Introduction
BHILAI
A JV of two Maharatnas, NTPC and SAIL, established in March,2001. Company Turnover (2012-13 ) : 1866.8 Cr. Total Number of Employees : 817 (as on 30.06.2013).
BHILAI
Innovation
Vision : To be an Efficient Power producer delivering consistent value to stakeholders Mission : To be recognized as a reliable power producer in the country.
NTPC-SAIL Power Company (Pvt.) Ltd
PERFORMANCE Highlights Unit-1 date of Commercial Operation : 22/04/2009 Unit-2 date of Commercial Operation : 21/10/2009 6th rank on All India basis for PLF in 2012-13. 1st rank on All India basis for PLF 103.5 % in Oct10 1st rank on All India basis for PLF 105.07 % in Dec11.
BHILAI
1st rank on all India basis for best PLF (103.558%) in June12 and 1st Quarterly (Apr-June12) PLF of 101.67%
InnovationCulture of NSPCL
BHILAI
Reduce APC
SEC
ENCON
BHILAI
Savings In APC ( Mu)
Investment ( in Lacs )
No
0.355
12.0
0.769
15.0
11.0
BHILAI
Modification Done (2011-12)
One of the IAC has been stopped and kept as standby for which a logic is provided for auto start.
Investment ( in Rs )
NO
2.102
IAC-1
BHILAI
Modification Done (2011-12)
Interconnection of Ash Handling Compressed air system with that of Main plant Compressed air system, thereby stopping compressors of AHS. Interconnection of Mill Reject conveying air system with Main Plant Service air system thereby stopping Mill Reject conveying Compressors. Reduction of Auto Cut-of and Re-Start pressure of IAC from 7.4/6.8 to 6.4/5.8 Ksc (Reduction by 1 Ksc)
Investment ( in Rs )
NIL
1.33
NIL
0.164
NIL
0.24
BHILAI
Modification Done (2012-13)
Tap off has been provided from recovery & effluent discharge header into mixing chamber directly. Hence, running of waste water holding pump has been stopped.
Investment ( in Rs )
NO
BHILAI
Modification Done (2012-13)
Jockey pump taken in service with provision of pneumatic re-circulation valve. System is running in auto with jockey pump in service. Frequent start / stop of jockey pump / compressor / hydrant pump avoided
Investment ( in Rs )
Savings In APC ( Mu )
NO
0.67
17.8 4.223
BHILAI
Daily monitoring of Condenser performance and Unit heat rate deviation (24hr avg data). Timely inspection of Aux. Air Dampers (in every shift) for their mismatch to have better combustion. PA flow through mills are maintained as per coal feeding to avoid secondary combustion, which increases dry flue gas losses. Operational parameters being maintained near to rated value.
A separate mimic diagram displaying instantaneous Heat Rate Deviation and helps in keeping vigil on Heat rate deviation due to operating parameter.
NTPC-SAIL Power Company (Pvt.) Ltd
BHILAI
BHILAI
Total Savings In SEC (Kcal/Kwhr) 0.4188
2010-11
Attending APH and Flue Gas Duct air ingress Condenser Tube Cleaning
496
9900
8.3612
Sub Total
NTPC-SAIL Power Company (Pvt.) Ltd
10396
8.78
BHILAI
Year Of Implementation ENCON Projects Implemented Annual Electrical Savings Units 0.88 Total Savings In SEC (Kcal/Kwhr) 0.599
2011-12
Attending APH and Flue Gas Duct air ingress Reduction of IAC & PAC air Pressure
0.235
0.161
Sub Total
NTPC-SAIL Power Company (Pvt.) Ltd
1.115
0.76
BHILAI
Year Of Implementation ENCON Projects Implemented Attending APH and Flue Gas Duct air ingress Insulation Survey Condenser Tube Cleaning Sub Total
NTPC-SAIL Power Company (Pvt.) Ltd
2012-13
1220 9750
1.038 4.44
14970
8.88
BHILAI
Savings of CO2(tons) 2815
Avoiding continuous running 2013-14 of Condensate Make up Pump Providing Orifices in selected Equipment in cooling water lines to reduce DM water flow, thereby reducing loading of DMCW pump.
0.25
0.246
410
0.23
0.141
237
BHILAI
Year Project Replacement of normal Tube light and Halogen lamps with LED lamps in selected areas. Auxiliary power consumption Audit Replacing Hydraulic Scoop of ID fan with VFD. Investment (in Lacs) 7.5 Savings In SEC 2.1 Savings of CO2(tons) 6000
2013-14
5.0
NIL
6250
0.837
2725
2014-15
5MW Solar Power Plant at Daman Diu has been (as per CERC rate) planned.
34065
BHILAI
Year Project Investment (in Lacs) Savings In SEC Savings of CO2(tons)
Addition of one layer of baskets in APH for more heat recovery Helium leak detection test. Optimization of PA fan operation by Installing VFD in PA Fan Attending air ingress in APH and Flue gas duct
7.5lakhs
2.1
6000
2014-15
Performance Highlights
Parameter All India Rank Generation (MU) PAF % PLF % APC % 2010-11 16 4019.7 92.72 91.73 8.55 2011-12 12 3978 92.95* 90.57 * 8.456
* Lower PAF/PLF in 2011-12 was due to coal shortage ** Backing down of Generation led to Higher APC and SEC.
BHILAI
BHILAI
Implementation Methodology
STATION LEVEL
BHILAI
Employee Involvement Activities Quality Circle Professional Circles Suggestion Schemes Participation in Energy Conservation Campaigns Cost Control Campaigns Water Saving Campaigns.
BHILAI
BHILAI
Timely Energy audit of Equipment to access their performance. Weekly Review by Senior Management Real time measurement of Heat Rate Deviation Preventive Maintenance of Machines to avoid energy loss due to sudden Outage of Machines.
BHILAI
Fin. Year
Total Utilizn %
BHILAI Zero Effluent Discharge- ETP and STP has been installed in the plant to have zero discharge. The water is recycled for use in Ash water system. 120 KLD- STP has been installed in township to avoid ground water contamination & to reduce water consumption by using treated water for gardening purpose. Rain water harvesting system- 06 nos rain water harvesting pits constructed across township for recharging ground water at a depth of -15m. Tree Plantation -Total sapling plantation till 2012-13 is 2.20 Lakhs.
NTPC-SAIL Power Company (Pvt.) Ltd
BHILAI
NSPCL received 10th Best Employer award, and Best HR Strategy in Line with Business from World HRD congress-2013 Great Place to Work-2012 (Top 20 companies in India) and 3rd in Manufacturing sector. Edward D Buno HR Innovative practices Award-2012 CEO of NSPCL was conferred with Exemplary Leader Award .