cwZwU
3714.00
wZc~iY(ivBU Ae Iq)t 132 Kwf GK eZbx wewk ev `yB eZbx wewk UvIqvi mn 1g eZbx wbgvbi mgq jvBb Kvii Mgb c_i Dfq cvk 10 wgUvii ga AewZ MvQcvjv, kmvw` I Avqx KuvPv Nievwoi cKZ gvwjKK jvBb wbgvbi i nBZ kl ch mKj cKvi wZc~iY c`vb KwiZ nBe| kmvw`, MvQcvjv I Avqx Nievwo gvwjKKB nvi KwiZ nBe| cvKv wfZmn evox Nii wZc~ib GB `ii ewnf~Z| UvIqvi cwienbt(KvVi cvj, xj cvj BZvw` UvKhvM moK c_ cwienb) PMvg e`i GjvKv/gsjv e`i GjvKv/Lyjbv/ebvcvj/evR nBZ/RvnvRi K nBZ/msvi h Kvb vi A_ev evsjv`ki h Kvb vb nBZ KvVi cvj, xj cvj BZvw` gvjvgvj Mnb, hZ mnKvi nvwjs, mwUs, DVvbv, bvgvbv, kYxwebvm mnKvi mvwiefve ivLv, h_vh_fve evavB Kiv cqvRbeva Zvicwjb viv XvKv cfwZ hveZxq KvRmn moKc_ evsjv`ki hKvb Rjvq/vb/vi fvicv KgKZvi mw I wb`k gvZveK myzfve cwienb Kiv (AvfixY exgv LiP, e`i KZc K `q KjvY fvZv, e`ii AvbymvwK LiP miKvii c`q fvU evwZiK D KvRi `i hveZxq LiP mn h_v- cwienb fvov, Y fvov, kwgK gRyix, UvwkcgU PvR, WgviR/wWUbkb PvR, nvqws PvR Ges AvbylvwK wewea LiP BZvw`)| 4) 0-200 wKjvwgUvi ch `yiZ
0.6
cwZ wKtwgt
112436.40
1800
Ub wKtwgt
21600.00
gvjvgvj cwienb (moK c_ 1.5 Ub IRb ch)t UvK viv mvjb jvBbi givgZi mKj cKvi gvjvgvj/hcvwZ DcK` vi nBZ KvRi mvBU vi ch cQvbv Ges KvR kl Aewk gvjvgvj I hcvwZ DcK` vi cQvbv| hvZvqvZ mevP 200 wKwg ch (AvmvhvIqv 200 wKwg)| Rvjvbx fvU I Uv BZvw`mn Dfq cv jvwWsAvbjvwWs Gi hveZxq LiP| 24 NUv mgqi Rb fvov| (gvU IRb = 15 Ub| cwZ wUc 1.5 Ub wnmve gvU 10 wUc)| (wcwRwmwei Abygvw`Z `i, AvBUg-1.1.1, cv-1) KuvPv ivvq gvjvgvj hcvwZ nWjvW enb (Avbv bIqv) 1.5 Ub IRb ch)t mvBUi vi nBZ KvRi wbavwiZ vb givgZ/(UvIqvi nBZ Lvjv) mg gvjvgvj I hcvwZ KuvPv ivq 3 wKtwgt `~iZi ga nW jvW enb (Avbv-bIqv)| (wcwRwmwe KZK Abygvw`Z `i- AvBUg 1.1.2, cv-1)
cwZ wUc
15000
cwZ wUc
7500.00
bs
weeiY cvj emvbvt 132 Kwf xj cvvi gv cvj bKmv gvZveK mshvRb Kwiqv wbavwiZ vb Lvovfve mshvRb KwiZ nBe| cvj I Zvi AvbylwK gvjvgvj wefvMxq `vg nBZ MnY Kwiqv Kgj cwienb KwiZ nBe| GKB mij iLvq cvjwU mwVK fve Lvov Kwiqv Dnvi wfw XvjvB KwiZ nBe Ges XvjvB Kivi c~e cvjwUK mwVKfve ivLvi Rb Avqx fve Uvbv w`qv ivwLZ nBe Ges XvjvB k bv nIqv ch wKsev 7 w`bi c~e Kvb Uvbv Qvov hvBe bv| K) cvji IRb 1.5 gt Ub ch AvgW ewms I Dnvi AvbymvwK gvjvgvj bKkv gvZveK mshvRbt 132 Kwf GBP cvji k AvgW ewms I Dnvi AvbymvwK gvjvgvj bKkv gvZveK mshvRb KwiZ nBe | D gvjvgvj wefvMxq `vg nBZ Mnb Kwiqv Kgj cwienb KwiZ nBe| MvB jvMvbvt 132 Kwf GBP cvj Uvbv `Iqvi mivgvw` bKmv gvZveK mshvRb KwiZ nBe| 38 mwg WBb z I cqvRbxq bvU-ev, MvBK mieivn mn `yB c Kvjv Gbvgj is KwiZ nBe| Uvbv `Iqvi Rb Zvi wefvMxq `vg nBZ mieivn Kiv nBe hvnv wVKv`viK wbR LiP Kgj cwienb KwiZ nBe| BbmyjUi jvMvbvt wefvMxq `vg nBZ ByjUi Kgc 10wU Ki ByjUii (Szj I Uvbv) Qov Zix Ki wbavwiZ vb AvUKvBZ nBe|
cwigvY
GKK
GKK `i
gvU UvKv
cwZwU
27507.00
cwZ cvj
7221.00
15
cwZ mU
39750.00
18
cwwZmU
6012.00
dR Kvi wswMst 132 Kwf mvjb jvBbi dm Kvi (wZbwU) bKkv I wb`k gvZveK Uvbv Ges Dnvi mDnvi mwnZ Wvi I AvbylvwK gvjvgvj mshvRb Kiv | 10 D KvRi Rb hveZxq gvjvgvj wefvMxq `vg nBZ Mnb Kwiqv Kgj cwienb KwiZ nBe Ges D KvRi Rb hveZxq hcvwZ wVKv`viKB eev KwiZ nBe| Av_ Iqvi Uvbvt 132 Kwf mvjb jvBb Av_ Iqvi/IwcwRWweD bKkv I wb`k gvZveK Uvbv Ges Dnvi mwnZ Wvi I AvbylvwK gvjvgvj mshvRb Kiv | D 11 KvRi Rb hveZxq gvjvgvj wefvMxq `vg nBZ Mnb Kwiqv Kgj cwienb KwiZ nBe Ges D KvRi Rb hveZxq hcvwZ wVKv`viKB eev KwiZ nBe| Earth Excavation: Earth work in excavation in all kinds of soil for foundation trenches including. layout, providing center lines, local benchmark pillars, leveling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer, 12 subject to submit method statement of carrying out excavation work to the Engineer for approval. However, Engineers approval shall not relieve the contractor of his responsibilities and obligations under the contract. Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead: in very stiff (hard) clayey soil/ rubbish etc.
0.6
cwZ wKtwgt
38366.40
0.6
cwZ wKtwgt
7137.00
536
NbwgUvi
48159.60
bs
cwigvY weeiY Boring/drilling for cast in situ pile: Boring/drilling for cast in situ pile up to the required depth and diameter with minimum 6 m long temporary steel casing, true to vertical, providing bentonite slurry and maintaining water level in the hole, washing the hole for at least 30 minutes, clean the bore-hole and make the bore- hole ready for placing steel cage and concreting including hire charge of rig set with winch machine, tripod stand, trimie pipe, cost of fuel, lubricant, mobilization, demobilization, maintenance, spares, stand-byes, insurance coverage, water, electricity and other 13 239.6 charges all compete approved and accepted by the Engineer. Before commencing boring operation Contractor shall submit the method statement of cast-in-situ pile work including sequence of boring and casting, disposal of spoils, test result of materials to the Engineer for approval. However, Engineers approval shall not relieve the Contractor of his responsibilities and obligations under contract. 600mm(depth up to 20m)
GKK
GKK `i
gvU UvKv
wgUvi
212367.06
Dformed bar: Supplying, fabrication and fixing to details as per design deformed bar reinforcement in concrete in accordance with BDS 1313 : 1991 standard including straightening and cleaning rust, if any, bending and binding in position including 14 supply of G.I. wires etc. complete in all respects and accepted 81.92 by the Engineer. 400-grade deformed bar with minimum fy = 400 MPa & tensile strength at least 460 MPa: up to ground floor Mpa. Making Point Welidng: Providing and making point welding at contact point of the spiral binders at reasonable intervals with the main reinforcements by electric arc welding for construction of cast 15 11280 in situ bored pile carefully with highly oxidized electrodes making the points prominent and accepted by the Engineer (rate is inclusive of all materials labour, tools and plants, electricity and all equipment).. Making Welded Splice: Providing and making welded splice by welding of minimum 300 mm length at the lap of main reinforcement in re-bar cage to be placed in bore-hole where necessary by electric arc 16 welding with highly oxidized electrodes making the joint prominent and accepted by the Engineer. (rate is inclusive of all materials labour, tools and plants, electricity and all equipment). Casting of Pile: Cast in situ pile with reinforced cement concrete works with minimum cement content relates to mix ratio 1 : 1.5 : 3 having minimum f'cr = 26 Mpa, and satisfying a specified compressive strength fc = 21 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & cement conforming to BDS EN-197-1- CEM 1 (32.5 to 52 5 N) / ASTM-C 150 Type I best quality coarse sand
KzBUvj
719391.95
cwZ cqU
27072.00
2880
Bw
17308.80
bs
cwigvY weeiY 52.5 N) / ASTM-C 150 Type I, best quality coarse sand [Sylhet sand or coarse sand of equivalent F.M.2.2], 20 mm down well graded crushed stone chips conforming to ASTM C-33, including breaking chips, screening through proper sieves, making, placing re-bar cage in position, placing and 17 67.74 removing tri-pod as per requirement, pouring the concrete in bore-hole with the help of a trimie pipe, maintaining the trimie pipe immersed in concrete by at least 1 meter throughout the period of concreting, maintaining required slump etc. mixing the aggregates with standard mixer machine with hoper, casting in forms, all complete including water, electricity, testing of materials and concrete etc and other charges as per design, drawing etc all complete approved and accepted by the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding,
GKK
GKK `i
gvU UvKv
NbwgUvi
618802.87
Removing of spoils : Removing of spoils / mud accumulated during boring for cast in situ pile by wash boring from working site to a safe distance by contractors own arrangement i.e. with container set in truck 18 203.22 NbwgUvi or on cart including loading, unloading everything complete as per standard practice. (Quantity should be given three times of solid volume of boring) Breaking Head of Pile: Labour for breaking head of hardened cast in situ bored pile/pre-cast pile up to a required length by any means but without damaging the rest and removing the dismantled materials such as concrete to a safe distance including scraps and cleaning concrete from steel/M.S. rods, straightening and 19 bending of pile bars, preparation and making platform where 1.81 NbwgUvi necessary, carrying, all sorts of handling, stacking the same properly after clearing, leveling and dressing the situ and clearing the bed etc. complete in all respects and accepted by the Engineer. (Measurement will be given for the actual pile head volume to be broken) Laying of Polythene: Supplying and laying of single layer polythene sheet weighing 20 one kilogram per 6.5 square meter in floor or any where below 100.92 etwgt cement concrete complete in all respect and accepted by the Engineer. Bottom CC Work: Mass concrete (1:2:4) in foundation or floor with cement, sand (F.M. 1.2) and picked jhama chips including breaking chips, screening, mixing, laying, compacting to levels and curing for at least 7 days including the supply of water, 21 electricity and other charges and costs of tools and plants etc. 6.53 NbwgUvi all complete and accepted by the Engineer. (Cement: CEM-II/A-M) Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2
79599.24
4235.44
2445.29
36058.46
bs
cwigvY GKK weeiY Chimney and Foundation (RCC): Reinforced cement concrete works using steel shutter with minimum cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa, and satisfying a specified compressive strength fc = 25 Mpa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM & Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150 Type I, best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and 20 mm down well graded stone chips conforming to ASTM C-33, making, placing shutter in position and maintaining true to plumb, making 22 shutter water-tight properly, placing reinforcement in position; 125.59 NbwgUvi mixing with standard mixer machine with hopper, fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering including cost of water, electricity, testing and other charges etc. all complete approved and accepted by the Engineer. (Rate is excluding the cost of reinforcement and its fabrication, binding, welding and placing) i) Concrete Ground floor and below plinth Level (Minstry of Power, Item-7.6.4.1 , Page-63, Rate schedule2011 ) ii) Formwork/shuttering, prop and necessary supports 23 etc.(STEEL) 111.1 etwgt
GKK `i
gvU UvKv
911317.46
30842.47
Earth filling:Earth filling in foundation trenches and plinth in 150 mm layer with earth available within 90 m of the building site to achieve minimum dry density of 90% with optimum 24 moisture content (Modified proctor test) including 397.35 NbwgUvi carrying, watering, leveling, dressing and compacting to a specified percentage each layer up to finished level etc. all complete and accepted by the Engineeer. gvjvgvj cwienb (moK c_ 1.5 Ub IRb ch)t UvK viv mvjb jvBbi givgZi mKj cKvi gvjvgvj/hcvwZ DcK` vi nBZ KvRi mvBU vi ch cQvbv Ges KvR kl Aewk gvjvgvj I hcvwZ DcK` vi cQvbv| hvZvqvZ mevP 200 wKwg ch (Avmv25 hvIqv 200 wKwg)| Rvjvbx fvU I Uv BZvw`mn Dfq cv jvwWsAvbjvwWs Gi hveZxq LiP| 24 NUv mgqi Rb fvov| (gvU IRb = 27 Ub| cwZ wUc 1.5 Ub wnmve gvU 18 wUc)| gvjvgvj dweKkb: cqvRbxq mKj 33 Kwf gvjvgvj dweKkb Kiv| Zrm gvjvgvj 26 KZb, euvKv, wQ` Kib| Iqws Ges Gvjywgwbqvg is jvMvbv| gvjvgvj wefMxq fvvi nBZ IqvKmc ch cwienb Ges dweKkb kl wefvMxq fvvI Rgv `Iqv KvRwUi Af y | UvIqvi BiKkb: UvIqvii hveZxq gvjvgvj wefvMxq `vg nBZ Kgj ch enb Kwiqv UvIqvi wbgvY KwiZ nBe| mg gvjvgvj, bvU-ev k fve mshvRb 27 w B vwU B w D vc v vw c v v
28080.87
cwZ wUc
15000.00
1.4
cwZ Ub
14799.40
cwZ
80423 00
cwigvY bs weeiY 27 KwiZ nBe| gvwU nBZ 10 wg: DPZv ch mg evi evwnii cPvbv 1 Ask b Kwiqv w`Z nBe| mvavib UvIqvi, hvnvi IRb 10 Ubi Dci| GwUKvBw^s wWfvBm mshvRb UvIqvii Rbt wR, AvB, Gvj mieivn mn 4 KvUv wewk 2 fvR 12 MwR wR, AvB, KvUv 28 Zvi w`qv bKkv I wb`k gvZveK GwUKvBw^s wWfvBm Zwi Kwiqv UvIqvii wbavwiZ vb AvUKvBqv w`Z nBe | 1) 132 Kwf UvIqvii Rb GwUKvBw^s wWfvBm mshvRb cvji Rbt 29 mKj gvjvgvj mieivn eZxZ 132/230 Kwf mvjb jvBbi cvj GwUKvBw^s wWfvBm Zwi Kwiqv wbavwiZ vb AvUKvBqv w`Z nBe| Number writing: Supplying, fitting and fixing in position 1.22 mm thick M.S 30 sheet including writing the name/number with enamel paint of approved colors complete as per direction of the engineer-incharge. wcZj SvjvB Kivt 31 UvIqvii m Avg ch mg bvU I ev wcZj SvjvB Kivi ci DnvZ wb`k gvZveK wRsK wiP is KwiZ nBe| Avw_s Kivt 4 mwU wgUvi evm wewk 8 wgUvi j^v wRAvB cvBc mieivn Kwiqv wbavwiZ 32 vb cywZqv 4 GBP wW we wm A_ev 7/12 AvKvii Zvgvi Zvi Bnvi mwnZ Iqws Ges Kv viv AvUKvBZ nBe| iwRv mevP 1 Ing nBZ nBe| bKkv I wb`k gvZveK KvRwU KwiZ nBe| vdvwst 230/132 Kwf mvjb jvBbi givgZ KvRi chvq bxP w`q hvIqv 33 33/11/0.4 Kwf jvBb Avjv`v ivLvi Rb/Wvevq cvwbi ga KvR Kivi Rb euvk A_ev h Kvb Dcvq gvPv (vdvw) cZ Kiv, h Kvb vb Ges fvicv cKkjxi wb`k I Zvnvi mvw gvZveK| dBR KbWvi wiwswMs Kivt fvicv cKkjxi wb`k gvZveK GKwU dBR KbWvi cwZ vb wewQb Zvi Kcmb RqU kl wiwswMs Kiv Ges Wvvi I AvbylwK wdwUsm mshvRb Kiv| cqvRb GvsMj UvIqvi nBZ Zvi UvwbZ nBe| D KvRi Rb hveZxq gvjvgvj wefvMxq `vg nBZ msMn KwiZ nBe Ges D 34 KvRi Rb hveZxq hcvwZ wVKv`viK eev KwiZ nBe| (Dciv KvRi mgq gvVi dmji Kvb wZ nBj Dnvi LiP wVKv`vi KZK enb KwiZ nBe| D wZc~iYi UvKv GB `ii m Af y AvQ ewjqv awiqv jBZ nBe|) (1)132 Kwf mvjb jvBbi Rb (636 GgwmGg) H-Pole & Tower Painting: 35 Renewing epoxy based top-coat of textured paint as per direction of Engineer incharge. Kwgkwbs t 132 Kwf mvjb jvBbi evwnK cwiv, dR PwKs, Byjkb cwigvc Kiv 36 BZvw` cixv wbixvKiY | mgvw wicvU t gRv gvci Dci mg Mgb c_i w`K I cwicvwk Aevb DjL Kwiqv 37 hgb Zwi Kiv nqQ Ab~ic (GRwe) bKkv cZ KwiZ nBe | D GRwe bKkvi g~j Uwms mn 5 Kwc bKkv ck KwiZ nBe|
GKK UvIqvi
GKK `i
cwZ UvIqvi
10241.00
cwZ cvj
4221.00
1.5
et wgt
2205.00
800
cwZ mU
40000.00
cwZwU
41489.00
620
cwZ et wgt
227540.00
20
cwZ vb
90000.00
25
4136.75
1266.00
1048.00
bs
weeiY
cwigvY
GKK
GKK `i
K) GKwU bZzb UvIqvi Ges GBP cvj wbgvY I PvjyKib KvRi gvU LiP
3000 etwgt
16500.00
16
cwZ vb
15200.00
15
cwZ mU
2385.00
12
cwZwU
12720.00
cwZwU
9224.00
cwZ wUc
7500.00
cwZ wUc
15000.00
bs
cwigvY GKK weeiY cvj cwienbt(KvVi cvj, xj cvj BZvw` UvKhvM moK c_ cwienb) PMvg e`i GjvKv/gsjv e`i GjvKv/Lyjbv/ebvcvj/evR nBZ/RvnvRi K nBZ/msvi h Kvb vi A_ev evsjv`ki h Kvb vb nBZ KvVi cvj, xj cvj BZvw` gvjvgvj Mnb, hZ mnKvi nvwjs, mwUs, DVvbv, bvgvbv, kYxwebvm mnKvi mvwiefve ivLv, h_vh_fve evavB Kiv cqvRbeva Zvicwjb viv XvKv cfwZ hveZxq KvRmn moKc_ evsjv`ki hKvb Rjvq/vb/vi fvicv KgKZvi mw I wb`k gvZveK myzfve cwienb Kiv (AvfixY exgv LiP, e`i KZc K `q KjvY fvZv, e`ii Avby m vwK LiP miKvii c `q fvU evwZiK D KvRi `i hveZxq LiP 45 337.5 Ub mn h_v- cwienb fvov, Y fvov, kwgK gRyix, UvwkcgU PvR, wKtwgt WgviR/wWUbkb PvR, nvqws PvR Ges AvbylvwK wewea LiP BZvw`)| 4) 0-50 wKjvwgUvi ch `yiZ (AvBUg 1,(N),2, cv-4, mivg cwienb iU (weRvLR)wmwWDj, 2011)
GKK `i
gvU UvKv
12150.00
90679.00 3644973.46
K_vqt
wVKv`vix cwZvbi bvg I wVKvbv m^wjZ mxj Ges ^vi Uwjdvb bsc-AWvi bsZvwiLt UvKvt evsKt kvLvi bvgt
(gvt Avym mvvi) wbevnx cKkjx wRGgwW, wcwRwmwe, kxgj