(15+0.5+0.5+0.05+0.05)
16.1
H
203.5831 m2
2035.831 m3
(one)
4071.661 m3
(two)
(20+0.5+0.5+0.05+0.05)
21.1
H
349.6671 m2
5245.007 m3
Formwork
1 15m Dia Caisson
P=2PiR
P Int
P ext
A
A
D1
D2
47.12389
50.26548
97.38937 m2
194.7787 m2
10 m
15 m
15 m
16 m
1m
20 m
21 m
1m
(one)
(two)
D1
D2
62.83185
65.97345
128.8053 m2
H
15 m
16 m
A1
A2
9.5 m
(exclude cutting edge)
176.7146
201.0619
1678.789
1910.088
231.2998 m3
Cutting edge
A1
A2
Vol 1
Vol 2
D
m2
m2
m3
m3
203.5831
201.0619
1.260564
6.086836
Total Vol
Total Vol
238.6472 m3
477.2943 m3
16.1 m
(one)
(two)
0.5 m
H
20 m
21 m
Vol 1
Vol 2
Vol
4555.309
5022.229
466.9192 m3
Cutting edge
A1
A2
Vol 1
Vol 2
349.6671
346.3606
1.653263
8.050331
Total Vol
476.6228 m3
Crush rock
1 15m Dia Caisson
A1
V1
A1
A2
D
m2
m2
m3
m3
21.1 m
Height
176.7146 m2
176.7146 m3
24.34734 m2
6.086836 m3
Total Vol
Total Vol
182.8014 m3
365.6028 m3
(one)
(two)
Height
314.1593 m2
314.1593 m3
A2 Tri
V2 Tri
32.20132 m2
8.050331 m3
Total Vol
322.2096 m3
Reinforcement
1 15m Dia Caisson
Horizontal
Dia
Wal thick
D
P
Max 12m rebar
12-0.85-0.85=
15
0.5
15.5
48.69469
0.5 m
1m
A2 Tri
V2 Tri
14.5 m
(exclude cutting edge)
314.1593
346.3606
0.5 m
1m
m
m
m
m
0.5 m
Weight
12 m
10.3 m
3.64 kg/m
4.727639 =
10m/0.5m =
Total length
Total weight
20 +1 =
1260 m
4586.4 kg
Vertical
Height
Circumference
10 m
48.69469 m
No of circle
97.38937 =
21
4.5864 t
98
this we only need 1 @12m steel rebar because total length only 10m
Total length
Total weight
1176 m
4280.64 kg
4.28064 t
Total Weight for both hori and vert rebars for one caisson
Total Weight for both hori and vert rebars for two caisson
2 20m Dia Caisson
Horizontal
Dia
Wal thick
D
P
20
0.5
20.5
64.40265
m
m
m
m
Weight
3.64 kg/m
12 m
10.3 m
6.252684 =
15m/0.5m =
6 @ 12m rebars
1 @ 2.6m (1/3 @ 12m) = 4m
Total length
Total weight
8.86704 t
17.73408 t
6 @12m
30 +1 =
12 m
4m
2356 m
8575.84 kg
Vertical
Height
Circumference
15 m
64.40265 m
No of circle
128.8053 =
8.57584 t
129
31
12 m
4m
3m
3.7
2064 m
7512.96 kg
7.51296 t
Total Weight for both hori and vert rebars for one caisson
Install cutting edge
1 15m Dia Caisson
P = 2Pi R
P = 2Pi R
No. Of 4m steel
R = 16/2
50.26548 m
12.56637
8.00
=
=
R = 21/2
65.97345 m
16.49336
16.0888 t
13 (one)
26 (two)
10.50
17
Description
1
2
3
4
5
6
Unit
m3
t
m2
m3
m3
joints
Caisson A
Caisson B
(for 2 off)
4071.7
5245.0
17.7
16.1
194.8
128.8
477.3
476.6
365.6
322.2
26
17
Description
1
2
3
4
5
6
7
8
Caisson A
(for 2 Off)
20.00
21.72
17.73
3.90
47.73
91.07
11988.53
1249.92
Sum of
Caisson B Production Rates
(2A +B)
15.00
35.00
37.30
59.01
21.45
39.19
3.43
7.33
63.55
111.28
125.73
216.81
11986.78
23975.31
1342.49
2592.41
12/30/2013
Description
Caisson A
(for 2 off)
Caisson B
4072
18
5245
16
193
129
456
459
m
joints
825
26
1571
17
Caisson A
(for 2 off)
24
22
18
4
48
83
12323
1284
Caisson B
32
37
21
3
64
112
12209
1352
Unit
m
t
3 Formwork (walls)
1
2
3
4
5
6
7
8
Description
Minimum number of pours required
Excavation (time per lift)
Rebar (time per lift)
Formwork (time per lift)
Concrete (time per lift)
Minimum (time per lift)
Total manhours
Total crane hours
Page 2/2
Sum of Production
Rates (2A +B)
56
37
39
7
111
195
24531
2636
Summary
12/30/2013
Caisson A
Description
Excavation (Common material)
FEL for handling/spreading
spoil
Hand trimming floor
Formwork
Concrete placing
Rebar
Assembling & welding
Crushed rock
TOTAL
Qty
Unit Rate Hours
Foreman
4071.7 m3
15 271.4 81.4 30%
4071.7 m3
25 162.9 16.3 10%
201.06
193.21
455.53
17.734
26
824.69
m2
m2
m3
t
join
m3
5
2.5
2
20
20
50
40.2
77.3
911.1
354.7
520.0
16.5
20.1 50%
30.9 40%
911.1 100%
177.3 50%
1.6
10%
Crane
Operator
Labourers
271.4 100%
2 542.9
FEL
Operator
Spotter Welders
162.9 100%
15.5 20%
911.1 100%
35.5 10%
5
6
6
6
201.1
463.7
5466.4
2128.1
16.5 100%
1249.9
16.5
Totals
m/hrs Duration
895.77
271.44
179.15
162.87
221.17
510.07
7288.48
2340.90
520
520.00
32.99
11988.53
40.21
77.28
911.06
354.68
520.00
16.49
2354.04
Caisson B
Description
Excavation (Common material)
FEL for handling/spreading
spoil
Hand trimming floor
Formwork
Concrete placing
Rebar
Assembling & welding
Crushed rock
TOTAL
Qty
Unit Rate Hours
Foreman
5245 m3
15 349.7 104.9 30%
5245 m3
25 209.8 21.0 10%
346.36
128.81
459.46
16.089
17
1570.82
m2
m2
m3
t
join
m3
5
2.5
2
20
20
50
69.3
51.5
918.9
321.8
340.0
31.4
34.6 50%
20.6 40%
918.9 100%
160.9 50%
3.1
10%
Crane
Operator
Labourers
349.7 100%
2 699.3
FEL
Operator
Spotter Welders
209.8 100%
10.3 20%
918.9 100%
32.2 10%
31.4 100%
1342.5
Page 1/1
5
6
6
6
346.4
309.1
5513.5
1930.7
31.4
Totals
m/hrs Duration
1153.90
349.67
230.78
209.80
381.00
340.05
7351.36
2123.72
340
340.00
65.97
11986.78
69.27
51.52
918.92
321.78
340.00
31.42
2292.37