Project : 2E1 & 2E2, Bkt Rimau

Subject : Summary Of Surface Drain - 2E2 Date prepared : 29/8/01

a b c d
Ref Length Avg/bwk Inner Outer Fwk to side 300mm 230mm thk 345mm thk Strut Weephole Plastering
No Depth Width Width of drain base H/R brickwall brickall at 3m c/c
(m) (m) (m) (m) (m2) (m) (m2) (m2) (nr) (nr) (m2)
a x 0.318 x 2 a 2xaxb a/3 x 2 a (b+0.23)2

1 213.764 0.33 0.60 1.06 135.95 213.76 141.08 - - 142.51 239.42


92.964 0.63 0.60 1.06 59.13 92.96 117.13 - - 61.98 159.90
99.561 1.17 0.60 1.06 63.32 99.56 179.21 * 52.77 * 34 66.37 278.77
24.384 0.93 0.60 1.06 15.51 24.38 41.84 * 2.41 * 3 16.26 56.57
74.591 1.20 0.76 1.22 47.44 74.59 134.26 * 44.01 * 25 49.73 213.33

2 94.858 0.69 0.60 1.06 60.33 94.86 130.90 - - 63.24 174.54


119.478 1.22 0.60 1.06 75.99 119.48 215.06 * 75.27 * 40 79.65 346.49
204.870 0.99 0.60 1.06 130.30 204.87 365.48 * 28.59 * 32 136.58 499.88
42.994 0.69 0.60 1.06 27.34 42.99 59.33 - - 28.66 79.11
92.964 0.48 0.60 1.06 59.13 92.96 89.25 - - 61.98 132.01
21.336 0.61 0.60 1.06 13.57 21.34 26.03 - - 14.22 35.84
97.820 0.48 0.60 1.06 62.21 97.82 93.91 - - 65.21 138.90

3 94.858 0.67 0.60 1.06 60.33 94.86 127.11 - - 63.24 170.74


136.242 1.24 0.60 1.06 86.65 136.24 245.24 * 92.64 * 46 90.83 400.55
42.994 0.67 0.60 1.06 27.34 42.99 57.61 - - 28.66 77.39
88.392 0.85 0.60 1.06 56.22 88.39 150.27 - - 58.93 190.93
99.714 1.30 0.60 1.06 63.42 99.71 179.49 * 78.77 * 34 66.48 305.12
21.336 0.50 0.60 1.06 13.57 21.34 21.34 - - 14.22 31.15
92.964 0.49 0.60 1.06 59.13 92.96 91.10 - - 61.98 133.87
97.820 0.48 0.60 1.06 62.21 97.82 93.91 - - 65.21 138.90

4 92.916 0.75 0.60 1.06 59.09 92.92 139.37 - - 61.94 182.12


103.382 1.32 0.60 1.06 65.75 103.38 186.09 * 86.84 * 35 68.92 320.48
197.298 0.62 0.60 1.06 125.48 197.30 244.65 - - 131.53 335.41
24.384 0.38 0.60 1.06 15.51 24.38 18.53 - - 16.26 29.75
6.000 1.17 0.60 1.06 3.82 6.00 10.80 * 3.18 * 3 4.00 16.80
40.000 1.28 0.60 1.06 25.44 40.00 72.00 * 30.40 * 14 26.67 120.80
34.000 1.44 0.90 1.36 21.62 34.00 61.20 * 36.72 * 12 22.67 113.56
11.000 1.52 0.60 1.06 7.00 11.00 19.80 * 13.53 * 4 7.33 38.50

1,502.80 2,362.88 3,311.99 545.13 282 1,575.26 4,960.83


Summary Of Entrance Slab - 2E2 Date prepared : 29/8/01

Entrance Slab Cover

a b c
Length width Qty 125mm thk Steel bar 2 layer of Fwk to soffit Fwk to side
Concrete R12 BRC B6 of slab of cover slab
(m) (m) (nr) (m2) (kg) (m2) (m2) (m)
axbxc 8.88 x c axbxcx2 a x 0.6 x c (2a +b)c

5.162 1.06 158 864.53 1,403.04 1,729.06 489.36 1,798.67

Entrance Slab Base

a b c
Length width Qty BRC B6 Fwk to side Extra fwk to side Lean conc.
of slab base of slab base
(m) (m) (nr) (m2) (m) (m) (m2)
axbxc 2a x c 2 x 0.15 x c axbxc

4.037 1.36 158 867.47 1,275.69 47.40 867.47

Steel bar - R12


L = 4 x 1.5 + 4{1.060 - 2(0.03)}
=6+4
= 10 m per grating cover

Weight
R12 = 10m x 0.888m/kg
= 8.88 kg per grating cover
Date prepared : 29/8/01

Omission And Addition For Rebated Concrete Coping & Plastering - 2E2

Deduction For Rebated Concrete Coping At Backlane


Ref No. Backlane

(m)
1 213.76
2 190.78
3 190.78
4 203.3

Total 798.63

Deduction For Rebated Concrete Coping & Plastering At Entrance Slab

a b
Length Qty Entrance cover Top plastering
slab length for entrance slab
(m) (nr) (m) (m2)
axb a x 0.23 x b x 2

5.162 158 815.60 375.17

Addition For Rebated Concrete Coping At Backlane

Rebated concrete coping at backlane = 158 x 2 x 0.45


= 142.20 m
Date prepared : 29/8/01

Rebated Concrete Coping , Plastering, Side Formwork To Drain Base, Concrete To Drain Base & Concrete Benching - 2E2

∴ Rebated concrete coping = 2 (Total drain length - Backlane - Entrance slab ) + P.C.slab at backlane
= 2 (2362.88 - 798.63 - 815.60) + 142.20
= 1497.30 + 142.20
= 1639.50 m

∴ Plastering = Total plastering - Entrance slab area top plastering


= 4960.83 - 375.17
= 4585.66 m2

∴ Formwork to side of drain base = Side formwork of total drain base - Side formwork of entrance slab base
= 1502.80 - (1275.69 x 0.15)
= 1512.12 - 191.35
= 1311.45 m2

∴ Concrete to drain base = Drain base concrete + Extra arising from entrance + Additional conc.for 345mm thk bwk
= 379 + 158(2 x 0.15 x 0.15 x 4.037) + 28.56
= 379 + 28.70 + 28.56
= 436.26 m3

∴ Concrete to benching = Concrete benching - Volume affected by entrance base detail + Additional conc for 345mm thk bwk
= 319.67 - 158 x 2 ( 0.23 x 0.168 x 4.037) + 31.99
= 319.67 - 49.29 + 31.99
= 302.37 m3

∴ 230mm thk brickwork = 230mm thk bwk + Additional bwk for affected by entrance base detail
= 3311.99 + 158 x 2 ( 0.168 x 4.037)
= 3311.99 + 214.32
= 3526.31 m2

∴ 450 x 600mm p.c slab = Qty for rebated concrete ÷2 ÷ 0.45


= 1639.50 ÷2 ÷ 0.45
= 1822 pcs

∴ Excavation n.e. 1.5m deep = Excavation n.e. 1.5m + Additional excavation for 345mm thk bwk
= 2823.26 + 294.61
= 3117.87 m3
m thk bwk

c for 345mm thk bwk