(The question bank contains the illustrative example of objective, short notes as well as essay type questions, but

this is not exhaustive.)


QU !T"#$ %&$' (#) *.+&,
I. Objective Questions 1. As a PWI (not- in-charge), foot inspection of his entire jurisdiction should be carried out once in ________ months. a) 1 b) 6 c) 1 . As a PWI ( in-charge), push trolle! inspection of his entire jurisdiction "ith P#$ sleeper should be carried out once in ________ months. a) 1 b) % c) 1 &. In case of a $#'() sleeper trac*, *e! man has to attend ______ +o. of '.Ps thoroughl! e,er! da!. A) b) - c) none of the above .. $ur,e is inspected once in ___ months in A route "ith P#$ sleeper b! /0(#0(P.Wa! in rotation. A) . 1) c) 6 -. #chedule of inspection of monsoon patrolling b! train is once in ________ for /0(II(P.Wa!. a) fortnight b) a month c) a "ee* %. 02$ in _______ number of P#$ sleepers ha,e to be greased during *e! man3s dail! inspection "hen his entire length is "ith P#$ sleeper a) 45 b) 20 c) 15 6. 'ools and e7uipment "ith gang has to be inspected once in _____ b! /0(P."a! a) fortnight b) a month c) a "ee* 4. Points and crossing on non running line has to be inspected once in ________ months b! /0(#0 on rotation a) 6 b) & c) 1 ). 'he #0 ( P."a! has to inspect the small trac* machines once in ______ . A) a fort night b) a month c) & months 15. 8inimum le,el of super,ision for mass lubrication of rail joints is ________. (a) *e! man (b) 9.mate,(c) PWSupervisor 11. 9ang mate has to perform the *e! man patrolling once a ______. A) fortnight b) wee c) month 1 . If prima facie cause of accident is rail fracture, the fractured rail pieces are sent to ______ a) $8'(P02 b) !"SO c) 2l! 1oard 1&. 'he threshold 98' for rail rene"al of %5*g :'# rails on 19 trac* in a tunnel is _____ a) #00 b) 455 c) - 1.. $hamfering of rail holes reduces stress concentration b! ________ ; a) 1# b) . c) . 1-. In need based s!stem of :#<= testing of rails, the inter,al bet"een successi,e tests in the field "ill be after the passage of ____ subject to a ma>imum inter,al of . months. A) b) $ c)1 1%. If flame cutting of rail is una,oidable, preheating of ____ mm on either side has to be done before cutting a) -55 b) 100 c) &55 16. #econd coat in the anticorrosi,e treatment of rails "ill be gi,en "ith _____ emulsion. A)blac* b) bituminous c) I# - 1-4 14. $ombination joints are pro,ided "ith __________ mm gap a) % b) 15 c) 0 1). ________ is used for using "ornout fish plates in the trac* a) shim b) saddle plate c) half moon "asher 5. 2ail "ith rolling mar* %5 445 #AI? 5 @I ( 55 indicates _________ grade rail a) %5 b) $$0 c) 5 1. _________ route in southern 2ail"a! is classified as = special a. 8A#-9=2 b) 8A#-/'/ c) %o. . 2ail of 1& m length should be transported b! ____numbers of dip lorries. (a) 1 (b) 2 (c) 1& &. 8a>imum permissible ,ertical "ear for %5*g rail section ___ mm (a)1 (b)1(c) 1& .. A03 route 19 'rac* "ith annual 98' of more than 5 should ha,e minimum rail section of _____ *g a) - *g 445 grade b) 60 g c) - *g 615 grade -. ____ route in southern 2ail"a! is classified as BAB route a. '(S)*"! b) 8A#-/'/ c) +o. %. I82 defecti,e rails shall be replaced "ith in _______ da!s. A. 1 b. & c.1-

6. =<W "elds secured "ith joggled fish plates and clamps shall be replaced "ith in _____ da!s. A. & b. 1+ c. & months 4. 'he fre7uenc! of #CD "eld testing in sections ha,ing .5 98' is once in ______ !ears. A. b. & c.. ). 'he fre7uenc! of rail testing in sections ha,ing .4 98' is once in _______ months. A. 1.b.2 c.& &5. 'he double rail tester of :#<= machine is ha,ing ________ +o. of probes. A.. b. c. 10 &1. 9roo,ed rubber pad used on %5 *g P#$ sleeper is '-___. A) &65% b) &65& c) &,11 & . ' &656 9<+ liners are used at __________ side "hen - *g rail is fi>ed on ' .)% P#$ sleepers in trac* circuited area a) gauge b) non gauge c) not applicable &&. #iEe of auger used for drilling of rail scre" holes in hard "ood sleepers is _______mm. a) 14 b) 20 c) &.. In toe load testing of 02$ if 5; of sample siEe or more records less than %55*g of toe load, then double the _____________ . A) fre7uenc! of inspection b) sample siEe c) both a - b &-. #addled plates are used for ___________ sleeper a) .S/ 0 b) steel c) "ooden &%. #leeper densit! of 1%%5 nos(*m has a sleeper spacing of _________ cm a) -- b) 60 c) %&6. P#$ sleeper is ha,ing ______ scrap ,alue a. 0 b) less c) more &4. _______mm is the nominal gauge for ne" 19 P#$ sleepers a) 16,& b) 1%6% c) 1%6) &). 9<+ liner used for fi>ing - *g rail on ' .)- P#$ sleeper is _____ a) /&,02 b) '&65% (9<) c) '&656 (9<) F '&654 (+9<) .5. 9reasing of 02$ is carried out once in ___________ months for normal area. A) % b) 1 c) 2# .1. #teel *e!s are dri,en in opposite direction in alternate sleepers in _________ section (a) double line (b) sing1e 1ine (c) an! line . . #leeper spacing on cur,ed trac* mar*ed on ____ rail (a) inner (b) outer (c) either inner or outer .&. 8ass lubrication of 02$s is carried out b! *eeping ____ sleepers on either side intact (a) 1+ (b) 15 (c) &5 ... 8inimum ballast cushion for .1' a>le load route is _________mm. a) -5 b) &55 c) &+0 .-. 'he sie,e opening used for siEe F gradation of ballast is ___mm. A) 4- > 4- b) #0 2 #0 c) 15 > 15 .%. 8a>imum height of ballast stac* is _______m a) 1 b) 5.- c) 2 .6. 8easured ballast stac* are identified b! ______ a) #prin*ling cement mortar b) sprin 1ing 1ime c)sprin*ling sand .4. 1allast deficienc! is assessed for deep screening "or* at -& sleeper ba! for e,er!_______ a) m b) hectometer c) *m .). ____ number of stac*s can be collected in a Plot of a ballast depot a) . b) c) 1 -5. :nloading of ballast at centre of trac* and at shoulder is done b! using ________ "agons. A) 1CG b) 3O3 c) 1H@ -1. 2etention of ballast in sie,e anal!sis is determined b! _________ a) Weight b) Dolume c) both aFb - . Abrasion and impact ,alue for ballast are tested for suppl! of ballast for e,er! ______ cum a) 1555 b) 2000 c) -555 -&. 'he bridge is classified as _________ 1ridge "hen total linear "ater "a! is &-5m a. minor b. major c. important -.. 'rolle! refuges are pro,ided for bridges ha,ing main spans less than 155m at e,er! __________m a) 55 b) 100 c) -5 --. ____ bearing plates can be used o,er girder bridges a) cante4 b) Anti creep c) special siEe -%. $on,erging of guard rails for 19 trac* o,er girder bridge is laid for a length of _____ mm. A) &%%5 b) #$,+ c) 1455 -6. $lear spacing of bridge timber on 19 ne" trac* should not be more than ______mm a) #+0 b) -15 c) 55 -4. ____ mm is the distance bet"een guard rail and running rail of 89 trac* o,er bridges . A) -5 b) 200 c) 1-5 -). Goo* bolts used for plate girder bridges are___ t!pe a)#loping leg b) straight 1eg c) an! of the abo,e %5. $lear spacing of bridge timber at rail joints on 19 trac* should not be more than __________ mm (a)-55 (b).-5 ( c) 200 %1. 'he length of a 19 bridge sleeper is outside to outside of girder flanges plus &5-mm but not less than ______mm a) 2##0 b) 6-5 c) &5-5

% . 8inimum thic*ness of 19 bridge sleeper e>cluding notching is _________ mm. (a) 1+0 (b)16(c) 55 %&. As an alternati,e to "ooden sleeper,__________ sleepers are used in rail"a! steel girder bridges. (a) steel trough (b) stee1 channe1 (c) $#'-) %.. 'he siEe of auger used for fi>ing rail in 1ridge timber is _______ mm a) 14 b) 20 c) %-. 'he P#$ sleeper to 2=#H =rg.no. '- .544-.5)6 are used at the _______ of bridges. A. center b. end c. approaches %%. 2etarring of bridge timber is to be done once in ___ !ears a) & b) + c) 15 %6. 'he danger mar* is painted in ____ colour in bridges a) !ello" b) re4 c) "hite %4. '1'2 is done in ___________ bridges a) ballasted b) gir4er c) both a F b %). 1allast penetration profiles should be obtained at ____________ inter,als. A) ever5 /P b) e,er! *m c) e,er! hectometer 65. As per fi,e step method increasing the ballast cushion e,en up to _________ mm b! raising the trac*. A) -5 b) &+0 c) .-5 61. 'he sand piles are so arranged that the cross section area of the sand piles should be about __________ ; of the formation area (e>cluding cess portion). A) 15 b) 20 c) 6 . 'he minimum thic*ness of blan*et is ___________ mm in ordinar! cla! soil. a) &00 b) -55 c) 1555 6&. 'he recommended formation "idth for 19 double line emban*ment is __________ mm. a) 11--5 b) 121+0 c) %4-5 6.. 'he catch "ater drain should be pro,ided _________ meter a"a! from the edge of cutting. A) 2 b) & c) 6-. 'he ban* side slope should be __________ for good formation soil. A) 261 b) 1I c) 1I1 6%. 'he slope of top of formation should be ______. a) 1 in 5 b) 1 in %5 c) 1 in #0 66. #oil should be filled in la!ers of __________ cm thic*ness before consolidation. a) 1b) &0 c) .64. #er,ice tolerance of gauge is ________ mm for -55m radius cur,ed 19 trac* a) -% to J% b) )6 to 71+ c) :p to J 5 6). Accurac! of ' s7uare can be chec*ed b! ________ its position a) tilting b) reversing c) both a Fb 45. A ramp of 1 in ____ has to be ensured during major lifting of trac* before allo"ing the train o,er the "or* spot a) 155 b) 55 c) +00 41. =istance pieces to platform lines are pro,ided for e,er! __________m a) &0 b) 155 c) -5 4 . 8a>. Permissible creep in I2 is ____________ a) -5 b) 1+0 c) -5 4&. 'he 9auge is measured ___ mm belo" rail top in the trac* a) 1& b) 5 c) 1) 4.. 9rease and *.oil are mi>ed in ________ proportion to form stiff paste for lubricating fishplate a) & 62 b) .I6 c) 1I1 4-. _______ m length of trac* can be left unscreened in a da!3s (deep, screening) "or* A) 1& b) 155 c) 0 4%. #hallo" screening of crib ballast is carried out up to ____mm belo" bottom of sleeper in machine maintained section a) -5-6- b) - - -5 c) ,+)100 46. 'he screen is inclined at an angle not less than ______ K to ,ertical in deep screening "or*. a) &5 b) .- c) 60 44. #erial number of sleepers begin at e,er! _______. a) p."a! section b) m c) gang length 4). #ighting of rail for lifting trac* is done b! ,ie"ing ____ a) 'op of rail table on gauge face side b) top of rail table on non gauge face side c) bottom of rai1 tab1e on non gauge face si4e )5. 2ails are identified as ?G(2G along the ________ in case of single line section a) traffic b) increasing m c) both a F b )1. ______ joints are not lubricated. a) insu1ate4 b) combination c) both a F b ) . 0ach gang chart is meant for ___________ months a) & b) 6 c) 1 )&. Pre tamping "or*s are to be done b! ___ in & tier s!stem of maintenance a) H8: b) 88: c) sectiona1 gangs ).. ____ acti,it! is not carried b! ''8 during tamping "or* a) pac*ing b) aligning c) bo2ing )-. ____________are used to find out crac* in bottom of rail a) 8irror b) 8agnif!ing glass c) 3oth a b )%. In =eep screening process, the screen of siEe _____ mm is used for manual deep screening. a) -5 > -5 b) &0 2 &0 c) .- > .)6. ___ ballast is not screened in shallo" screening a) crib b) shoulder c) cushion )4. =eep screening of plain trac* is carried out once in ____ !ears a) 10 b) & c)

)). 9ang chart to be mar*ed "ith ____ a) "or* done b! gang b) "eather c) both a - b 155. ______is used to chec* pac*ing of "ooden sleeper in the trac* a) .anna)a 3ou1e b) hammer c) "ooden rammer 151. Hne of the functions of 88: L II of three-tier maintenance s!stem is _______. A) recon4itioning of crossing b) #CD "elding c) =estressing 15 . 'he cur,e shall be realigned "ithin _____ from the date of measurement. a) a "ee* b) fortnight c) a month 15&. 'he cur,e is measured "ith ,ersine to an accurac! of ____mm a) b) 1 c) 15.. 'he cur,e in 19 A route trac* shall be measured on ____ m chord. A) 15 b) 20 c) % 15-. While using #P00= H+ $:2D0 soft"are for cur,e design, pass"ord to be entered ____. a) I20$0+ 1) I2I$I+ $) I!I.8% 15%. 8inimum radius of a turn in cur,e in 19 is ___m a) 1%- b) 5 c) &+0 156. $ant gradient of 5. -; induces inbuilt t"ist of _________ mm(m a) 5. - b) 2.+ c) 154. #uper ele,ation difference bet"een t"o consecuti,e stations on a 19 cur,ed trac* should not e>ceed ________ mm "ithout $03s appro,al. a) 1# b) 4 c) &15). __________ t!pe junction of gradients leads to bunching of ,ehicles. A) sag b) summit c) both a F b 115. 8inimum radius of a ,ertical cur,e on 9r. = route is _________ m. a) 2+00 b) &555 c) .555 111. +e" trac* laid o,er a 19 cur,e of % degree shall ha,e gauge up to ______mm a) 710 b) J1c) J 5 11 . Hn cur,es,_______ rail is ta*en as reference for longitudinal le,el. a) outer b) an! c) inner 11&. 2e,erse cur,e on 19 high speed route should ha,e a minimum straight of ______m bet"een cur,es. a) &5 b) +0 c) 15 11.. #peed of goods train on '(H on 1 in 4 M of straight s"itch la!out is ____*mph a)10 (b) 1- (c) &5 11-. 8a>imum degree of 19 cur,e is _______. (a) 1- (b) 10 (c) 11%. ___________ is pro,ided on cur,e to balance the centrifugal force. A) cant b) shift c) cant e>cess 116. If a 1 in 1 turn out "ith cur,ed s"itch ta*es off from the outside of 19 cur,e of &-5 m radius, the t!pe of turn out "ill be ________ . A) simi1ar f1e2ure b) contra fle>ure c) s!mmetrical split 114. 1 in 4.- 'urn outs should not normall! ta*e off from ________ cur,e. A) insi4e b) outside c) an! side 11). 07uilibrium cant for minimum sectional speed J ________ N Actual cant. (a)cant deficienc! (b)cant e2cess (c) rate of change of cant 1 5. In I2, transition cur,e shape is _________ (a)cubica1 parabo1a (b)spiral (c)clothoidal 1 1. 8id stagger joints are pro,ided on 19 1& m rail cur,ed trac* of radius ___. (a)1ess than #00m (b)more than .55m (c)more than %55m 1 . 8a>imum permissible cant on 19 9roup = route is ______ mm a) 1%- b) 1#0 c) 155 1 &. If ,ersine of 155 mm is measured o,er 5 m chord on the circular cur,e, radius of the cur,e is designated as ________ m. (a)+00 (b)1555 (c) 1-55 1 .. Dersine in cm measured on ___ m chord of cur,e gi,es te degree of cur,e. a) 5 b) % c) 11.$ 1 -. Dirtual transition length on 19 is _______m a) 1#.6 b) 1&.6 c) 5 1 %. In Indian 2ail"a!s, setting of circular cur,e is done b! ______ method. a) !an ine9s b) string lining c) offset 1 6. _______ mm(sec is the ma>imum rate of change of cant permissible on 19 routes. A) &- b) ++ c) 1 4. ____ Authorit! "ill be gi,en b! the gateman after closing and loc*ing the ?$ gate against road traffic a) P% b) ?1 c) loo* out caution 1 ). In an unmanned ?$, ______ board for road users should be pro,ided in the road approaches at -m from the centre of nearest trac*. a) Stop b) caution c) speed 1&5. $ensus at ?$ shall be ta*en b! ____ department onl!. A. engg b. personnel c. none 1&1. W(? Indicator has to be pro,ided at ___m from unmanned ?$ "ith clear ,isibilit! on #ingle line a) %55 b) &+0 c) 1 55 1& . In case of an obstruction at ?$, banner flag should be displa!ed at a distance of - m from ___________. (a) end of ?$ (b) en4 of chec rai1 (c) end of gate lodge 1&&. $leaning of flange "a! of chec* rails is done b! ___ in :8 ?$ a) gang mate b) 9C c) e5 man

1&.. ?$ ha,ing 'D: O -5555 is classified as ____ categor! a) 11 b) A c) Specia1 1&-. ____ gradient shall be pro,ided on road surface "ithin gates in ?$ a) %o b) 1 in &5 c) 1 in .5 1&%. 'he census is ta*en once in ___ !ears a) 1 b) & c) 1&6. Geigth gauge is pro,ided at a distance of ___m from the gate in ?$ a) & b) c) $ 1&4. Got "eather patrolling is introduced "hen the pre,ailing rail temperature falls abo,e 'd ____ 5 $. A) J15 b) - 5 c) 720 1&). 8anual pac*ing in ?W2 trac* should be done, "hen the pre,ailing rail temperature is bet"een ____5$ (a) td J 5 and td L &5 (b) t4 7 10 an4 t4 : &0 (c) td J 5 and td L 5 1.5. =estressing temperature range for - *g rail section ?W2 is ____5$ a) tm J - to tm J 1- (b) tm 7 + to tm 7 10 ( c ) tm to tm J 15 1.1. 9lued joints used in ?W2 should be _________ t!pe a) 9&# b) *&; c) both a F b 1. . 'he gradient shall not be steeper than 1 in ___ for la!ing ?W2 a) -5 b) 100 c) 1.&. 'he other thermometer is chec*ed for accurac! "ith ___ t!pe thermometer a) dial b) embe44e4 c) pen 1... 'emporar! destressing is not re7uired for deep screening "hen pre,ailing rail temprature is P 'd J____ 5$ a) 710 b) J 5 c) J&5 1.-. 2ollers shall be placed at e,er! __ sleepers during destressing a) - b) 1+ c) -5 1.%. 'he shoulder ballast shall be heaped o,er ___ mm abo,e top of sleeper for ?W2trac* a) -5 b) 100 c) 1-5 1.6. 8inimum le,el of super,ision of rene"ing fastenings in ?W2 trac* "ith lifting is ___ a) *e! man b) gang mate c) PW# 1.4. _________ Patrolling is introduced during ci,il disturbance.a) monsoon b) emergenc! c) securit5 1.). 0mergenc! patrol can be introduced b! _______ of gang. a) *e! man b) gang mate c) trac* man 1-5. 1eat length of each patrol man should not e>ceed _________ *m. a) + b) 15 c) 11-1. 'he ma>imum "al*ing speed of monsoon patrol man is _________ *mph a) - b) 4 c) & 1- . 'apered "ashers are used in ___________ a) built up crossing b) .'S crossing c) obtuse crossing 1-&. ______ mm is deducted from measured "ear of - *g $8# @ing to get actual "ear of @ing. a) 2 b) .- c) 5 1-.. 1efore reconditioning, ______crossing is preheated. a) bui1t up b) $8# c) obtuse 1--. 'urn out cur,ature starts from actual toe of s"itch for _______s"itches a) straight b) curve4 c) both a F b 1-%. ___________ heel t!pe of s"itch is most preferable. a) loose b) fi2e4 c) t"o fit 1-6. 'he sleeper spacing of 1 in 1 fan shaped la!out is mar*ed on ____ rails onl! a) main 1ine b) turn out rails c) lead rails 1-4. =iamond crossing "ith double slip has _______ number of leading stretcher bar. A) 1 b) 2 c) . 1-). 'he groo,e is made at _________ rail seat on bearing plate be!ond heel of s"itch. a) s"itch b) stoc c) an! 1%5. _____t!pe of electrodes are used for reconditioning of cur,ed s"itches a) G& b) G&A c) both a-b 1%1. 'he end bend of "ing rail is called as ___________ a) f1are b) toe c) heel 1% . Q clamp is used in ______ portion to reduce the creep a) crossing b) switch c) lead rail 1%&. ?G tongue rail of 2G cur,ed s"itch 19 turnout shall be ________ a) curve4 b) straight c) partl! cur,ed 1%.. Interloc*ed points are attended in presence of _______________ staff. A) '2= b) mechanical c) signa1 1%-. 'urn in cur,e is measured on ____ m chords at ___ m inter,al. A) 6 - & b) & F % c) 5 F 15 1%%. 'he gauge at 1-5 mm behind nose of $8# @ing in fan shaped la!out is ____ . A) 1%6% b) 16,& c) 1%6) 1%6. ________is used to secure point setting during passage of train in spring loaded points. A) cotter b) loc*ing bolt c) both a - b 1%4. 'he gap bet"een lead rail and toe of $8# crossing is ___ mm. a) % b) . c) 0 1%). 8# brac*et of 'W# are connected to ____ rail (a) "eb of tongue (b) foot of tongue (c) foot of stoc* 165. #pherical "ashers are used at _____ side of heel bloc* on I2# straight s"itches a) ;< (b) both (c) 2G

161. 9auge ,ariation at the entr! (e>ist of turn out is eased out at the rate of 1 mm per ___m a) 1 (b) & (c) 16 . Hbtuse crossing chec* rail is raised b!____ mm o,er rail top table a) 1& (b) &) (c) 2+ 16&. ?etter A203 on top of sleeper of ?G fan shaped la!out is laid on ____ side of turnout (a) an! (b) right (c) left 16.. Geel di,ergence is ______ mm for 19 1 in 4 M cur,ed s"itch turnout. A) 1&% b) 16- c) 1$2.+ 16-. 'ongue rail table is ______ mm higher than stoc* rail table at heel of s"itch for thic* "eb s"itch a) % b) 0 c) 1 16%. 'he gauge in A'# is ________ mm for 1 in 1 P#$ fanshaped la!out a) 16,& b) 1%6% c) 1%6) 166. #tretcher bar is assembled b! *eeping ____the thro" of s"itch a) full b) ha1f c) 7uarter 164. In the 1 in 4.- scissors cross o,er, the @ing number of =iamond is 1 in ___. A) % b) 4.- c) #.2+ 16). 'he limiting ,ertical "ear of %5 *g tongue rail is ______ mm of 1 in 1 fan shaped la!out. A) $ b) 1& c) 15 145. 'he minimum gap bet"een top of leading stretcher bar and bottom of stoc* rail of a ne" point shall be ___mm a) b) 1.+ c) 5 141. In Indian 2ail"a!s, =iamond @ing number is restricted to 1 in ____ a) 1 b) % c) $.+ 14 . ?ubrication of rail joints comes under "or* of ___________ (a) short 4uration (b) long duration (c) line bloc* 14&. 2ail rene"al is carried out "ith ________ protection (a) short duration (b) long duration (c) 1ine b1oc 14.. At night, 1= #pecial shall lea,e the station "ithin ___ minutes form the time of siren a) 1- b) &5 c) #+ 14-. 2AW means _______ a) 2ain affecting "or*s b) 2ail"a! affecting "ater c) !ai1wa5 affecting wor s 14%. If sabotage is suspected to be cause of accident then, _____ clearance is re7uired before "or*ing at accident site. a) magistrate b) 98 c) po1ice 146. 'he accident due to failure of ______ is classified under C categor!. a) P.Wa5 b) signal c) mechanical 144. #peed indicator is pro,ided at __m from "or* spot "hen one speed restriction is in force a) %55 b) - c) &0 14). #top indicator "ill be pro,ided in the ?$ road approaches at -m from the ___ a) gate b) centre of nearest trac c) centre of road 1)5. <lare signal emits bright red flame for ________ minutes a) 15 b) , c) 1)1. #iEe of stop indicator used in "or* of long duration is a) 1.55 > &55mm b) 1#002#00mm c) 1555>.55mm 1) . =ip lorr! ma! be "or*ed during da! time clear "eather "ith ___________ protection (a) 1ine b1oc (b) caution order (c) "histle 1)&. =eep screening comes under "or* of ___________ (a) short duration (b) 1ong 4uration (c) line bloc* 1).. #peed indicator "ill be erected at a height of _______ m from rail le,el a) 1.%b) .c) 2 1)-. 'ermination indicator "ill be erected at a height of _______ m from rail le,el (a) . - (b) 1.6+ (c) .5 1)%. 08: trains can be allo"ed to run "hen "ater le,el abo,e rail le,el is ____mm a) &5 b) .-5 c) 0 1)6. $aution indicator is pro,ided at a distance of ___m from 19 "or* spot. a) %55 b) &5 c) 1200 1)4. 8inimum le,el of super,ision for rail dolle! "or*ing is _____ a) PW# b) 9ang mate c) e5 man 1)). =etonators can be used in main line for ___ !ears. a) , b) 16 c) & 55. #iEe of banner flag for 19 trac* is ___ > ____m. a) 1.- > 5.- c) 1.%6% > 5.%) c) 1.0& 2 0.60 51. 'he caution indicator is pro,ided at ___ m height abo,e rail le,el. A) 1 b) 1.- c) 2 5 . 0ngineering indicators are used for "or* of _____ duration. A) 1ong b) short c) both a F b 5&. 'he minimum distance from the center of 19 trac* to the platform coping is ___ mm a) 1-6% (b) 16,0 (c)1% % 5.. 8inimum chec* rail clearance of - *g $8# @ing used for P#$ la!out is _____ mm. a) #1 b) .. c) -1 5-. 'he minimum $hec* rail clearance at ?$ is ____ mm (a) .6 (b) +1 (c) %6 m 5%. 'he Permissible thro" of s"itch in ne" 19 turnout is _____ mm. a) 11+ b) 155 c) )-

56. _________ is the e>tra clearance re7uired on the outside due to cur,ature. A. en4 throw b. o,er thro" c. lean 54. 8in. height of <H1 at the centre of a 19 trac* in electrified sections is ________mm. a.-465 b. %155 c.62+0 5). 8in. height of a 19 high le,el passenger platform from rail le,el is _____mm a) ,60 b) 4.5 c) 15&15. $hec* rail clearance of 19 "ooden turnout is bet"een _____ mm. a) .1 - .- b) ##)#$ c) -1 -6 11. 8in. height of 2H1 at the centre of a 19 trac* in electrified sections is ________mm. a.+$,0 b.%155 c.% -5 1 . #W2 can be continued o,er bridge upto a span of _______ m for uns!mmetrical condition. A) 1&.& b) 6.1 c) &5.1&. #W2 shall not be laid o,er cur,ed P#$ sleeper trac* "ith 2adius less than _____ metre a) -55 b) ##0 c) 461.. 2egular maintenance of 1555 m 2adius 19 #W2 trac* can be carried out "ith out an! restrictions "hen rail temperature is up to _______ 5$ a) 'm J 15 b) 'm J 1- c) /m 7 2+ 1-. =eep #creening in 19 #W2 trac* can be carried out "hen rail temperature is up to _______ 5$ a) 'm J 15 b) /m 7 1+ c) 'm J 1%. 9ap #ur,e! is conducted once in ______ a) a month b) a 5ear c) fortnight 16. 'he fish plated joints of #W2 trac* at le,el crossing shall not be located "ith in ____ m from end of ?$. A) & b) 5 c) 6 14. 9ap sur,e! shall be carried out "hen the rail temperature is in _____ trend onl!. A) rising b) falling c) both a F b 1). Profiling and distribution of ballast is carried out b! ________ machine a) 3!' b) 1$8 c) PR2# 5. ___ number of insertions is gi,en per sleeper b! ''8 "hen 19 P#$ sleeper trac* is lifted b! -5 mm. a) 1 b) 2 c) & 1. 8otoriEed trolle!s in '- 4 machine shall shift the loaded PF$ to a ma>imum of ______ mm to a,oid infringements a) .-5 b) &00 c) 6-5 . In smoothening mode of ''8 "or*ing "ith four point lining method, the residual error ratio is 1I ____. A) &.1. b) 6.00 c) 1 &. 'he e>isting trac* shall be replaced "ith ____ m rails to carr! out rene"al "ith PR2# machines a) &) b) 1& c) % .. 'he machine that pac* & sleepers at a time is _____ a) :nimat b) $#8 c) /amping 82press -. 9enerall!, in 1$8 "or*ing, the machine can screen the ballast for a "idth of ____ mm a) &.55 b) 6-5 c) #100 %. _____ machine is used for trac* rela!ing a) PR2# b) '2' c) both a - b 6. 'he tamping c!cle for trac* ha,ing other than P#$ sleeper is once in ______ !ears. A) 1 b) 2 c) & 4. 'he d!namic gauge of au>iliar! trac* is ___ mm in PR2# "or*. a) 16-5 b) 1%6& c) &#00 ). $rane "heels of PR2# machine mo,es on ___. a) road b) rail c) both a - b &5. Alignment correction can be made "hen :+I8A' "or* on _____ trac* onl!. a) main 1ine b) turnout c) an! &1. =esign mode of "or*ing of 'amping machines cause _________ residual error. A) 1I &.1. b) 1I %.5) c) =ero & . '9I ,alue of &5 indicates that bloc* re7uires _____ attention. A) planned b) urgent c) local &&. ___ based method suitable for isolated attention in trac* monitoring a) pea b) #= c) both a Fb &.. 'he 19 trac* "ith section speed more than 115 *mph ha,ing O ___g location re7uire attention a) 0.1+ b) 5. c) 5.1 &-. 'he trac* "ith A- categor! has - pea*s more than ___ limit a) $ b) 3 c) A &%. Alignment is gi,en "ith "eightage factor of ___ in calculation of '9I a) 1 b) c) 6 &6. H8# inspection for trac* "ith 155 *mph is once in ___ months a) 1 b) 2 c) . &4. 2ide inde> O &.- re7uire ___ attention a) planned b) urgent c) imme4iate &). 8inimum height of a - *g rail section for A' "elding of rail joints is ____mm a) 1-% b) 1+0 c) 1-& .5. 8inimum head "idth of a %5*g rail section for A' "elding of rail joints is ___ mm (a) 6 (b) %) (c) 66

.1. A' "elding of rail joints should be adopted for _____ a) $on,ersion of 1& m trac* into ?W2 , b) .onversion of SW! trac into ;W! , c) $on,ersion of 1& m trac* into #W2 . . _____ fuel is adopted for A' "elding of rail joints. (a) Air - petrol (b) ?P9-H@S ($) both a - b .&. If 445 grade rail has to be "elded "ith 615 grade rail in una,oidable circumstances, "elding portion to be used should be ________ grade. a) 1555 b) 615 c) $$0 ... =uring A' "elding of rail joints using second hand rails , old A' "eld and ____ mm length on either side should be remo,ed.(a)4- (b) 155 (c) 1+0 .-. 9ap for #CD t!pe of A' "eld is ___ mm (a) 5T 1 (b) 2+> 1 (c) &5 T 1 .%. <astenings of at least ___ sleepers on either side should be made free before "elding in the trac*. (a) (b) . (c) + .6. At least _____ no. of supports should be pro,ided on either side for cess "elding (a) - (b) (c) 10 .4. ___ po"der is used in crucible for insulating the reaction process from tapping hole. A. aluminum b. iron c. asbestos .). While fi>ing mould for A' "elding, centre of mould to coincide "ith _______ a) centre of rai1 gap b) centre of crucible c) none of the abo,e -5. 'est "eld rail length should be ___ m for sending to $8' for "eld test. A) 5.-5 b) 1 c) 1.+ -1. 'he sample test joint shall be made once for e,er! ______ +o. of joints. A. 100 b. 55 c. 1555 - . 'he tolerance for the finished "elds of lateral alignment is ______ mm on 15 cm straight edge. A.J(- 1 b.J(- 5.- c.7?) 0.& -&. ______ is reco,ered from the running bills of successful bidder of contract a) 08= b) S" c) $= -.. All instructions to the contractor is gi,en b! ____ a) oral b) written c) both aF b --. $ontractor shall commence the "or* "ithin ___ da!s after receipt of letter of authorit! a) 6 b) & c) 1+ -%. In 8easurement boo*, ____ pages to be machine numbered. a) odd b) e,en c) a11 -6. #ecurit! deposit is ____; of contract ,alue. A) b) + c) 15 -4. 8a>imum ,alue for calling of single tender b! $AH ( $+ for "or*s of specialiEed nature is ____. A) fu11 powers b) 15 la*hs c) - la*hs -). Appro,ed list of contractor is prepared in consultation "ith _____ department a) stores b) signal c) accounts %5. 'ermination of contract can be gi,en b! the officer ____ the authorit! "ho accepted the tenders. A) lo"er than b) not 1ower than c) none of the abo,e %1. Hpen tender is published at least in ___ regional ne"s paper a) 1 b) c) & % . A tender "hich is submitted after due date and time of submission but before opening is called ____ tender a) Hpen b) ?ate c) "e1a5e4 %&. 'he amount of 08= for a "or* of . la*hs is 2s.______ a) .555 b) $000 c) none of the abo,e %.. 'he ma>imum ,alue of "or* order "ith in po"ers of =0+ is 2s.______ a) 2+@000 b) -5,555 c) 155,555 %-. <or 7uotations, annual ceiling for #r.=0+ is 2s._______ la*hs a) 1 b) + c) %%. Qonal contract is for the period from 1st __________ a) 8arch b) /anuar! c) Au15 %6. In case of ?imited tenders, the number of offers should be at least _______from the appro,ed list of contractors a) b) 10 c) 6 %4. 8a>imum number of dependents allo"ed in free pass is________. (a) 1 (b) 2 (c) %). 'he currenc! period of return journe! pri,ilege pass is ____ month. (a) 1 (b) & (c) # 65. PW# is eligible for ____ no. of da!s $? in a !ear. (a) 4 (b) &5 (c) 10 61. 2ail"a! ser,ant shall not consume alcohol before ___hours of commencement of dut! (a). (b)$ (c)5 6 . Pa! scale of #0(P.Wa! is 2s. _____. a) -555 L 4555 b) --55 L )555 c) 6+00 : 10+00 6&. #< __ is issued for major penalt!. a) 11 b) 1 c) + 6.. _____ allo"ance is gi,en for suspended 2ail"a! emplo!ee. A) house rent b) transportation c) subsistence 6-. <ather can be included in ______ pass a) pri,ilege b) transfer c) dut! 6%. #0 shall report if he can accept gift up to 2s.____ in religious function a) 1555 b) 2000 c) &555 66. 8a>imum ?AP that can be accumulated b! an emplo!ee is ___ a) .5 b) &00 c) 11 64. Ce! man "ith t"o !ears ser,ice is eligible for _____ set of II class pass (a) 1 (b) & (c) -

6). Wages shall be paid "ithin ___ da!s after the "age period "hen the staff strength is 1-55 a) 6 b) 10 c) 145. P.Wa! engineers are classified as ___ categor! under GH02. A) Intensi,e b) continuous c) e2c1u4e4 41. When the injur! on dut! lost for more than ___ da!s, the emplo!ee is eligible for W$A. A) 1 b) c) & 4 . Paternit! lea,e is gi,en to ____ emplo!ee (a) female (b) ma1e (c) none of the abo,e 4&. As per minimum "ages act, hours of "or* shall not e>ceed ____hrs(da!. a) 15 b) 1 c) 0 4.. 'he rail"a! boundar! stones are pro,ided at e,er! ___. a) -5m b) change in alignment c) both a - b 4-. 'he rail"a! land in mid section is maintained b! _____. a) S8?PW b) #0(W c) #8 4%. ___ is the estate officer in 2ail"a!s in =i,ision a) ("!' b) A98 c) A=88 46. 'emporar! licensing of land for conduction e>hibitions, malls, charnels etc. can be permitted on licensing bases for a ma> period of _________ months a) % b) 1 cB & 44. Permanent 2ail"a! ?and are mar*ed in ____ colour in land plan a) pin b) !ello" c) red 4). 'emporar! licensing of land for conduction shopping etc. can be permitted on licensing fee _________ of the mar*et ,alue a) 15; b) -; c) 1-; 4B 20C )5. 'he minimum license fee for 2l! land is 2s. ____ per annum. A) 1000 b) 555 c) -555 )1. UGindi =a!V is celebrated e,er! !ear on ___ a) 1st #ep b) 1.st Apr c) 1#st Sep ) . 'he Hfficial ?anguage of India is ______. A) <in4i b) =e,anagiri c) 'amil )&. 'he official language act "as formed ________ a) 1).6 b)106& c) 1)6% ).. 'he official language rules "ere formed _________ a) 1).6 b)1)%& c) 10,6 )-. Important decisions pertaining to Hfficial ?anguage is ta*en b! 8inistr! of ____ a) =efence b) <ome affairs c) communication )%. According to official language rules, 'amil +adu falls under ______. a) 2egion A b) 2egion 1 c) !egion . )6. 'he onl! :nion 'erritor! classified under regions 1 is ______ a) Andaman F +icobar b) Pondichear! c) .han4igarh )4. 'he official ?anguage is "ritten in _____ script a) 'amil b) #anscrit c) "evanagiri )). At present ____ languages are enlisted in the 0ighth #chedule of the $onstitution a) 14 b) 22 c) % &55. $hairman of $entral Gindi #amithi is _____ a) Prime 'inister b) President c) $hief 8inister &51. 'he released rails are classified b! _________ a) SS8?PW b) A=0+ c) =0+ &5 . +umber of form for +# Indent is #_______ a) 1&1& b) 1&02 c) 1-&) &5&. #toc* ,erification of 'FP is carried out once in _______ !ears a) 1 b) c) & &5.. $hallans are prepared "ith ___ form. a)# 1&1& b) #1&5 c) S/#, &5-. +umber of form for #toc* Indent is #_______ a) 1&1& b) 1&5 c) 1-&) &5%. #toc* indent is prepared in _________ number of copies. A) b) 6 c) &56. 'he accounts stoc* ,erification of P.WAS materials are conducted once in ______ !ears a) 1 b) c) &. &54. =8'2 is used to account of stores_______. a. receipts onl! b. issues onl! c. both a- b &5). 2eser,e price is fi>ed to sell the scrap materials b!______. a. P$0 b. .OS c. <A F $AH &15. Permanent "a! materials of stoc* items are comes under _______ P.?. group. a) 6 b) 60 c) )&11. #toc* sheets are prepared in _______ copies after stoc* ,erification. a) single b) duplicate c) trip1icate &1 . If "agons are detained for more than allo"ed free period for unloading p."a! materials ___ charges are to be collected a) "arfage b) 4emurrage c) transport &1&. 'he P.?. number is codified in_______ digit number . A. % b. $ c.15 &1.. +on stoc* indents are prepared in ____ copies. A) % b) 2 c) 15 &1-. 28$ note is used for transporting ___ materials. A) !15 b) =efence c) Public &1%. <orm used for scrap disposal through =#-4 is _____. A. #-1&5 b.#-1&1& c. S)1+&0 &16. =ead stores are the items not used for more than ____ months. a) 2# b) 14 c) 1 &14. =etailed estimation is prepared to enable _______. a) $all tender b) to e>ecute "or* c) to obtain technica1 sanction &1). 2e,ised estimate to be prepared "hen a) 82pen4iture e2cee4s 2+ C of (gt. Da1ue b) after completion of "or* c) While submitting $$ III bill

& 5. 'o control o,er re,enue budget _______ pla!s the important management tool a) 82cheEuer b) 2e,enue Allocation 2egister c)both a) F b) & 1. 'he 7ualif!ing ser,ice for full pension is ______ !ears. A. 5 b. c. && & . A,erage emoluments for pension is calculated b! the basic pa! J =P dra"n b! an emplo!ee during the last ______ months. A. 10 b.1 c. . & &. 'he P+8 is conducted at =i,ision le,el once in ______ months. A . 2 b. & c. % & .. 'he first sur,e! conducted for a construction project is _______ sur,e!. A. preliminar! b. reconnaissance c. traffic

"". &nswer in brief


1. Write the permissible limits of ph!sical properties of stone ballast to be used in 19 BAB route trac* . Write the minimum ballast cushion re7uired for 19 trac* of different routes &. Go" to ensure that hoo* bolt is holding the flange of girder or not during !our trolle! inspection and mention the action to be ta*en. .. ?ist the condition for la!ing rail joints in the approaches and girder bridge on #W2 trac* -. =ifferentiate bet"een late F dela!ed tender %. What is the necessit! of contracts W 6. What are the different forms of contractsW 4. What are the contents of tender notice W ). What are the t!pes of tendersW 15. ?ist the criteria for realignment of cur,e 11. What is the accurac! at "hich sle"ing of trac* is done in realigning the cur,e 1 . When does the entire cur,e to be realigned 1&. =ifferentiate bet"een re,erse cur,e and compound cur,e 1.. =efine the cant gradient 1-. =efine the super ele,ation 1%. =efine the re,erse cur,e 16. 0>plain briefl! an! three methods of setting out cur,es 14. Write short notes on $utting of rails on cur,es 1). Write short notes on chec* rail on cur,es 5. ?ist different methods to set out the simple circular cur,e 1. ?ist the inspection schedule of point and crossing in running F non running lines b! #0(P.Wa! . ?ist the duties of gang mate &. =ra" a neat s*etch to sho" the method of pro,iding /umpers for rene"al of one rail in #ingle line section .. ?ist the precaution to be adhered "hile doing deep screening "or* near +eutral #ection in electrified area. -. ?ist different *inds of lea,es. %. ?ist different *inds of passes 6. ?ist the <i,e step method before ta*ing up formation treatment 4. 9i,e the specification for blan*eting material as per 2=#H. ). Write a short note on licensing on 2ail"a! land &5. Write a short note on leasing of 2ail"a! land &1. Write a note on height gauge at ?$ & . Write a note on classification of ?$ &&. Write a note on inspection of #0/ &.. 'abulate the speed restriction chart for carr!ing out deep screening "ith manual pac*ing &-. 'abulate the speed restriction chart for carr!ing out trac* rene"al "ith machine pac*ing &%. ?ist the acti,ities in,ol,ed in through pac*ing. &6. ?ist the function of 88: - II in three tier s!stem of maintenance &4. Write a note on periodicit! of lubricating 02$ in the 19 trac* &). Write a note on creep pillars .5. :nder "hat situations deep screening is resorted toW .1. Write a note on 9ang $hart . . What are all the three Gindi courses, prescribed for $entral 9o,t. emplo!eesW .&. In "hich script the Hfficial ?anguage of :nion of India is "rittenW ... What is the Hfficial ?anguage of :nion of India .-. ?ist the different t!pes of patrolling of trac*W

.%. Write a note on stoc* rail bolt holes .6. Write a note on stud bolts .4. Write a note on crossing number .). Go" housing of tongue rail F stoc* rail is ensured in non-interloc*ed point during passage of trainsW -5. Go" stretcher bar is assembled at siteW -1. Go" actual "ear at 155mm from nose of - *g $8# crossing is arri,ed atW - . Wh! s"itch diamond is preferred than ordinar! diamond crossing "hen no. of crossing is more than 4 M -&. $alculate the radius of turnout cur,e for 1 in 4 M 19 straight s"itch la!out -.. Go" turn out cur,e is inspected for 1 in 4 M fan shaped la! out --. When turn out cur,e re7uires attention for 1 in 1 fan shaped la! out -%. Write a note on electrodes for reconditioning cur,ed s"itch -6. Go" rail grade is identified in the fieldW -4. Write the classification of ,arious routes in I2 -). =ifferentiate 9lued joint and 1loc* joint %5. Go" second 7ualit! rails are identified at site %1. 'abulate the recommended minimum rail section and sleeper densit! for trac* carr!ing .1 t a>le load % . 'abulate the elastic fastenings for different - *g rail o,er ' .)% P#$ sleeper assembl! "ith 2=#H dra"ing number. %&. 0>plain the periodicit! of toe load measurement of 02$ %.. 0>plain the action ta*en on toe load measurement of 02$ %-. Write a note on Auguring on hard "ood sleepers %%. As #0(P.Wa!, ho" "ill !ou retain the steel *e!s in the tight position in the "orn out steel sleeper trac* %6. Write a note on stoc* sheet . %4. Write a note on surplus stores. %). Write a note on au>iliar! trac* 65. ?ist the different trac* machines used in I2 "ith their functions 61. ?ist the number of insertions of tamping tools per sleeper re7uired for different lift of the P#$ sleeper trac* 6 . ?ist the fastenings used for glued joint o,er ' .)% P#$ sleeper 6&. Write a note on "elding portion of #CD "elding 6.. Write a note on remo,al of fastenings during in situ #CD "elding 6-. Write short notes on famil! pension 6%. Write do"n the inspection schdule of #0 ( P."a! in the follo"ing a. tunnel b. "eigh bridge pit c. turn table

""". &nswer in -etail


1. =ra" a neat s*etch of a ballast profile of 19 BAB route ?W2 on P#$ sleeper single line straight trac* . Write a note on siEe and gradation of ballast &. Write the guidelines for depot collection of ballast .. Go" "ill !ou assess ballast deficienc! for maintenance F deep screening "or* -. As #0(P.Wa!, list out an! ten precautions !ou "ill ta*e before la!ing bridge timber. %. =ra" a neat s*etch of guardrail arrangement o,er bridge "ith necessar! dimensions. 6. ?ist the salient features during inspection of 1ridge F its approaches. 4. Write short notes on Qonal contract ). Write short notes on 08= and #= 15. Wor* out a solution for realignment of the follo"ing cur,e using optimiEation method. ?ength of transition cur,e is . station units. #tn +o. 0>g. Dersine 5 1 5 & . - % 6 4 ) 15 11 1 1& 1. 1- 1% 6 1& 1- -- 14 16 11 % 14 . 15 6 5

11. As a #0(PW, list an! ten precautions !ou "ill ta*e during realignment of cur,e at site. 1 . 19 cur,e of -55m radius introduced on a #hatabdi route "ith ma>imum sectional speed as 1 5 *mph and speed of goods train as %5 *mph . =esign the cur,e parameters. 1&. A le,el trac* is follo"ed b! a rising gradient of 1 in -5 on a 19 group A route, find out "hether ,ertical cur,e is re7uired at the junction and if so, calculate the re7uired ,alues for setting out. 1.. ?ist the permissible ,alues for ,arious cur,e parameters.. 1-. Write a note on transition cur,e 1%. A 1in 4 1( turn out ta*es off from the outside of 19 cur,e of 655 m radius. 8a>imum sectional speed is 115 *mph and radius of the turnout ta*ing off straight is -4.& 5 m. =etermine the ma>imum permissible speed o,er the main line cur,e. 16. 0>plain an! t"o methods of setting out circular cur,e. 14. A 1in 1 turn out ta*es off from the inside of 19 cur,e of 455 m radius. 8a>imum sectional speed is 115 *mph and radius of the turnout ta*ing off straight is .-4.1 5 m. =etermine the ma>imum permissible speed o,er the main line cur,e. 1). =istinguish contra fle>ure and s!mmetrical split 5. ?ist out the duties of *e! manW 1. ?ist out the duties of P.Wa! 0ngineer not o,erall in chargeW . ?ist out the duties of P.Wa! 0ngineer o,erall in chargeW &. As #0(P."a!, list an! ten precautions !ou "ill ta*e to "or* in electrified area .. 0>plain an! t"o recorded lea,e eligible for #0(P.Wa!. -. ?ist the major and 8inor penalties %. Write a note on che7ue pass 6. Write a note on GH02. 4. Write a note on W$A. ). =ra" a neat s*etch of cross section of 19 single line cutting sho"ing the drains including the measurements. &5. 0>plain "ith neat s*etch of drainage of ballast poc*ets &1. 0>plain formation treatment "ith 9eo te>tile method. & . What are all the 7ualit! controls to be adopted for construction of ne" ban* as per 2=#H guidelinesW &&. 0>plain briefl! inspection and cleaning of side drain, catch "ater drain and "ater"a!s. &.. 0>plain sand piling method &-. Go" the demarcation of 2ail"a! boundaries done . &%. Write short notes on afforestation. &6. 0>plain briefl! different categories of encroachment of 2l!. ?and . &4. As a #0(P.Wa!, list the items to be inspected in an unmanned ?e,el $rossing. &). =ra" a neat s*etch of a single line unmanned ?$ dul! indicating position of #top board, 2oad user "arning boardX "histle board, height gauge, gate lodge, speed brea*er, and gates etc. .5. ?ist the e7uipments of gate *eeper at a manned le,el crossing on a 7uadruple line trac* .1. =ra" a neat s*etch of protection arrangement for an obstruction at manned ?$ on single line 19 trac* . . Write a note on ?W2 on bridges. .&. Go" destessing of one *m ?W2 trac* is done "ithout the use of rail tensor. ... ?ist the permitted locations for la!ing ?W2 .-. As #0(P."a!, during the trolle! inspection !ou notice the creep in the section. What are the actions !ou "ill ta*e to control the creepW .%. As a #0(P.Wa!, dra" do"n an annual program for regular maintenance of P#$ sleeper trac* .6. Write a note on shallo" screening. .4. Write a note on preparator! "or* for deep screening .). As a #0(P.Wa!, list the precautions !ou "ill ta*e during lubrication of rail joints -5. $ompare H8: "ith 88: -1. Go" lubrication of fishplate is carried out b! *e! man "ith one assistant. - . In "hich form Hffice(#tation +ame boards, #ign boards, =esignation 1oards and <orms used b! public are to be preparedW -&. As a #0(P.Wa!, "hat action !ou "ill ta*e as 8onsoon Precautions -.. Go" a single patrol man on single line protect the trac* "hen he apprehend danger in the trac*. --. ?ist out the duties of monsoon patrol man. -%. ?ist the e7uipments of monsoon patrolman -6. =ifferentiate bet"een bulit up crossing and $8# crossing

-4. =ifferentiate bet"een $ur,ed s"itch and thic* "eb s"itch -). =ifferentiate bet"een #cissors $ross o,er and =iamond @ing "ith double slip %5. =ifferentiate bet"een #"itch stop and sliding bloc* %1. =ifferentiate bet"een fi>ed heel F loose heel. % . As a #0(P.Wa!, list the precautions to be ta*en during la!ing of fan shaped la!out %&. =ra" a neat s*etch of 1 in 1 , %5 *g fan shaped la!out "ith salient features and dimensions %.. Go" pre cur,ing of cur,ed stoc* F tongue rails are chec*ed at fieldW %-. As a #0(P.Wa!, list an! ten precautions !ou "ill ta*e on reconditioning of 1uilt up >ing. %%. What action has to be ta*en for the rail("eld defects noticed during need-based s!stem of :#<=W %6. 0>plain briefl! the ,arious defects in rail during ser,ice "ith neat s*etches %4. If a "eld failure is noticed during !our foot inspection on a single line 19 trac* , What action "ill be ta*en b! !ou to pass the trains o,er fractured location W %). 0>plain briefl! "ith s*etches the ser,ice defects in railW 65. ?ist the precautions for handling higher-grade rails at site 61. Go" rails are gi,en 1ituminous based anticorrosi,e treatment for ne" and ser,ice rails 6 . ?ist the criteria for rail rene"al 6&. ?ist trac* la!ing standard for different parameters 6.. As a #0(P.Wa!, "hat action !ou "ill ta*e on reaching the accident site 6-. As a #0(P.Wa!, "hat action !ou "ill ta*e on recei,ing the =ri,er3s lurch message. 6%. =ra" a neat s*etch of protection arrangement for carr!ing out e>pansion gap adjustment in #W2 19 single line trac* 66. =ra" a neat s*etch of the protection arrangement for deep screening "or* on do"n line trac* 64. As a #0(P.Wa!, list the precautions !ou "ill ta*e during lubrication "or* of 02$ 6). 'abulate the elastic fastenings for different rail sections o,er P#$ sleeper assembl! "ith their 2=#H dra"ing number. 45. Write a note on toe load test of 02$. 41. ?ist the permissible ,alues i) 'hro" of s"itch of straight s"itch ii) Wing rail and $hec*rail $learance 4 . Write a note on e>tra clearance on cur,es 4&. ?ist the stores account to be maintained b! P.Wa! 0ngineer. 4.. What is periodical 2eturns and ho" it is prepared 4-. Go" the scrap materials are disposedW What is the procedure of sale of rail"a! materialsW 4%. ?ist Pre, =uring and post tamping operations of a $#8 machine 46. ?ist the precaution !ou "ill ta*e as a #0(P.Wa! for 1$8 "or*ing 44. ?ist the precaution !ou "ill ta*e as a #0(P.Wa! for PR2# "or*ing 4). As #0(P."a! list an! ten precautions !ou "ill ta*e to "or* in trac* circuited area )5. ?ist an! ten precautions !ou "ill ta*e as a #0(P.Wa! for #CD "elding of rail joints )1. Go" ser,ice rails are selected for A' "elding of rail jointsW ) . 0>plain the ph!sical tests for A' "elding of rail jointsW )&. ?ist the ,arious tolerances prescribed during the e>ecution of A' "elds ).. Write the common defects in A' "eld along "ith causes )-. Write short notes on I= Act. )%. Write short notes on decasualiEation

97. Write short notes on different types of surveys conducted in new railway projects.