EcoWebServer is a data collection server for energy saving. Easy, Convenience, and Compact Visualization of energy and production information

Features

Energy and production data from the CC-Link terminal are collected only by the setting, no programming.
LAN(Ethernet)

The measurement data is graphed by Web browser without the addition of software in the PC.

EcoWebServer
2

Externals and part names and functions

Data Collecting Server Pet name EcoWebServer Type name MES3-255C-EN


Product name

State of operation LED CC-Link Transmission rate setting switch 122.5mm 98mm Out put Power supply 100-240VAC Ethernet 10/100M Unused (for future) 114mm 3 CC-Link I/F

Feature 1: Easy setting


A minimum setting necessary to operate is three items.

necessary minimum setting is three items

Feature 1
Energy information and production information from the CC-Link terminal are only set.

The CC-Link measurement terminal and the measurement data can be set by an easy mouse and the keyboard operation by the use of the configuration software of the attachment.
A basic graph can be displayed only by setting three items.

A set value is downloaded by way of Ethernet.

Data is selected from the list.

group

Feature 2: The addition is unnecessary of the program and software.


It is possible to display it by graphing the measurement data by Web a browser.

Ethernet

Feature 2

Input Internet Protocol address which was set to EcoWebServer

Select the date of data

The data of the graph can be taken into the PC as csv file.

Select the kind of the graph

the graph is displayed on a central screen


7

Feature 2
Investigate the cause of the specific consumption deterioration, and plan. Energy conservation

From all measuring point registered Select energy amount in the numerator. Select the production in the denominator. Register
EcoWebServer makes the specific consumption graph.

Download the set value


Ethernet

Specific consumption graph Daily graph:Specific consumption kWh Baseunitpoint00000000001

Baseunit

Hour Hour
Get the production from MELCEC PLC By way of CC-Link.

Feature 2 Virtual measuring pointthe computation result between measuring points


The main circuit is calculated by adding up energy information on the branching circuit. The branching circuit is calculated by subtracting energy information on the main circuit.

Feature External output function of data and information Transfer the csv format data files to the FTP Server Upper/lower limit monitoring and mail report, contact output

SMTP Server

FTP Server

Ethernet

Setting can be set by the option setting menu of the configuration software.

10

Feature
About the following monitoring EcoWebServer can e-mail report and contact output
Upper/lower limit monitoring Operating status monitoring Unit requirement target value monitoring Unergy plan value monitoring System error
Sample of upper/lower limit monitoring
Measurement value Target value for upper limit monitoring Contact output method In case of one-shot In case of Output condition interlocking E-mail report E-mail report 10s Upper limit alarm Occurrence data Upper limit alarm Reset data time Over the target value Under the target value The record remains in the system log file. occurrence/reset date the kind of error occurrence/reset date the kind of error occurrence/reset date the kind of error

Ethernet

lamp buzzer

The state of the contact can be confirmed even on the Web screen.

11

Feature
EcoWebServer can automatically adjust the time of its clock to SNTP server
SNTP server

Ethernet

Its possible to set it with the configuration software or Web sreen

In case of adjustment software

In case of Web screen

12

Wiring for LAN cable

Wiring
Wiring for output

Power supply and earth


AC100/200V or DC24V

Wiring for CC-Link cable

Type D Earth

AC100/200V or DC24V

13

Wiring
The maximum overall cable length changes by setting the CC-Link transmission speed. Please wire so as not to exceed the maximum overall cable length according to the table below.

Transmission speed Cable length between stations Maximum overall cable length

156kbps 20cm 1200m

625bps 20cm 900m

2.5Mbps 20cm 400m

5Mbps 20cm 160m

10Mbps 20cm 100m

14

Wiring
Terminal list that can be registered

ME96NSR

EMU2-RD3-C EMU2-RD5-C EMU2-RD7-C EMU2-RD2-C-4W EMU2-RD4-C-4W

EMU3-DP1-C

MDU-AC AE-SW(BIF-CC)

Analog Temperature input modules input modules

Remote IO modules

CC-Link ModuleLocal station QJ61BT11N

AJ65BT-68TD AJ65BT-64RD3

AJ65BT-64AD

AJ65SBTB1-8D AJ65SBTB1-16D AJ65SBTB1-32D AJ65SBTB1-16DT AJ65SBTB1-32DT 15

Wiring
EcoWebServer

QJ61BT11N is added to the PLC and set as the local stationEcoWebServer can take the production information stored in the device of PLC. For example the data of QE81WH and QE82LG necessary to make ladder program

Production information For example, the number of production

QE81WH

QE82LG

QJ61BT11N 16

EcoWebServer support the energy conversation activities by visible management.


Energy management of each section Specific consumption management Management by objective every monthevery year Watch the status of the equipment Management and record of energy data

Plant manager

employee

Production site
Watch the status of the equipment Management by objective Improvement activities

To activate the energy conservation activitiesits important to have all employees to be considered the energy conservation For thatthe usage condition of the energy managed in the limited section such as departments of management is opened to the public on Web by way of Intranet. And sharing information visible managementbecomes more important. EcoWebServer support the energy conservation activities by visible management as an easy, convenient, compact energy conservation activity supporting tool