Form CON - 3.

1 :

WORK PROGRAMME FOR WHOLE WORKS


Year

2006

2007

2008

2009
Remarks

Month Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Cumulative months 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 Total working days * * * * * * * * * * * * * * * * * * Construction Activity A. Mobilization 1. Camp facilities 2. Site Office, Laboratory 3. Setting out, surveying B. Earthworks 1. Cut & fill 2. Embankment fill 3. Improved subgrade C. Aggregate Pavement 1. Sub-base course 2. Lower base course 3. Upper base course D. Bituminous Pavement 1. Binder course 2. Wearing course E. Box Culvert 1. Diversion, demolish, etc. 2. Concrete & reinforceing F. Bridge Works 1. Piling 2. Sub-structure 3. PC Girder 4. Deck, railing, etc. G.Miscellanious Works 1. Drainage & protection 2. Road appurtenants 3. Road sign & markings 4. Other items of Work Total Progress during the period (% in weightage) Cumulative Total Progress (% of Contract Amount) Bidder to show two monthly progress in barchart form and note down corresponding progress in percentage.

Form CON - 3.3 :

MATERIALS FLOW CHART FOR WHOLE WORKS


Year

2006

2007

2008

2009

Month Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Remarks Cumulative months 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

Material
A. Camp, Site Office, Laboratory 1. Bricks 2. Cement 3. Sand 4. M S reinforcement B. Earthworks 1. Fill materials 2. ISG materials C. Aggregate Pavement 1. Bricks 2. Stone aggregate 3. Sand D. Bituminous Pavement 1. Stone aggregate 2. Coarse sand/Fine aggregate 3. Sand 4. Bitumen E. Box Culvert & Bridge Works 1. Stone aggregate 2. Reinforcing Steel 3. H T Strand / Wire 4. Cement

Unit

Nos. Ton m Ton

m m

Bidder to show two monthly quantities of different materials to be used.

Nos. m m m m m Ton m Ton Ton Ton

Form CON - 3.4 :

DEPLOYMENT OF EQUIPMENT / PLANT TO MEET THE PROGRAMME


Year

2006

2007

2008

2009
Remarks

Month Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Sep-Oct Nov-Dec Jan-Feb Mar-Apr May-Jun Jul-Aug Cumulative months 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 1. Stone Crusher 2. Brick Crusher 3. Asphalt Plant 4. Paver Machine 5. Bitumen Distributor 6. Wheel Loader 7. Excavator 8. Bulldozer 9. Motor Grader 10. Tandem Roller 11. Vibratory Roller 12. Steel Wheel Roller 13. Tire Roller 14. Water Bowser 15. Dump Truck 16. Cargo Truck 17. Air Compressor 18. Generator 19. Concrete Batching Plant 20. Mixer Machine 21. Mixer Truck 22. Concrete Vibrator 23. Bored Pile Equipment 24. Low Bed Trailer 25. Water Pump 26. Wet Mixing Plant S.C B.C A.P P.M B.D W.L Ex. B.D M.G T.R V.R S.R R.R W.B D.T C.T A.C Ge C.B M.M M.T C.V B.P L.T W.P W.M Bidder to indicate item-wise expected quantities to be tackled per work front per day (or state no. of days). Also indicate combination of equipment per work front (say 5 Dump Truck + 1 Motoer Crader + 1 Wheel Loader + 1 Vibratory Roller).