Fill in the highlighted areas with your production data for a single shift. In some cases, you may have
to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM
(Pieces per Minute).
Production Data
Shift Length Hours = 0 Minutes
Short Breaks Breaks @ Minutes Each = 0 Minutes Total
Meal Break Breaks @ Minutes Each = 0 Minutes Total
Down Time Minutes
Ideal Run Rate PPM (Pieces Per Minute)
Total Pieces Pieces
Reject Pieces Pieces
World
OEE Factor Class My OEE%
Availability 90.00%
Performance 95.00%
Quality 99.90%
Overall OEE 85.00%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com
Calculating OEE Worksheet
Fill in the highlighted areas with your production data for a single shift. In some cases, you may have
to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM
(Pieces per Minute).
Production Data
Shift Length 8 Hours = 480 Minutes
Short Breaks 2 Breaks @ 15 Minutes Each = 30 Minutes Total
Meal Break 1 Breaks @ 30 Minutes Each = 30 Minutes Total
Down Time 47 Minutes
Ideal Run Rate 60 PPM (Pieces Per Minute)
Total Pieces 19,271 Pieces
Reject Pieces 423 Pieces
World
OEE Factor Class My OEE%
Availability 90.00% 88.81%
Performance 95.00% 86.11%
Quality 99.90% 97.80%
Overall OEE 85.00% 74.79%
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or
better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is
approximately 60%.
©2002-2005 Vorne Industries Inc., Itasca, IL USA ● (630) 875-3600 ● www.vorne.com ● www.oee.com