_Wily_
_________________________
Lot Number:____________________________________
Subdivision:____________________________________
Address:______________________________________
Estimate Budget
Draw 1
Draw 2
Draw 3
Draw 4
Total Draws
Estimate to
Finish
Grand Total
Date Submitted:
1. PRELIMINARY
100
Architectural plans
101
Achitectural review
102
Structural engineering
103
104
Stakeout / survey
105
Interior decorating
106
107
Lighting Design
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,000.00
$1,200.00
$0.00
$0.00
$0.00
$0.00
$4,000.00
$1,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,500.00
$3,000.00
$0.00
$0.00
$0.00
$5,000.00
$5,000.00
$5,000.00
$0.00
$2,500.00
$5,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,500.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,500.00
$3,000.00
$0.00
$0.00
$0.00
$5,000.00
$5,000.00
$5,000.00
$0.00
$2,500.00
$5,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,500.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$14,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$14,000.00
$0.00
$0.00
$0.00
2. TEMPORARY UTILITIES
200
Electric
201
Heat
202
Toilet
203
204
Water
Dumpsters & demolition
205
Construction clean up
5,000.00
1,500.00
4,000.00
1,200.00
3. FOUNDATION
300
301
302
303
Spandeck
304
Window wells
305
306
307
308
Damp proofing
309
310
311
400
Framing labor
401
Lumber / trusses
402
403
Structural steel
404
Porch cap
405
Windows
406
Doors exterior
407
408
House wrap
409
HVAC
410
Plumbing
411
Radiant heat
412
Radiant concrete
412
Fire sprinklers
414
Sewer pump
415
Jetted tub
416
Electrical
417
Fireplace / fleu
418
Central vac
419
Security system
420
Theatre / audio
421
Intercom system
422
Structured wiring
423
Lighting control
6,000.00
4,000.00
4,500.00
3,000.00
500.00
0.00
7,000.00
10,000.00
7,000.00
5,000.00
5,000.00
5,000.00
3,000.00
7,000.00
2,500.00
5,500.00
6,500.00
2,200.00
4,500.00
1,500.00
5. EXTERIOR ROUGH
500
501
502
Brick
503
Stone
504
Pre-cast concrete
505
Stucco
506
Siding
507
508
Aluminum crown
14,000.00
14,000.00
Estimate Budget
Draw 1
Draw 2
Draw 3
Draw 4
Total Draws
Estimate to
Finish
Grand Total
Estimate Budget
Draw 1
Draw 2
Draw 3
Draw 4
Total Draws
Insulation
601
602
Drywall
603
604
605
Hardwood flooring
606
Protective products
607
Fireplace mantels
608
Fireplace facings
609
Interior doors
610
611
612
Interior beams
613
614
Cabinets
615
Countertops
616
Tile backsplash
617
Painting
618
Specialty painting
$500.00
$2,000.00
$5,000.00
$2,500.00
$2,500.00
$6,000.00
$1,500.00
$1,000.00
$1,000.00
$600.00
$2,000.00
$3,000.00
$500.00
$1,000.00
$4,500.00
$2,200.00
$2,200.00
$5,000.00
$1,000.00
$700.00
$700.00
$500.00
$1,800.00
$2,000.00
$3,000.00
$22,000.00
$6,000.00
$1,500.00
$16,000.00
$2,500.00
$18,000.00
$5,000.00
$1,000.00
$12,000.00
619
Grand Total
$500.00
$1,000.00
$4,500.00
$2,200.00
$2,200.00
$5,000.00
$1,000.00
$700.00
$700.00
$500.00
$1,800.00
$2,000.00
$0.00
$2,500.00
$18,000.00
$5,000.00
$1,000.00
$12,000.00
$0.00
$0.00
$0.00
$500.00
$1,000.00
$4,500.00
$2,200.00
$2,200.00
$5,000.00
$1,000.00
$700.00
$700.00
$500.00
$1,800.00
$2,000.00
$0.00
$2,500.00
$18,000.00
$5,000.00
$1,000.00
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,500.00
$5,000.00
$600.00
$500.00
$800.00
$400.00
$0.00
$8,000.00
$1,500.00
$0.00
$0.00
$1,500.00
$5,000.00
$600.00
$500.00
$800.00
$400.00
$0.00
$8,000.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,500.00
$7,500.00
$0.00
$0.00
$7,500.00
$7,500.00
$0.00
6. INTERIOR ROUGH
600
Estimate to
Finish
7. EXTERIOR FINISH
700
701
702
703
704
704
Decks
706
Exterior railings
707
708
Final grade
709
Curb cut
710
711
Foundation plaster
712
713
Landscape
8. INTERIOR FINISH
800
801
Lighting fixtures
802
Appliances
803
Aplliance installation
804
Hardware
805
Shower doors
806
Mirrors
807
Closet organizers
808
Carpet
809
Final clean
$2,000.00
$10,000.00
$900.00
$800.00
$1,500.00
$500.00
$1,500.00
$5,000.00
$600.00
$500.00
$800.00
$400.00
$10,000.00
$1,800.00
$8,000.00
$1,500.00
810
9. MISCELLANEOUS
900
901
902
Winter conditions
903
Waterfall
904
10. FINANCES, INS., FEES
100
$500.00
$400.00
$9,000.00
$9,000.00
$7,500.00
$7,500.00
Estimate Budget
Totals
$195,800.00
Draw 1
$150,000.00
Draw 2
$0.00
Draw 3
$0.00
Draw 4
$0.00
Total Draws
$150,000.00
Estimate to
Finish
$0.00
Grand Total
$150,000.00
Estimate
Budget
Draw 1
Draw 2
Draw 3
Draw 4
Draw 5
Draw 6
Total Draws
Estimate to
Finish
600 Insulation
601 Sound insulation
602 Drywall
603 Tile floor / shower material
604 Tile floor / shower labor
605 Hardwood flooring
606 Protective products
607 Fireplace mantels
608 Fireplace facings
609 Interior doors
610 Interior finish mat
611 Finish carp. labor
612 Interior beams
613 Interior stairs & railings
614 Cabinets
615 Coutertops
616 Tile backsplash
617 Painting
618 Specialty painting
619
Grand Total
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
6. INTERIOR ROUGH
7. EXTERIOR FINISH
700 Garage doors / openers
701 Shutters / gable vents
702 Ext. trim / corbels / caulking
703 Exterior rough sawn timber
704 Cupolas & finials
704 Decks
706 Exterior railings
707 Garage floor coatings
708 Final grade
709 Curb cut
710 Drive / patio / sidewalk
711 Foundation plaster
712 Rain gutter extension / mis.
713 Landscape
8. INTERIOR FINISH
800 Paint repair & touch up
801 Lighting fixtures
802 Appliances
803 Aplliance installation
804 Hardware
805 Shower doors
806 Mirrors
807 Closet organizers
808
Carpet
809
Final clean
810
9. MISCELLANEOUS
900 Pools / sport courts
901 Energy star program
902 Winter conditions
903 Waterfall
904
10. FINANCES, INS., FEES
100 Builders risk insurance
1001 Liability insurance
1002 Construction interest
1003 Loan fees / closing costs
1004 Sales commission
1005 Contingency
11. BUILDER
1100 Lot
1101 Mgmt supervision / overhead
1102 Contractor fee
DRAW AMT PAID BY BANK
Totals
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00