Legend
NEORSD CSO Green Infrastructure Projects (Consent Decree Appendix 3)
44 41 30 24 31 29 8
Bratenahl
73 75
Euclid
Lake Erie
27 78
Richmond Heights
61
26 18 42 46
90
49
East Cleveland
67
South Euclid
25 66 35 36 43 52 65
33 53
50
51
63
54
3 56
59 55
60
62 38
47
76
77
Cleveland Heights
57 10 32 40
Cleveland
39 72
14 15
58
6 74 21
Shaker Heights
University Heights
37
34
45
11 7 48
Lakewood
22
490
12 9
19
Rocky River
90
49 0
20
Beachwood
Fairview Park
This map/data was compiled by the Northeast Ohio Regional Sewer District ("District") which makes every effort to produce and publish the most current and accurate information possible. This map/data was created and compiled to serve the District for planning and analysis purposes. The District makes no warranties, expressed or implied, with respect to the accuracy of the map/data and its use for any specific purpose. The District and its employees expressly disclaim any liability that may result from the use of this map/data. For more information, please contact: Kyle Dreyfuss-Wells (Manager of Watershed Programs) or Jeffrey Duke, P.E. (Engineering Technical Services) 3900 Euclid Avenue, Cleveland, Ohio 44115 (216-881-6600).
23 7
69 5
70
28
Highland Hills
Project: NEORSD GI ProjectsSources: Parcels, Cuyahoga Co, 2011; Orthos, Cuyahoga Co, 2013; CAMA data, Cuyahoga Co, 2011
64
68
Newburgh Heights
71
Linndale
71
23
Warrensville Heights Cuyahoga Heights Garfield Heights
17
Brooklyn
North Randall
16
Brookpark
Parma
480
0
0 48
.
2
77
Maple Heights
Bedford Heights
Miles
Lake Erie
Bratenahl
Richmond Heights
East Cleveland
90
South Euclid
Cleveland Heights
University Heights
Lakewood
Cleveland
490
Rocky River
90
49 0
Shaker Heights
Beachwood
Fairview Park
This map/data was compiled by the Northeast Ohio Regional Sewer District ("District") which makes every effort to produce and publish the most current and accurate information possible. This map/data was created and compiled to serve the District for planning and analysis purposes. The District makes no warranties, expressed or implied, with respect to the accuracy of the map/data and its use for any specific purpose. The District and its employees expressly disclaim any liability that may result from the use of this map/data. For more information, please contact: Kyle Dreyfuss-Wells (Manager of Watershed Programs) or Jeffrey Duke, P.E. (Engineering Technical Services) 3900 Euclid Avenue, Cleveland, Ohio 44115 (216-881-6600).
23 7
Highland Hills
Project: NEORSD GI ProjectsSources: Parcels, Cuyahoga Co, 2011; Orthos, Cuyahoga Co, 2013; CAMA data, Cuyahoga Co, 2011
Brooklyn
North Randall
Brookpark
Parma
480
0
0 48
.
2
77
Maple Heights
Bedford Heights
Miles
GREENINFRASTRUCTUREPROJECTSWITHINNEORSDCOMBINEDSEWERSERVICEAREA
January17,2014
NEORSDGREENINFRASTRUCTUREPROJECTS CSOAppendix3GIProjects
ProjectID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
NEORSDProjectTitle
IndustrialCorridorGreenInfrastructure IndustrialCorridorGreenInfrastructure CourtyardbyMarriott SlavicVillageDemostrationProjects FleetAvenueGreenInfrastructure FairhillMLK UrbanAgricultureInnovationZone AspinwallGreenInfrastructure WoodlandHillsGreenInfrastructure KingsburyRunGreenInfrastructure KingsburyRunGreenInfrastructure Union/BuckeyeGreenInfrastructure Union/BuckeyeGreenInfrastructure(GiddingsZone2) DoanValleyGreenInfrastructure(GiddingsZone1) DoanValleyGreenInfrastructure(GiddingsZone3)
ProjectLocation
PuritasLongmead(W.160TH) HarvardAvenue(NewburghHeights) UniversityCircle(EuclidandMayfield) SlavicVillage(E.75th,E.78thandMorganaRunTrail) FleetAvenuebetweenE.49thandE.65th Fairhill/MLKinAmblerPark E.80thtoE.84thoffKinsman E.140thandAspinwall WoodlandHillsneighborhood Woodland/Central HoltonAvenuebetweenE.75thandE.78th SlavicVillageatUnionAvenue BuckeyeRoadatShakerBlvd. BaldwinReservior QuincyandWoodhill
SmallScaleStormwaterDemonstrationProjects
ProjectID
16 17
Organization
BellairePuritasDevelopmentCorporation BellairePuritasDevelopmentCorporation
ProjectDescription/Location
Improvementoftheriparianzone,streambankstabilizationandfloodplainenhancement. AvacantpropertyadjacenttotheChevyBranchoftheBigCreekisregradedandplantedtomanagestormwater thatdrainsontothesidewalkfromthestreetandsidewalk.Neighborreportsnobasementfloodingsinceproject completion. Redirectstormwaterfromtheroofofanadjacentindustrialbuildingandprovideirrigationforthefarm Bioswalethatservestoreducesstandingwaterandlocalizedstreetflooding. Acampusdemonstrationprojectthatcaptureswaterfromasteepslopeandreducesstandingwaterand flooding. Theraingardenislocatedinapopularneighborhoodpark.Thisgardensiteisnearastormdrainandtendstostay saturated.Theraingardenisvalueaddedinaveryvisiblearea. Thebioretentioncellswillbepartofaprojecttoredesigntheparkingareaatthelibrary. TheCDChasincreasedpartnershipparticipationimprovingtheprojecttoneighborhoodparkwithstormwater demonstrationsites ApartoftheWaterlooRoadStreetscape;partofaplantocreateanoverallreductionofstormwater(100yr/24 hr)fortheareabyinstallingbioswales,perviouspavementandaninfiltrationbasinfortheparkinglot. Thewaterharvestingsystemwillcapturerunofffromtwocommercialrooftopintocisterns.Thewaterwillbeuse bytheDowntownClevelandAlliancetowaterplants,powerwashing,andothercleaningandsafetyactivities.
18 19 20 21 22 23 24
25
WarehouseDistrictDevelopmentCorporation
GREENINFRASTRUCTUREPROJECTSWITHINNEORSDCOMBINEDSEWERSERVICEAREA
26 BluePikeFarm Theprojectwillassistinfundingastormwatercollectionsystemandinfrastructureforanurbanfarmthatwill redirectrainwaterforhightunnelhoophouseandfruittrees,bramblesandbeneficialpollinatorhabitat. Severalstormwatermanagementtechniqueswouldbeimplementedatthesitetoreduceimpervioussurfaceand stormwaterrunoff Curbextensionbioretentioncellswithprovidebiofiltratiionbyredirectingstormflowsthroughthisgreen infrastructureelement. Thefundingwillsupporttheadditionalbioretentionareaandplantmaterial,drainagemodificationtotheexisting lotandadeepgravelinfiltrationtocreateanoverallreductionofstormwater(100yr/24,hr)forbothparking areas. Thegrantwillfundtheadditionalbioretentionareaandplantmaterial,drainagemodificationtotheexistinglot andadeepgravelinfiltrationtocreateanoverallreductionofstormwater(100yr/24hr)fortheparkingarea.
January17,2014
27 28 29
30
NortheastShoresDevelopmentCorporation
31
NortheastShoresDevelopmentCorporation
Retrofitoftheexistinglandscapeislandintoaninfiltrationbasin.Thisbasinwillcapturewaternaturallydraining towardstheareaandcapturewaterfromthebuildingroof. Redirectingflowfromthe7,800sq.ft.rooftoa10,000gallonundergroundcistern.Graywatertobeusedfor toilets,urinal,dishwashing,andplantings.Initialestimateof630gal/dayusage. Avacantlotreuseprojecttodevelopaninnovativegrowingfacilitythatstoreswaterthatfallsonthestructurein aninternal2000galloncisternwithoverflowtoanadjacentraingarden. Collectrainwaterfroma10,000sq.ft.drainageareathatincludesbuildingroofandadjacentcourtyardin4500 galloncisterns.Waterwillbeusedforhangingwallgardensandlandscaping. Toprovideahighprofile,ultraurbanstormwatercontrolmeasureofvegetatedroof.Theprojectwithcapture andslowtherainwateronthe320sq.ft.roofareaofthebikeboxes. Installationofa300sq.ft.raingardentoattenuatethepoorgradinganddrainageatthisveryvisiblesite.
32 33 34 35 36
37
FredandLauraRuthBidwellFoundation
Anewpocketparkadjacenttothebuildingwillcapturerainwaterfroma$2,600sq.ft.roofareaandrouteit throughaseriesofbioswalesandraingardens.
GREENINFRASTRUCTUREPROJECTSWITHINNEORSDCOMBINEDSEWERSERVICEAREA
January17,2014
NONNEORSDGREENINFRASTRUCTUREPROJECTS
ProjectID
38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
Organization
ClevelandClinicLangstonHughesCenter CuyahogaCounty CityofCleveland CityofCleveland Famicos CityofCleveland StateofOhio GreenCityGrowers Privatedeveloper CWRU CWRU CityofCleveland RTA CSU AmericanTankandFabrication USAParkingSystems CMM,Inc. ClevelandClinic ClevelandClinic CuyahogaMetropolitanHousingAuthority CuyahogaMetropolitanHousingAuthority ClevelandMuseumofArt ClevelandMuseumofArt ClevelandMetropolitanSchoolDistrict EmeraldAllianceV,LP EuclidCorridorSeniorHousing FairviewHospital CityofClevelandPublicUtilitiesWater GreatLakesTowingCompany CityofClevelandPublicUtilitiesWater LakeparkCongregation MetrohealthSystem CityofCleveland GreaterClevelandRegionalTransit VoconPartners,LLC SloveneHomefortheAged STLDevelopment CityofClevelandPublicUtilitiesWater RoyalLandscape,Inc. MRNLimitedC/OHolidayInnExpress VillageGreenElderly,LLC
ProjectDescription/Location
East79thStreetandQuincyAvenuebioretention BMPsassociatedwiththeCountybuildingatQuincyand93rd ProfessorStreetrehabilitationinTremontfullstreetlengthredonewithrightofwaybioretention CollinwoodRecreationCenterbioretentioninparkinglot DoanClassroomApartmentsat1350East105thstreetbioretentioninparkinglot ZoneRecreationCenterbioretentioninparkinglot WildwoodStateParkbioretentioninparkinglot GreenCityGrowersatGrandAvenueandKinsmanRoadretentionandwaterreusing HazelApartmentsonHazelDriveinUniversityCitcleinfiltration CWRUTinkhamVealeStudentCenteronEastBlvd CMHAHeritageViewEastatesonKinsmanRoadandEast77thstreetdistributedbioretention WaterPollutionContol'sHeadquartersOfficeonKirbyAvenueperviouspavement RTAStephanieTubbsJonesTransitCenterE.21standProspectAvenuepermeablepavers ClevelandStateRecreationCenter2420ChesterAvenuegreenroof AmericanTankandFabrication12501ElmwoodAvenueinfiltrationtrench CasinoWelcomeCenter2105OntarioStreetsandfilter ChesterParkingLot1945E.97thStreetinfiltrationtrench ClevelandClinicNewLabBuilding10300CarnegieAvenueperviouspavement ClevelandClinicParkingLotExpansion9701EuclidAvemanufacturedsystem CMHAOuthwaiteBldg.#32452E.43rdStreetbioretention CMHAWoodhill2488MorrisBlackbioretention ClevelandMuseumofArt11150EastBoulevardbioretention ClevelandMuseumofArt,Phase211150EastBoulevardbioretention EastClarkNewK8School885E.146thStreetbioretention EmeraldAllianceV7515EuclidAvenueinfiltrationtrench EuclidCourtSeniorHousing73387350EuclidAvenuesandfilter FairviewHospitalN.LorainParkingLot18200LorainRoadenhancedbioswale GarrettMorganWaterWorks#1191245W.45thStreetperviouspavement GreatLakesTowingCompany4500DivisionAvenuebioretention KirtlandPumpStation4901S.MarginalRoadperviouspavement LakeparkCongregationKingdomHall15600LorainRoadbioretention MetrohealthDriveEntrance2500MetrohealthDrivebioretention,treebox MorganaAthleticComplex6619Baxterinfiltrationtrench PuritasW.150thRTA4200W.150thStreetbioretention,perviouspavement QuincyParkingLot9409QuincyAvenuesandfilter SloveneHomefortheAged18621NeffRoadbioretention St.Luke'sManorPhase118621NeffRoadbioretention Technology&Security1230ChardonRoadbioswale UniversityHospitalUrbanPark11224EuclidAvenueinfiltrationbasin UptownProject11451,11452EuclidAvenueperviouspavement VillageGreenElderlyApartments18235EuclidAvenuebioswale