Anda di halaman 1dari 4

1.

WIPParameters[Link] a.

2.

TypesofJob a. Discrete This is an order to production to make a specific (discrete) quantity of an assembly using a fixed routing and operations. b. Project These are jobs with Project and Task references. They are used in a Project Manufacturing environment. c. Repetitive Repetitive Schedules are the counterparts for Discrete jobs in a Repetitive Manufacturing environment where, assemblies are built on a continuous basis. d. Flow Flow Schedules are used in to make assemblies in a manufacturing environment that is influenced by a just-in-time (JIT) or a pull system driven by customer orders. Flow Schedules are employed to run the production schedule when the Flow Manufacturing module is implemented. e. Lot based Lot based jobs can be used only if the Oracle Shop Floor Management module is implemented. As opposed to a Discrete job, a lot based job follows a network routing. In a network routing, the user can choose the next operation from a given set of options. This in turn will determine the series of operations the job moves through next. f. Assemble-to-order This is a job used to assemble items for a final assembly based on a customer order. g. Configure-to-order In this environment, the options and included items in a model appear on pick slips. Order pickers gather these options before shipping the order to the customer.

3.

Discretejobdefinitions a.

Discrete Job Creation


i. ii. iii. iv. v. vi. Manually enter/create. Convert from a simulation. Planned order release from Supply Chain Planning / MRP. Planned order release from Advanced Supply Chain Planning. Auto create from a Configure to Order (CTO) Sales Orders. Using work order open interface

DiscreteJobStatuses
Discretejobstatusesdescribethevariousstagesinthelifecycleofajobandcontroltheactivitiesthatyoucan performonit.

UserControlledStatuses
Youcanmanuallychangeusercontrolledstatuses.Forexample,youcanchangeajob'sstatustoReleasedto initiatetheproductioncycle.Someusercontrolledstatusesareautomaticallychangedbasedonotherevents.For example,whenyoucompleteajob,itsstatusischangedtoComplete.

Released

Thejobisavailableforproductionandcanbetransactedagainst.Whenajobischangedto thisstatus,thedatereleasedisautomaticallysettothecurrentdateand,ifaroutingexists, thejobquantityismovedtotheQueueintraoperationstepofthefirstroutingoperation.

Youcanchangejobstothisstatusasyoudefinethem.

Unreleased

Thejobisnotreleasedfortransactionactivity.Youcanupdatebutcannottransactagainstit.

YoucanassignastatusofUnreleasediftherearenonetissue,move,resource,completion, orscrapchargesassociatedwiththejobandnopurchaseordersorpurchaserequisitions linkedtothejob.

Complete

Thejobiscompletedbutacceptingtransactionsandcharges.Jobsareautomatically updatedtothisstatuswhenthequantitycompletedintoinventoryequalsthejobquantity.

Youcanmanuallyassignthisstatusonlywhenyouupdatethejob,notwhenyoudefineit.

CompleteNo Charges

Thejobiscompleteandacceptingnofurtheractivity.Youcannotupdateortransactagainstit, butyoucanchangeitsstatustoComplete.Youcanassignthisstatusonlywhenyouupdate thejob.

OnHold

Youcanupdatethejobbutcannottransactagainstit.Youcanassignthisstatustoajob whenyoudefineit.

Cancelled

Thejobwascancelledbeforecompletion.Youcannotupdatethejobortransactagainstit, butyoucanchangeitsstatus.Youcanassignthisstatusonlywhenyouupdatethejob.

Closed

Thejobisclosedandacceptingnofurtheractivity.Jobareautomaticallyupdatedtothis statusuponsuccessfulcompletionofthejobcloseprocess.Youcanchangejobswiththis statustoanotherstatusiftheaccountingperiodthatthejobwascompletedinisstillopen andifyourfunctionalsecuritysetuppermits.

4. ReportsusedinOracleEngineeringModule a. b. c. d. e. f. g. h. i. j. BillofMaterialListingReport BillofMaterialStructureReport ConsolidatedBillofMaterialReport ItemWhereUsedReport EngineeringChangeOrderDetailReport EngineeringChangeOrderScheduleReport EngineeringChangeOrderPrioritiesReport EngineeringChangeOrderReasonsReport EngineeringChangeOrderApprovalListsReport EngineeringChangeOrderTypesReport

5. ConcurrentsusedinOracleEngineeringModule: a. EngineeringChangeOrderPurgeprogram b. DeleteItemInformation c. EngineeringInterface d. MassChangeBillsofMaterial e. BillofResourcesLoad f. AutomaticEngineeringChangeOrderImplementation


6. Tables a. EngineeringModule i. ENG_CHANGE_ACTIONS
ii. iii. iv. v. vi. vii. viii. ix. x. ENG_CHANGE_LINES ENG_CHANGE_OBJECTS ENG_CHANGE_POLICIES ENG_CHANGE_POLICY_APPROVERS ENG_CHANGE_POLICY_VALUES ENG_CHANGE_PRIORITIES ENG_CHANGE_REASONS ENG_CHANGE_ROUTES ENG_CHANGE_RULES

b.

BillOfMaterials i. BOM_BILLS_HEADER_TEMP
ii. iii. iv. v. vi. vii. viii. ix. x. xi. BOM_BILL_OF_MATERIALS BOM_BILL_OF_MATERIALS_ARCHIVE BOM_BILL_OF_MATERIALS_TEMP BOM_CALENDARS BOM_COMPONENTS_B BOM_COMPONENT_TYPES BOM_DELETE_ERRORS BOM_DEPARTMENTS BOM_EXPLOSIONS BOM_EXPLOSIONS_ALL

c.

WorkInProgress i. WIP_ACCOUNTING_CLASSES
ii. iii. iv. v. vi. vii. viii. ix. x. xi. WIP_DISCRETE_JOBS WIP_ENTITIES WIP_EXCEPTIONS WIP_LINES WIP_MOVE_TRANSACTIONS WIP_OPERATIONS WIP_PARAMETERS WIP_PREFERENCES WIP_TRANSACTIONS WIP_TRANSACTION_ACCOUNTS

7.

WIPAccountingclass a. StandardDiscrete b. NonStandardAsset c. NonStandard Expense

d. NonStandardExpenseLotbased e. RepetitiveAccountingClasses f. Repetitive


8. MRP/MPS>Definitions a. MRP: b. MPS:

9. 10. 11. 12. 13. 14. 15. 16. 17. 18.

ECOChanges a. DifferencebetweenEngBOMandNormalBOM a. ExplainStandardbillofmaterial a. BOMSetup a. BOMImport?howtodo? a. Autochanges/Countpoint a. Variousstagesinmaterialtransaction a. MRPSetup a. ExplainIntendbill? a. BOMRevision