Project Engineer (Civil) Address: P. O. Box 11814 31961 Jubail, Saudi Arabia Contact by Email Day Phone Number: +9663.3567115 Evening Phone Number: +9663.3632037 Mobile Phone Number: +966.555271205

Target Job Target Job Location: Target Industry: Employment Type: Employment Status: Saudi Arabia Consulting Services; Petrochemicals; Construction/Civil Engineering Employee Full time

Target Monthly Salary: USD 5500

Personal Information Birth Date: Gender: Nationality: Visa Status: Residence Location: Marital Status: 14 July 1971 Male India Residency Visa (Transferable) Jubail, Saudi Arabia Married

Number of Dependants: 3

Driving License:

India; Saudi Arabia

Professional Experience (3 Years, 1 Month) August 2008 - May 2011: Project Engineer Sahara Petrochemical Company P. O. Box-11814, Jubail, Saudi Arabia Company Industry: Petrochemicals Job Role: Engineering From April, 2010 to Date SAHARA Petrochemical Company-Jubail, Saudi Arabia. Position: Project Engineer (Civil) Project: Caustic Soda-Ethylene Di-chloride (CA-EDC) Project Contractor: Daelim Saudi Arabia Contract Value: $ 750 Million US Dollars From August, 2008 to March, 2010 Arabian Amines Company-(Aminat), Jubail, Saudi Arabia (Affiliated with Sahara Petrochemical Company) PROJECT: AAC - Ethyleneamines Plant Project Contractors: Hyundai Engineering Co. Ltd. Hanwha Engineering & Construction Corporation Position: Civil Const. Engineer Contract Value $350 Millions Summary of Duties & Responsibilities: Supervise the construction of DCS, MCC, Control & Lab., Maintenance Buildings, tank foundations, Steel structure, Pipe rack foundations, Warehouses, parking lots, and roads etc. Inspection of executed work (Civil, Building) by EPC Consortium. Progress Monitoring of the work performed by EPC Consortium and expediting the work to achieve the targeted/planned progress. Review of engineering deliverables requiring site modification/revisions covered under Field Change Notification Procedure.

Reviewed the design mix of Concrete, Asphalt and Backfilling materials prior to approval. Check / Review the approved construction drawings, project technical specifications, and submittal of materials. Coordinate with Project/Construction Manager regarding project status and development of the project. Reviewed project schedule, manpower and equipment line-up. Coordinate with contractors QA/QC Manager/Supervisor/Inspectors and with other concerned departments, Monitored all testing activities such as compaction test, concrete test, asphalt test etc.

March 2004 - July 2008: QA/QC Engineer Al-Nour Company LTD. P. O. Box-11814, , Jubail, Saudi Arabia Company Industry: Construction Job Role: Quality Control AL-Nour Company Ltd., Riyadh, Saudi Arabia. PROJECTS: 1-Saudi Railway Organization Project (Dammam-Riyadh Railway Line 1 & 2) NOUR- SIEMENS CONSORTIUM CLIENT: SAUDI RAILWAY ORGANISATION / GETINSA (SPANISH CONSULTANT) POSITION: QA/QC ENGINEER Contract Values SAR 430 Millions 2- TETRA Project CLIENT: SAUDI ELECTRICITY COMPANY (SEC-ERB) POSITION: QA/QC ENGINEER Contract Values SAR 40 Millions Summary of Duties & Responsibilities: Prepared and Implemented the Project Quality Plan in coordination with QA/QC Dept. to ensure an effective quality management system with respect to Company and Contract requirements are established in the project. Reviewed the design mix of Concrete, Asphalt and Backfilling materials

prior to procurement & submission to the client. Monitored all testing activities such as compaction test, concrete test, asphalt test etc. Responsible to organize, implement, conduct and manage the QA/QC Programs as per the companys Quality Policy and contract specification requirements of the Project. Prepared QA/QC Plan, ITPs and procedures and implementation at site. Coordinate the document controls of technical submittals; drawings etc. with the Project team and to ensure the QA/QC validation have been done, to ensure the issue, amendment and recall of controlled documents. Checked/ reviewed designs, drawings, standards, project technical specifications, submittal of material etc. Inspection with Clients representative for conducting of day-to-day inspections of the project. Provided technical support to the Project Manager and necessary guidance to staff in submission of material for approvals, inspection requests, shop drawings preparation of Project Quality Plans, Scheduled, As built drawings, O&M Manual, prepare & update quality records, drawing control and to set up Companys established integrated management system in the Project.

November 2001 December 2003:

QA/QC Supervisor Tamimi Company Construction Division Dammam, Saudi Arabia Company Industry: Oil/Petroleum Job Role: Quality Control From Nov. 2001 to Dec.2003 Tamimi Co. Construction Division, Dammam, Saudi Arabia. PROJECT: Haradh Gas Gathering and Crude P/L Phase - II (40 km. 36Crude P/L, 20 km. 32 Gas P/L, 20 km 24 Gas P/L Including main valve station and Scraper Traps) Worked in Uthmaniyah Gas Plan, Haradh GOSP-2, Hawiyah Water Injection Plant (Hwy-WIP) Haradh Arabian Light Crude Increment - II P/L (62 km. 42, 11 km. 30, 09 km. 24 & 32 km. 16 Sea water P/L) Contract # 44604/00 & 44605/00 B.I. # 31421 & 31422 Contract Value: SAR 88 Millions

CLIENT: SAUDI ARAMCO POSITION: QC SUPERVISOR Summary of Duties & Responsibilities: Reviewed all products/materials and services prior to procurement & submission to the company to ensure conformance to specified requirement. Monitored and site inspection and testing activities at all phases and quality audit at appropriate stages of the Project Construction. Inspected all material delivered to site for compliance with approved documents, prior to material being included in the permanent works. Coordination of field inspections (on and off site) with Client Inspector. Coordination of the Independent Laboratory Testing as required (on and off site). Notify QA/QC Manager of any Non-Conforming works/materials on the jobs. Freedom to issue NCR, verify implementation of corrective actions and prevent use of non-conforming items until the deficiency has been satisfactory resolved. Re-inspect repaired and reworked non-confirming items and shall not use any repaired item or product unless approved by the Client. Submitted Bi-weekly site QA/QC reports to the Client representative about non-compliance where identified cause and corrective actions should be included. Coordination with QA/QC Inspectors, clients, with other concerned departments.

February 1999 November 2001:

QA/QC Engineer Al-Mashrik contracting Company Riyadh, Saudi Arabia Company Industry: Construction/Civil Engineering Job Role: Quality Control Al-Mashrik Contracting Company, Riyadh, Saudi Arabia. POSITION: QA/QC ENGINEER (CIVIL) CLIENT: SAUDI ELECTRICITY COMPANY (SEC-ERB)

Project: Central Administrative Services Area (CASA) Contract# 83000/00 B.I. #16101 Construction of CASA (Central Administrative Services Area) at Ghazlan Power Plant near Dammam under the supervision of Saudi consolidated Electricity Co. (SCECO-East) with the contract value of SR.90 Millions, which includes precast structures, cast-in-situ structures, steel structures utilities etc. Summary of Duties & Responsibilities: Perform inspection of work to ensure that it is executed to the correct line and level. Coordinate with the batching plant regarding the quality of material, design mix and parameter of concrete in order to maintain good workable concrete for the structure. Coordinate and inspect the activities of other department and unit heads involving in execution of work. Ensured that the procurement of material and equipment is in accordance with applicable standards such as SEC-ERB standards, American standards, UBC etc. Coordinate and report to Project Manager about the execution and progress of work. Reporting Non-Conformance violation to the project Manager for resolution. Reviewed the project proposals, design drawings, attending technical review teams, attending construction meetings, monitoring construction activities. Coordination with Client for the Inspection. Preparation of QA/QC Plan Checked /reviewed the concrete mix design & asphalt mix design. Prepared of QA/QC Plan, ITPs and procedures and implementation at site.

Education June 1997: A.M.U., Aligarh, India Bachelor's degree/higher diploma, Civil Engineering I have 72% overall in 4-years.

Career Level

Career Level:

Management

Notice Period to Work: 1 month or less Last Monthly Salary: USD 4000

References Name Obaid A. Khan Sahara Petrochemical Co. Job Title Phone Number Email Address khanoa@saharapcc.com

Planning Engineer +9663.3567229