the poorer districts of Southern Punjab
• Targeted poverty alleviation schemes for less development areas.

STRATEGIC INTERVENTIONS

• Southern Punjab Development Programme


• DFID assisted Punjab Economic Opportunities Programme in Southern Areas.
• Command Areas Development Project of Small Dams and Contiguous Areas in Pothohar Region, Barani Tracts of Punjab.
• Water Resource Development (through Construction of 200 Mini Dams alongwith Command Area Development) of Pothohar Region,
Barani Areas of Punjab.
• Provision of Necessary Infrastructure like Roads and Water Supply in Cholistan Area.
• Shaadbad Cholistan Project.
• Provision of Drinking water through pipe line from Bahawal Canal at Jaganpir to Khutri Dahar Water Works.

554
OUTCOME-BASED TARGETS
ACTIVITIES TARGETS 2009-10
Southern Punjab
Community Development Sub-Projects 85
Rehabilitation & construction of jeep-able tracks/ Pacca Roads 64
Alternate Energy Resources 14 chaks
Institutional Support (training) in Education and Health fields 714
Water Resources Development (Small Dam Reservoirs etc.) 3
Skill Development 20,000 Persons
Livestock Sector Loans 10,000 Loans

Barani Area
Medium Scale Interventions 216
Training of community members 2200
No. of Loans 7000
Small Scale Interventions 600
Mini Dams with Water Conveyance System 75
Ponds / Water Storage Tanks , Dug / Sump Wells with Water Conveyance System 100
Lift Irrigation System 10
Establishment of Nurseries including Fruit Plants 9
Check Dams and Related Soil Conservation Work 400 acres
Cholistan Development Programme
Water Supply through Pipelines 4 chaks
Canal Water Storages Ponds 10
Construction and Rehabilitation of Roads 23 KM
VR Bridges 3
Veterinary Dispensaries 6

555
MTDF 2009-12
Regional Planning : Summary
Development Programme 2009-10

(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
SOUTHERN PUNJAB DEVELOPMENT PROGRAMME 0.000 0.000 0.000 0.000 0.000 3,000.000 2,000.000 5,000.000 0.000 5,000.000 3,000.000 2,000.000 5,000.000 0.000 5,000.000
PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID) 0.000 0.000 0.000 0.000 0.000 0.000 700.000 700.000 700.000 1,400.000 0.000 700.000 700.000 700.000 1,400.000
AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD) 8.376 131.624 140.000 400.000 540.000 0.000 150.000 150.000 0.000 150.000 8.376 281.624 290.000 400.000 690.000
CHOLISTAN DEVELOPMENT AUTHORITY (CDA) 0.000 225.000 225.000 0.000 225.000 0.000 100.000 100.000 0.000 100.000 0.000 325.000 325.000 0.000 325.000
INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN
0.000 50.000 50.000 0.000 50.000 0.000 0.000 0.000 0.000 0.000 0.000 50.000 50.000 0.000 50.000
PUNJAB (PRSP)
Bahawalpur Rural Development Project (BRDP) 0.000 10.000 10.000 0.000 10.000 0.000 0.000 0.000 0.000 0.000 0.000 10.000 10.000 0.000 10.000
Total 8.376 416.624 425.000 400.000 825.000 3,000.000 2,950.000 5,950.000 700.000 6,650.000 3,008.376 3,366.624 6,375.000 1,100.000 7,475.000
No. of schemes 54 11 65
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID) 0.000 950.000 950.000 950.000 1,900.000 0.000 0.000 0.000 0.000 0.000 0.000 950.000 950.000 950.000 1,900.000
AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD) 20.000 426.282 446.282 794.000 1,240.282 0.000 150.000 150.000 0.000 150.000 20.000 576.282 596.282 794.000 1,390.282
CHOLISTAN DEVELOPMENT AUTHORITY (CDA) 0.000 597.125 597.125 0.000 597.125 0.000 200.000 200.000 0.000 200.000 0.000 797.125 797.125 0.000 797.125
INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN
0.000 100.000 100.000 0.000 100.000 0.000 0.000 0.000 0.000 0.000 0.000 100.000 100.000 0.000 100.000
PUNJAB (PRSP)
NEW INITIATIVES 0.000 0.000 0.000 0.000 0.000 3,000.000 1,812.593 4,812.593 0.000 4,812.593 3,000.000 1,812.593 4,812.593 0.000 4,812.593
Total 20.000 2,073.407 2,093.407 1,744.000 3,837.407 3,000.000 2,162.593 5,162.593 0.000 5,162.593 3,020.000 4,236.000 7,256.000 1,744.000 9,000.000
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
PUNJAB ECONOMIC OPPORTUNITIES PROGRAMME (DFID) 0.000 950.000 950.000 950.000 1,900.000 0.000 0.000 0.000 0.000 0.000 0.000 950.000 950.000 950.000 1,900.000
AGENCY FOR BARANI AREAS DEVELOPMENT (ABAD) 16.000 590.000 606.000 265.000 871.000 0.000 200.000 200.000 0.000 200.000 16.000 790.000 806.000 265.000 1,071.000
CHOLISTAN DEVELOPMENT AUTHORITY (CDA) 0.000 376.000 376.000 0.000 376.000 0.000 200.000 200.000 0.000 200.000 0.000 576.000 576.000 0.000 576.000
INTEGRATED POVERTY ALLEVIATION PROGRAMME FOR SOUTHERN
0.000 163.130 163.130 0.000 163.130 0.000 100.000 100.000 0.000 100.000 0.000 263.130 263.130 0.000 263.130
PUNJAB (PRSP)
NEW INITIATIVES 0.000 0.000 0.000 0.000 0.000 4,000.000 2,189.870 6,189.870 0.000 6,189.870 4,000.000 2,189.870 6,189.870 0.000 6,189.870
Total 16.000 2,079.130 2,095.130 1,215.000 3,310.130 4,000.000 2,689.870 6,689.870 0.000 6,689.870 4,016.000 4,769.000 8,785.000 1,215.000 10,000.000
REGIONAL PLANNING MTDF 2009-12 GRAND TOTAL: 26,475.000

556
REGIONAL PLANNING: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES
Integrated Poverty 1 0.000 50.000 0.000 0.000 0.000 50.000 50.000 100.000 163.130
Alleviation Programme for
Southern Punjab (PRSP)
Agency for Barani Areas 3 8.376 131.624 0.000 400.000 8.376 531.624 540.000 978.282 326.094
Development (ABAD)
Cholistan Development 49 0.000 225.000 0.000 0.000 0.000 225.000 225.000 381.707 167.025
Authority (CDA)
Bahawalpur Rural 1 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000
Development Project (BRDP)
Total: ON-GOING SCHEMES 54 8.376 416.624 0.000 400.000 8.376 816.624 825.000 1,459.989 656.249
NEW SCHEMES
Southern Punjab 1 3,000.000 2,000.000 0.000 0.000 3,000.000 2,000.000 5,000.000 0.000 0.000
Development Programme
Punjab Economic 1 0.000 700.000 0.000 700.000 0.000 1,400.000 1,400.000 1,900.000 1,900.000
Opportunities Programme
(DFID).
Agency for Barani Areas 3 0.000 150.000 0.000 0.000 0.000 150.000 150.000 260.000 295.000
Development (ABAD)
Cholistan Development 6 0.000 100.000 0.000 0.000 0.000 100.000 100.000 217.418 154.582
Authority (CDA)
Total: NEW SCHEMES 11 3,000.000 2,950.000 0.000 700.000 3,000.000 3,650.000 6,650.000 2,377.418 2,349.582

Grand Total 65 3,008.376 3,366.624 0.000 1,100.000 3,008.376 4,466.624 7,475.000 3,837.407 3,005.831

557
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Integrated Poverty Alleviation Programme for Southern Punjab (PRSP)
2233 1 Name of the Scheme Integrated Poverty Alleviation 0.000 608.130 295.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 100.000 163.130 0.000
Programme for Southern Punjab
(PRSP)
Approval Date Approved 27-05-2006
Major Components CO formulation, Community Physical,
infrastructure schmes, Activists to be
trained through Community Trainings,
Credit Disbursement
Major Targets No. 1000, No. 193, No. 2000
District and Tehsil Muzaffargarh, Dera Ghazi Khan,
Rajanpur, Layyah , M.Garh, D.G.Khan,
Rajanpur, Layyah

Sub-Total: Integrated Poverty Alleviation 0.000 608.130 295.000 0.000 50.000 0.000 0.000 0.000 50.000 50.000 100.000 163.130 0.000
Programme for Southern Punjab (PRSP)

Agency for Barani Areas Development (ABAD)


2234 2 Name of the Scheme Addition/ Alteration of old ABAD 0.000 28.745 11.055 8.376 9.314 0.000 0.000 8.376 9.314 17.690 0.000 0.000 0.000
Colony
Approval Date Approved 05-06-2007 Revised 14-02-
2009
Major Components Repair, Renovation and Alteration
Major Targets Repair and Renovation of Houses of
ABAD Colony
District and Tehsil Rawalpindi

558
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2235 3 Name of the Scheme Sustainable Livelihood in Barani 2,460.000 3,516.000 1,182.180 0.000 92.165 0.000 400.000 0.000 492.165 492.165 978.282 326.094 0.000
Areas Project.
Approval Date Approved ECNEC 25-02-2005
Major Components 1. Union Council Development
Component, 2. Targeted Poverty
Allevation, 3. Literacy Through Skill
Training
Major Targets Medium Scale Intervention (MIS)=955,
Formulation of COs=4738, Training of
COs=42292, Loans=46062, Small Scale
Interventions = 2216, Income Generation
Training = 25,000, Literacy/skill trainings
= 12000, Training of master trainers=60.
District and Tehsil Rawalpindi, Jhelum, Chakwal,
Mianwali, Sialkot, Gujrat, Bhakkar,
Layyah, Narowal, Khushab , Kotli
Sattian, Jhelum, C.S.Shah, Mianwali,
Isa Khel, Piplan, Pasrur, Sari Alamgir,
Kharian, Bhakkar, Darya Khan,
Mankera, Layyah, Narowal, Khushab,
Nurpur

2236 4 Name of the Scheme Development of Left Over Barani 0.000 60.000 29.855 0.000 30.145 0.000 0.000 0.000 30.145 30.145 0.000 0.000 0.000
Areas.
Approval Date Approved 25-01-2007
Major Components Soil & Water Resources Development
Major Targets 1. Mini Dams with Water Conveyance
System (25 Nos.), 2. Ponds/ Water
Storage Tanks, Dugs/Sums Wells with
Water Conveyance System (40 N0s), 3.
Lift Irrigation System (10 Nos.), 4. Estt. Of
Nurseries including Furit Plants (09 Nos.).
5. Check Dams and related Soil
Conservation Works (400 Acers).
District and Tehsil Attock, Rawalpindi, Jhelum, Chakwal, ,
Fatehjhang, Rawalpindi, Taxila,
Khuhta, Kallar Syedan & Murree,
Sohawa, Chakwal, Kalar Kahar.

Sub-Total: Agency for Barani Areas Development 2,460.000 3,604.745 1,223.090 8.376 131.624 0.000 400.000 8.376 531.624 540.000 978.282 326.094 0.000
(ABAD)

559
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Cholistan Development Authority (CDA)


2237 5 Name of the Scheme Construction of Missing Link road 0.000 19.973 10.000 0.000 2.973 0.000 0.000 0.000 2.973 2.973 7.000 0.000 0.000
from Pul Kalar wala to Qila
Derawar (Phase-II).
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 8 Km
District and Tehsil Bahawalpur , Yazman

2238 6 Name of the Scheme Const. Of Metalled Road from 0.000 7.081 3.000 0.000 4.081 0.000 0.000 0.000 4.081 4.081 0.000 0.000 0.000
Mithra Road to Qilla Derawar
Along 1-L Derawar (Phase-II)
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 2 Km
District and Tehsil Bahawalpur , Yazman

2239 7 Name of the Scheme Construction of Missing Link road 0.000 10.248 6.000 0.000 4.248 0.000 0.000 0.000 4.248 4.248 0.000 0.000 0.000
from Yazman-Kud wala road to
87/DB road via 86/DB (Alif).
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 4 Km
District and Tehsil Bahawalpur , Yazman

2240 8 Name of the Scheme Construction of Metalled Road 0.000 10.037 6.598 0.000 3.439 0.000 0.000 0.000 3.439 3.439 0.000 0.000 0.000
from Jugaitpir to Mouza Jand
Awan.
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 5 Km
District and Tehsil Bahawalpur , Yazman

560
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2241 9 Name of the Scheme Construction of Metalled Road 0.000 13.996 11.774 0.000 2.222 0.000 0.000 0.000 2.222 2.222 0.000 0.000 0.000
from 74/DB to NAGRA.
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 4 Km
District and Tehsil Bahawalpur , Yazman

2242 10 Name of the Scheme Const. of Missing Link Road from 0.000 9.129 5.039 0.000 4.090 0.000 0.000 0.000 4.090 4.090 0.000 0.000 0.000
133/DNB Kalar Wala Road to Pul
Chak No. 134/DNB Road via Chak
No. 135/DNB Abadi Deh.
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 4 Km
District and Tehsil Bahawalpur , Yazman

2243 11 Name of the Scheme Construction of 10 Nos. 0.000 20.000 12.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 4.000 0.000 0.000
Veterinary Dispensaries in
Cholistan.
Approval Date Approved 07.03.2007
Major Components Provision of Veterinary Dispensary
Major Targets 10 Nos.
District and Tehsil Bahawalpur , Yazman

2244 12 Name of the Scheme Construction of Metalled Road 0.000 19.353 12.000 0.000 7.353 0.000 0.000 0.000 7.353 7.353 0.000 0.000 0.000
form Chak No. 146/DNB to Toba
Azim Wali.
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 8 Km
District and Tehsil Bahawalpur , Yazman

561
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2245 13 Name of the Scheme Construction of Metalled Road 0.000 18.357 8.347 0.000 4.010 0.000 0.000 0.000 4.010 4.010 6.000 0.000 0.000
from 58/DRB Link Canal to Bakhu
Wala.
Approval Date Approved 28.09.2006
Major Components Construction of Road
Major Targets 8 Km
District and Tehsil Bahawalpur , Yazman

2246 14 Name of the Scheme Widening & Improvement of 0.000 162.530 10.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 70.000 83.000 0.000
Metalled road from Kanday wala
Bridge to Derawar Fort District
Bahawalpur.
Approval Date Approved 31.03.2009
Major Components Widening of Road
Major Targets 34 Kms
District and Tehsil Bahawalpur , Yazman

2247 15 Name of the Scheme Widening & Improvement of 0.000 79.860 23.960 0.000 5.364 0.000 0.000 0.000 5.364 5.364 35.900 15.000 0.000
Metalled road from Mukdee
Chowk to Derbar Channanpir
District Bahawalpur.
Approval Date Approved 12.02.2009
Major Components Widening of Road
Major Targets 16.5 Kms
District and Tehsil Bahawalpur , Yazman

2248 16 Name of the Scheme Rural Water Supply Scheme at 0.000 9.364 1.000 0.000 5.364 0.000 0.000 0.000 5.364 5.364 3.000 0.000 0.000
73/DB Distt. Bahawalpur.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

562
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2249 17 Name of the Scheme Rural Water Supply Scheme at 0.000 10.256 1.000 0.000 5.256 0.000 0.000 0.000 5.256 5.256 4.000 0.000 0.000
Chak No. 144/DB District
Bahawalpur.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

2250 18 Name of the Scheme Rural Water Supply Scheme at 0.000 8.328 1.000 0.000 5.328 0.000 0.000 0.000 5.328 5.328 2.000 0.000 0.000
145/DB District Bahawalpur.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

2251 19 Name of the Scheme Rural Water Supply Scheme at 0.000 7.600 1.000 0.000 4.600 0.000 0.000 0.000 4.600 4.600 2.000 0.000 0.000
Chak No. 147/DB District
Bahawalpur.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

2252 20 Name of the Scheme Rural Water Supply Scheme Basti 0.000 9.531 1.000 0.000 5.531 0.000 0.000 0.000 5.531 5.531 3.000 0.000 0.000
Lateef Abad, Jugaitpir, and Basti
Ther district Bahawalpur.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

563
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2253 21 Name of the Scheme Solar Electrification of Houses in 0.000 19.370 17.500 0.000 1.800 0.000 0.000 0.000 1.800 1.800 0.000 0.000 0.000
Kalay Pahar, Janu Wali & Jam Sar.
Approval Date Approved 01.04.2009
Major Components Solar Energy for 135 Houses
Major Targets 1. Fan, 2. Lights, 3. Mobile Charging for
each house.
District and Tehsil Bahawalpur , Yazman

2254 22 Name of the Scheme Rural Water Supply Scheme Jinah 0.000 8.028 1.000 0.000 5.028 0.000 0.000 0.000 5.028 5.028 2.000 0.000 0.000
Colony Muttan Wali 286 more.
Approval Date Approved 01.04.2009
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Bahawalnagar , Fort Abbas

2255 23 Name of the Scheme Provision of drinking water 0.000 18.633 17.144 0.000 1.489 0.000 0.000 0.000 1.489 1.489 0.000 0.000 0.000
facilities through pipeline at
Saurian.
Approval Date Approved 23-01-2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2256 24 Name of the Scheme Provision of drinking water 0.000 21.691 15.397 0.000 4.294 0.000 0.000 0.000 4.294 4.294 2.000 0.000 0.000
facilities through pipeline Saurian
to Rither wala.
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

564
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2257 25 Name of the Scheme Provision of drinking water 0.000 15.125 4.000 0.000 4.125 0.000 0.000 0.000 4.125 4.125 4.000 7.125 0.000
facilities through pipeline Rither
wala to Chai wala (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets 73%
District and Tehsil Rahim Yar Khan , Liaqatpur

2258 26 Name of the Scheme Provision of drinking water 0.000 21.106 3.000 0.000 4.000 0.000 0.000 0.000 4.000 4.000 10.106 2.000 0.000
facilities through pipeline Rither
wala to Bahoo wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets 38%
District and Tehsil Rahim Yar Khan , Liaqatpur

2259 27 Name of the Scheme Provision of drinking water 0.000 21.278 15.664 0.000 3.614 0.000 0.000 0.000 3.614 3.614 0.000 0.000 0.000
facilities through pipeline Bahoo
wala to Lamban wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2260 28 Name of the Scheme Provision of drinking water 0.000 20.436 2.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 10.436 0.000 0.000
facilities through pipeline Lamban
wala to Ghamney wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets 39%
District and Tehsil Rahim Yar Khan , Liaqatpur

565
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2261 29 Name of the Scheme Provision of drinking water 0.000 15.128 2.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 5.128 3.000 0.000
facilities through pipeline Lamban
wala to Bhai Khan wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets 53%
District and Tehsil Rahim Yar Khan , Liaqatpur

2262 30 Name of the Scheme Provision of drinking water 0.000 18.219 12.279 0.000 3.940 0.000 0.000 0.000 3.940 3.940 2.000 0.000 0.000
facilities through pipeline 240/P to
Baghla. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2263 31 Name of the Scheme Provision of drinking water 0.000 18.719 16.711 0.000 2.008 0.000 0.000 0.000 2.008 2.008 0.000 0.000 0.000
facilities through pipeline Baghla
to Chai wala.
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2264 32 Name of the Scheme Provision of drinking water 0.000 13.373 5.413 0.000 4.960 0.000 0.000 0.000 4.960 4.960 3.000 0.000 0.000
facilities through pipeline Chai
wala to Jabil wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

566
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2265 33 Name of the Scheme Provision of drinking water 0.000 12.755 4.000 0.000 4.755 0.000 0.000 0.000 4.755 4.755 4.000 0.000 0.000
facilities through pipeline Qabil
wala to Ghari Bhit. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2266 34 Name of the Scheme Provision of drinking water 0.000 22.210 20.090 0.000 2.120 0.000 0.000 0.000 2.120 2.120 0.000 0.000 0.000
facilities through pipeline Saurian
to Dhare wala.
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2267 35 Name of the Scheme Provision of drinking water 0.000 20.080 12.000 0.000 4.080 0.000 0.000 0.000 4.080 4.080 4.000 0.000 0.000
facilities through pipeline Dhare
wala to Bhi wala.
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2268 36 Name of the Scheme Provision of drinking water 0.000 21.330 12.000 0.000 4.330 0.000 0.000 0.000 4.330 4.330 5.000 0.000 0.000
facilities through pipeline Bhi
wala to Atharan Khoi. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

567
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2269 37 Name of the Scheme Provision of drinking water 0.000 20.924 2.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 6.924 7.000 0.000
facilities through pipeline Atharan
Khoi to Khair Bara. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets 57%
District and Tehsil Rahim Yar Khan , Liaqatpur

2270 38 Name of the Scheme Provision of drinking water 0.000 18.668 2.000 0.000 5.600 0.000 0.000 0.000 5.600 5.600 11.068 0.000 0.000
facilities through pipeline Khair
Bara to Shahi wala. (Revised)
Approval Date Approved 23.01.2007
Major Components Source, Main Pipeline, Distribution &
Machinery
Major Targets Completion
District and Tehsil Rahim Yar Khan , Liaqatpur

2271 39 Name of the Scheme Construction of 9 Nos. Ponds in 0.000 13.840 5.000 0.000 5.840 0.000 0.000 0.000 5.840 5.840 3.000 0.000 0.000
Cholistan.
Approval Date Approved 30.12.2005
Major Components Provision of Ponds
Major Targets 9 Nos.
District and Tehsil Rahim Yar Khan , Liaqatpur

2272 40 Name of the Scheme Construction of 9 Nos. Ponds in 0.000 13.840 6.000 0.000 2.840 0.000 0.000 0.000 2.840 2.840 6.000 0.000 0.000
Cholistan.
Approval Date Approved 31.12.2005
Major Components Provision of Ponds
Major Targets 9 Nos.
District and Tehsil Rahim Yar Khan , Liaqatpur

568
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2273 41 Name of the Scheme Widening & Improvement of 0.000 121.390 10.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 61.000 30.000 15.390
Metalled Road from Feroza to
Head Farid.
Approval Date Approved 31.03.2009
Major Components Widening of Road
Major Targets 24 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2274 42 Name of the Scheme Const. of Metalled Road from 0.000 6.819 1.000 0.000 5.819 0.000 0.000 0.000 5.819 5.819 0.000 0.000 0.000
Chak No.159/7R to Chak
No.174/7R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 2.5 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2275 43 Name of the Scheme Const. of Metalled Road from 0.000 13.423 1.000 0.000 5.423 0.000 0.000 0.000 5.423 5.423 7.000 0.000 0.000
Feroza Head Fareed road to Chak
No.159/7R via Basti Haji Mohd.
Musa Gunian.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 5 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2276 44 Name of the Scheme Const. of Metalled Road from 0.000 11.195 1.000 0.000 5.195 0.000 0.000 0.000 5.195 5.195 5.000 0.000 0.000
186/7R to 174/7R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 4 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

569
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2277 45 Name of the Scheme Const. of Metalled Road from Pul 0.000 11.835 1.000 0.000 5.835 0.000 0.000 0.000 5.835 5.835 5.000 0.000 0.000
Noor Ifshan Bagi wali Mori to
37000 RD via Chak No.156/7R,
155/7R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 3 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2278 46 Name of the Scheme Const. of Metalled Road from 0.000 11.821 1.000 0.000 5.821 0.000 0.000 0.000 5.821 5.821 5.000 0.000 0.000
Chak No.156/7R to Chak
No.153/7R via Chak No.154/7R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 3 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2279 47 Name of the Scheme Const. of Metalled Road from 0.000 4.673 1.000 0.000 3.673 0.000 0.000 0.000 3.673 3.673 0.000 0.000 0.000
183/7R to Canal 1/L,1/R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 1.5 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

2280 48 Name of the Scheme Const. of Metalled Road from 0.000 13.265 1.000 0.000 5.265 0.000 0.000 0.000 5.265 5.265 7.000 0.000 0.000
Chak No.200/2R to Canal 2-R via
Chak No.198/2R.
Approval Date Approved 01.04.2009
Major Components Construction of Road
Major Targets 2 Kms
District and Tehsil Rahim Yar Khan , Liaqatpur

570
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2281 49 Name of the Scheme Construction of 27 Diggies fed by 0.000 25.019 3.000 0.000 5.019 0.000 0.000 0.000 5.019 5.019 17.000 0.000 0.000
Canal Water for drinking water
facilities in Cholistani Chaks
District Rahimyar Khan (Chak
183/7-R, 153/7-R, 238/1-L, 316/6-R,
313/6-R, 207/7-R, 162/7-R, 156/7-R,
189/7-R, 204/2-R, 240/1-L, 186/7-R
(Hospital), 159/7-R (Basti Habib),
227/1-L (Ghullam Din), 198/2-R
(Abdul Majeed), 199/2-R (Abdul
Aziz), 163/7-R (Jam Manzor), 243/1-
L, 269/2-L, 267/1-L, 174/7-R, 176/7-
R, 218/1-L, 219/7-R, 193/1-L, 207/2-
R, 196/1-L)
Approval Date Approved 01.04.2009
Major Components Construction of Diggies
Major Targets 27 Nos.
District and Tehsil Rahim Yar Khan , Liaqatpur

2282 50 Name of the Scheme Construction of 10 VR Bridge on 0.000 22.678 1.000 0.000 5.678 0.000 0.000 0.000 5.678 5.678 16.000 0.000 0.000
various canals in Cholistan area
(1/R Canal Near Chak 191 & 184 /
1R/7R, 1/L Canal Between Chak
220 & 218 / 1-L, 7/R Canal Near
Chak 158 & 174 / 7R, 7/R Canal
Near Chak 162 /7R (Basti
Muhammad Mutuja), 7/R Canal
Near Chak 150 & 178 /7R, 1/R
Canal Near Chak 180 & 194 / 1-R,
7/R Canal at RD 17000, 2/R Canal
in front of Chak 216 /2R, 7/R Canal
at RD 8000, 5/R Canal Near Chak
144 / 5R Near Basti Haji Kutwal)
Approval Date Approved 01.04.2009
Major Components Construction of V.R Bridges
Major Targets 10 Nos.
District and Tehsil Rahim Yar Khan , Liaqatpur

571
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2283 51 Name of the Scheme Cholistan Social Development 0.000 51.876 6.000 0.000 12.631 0.000 0.000 0.000 12.631 12.631 33.245 0.000 0.000
Project.
Approval Date Approved 01.04.2009
Major Components Community Service Centres, Agriculture
Implements Centers, Women
Development Centers and de-siltation of
tobas
Major Targets 15, 15, 200 Nos.
District and Tehsil Bahawalpur, Rahim Yar Khan,
Bahawalnagar , Yazman, Fort Abbas &
Liaqatpur

2284 52 Name of the Scheme Purchase of 07 Nos. 4x4 0.000 36.759 34.000 0.000 2.759 0.000 0.000 0.000 2.759 2.759 0.000 0.000 0.000
ambulances for Cholistan area.
Approval Date Approved 01.04.2009
Major Components Provision of Mobile Civil Dispensaries/
Ambulances at Union Council Level.
Major Targets 07 Nos.
District and Tehsil Bahawalpur, Rahim Yar Khan,
Bahawalnagar , Yazman, Fort Abbas &
Liaqatpur

2285 53 Name of the Scheme Literate Cholistan. 0.000 57.905 3.000 0.000 5.200 0.000 0.000 0.000 5.200 5.200 9.900 19.900 19.900
Approval Date Approved 01.04.2009
Major Components Literacy campain, Non Formal Basic
Education Centres (NFBEC), Education
Development Fund.
Major Targets Literacy, 75 Centers, Scholarship for
Cholistani Students.
District and Tehsil Bahawalpur, Rahim Yar Khan,
Bahawalnagar , Yazman, Fort Abbas &
Liaqatpur

Sub-Total: Cholistan Development Authority (CDA) 0.000 1,159.054 352.916 0.000 225.000 0.000 0.000 0.000 225.000 225.000 381.707 167.025 35.290

572
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Bahawalpur Rural Development Project (BRDP)


2286 54 Name of the Scheme Continuation of PMU of 0.000 59.990 49.990 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
Bahawalpur Rural Development
Project (BRDP)
Approval Date Approved
Major Components i. Construction of leftover roads, ii.
Strenthening of SSIs, iii. Community
organized farming, iv. Capacity building
and training.
Major Targets i. 12 kms, ii. 560 Nos., iii. 50 No.
District and Tehsil Bahawalpur, Bahawalnagar, Rahim Yar
Khan

Sub-Total: Bahawalpur Rural Development Project 0.000 59.990 49.990 0.000 10.000 0.000 0.000 0.000 10.000 10.000 0.000 0.000 0.000
(BRDP)
Total: ON-GOING SCHEMES 2,460.000 5,431.919 1,920.996 8.376 416.624 0.000 400.000 8.376 816.624 825.000 1,459.989 656.249 35.290

NEW SCHEMES
Southern Punjab Development Programme
2287 55 Name of the Scheme Southern Punjab Development 0.000 5,000.000 0.000 3,000.000 2,000.000 0.000 0.000 3,000.000 2,000.000 5,000.000 0.000 0.000 0.000
Programme.
Approval Date
Major Components
Major Targets
District and Tehsil

Sub-Total: Southern Punjab Development 0.000 5,000.000 0.000 3,000.000 2,000.000 0.000 0.000 3,000.000 2,000.000 5,000.000 0.000 0.000 0.000
Programme

573
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Punjab Economic Opportunities Programme (DFID).


2288 56 Name of the Scheme Punjab Economic Opportunities 0.000 6,900.000 0.000 0.000 700.000 0.000 700.000 0.000 1,400.000 1,400.000 1,900.000 1,900.000 1,700.000
Programme (DFID).
Approval Date Un-Approved
Major Components i. Skill Development, ii. Livestock & Dairy
Development, iii. Access to Land, iv.
Empowerment of the Poor, v. Social
Protection.
Major Targets 250,000 Skill Training, 150,000 Livestock
Loans
District and Tehsil Bahawalpur, Lodhran, Muzaffargarh,
Bahawalnagar , Ahmadpur East,
Bahawalpur, Hasilpur, Khairpur Tame
Wali, Yazman, Dunyapur, Karor Pacca,
Lodhran, Alipur, Jatoi, Kot Addu,
Muzaffar-garh, Bahawal-nagar,
Chishtian, Fort Abbas, Haroonabad,
Minchinabad

Sub-Total: Punjab Economic Opportunities 0.000 6,900.000 0.000 0.000 700.000 0.000 700.000 0.000 1,400.000 1,400.000 1,900.000 1,900.000 1,700.000
Programme (DFID).

Agency for Barani Areas Development (ABAD)


2289 57 Name of the Scheme Command Areas Development 0.000 500.000 0.000 0.000 75.000 0.000 0.000 0.000 75.000 75.000 200.000 225.000 0.000
Project of Small Dams and
Contiguous Areas in Pothohar
Region, Barani Tracts of Punjab
Approval Date Un-Approved
Major Components Command Areas Development, Water
Resource Development, Soil
conservation component, Farm Incom
Generating Activities.
Major Targets Command Areas Development 16 Small
Dams.
District and Tehsil Rawalpindi, Attock, Chakwal, Jhelum
, All Tehsils of Four Districts

574
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2290 58 Name of the Scheme Water Resource Development 0.000 200.000 0.000 0.000 70.000 0.000 0.000 0.000 70.000 70.000 60.000 70.000 0.000
(through Construction of 200 Mini
Dams along with Command Area
Development) of Pothohar
Region, Barani Areas of Punjab
Approval Date Un-Approved
Major Components Construction of Mini Dams and
Command Areas Development, Water
Resource Development, Soil
conservation component, Farm Incom
Generating Activities.
Major Targets 200 Mini Dams and Command Areas
Development.
District and Tehsil Rawalpindi, Attock, Chakwal, Jhelum ,
All Tehsils of Four Districts

2291 59 Name of the Scheme PC-II study of Water Resource 0.000 5.000 0.000 0.000 5.000 0.000 0.000 0.000 5.000 5.000 0.000 0.000 0.000
Development in Non Pothohar
Area, Barani Tract
Approval Date Un-Approved
Major Components Assessment of most suitable
interventions required for water resource
development and command area
development in non Pothohar barani
area, mapping of existing water
development structures, development
plan for each district highlighting available
facilities, missing facilities and proposed
facilities.
Major Targets Completion of Study
District and Tehsil

Sub-Total: Agency for Barani Areas Development 0.000 705.000 0.000 0.000 150.000 0.000 0.000 0.000 150.000 150.000 260.000 295.000 0.000
(ABAD)

575
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Cholistan Development Authority (CDA)

2292 60 Name of the Scheme Provision of Drinking water 0.000 160.000 0.000 0.000 31.000 0.000 0.000 0.000 31.000 31.000 64.418 64.582 0.000
through pipe line from Bahawal
Canal at Jugaitpir to Khutri Dahar
Water Works.
Approval Date Un-Approved
Major Components Installation of Tube well & pump house at
Bahoo Wala, Ground storage Tank,
Pumping Machinery, Generator room,
Const. of Low level reservoir.
Major Targets Rising main 40000 RFT, Underground
Tank 100000 galons, Tube wells 4, Pump
house 4 sets
District and Tehsil Bahawalpur , Yazman

2293 61 Name of the Scheme PC-II study for Cholistan 0.000 2.000 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 0.000 0.000 0.000
Rangland Development along
Perennial Canal.
Approval Date Un-Approved
Major Components Assessing the availability of fresh water
lenses, potential of rangeland
development, assessment of risks
involved in depletion of lenses
Major Targets Completion of Study
District and Tehsil Bahawalpur , Yazman

2294 62 Name of the Scheme Raising Jatropha Nursery for 0.000 5.000 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 3.000 0.000 0.000
Plantation along existing Water
Pipe Lines (Pilot Project).
Approval Date Un-Approved
Major Components Development of Jatropha Nursery,
Jatropha Plantation on 5 Acres Plot at 5
Nos. Sites.
Major Targets i. Raising of Nursery, ii. Plantation of
Jatropha on 25 Acres.
District and Tehsil Bahawalpur , Yazman

576
REGIONAL PLANNING (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2295 63 Name of the Scheme Development of Camel Sports 0.000 3.000 0.000 0.000 3.000 0.000 0.000 0.000 3.000 3.000 0.000 0.000 0.000
Festival Arena near Derawar at
Dilwash Dahar, District
Bahawalpur.
Approval Date Un-Approved
Major Components Construction of Festival Arena
Major Targets Completion
District and Tehsil Bahawalpur , Yazman

2296 64 Name of the Scheme Shaadbad Cholistan Project. 0.000 300.000 0.000 0.000 60.000 0.000 0.000 0.000 60.000 60.000 150.000 90.000 0.000
Approval Date Un-Approved
Major Components 1. 10 Selected clusters of Tobas for
development of livestock, range land, 2.
Meat processing plants, 3. Development
of Milk and Meat Chain.
Major Targets 10 Clusters of Tobas, Milk and Meat
Chain and Training
District and Tehsil Bahawalpur, Rahim Yar Khan,
Bahawalnagar , Yazman, Fort Abbas &
Liaqatpur

2297 65 Name of the Scheme PC-II for Preparation of Master 0.000 2.000 0.000 0.000 2.000 0.000 0.000 0.000 2.000 2.000 0.000 0.000 0.000
Plan for Cholistan Area.
Approval Date Un-Approved
Major Components Listing of completed Projects, Impact of
Projects on Welfare of the Communities,
Demarcation of Negaive/ Positive Areas
and Potential of Development in
Cholistan.
Major Targets Completion of Study
District and Tehsil Bahawalpur,Rahim Yar Khan,
Bahawalnagar , Yazman, Fort Abbas &
Liaqatpur

Sub-Total: Cholistan Development Authority (CDA) 0.000 472.000 0.000 0.000 100.000 0.000 0.000 0.000 100.000 100.000 217.418 154.582 0.000
Total: NEW SCHEMES 0.000 13,077.000 0.000 3,000.000 2,950.000 0.000 700.000 3,000.000 3,650.000 6,650.000 2,377.418 2,349.582 1,700.000

Grand Total 2,460.000 18,508.919 1,920.996 3,008.376 3,366.624 0.000 1,100.000 3,008.376 4,466.624 7,475.000 3,837.407 3,005.831 1,735.290

577
LG&CD

578
LOCAL GOVERNMENT AND COMMUNITY DEVELOPMENT

Local Government and Community Development sector comprises Southern Punjab Basic Urban Services Project, Punjab
Municipal Improvement Services Project, Up-gradation of Villages, Institutional Capacity Building of LG&CD and District Governments and Punjab
Development Programme.

It also covers the development of Katchi Abadies through provision of basic municipal services (water supply & sanitation, small link
roads, pavement of streets and disposal of solid waste etc.) and decent housing to devellers

VISION

Assist local governments in enhancing their financial and institutional capacity for effective and efficient delivery of municipal services.

TREND OF ALLOCATIONS
(Million Rs)
Year Original Allocation Revised Allocation
2005-06 1200 2636
2006-07 1800 2568
2007-08 6955 14291
2008-09 8410 8237
2009-10 7700

POLICY INTERVENSIONS

• Promote participatory local development based on principles of equity, responsibility and sustainability.

• Revamp UIPT in urban tehsils to improve financial health of TMAs for sustainable service delivery.

579
• Evaluation of Punjab Development, Katchi Abadies Development and Up-gradation of Villages Programmes including review of

eligibility criteria/guidelines for inclusion of schemes under the said programmes.

• Implementation of globally tested self-sustaining models for development of Katchi Abadies, in phased/prioritized manner, through innovative

instruments and partnership with agencies with proven track record.

• Strengthen social mobilization capacity of department for greater beneficiary participation and ownership in local development.

• Strengthen capacities for sustainable O&M of services in TMAs based on clear assessment of resource generation potential, rationalization of

user fees, systems for collection of user fees etc.

FUNDING STRATEGY (2009-10)

• Adequate funding for Foreign Aided Projects


• Completion of leftover works under ‘Model Villages Program’ for its evaluation and replication, if required, after selection of villages under
modified comprehensive criteria and their prioritization.
• Provision of seed money for 2-3 storey apartments and resource generation for its recycling
• Sufficient allocation for implementation of local development projects identified by public representatives

MAJOR INITIATIVES

i) Punjab Development Programme (PDP)

This programme comprises of small projects/schemes to be identified by the local representatives for employment generation, and
poverty reduction in Punjab.

580
ii) Katchi Abadies Development Programme

Out of 1210 reported Katchi Abadies, 900 have already been notified by Punjab Government. Katchi Abadies development programme

envisages provision of basic services like water supply, sewerage, roads and street lights in Katchi abadies. Under this programme, 128 and 366

abadies have been fully and partially developed respectively in Punjab. This year, a new initiative for construction of 2-3 storey apartments in two

abadies each at divisional headquarter would be initiated on pilot project basis. Same will be replication based on findings of evaluation and success

of the program.

iii) Southern Punjab Basic Urban Services (ADB Assisted)

This ADB assisted project envisages implementation of sub-projects for provision of municipal services in 21 TMAs of six districts of

Southern Punjab to improve quality of life in the deprived areas. Emphasis during this year will be on completion of remaining sub-projects and

establishment of sustainable O&M systems in TMAs.

iv) Punjab Municipal Improvement Services

Project has been sponsored by Punjab Government with World Bank’s assistance for provision of municipal infrastructure (water

supply, sewerage, solid waste management, drainage, street lighting, roads, parks development, bus stands, bridges, fire fighting and capacity

building project) in the selected TMAs. Extra efforts will be made to compensate for the earlier slow progress of this project.

v) Capacity Building Project for LG&CD

Under this initiative, Strategic Policy Unit (SPU) Model, already implemented in Faisalabad, would be replicated in eight districts of
Punjab.

Gender Justice through Musallhat Anjuman Project (GJTMAP) Punjab would also be implemented with UNDP assistance during
2009-10.

581
MTDF 2009-12
LG & CD : Summary
Development Programme 2009-10
(Million Rs)
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
LG&CD 0.000 629.704 629.704 1,800.000 2,429.704 0.000 170.296 170.296 100.000 270.296 0.000 800.000 800.000 1,900.000 2,700.000
PDP 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Katchi Abadis 0.000 0.000 0.000 0.000 0.000 0.000 2,000.000 2,000.000 0.000 2,000.000 0.000 2,000.000 2,000.000 0.000 2,000.000
Total 0.000 629.704 629.704 1,800.000 2,429.704 0.000 5,170.296 5,170.296 100.000 5,270.296 0.000 5,800.000 5,800.000 1,900.000 7,700.000
No. of schemes 4 4 8
Development Programme 2010-11
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
LG&CD 0.000 773.914 773.914 700.000 1,473.914 0.000 1,526.086 1,526.086 0.000 1,526.086 0.000 2,300.000 2,300.000 700.000 3,000.000
PDP 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Katchi Abadis 0.000 0.000 0.000 0.000 0.000 0.000 2,500.000 2,500.000 0.000 2,500.000 0.000 2,500.000 2,500.000 0.000 2,500.000
Total 0.000 773.914 773.914 700.000 1,473.914 0.000 7,026.086 7,026.086 0.000 7,026.086 0.000 7,800.000 7,800.000 700.000 8,500.000
Development Programme 2011-12
Ongoing Programme New Programme Total
Sub-Sector
Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total Capital Revenue Total F. Aid Total
LG&CD 0.000 370.725 370.725 700.920 1,071.645 0.000 2,428.355 2,428.355 0.000 2,428.355 0.000 2,799.080 2,799.080 700.920 3,500.000
PDP 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Katchi Abadis 0.000 0.000 0.000 0.000 0.000 0.000 3,000.000 3,000.000 0.000 3,000.000 0.000 3,000.000 3,000.000 0.000 3,000.000
Total 0.000 370.725 370.725 700.920 1,071.645 0.000 8,428.355 8,428.355 0.000 8,428.355 0.000 8,799.080 8,799.080 700.920 9,500.000
LG&CD MTDF 2009-12 Grand Total: 25,700.000

582
LG&CD: SUMMARY (Million Rs)

No. of Provision for 2009-10 Projection Projection


Type / Sub Sector Schemes Local Foreign Aid Total G. Total for for
Capital Revenue Capital Revenue Capital Revenue (Cap+Rev) 2010-11 2011-12
ON-GOING SCHEMES 4 0.000 629.704 0.000 1,800.000 0.000 2,429.704 2,429.704 1,223.835 1,071.645

NEW SCHEMES 4 0.000 5,170.296 0.000 100.000 0.000 5,270.296 5,270.296 5,577.856 5,572.225

Grand Total 8 0.000 5,800.000 0.000 1,900.000 0.000 7,700.000 7,700.000 6,801.691 6,643.870

583
LG&CD (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ON-GOING SCHEMES
Regular
2298 1 Name of the Scheme Southern Punjab Basic Urban 5,220.120 7,458.920 5,126.680 0.000 473.000 0.000 1,300.000 0.000 1,773.000 1,773.000 0.000 0.000 0.000
Services Project (SPBUSP)
Approval Date Approved 27-07-2004
Major Components Water supply, Sewerage, Slaughter
House, Solid Waste
Management,Incremental Land,
Development, Road Links for poor
Major Targets Coverage of Municipal Services in 425
low income areas (21 Towns of 6
Districts). Provision of safe drinking water
in 7 towns. Const. of sewerage / new
waste water treatment plants 19
Slaughter houses, 11 Municipal
Management System Dev.in 21 Towns,
Low cost housing for poor in one TMA.
District and Tehsil Multan, Khanewal, Bahawalpur, Dera
Ghazi Khan, Muzzafargarh, Rajan Pur,

2299 2 Name of the Scheme Punjab Municipal Services 2,640.000 3,540.000 873.710 0.000 23.000 0.000 500.000 0.000 523.000 523.000 1,071.645 1,071.645 0.000
Improvement Project
Approval Date Approved 24-04-2006
Major Components Development of municipal services
infrastructure and capacity building of the
selected TMAs
Major Targets Development of municipal services
infrastructure, water supply, sewerage /
drainage, solid waste management,
streets lights, park, roads, bus stands,
bridges and capacity building of the
selected TMAs.
District and Tehsil Punjab

2300 3 Name of the Scheme PMU, for Clean Drinking Water for 0.000 231.011 28.821 0.000 50.000 0.000 0.000 0.000 50.000 50.000 152.190 0.000 0.000
all
Approval Date Approved 01-09-2007
Major Components Establishment of PMU to coordinate /
implementation of the project.
Major Targets Establishment of PMU to coordinate /
implementation of the project.
District and Tehsil Punjab

584
LG&CD (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2301 4 Name of the Scheme Up-gradation of 6 Villages i.e. 0.000 393.601 309.897 0.000 83.704 0.000 0.000 0.000 83.704 83.704 0.000 0.000 0.000
Gurah Manghot District Chakwal ,
Daval Sharif, ,Alliot and Kia &
Mohra District Rawalpindi, Chak
No.12/Janubi District Sargodha
and Jhallan District Gujranwala to
Model Villages
Approval Date Approved 25-05-2004
Major Components Provision of basic infrastructure and
social servies like road, water
supply,sanitation, BHU Establishment of
Girls & boys high school.
Major Targets Completion of on-going projects of 6
villages
District and Tehsil Punjab,Rawalpindi,Sargodha,Gujranwa
la.

Sub-Total: Regular 7,860.120 11,623.532 6,339.108 0.000 629.704 0.000 1,800.000 0.000 2,429.704 2,429.704 1,223.835 1,071.645 0.000
Total: ON-GOING SCHEMES 7,860.120 11,623.532 6,339.108 0.000 629.704 0.000 1,800.000 0.000 2,429.704 2,429.704 1,223.835 1,071.645 0.000

NEW SCHEMES
Regular
2302 5 Name of the Scheme Strengthening Governance in 528.920 1,899.297 0.000 0.000 137.570 0.000 100.000 0.000 237.570 237.570 566.404 566.403 528.920
Punjab
Approval Date Un-Approved
Major Components Improvement in service delivery in the
area of education, health and police.
Building Financial & Human Resource
Management System.
Major Targets Long term macro economic, social and
enviornmental stability implies security of
life, liberty, satisfactory state of law and
order, accountability,transparency and
community participation at all levels in the
affairs of the state.
District and Tehsil Faisalabad, Lahore, Gujranwala,Dera
Ghazi Khan,Multan'
Bahawalpur,Sargodha, Sahiwal,
Rawalpindi

585
LG&CD (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2303 6 Name of the Scheme Gender Justice through Musalihat 0.000 50.000 0.000 0.000 32.726 0.000 0.000 0.000 32.726 32.726 11.452 5.822 0.000
Anjuman Project (GJTMAP) (on
cost sharing with
(UNDP = Rs117.150 million
GOP =Rs 50.000 million)
Approval Date 14.3.2009
Major Components To provide women victims of violence an
alternative mechansim, whereby they
can obtain gender justice. To build the
capacity of Musalihat Anjuman for
dispensing gender-responsive justice. To
enhnace public engagement with
utilization of the services of Musalihat
Anjuman. To promote women's
awareness of their legal rights & men's
active participation in ending gender
based violence.
Major Targets To provide women victims of violence an
alternative mechansim, whereby they can
obtain gender justice. To build the
capacity of Musalihat Anjuman for
dispensing gender-responsive justice. To
enhance public engagement with
utilization of the services of Musalihat
Anjuman. To promote women's
awareness of their legal rights & men's
active participation in ending gender
based violence.
District and Tehsil Punjab

2304 7 Name of the Scheme Punjab Development Programme. 0.000 3,000.000 0.000 0.000 3,000.000 0.000 0.000 0.000 3,000.000 3,000.000 3,000.000 3,000.000 0.000
Approval Date
Major Components Construction of drains including
pavement of streets provision of water
supply electricity and gas.
Major Targets Generation of economic activity and
employment at local level.
District and Tehsil Punjab

586
LG&CD (Million Rs)
Provision for 2009-10 Projection Projection Throw fwd
GS SS Scheme Information Estimated Cost Exp. upto Local Foreign Aid Total G. Total for for beyond
No No 2008-09 (Cap+Rev) 2010-11 2011-12 June, 2012
F. Aid Total Cap Rev Cap Rev Cap Rev
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

2305 8 Name of the Scheme Development of Katchi Abadis 0.000 2,000.000 0.000 0.000 2,000.000 0.000 0.000 0.000 2,000.000 2,000.000 2,000.000 2,000.000 0.000
and Construction of 2/3 Storey
Apartments for Dwellers in Punjab
(Revolving fund)
Approval Date
Major Components Provision of main infrastructure
(sewerage, water supply,roads,electricity
lines, sui gas lines) and public parks.
Construction of 2/3 storey apartments for
resettlement of katchi abadis dewellers
(Pilot Project).
Major Targets Provision of 2/3 storey apartments for
resettlement of katchi abadis at 2 places
of each Divisional Headquarters in
Punjab.
District and Tehsil Punjab

Sub-Total: Regular 528.920 6,949.297 0.000 0.000 5,170.296 0.000 100.000 0.000 5,270.296 5,270.296 5,577.856 5,572.225 528.920
Total: NEW SCHEMES 528.920 6,949.297 0.000 0.000 5,170.296 0.000 100.000 0.000 5,270.296 5,270.296 5,577.856 5,572.225 528.920

Grand Total 8,389.040 18,572.829 6,339.108 0.000 5,800.000 0.000 1,900.000 0.000 7,700.000 7,700.000 6,801.691 6,643.870 528.920