HEALTH & SAFETY RISK ASSESSMENT RECORD

Record No. Site / Premises: Work Activity: Persons Affected Employees Other Workers Public Cable Pulling Yes No Classification Experienced Inexperienced Disabled Yes No Area / Section: 47

COMMENTS: Stromtechs Ltd have responsibility to ensure the safety of all persons. It should be remembered therefore that
EES's work activities can create an interaction with others and thus cannot be viewed in isolation. The work activities require that all persons in the area are made aware of the hazards and risks created before work begins and that in doing so we interact with the Principal Contractor to ensure controls are in place.

Hazard Type Physical Injury Health Hazard

Yes

No

Classification Biological (e.g. Micro Organism) Natural (e.g. Weather)

Yes

No

COMMENTS: Always bear in mind that the assessment of risk cannot be viewed in isolation. In order to obtain the "full picture of
risk" we need to consider each hazard present as part of a series of assessments. The total level of Risk needs to consider areas such as requirements for System of Work Employed,; Work Equipment in Use; Electrical Safety; Manual Handling; Work at Height; PPE and Protection of Third Parties on site.

Identified Hazards - tick as appropriate Contact With:


a) Moving Machinery Parts b) Falling Objects / Moving Materials c) Moving Vehicles d) Fixed Machinery Electrical a) Shock b) Burns c) Explosion Radiation a) Ultraviolet b) Ionising c) Lasers Fire Explosion Burns Falls from Height Slips Trips and Falls Pressurised Systems Vibration Noise Micro-Organisms Harmful Substances Vermin Dust & Fibre Particles Weather Temperature - Hot & Cold Manually Moving / Handling Materials Lone Working Remote Working Hand Tools Confined Spaces Restricted Access / Egress Crush / Trapping Power Tools Sharp Objects Posture

COMMENTS:
Cable Pulling can involve strenuous Manual Handling activities; where possible Mechanical methods should be used to assist. These must not however include improvised schemes.

Significant Risks Identified:


Falls from Height; Falling Objects; Posture / Manual handling / Pushing / Pulling; Electric Shock / Burns / Electrocution; Cuts from Sharp Objects; Slips, Trips & Falls; Manual Handling; Remote Working; Restricted Access / Egress.

Standard Control Measures: Please see Controls Shown on Page 2 of this document Signed Position in Company PROFORMA SWP18-05-01a Date

Page 1 of 2

HEALTH AND SAFETY RISK ASSESSMENT RECORD


Risk Assessment No.:
Persons Exposed Employees

47

Site:
No. Other Workers Public Visitors

Activity:
Young Persons

Cable Pulling
Total Persons at Risk

Location:
Person Conducting Assessment: Person Supervising Work:

Date

RISK = Likelihood x Severity 5 4

Acceptable Risk

Further Review Likelihood Rating 1 Rating 2 Rating 3 Rating 4 Rating 5 = = = = = Very Unlikely Unlikely Likely Very Likely Almost Certain

Unacceptable Risk Severity Rating 1 Rating 2 Rating 3 Rating 4 Rating 5 = = = = = First Aid Injury or Illness Minor Injury or Illness "3 day" Injury or Illness Major Injury or Illness Fatality, Disabling Injury etc.

Likelihood

3 2 1

Signature of Person Compiling Assessment:

C
1
1 2

3 Severity
3 Risk Multiple of Columns 1x2

Date of Assessment: Date of Assessment Review:

HAZARD

Factors of Harm Likelihood Severity

Falls From Height Personal Injuries - Dust in Eyes; Cuts to Hand / Fingers; Head / Facial Injuries Falling Objects Poor Posture / Manual Handling (Pushing / Pulling) / Restricted Access / Egress 3 4 12

4 5 6 7 8 CONTROL MEASURES Residual Risk Control Measures Likelihood Severity Multiple of As Applicable, Please Cross Reference with Separate EES Suite of Generic / Specific Implemented by See Note 1 See Note 1 Columns 5 x 6 Risk Assessments. (Name) Work at Height will be planned to ensure fall prevention. Accordingly provision of all Work at Height Equipment will be subject to a Task Specific Risk Assessment. 1 1 1 s smith Subject to a suitable PPE Risk Assessment, eye, hand, head and face protection will be worn at all times when personal injury could result whilst handling cables. If working in occupied premises, areas directly below will be cleared of personnel and warning signs displayed before work begins. Operatives will be trained in Manual Handling techniques and instructed in the precautions for safe work. A Pre-start Survey will be conducted to check route, manpower and equipment needs. Free running cable stands and motorised winders will be utilized when pulling cables through multi-storey buildings and over long distances. Good communications will be maintained at all time. Cable pulls will be smooth and maintained at a reasonable rate to prevent over-stretching, repeated twisting and bending. A Banksman will be positioned at the drum to ensure that over-run does not occur.

Slips, Trips & Falls

Route will be travelled / examined and any foreseeable slip, trip, fall hazards removed or rectified before work commences. Open risers, uneven floor slabs and / or pre-cut access points will be protected to avoid personal injury. Work will be monitored to ensure that additional precautions are taken if edge protection must be removed. Electrical supplies will be isolated in adjacent cables where and whenever possible. Cables will be examined after installation to ensure they remain undamaged.

Electric Shock / Burns / Electrocution

PROFORMA SWP18-05-01a Page 2 of 2