Expansion O&M Manual Completion Schedule

No.

Name of EPC Contractors

Name of O&M Manual (or System)

Commissioning Completion Due


Date

Comments Deadline by KPJB Each Division, PLN,


CJP

Compiled Comments Provision to EPC


Contractors

13

MHI

Boiler Ducts & Dampers

DONE

2/28/2011

3/15/2011

20

MHI

Chemical Dosing System

2/8/2011

3/10/2011

3/25/2011

21

MHI

Boiler Chemical Dosing System

2/8/2011

3/10/2011

3/25/2011

22

MHI

VVVF Cuble for Pulverizer Rotary Separator Motor

2/9/2011

3/11/2011

3/26/2011

30

MHI

Soot Bloowing System

2/22/2011

3/24/2011

4/8/2011

31

MHI

Soot Blower and Wall Deslagger

2/22/2011

3/24/2011

4/8/2011

32

MHI

Air & Flue Gas System

2/23/2011

3/25/2011

4/9/2011

33

MHI

Coal Feeder

3/2/2011

4/1/2011

4/16/2011

34

MHI

DCC Sludge Pump

3/2/2011

4/1/2011

4/16/2011

35

MHI

Electrode type Drum level Indicator

3/2/2011

4/1/2011

4/16/2011

36

MHI

FDF Maintenance

3/4/2011

4/3/2011

4/18/2011

37

MHI

PAF

3/4/2011

4/3/2011

4/18/2011

38

MHI

DCC Chemical Dosing System

3/4/2011

4/3/2011

4/18/2011

39

MHI

DCC Cooling Water Recirculation Pump

3/4/2011

4/3/2011

4/18/2011

40

MHI

pH meter for DCC Cooling Water

3/4/2011

4/3/2011

4/18/2011

41

MHI

DCC Local

3/4/2011

4/3/2011

4/18/2011

45

MHI

Boiler System

3/10/2011

4/9/2011

4/24/2011

46

MHI

Furnace Monitoring Camera

3/10/2011

4/9/2011

4/24/2011

47

MHI

Fuel Firing System

3/11/2011

4/10/2011

4/25/2011

48

MHI

Regenerative Air Preheater

3/11/2011

4/10/2011

4/25/2011

49

MHI

Boiler Water Circulation Pump

3/15/2011

4/14/2011

4/29/2011

54

MHI

TV/Flame Detector Cooling Fan

3/15/2011

4/14/2011

4/29/2011

55

MHI

Cooling Heat Exchanger

3/15/2011

4/14/2011

4/29/2011

56

MHI

Fire Fighting System

3/15/2011

4/14/2011

4/29/2011

57

MHI

Miscellaneous Valves

3/15/2011

4/14/2011

4/29/2011

No.

Name of EPC Contractors

Name of O&M Manual (or System)

Commissioning Completion Due


Date

Comments Deadline by KPJB Each Division, PLN,


CJP

Compiled Comments Provision to EPC


Contractors

58

MHI

Drain Traps

3/15/2011

4/14/2011

4/29/2011

59

MHI

Actuators

3/15/2011

4/14/2011

4/29/2011

60

MHI

Hangers

3/15/2011

4/14/2011

4/29/2011

61

MHI

Flame Detector

3/15/2011

4/14/2011

4/29/2011

62

MHI

ECO Outlet Flue Gas Oxygen Analyzer

3/15/2011

4/14/2011

4/29/2011

63

MHI

Auxiliary Machine Vibration Monitor

3/15/2011

4/14/2011

4/29/2011

64

MHI

Furnace Gas Temperature Probe

3/15/2011

4/14/2011

4/29/2011

65

MHI

Control Drives

3/15/2011

4/14/2011

4/29/2011

66

MHI

Transmitter

3/15/2011

4/14/2011

4/29/2011

67

MHI

Binary Sensors

3/15/2011

4/14/2011

4/29/2011

68

MHI

Flow Element

3/15/2011

4/14/2011

4/29/2011

69

MHI

Desuperheater

3/15/2011

4/14/2011

4/29/2011

70

MHI

Thermocouple

3/15/2011

4/14/2011

4/29/2011

71

MHI

Local Gauge

3/15/2011

4/14/2011

4/29/2011

72

MHI

Induction Motor

3/15/2011

4/14/2011

4/29/2011

73

MHI

DC Motor

3/15/2011

4/14/2011

4/29/2011

74

MHI

DC Motor Starter Panel

3/15/2011

4/14/2011

4/29/2011

75

MHI

Boiler Switchgear

3/15/2011

4/14/2011

4/29/2011

76

MHI

Boiler Motor Control Center

3/15/2011

4/14/2011

4/29/2011

77

MHI

LV Distribution Board

3/15/2011

4/14/2011

4/29/2011

79

MHI

Pulverizer

3/16/2011

4/15/2011

4/30/2011

81

MHI

Boiler Pressure Parts & Piping

3/18/2011

4/17/2011

5/2/2011

95

MHI

Burner

3/31/2011

4/30/2011

5/20/2011

96

MHI

Coal Bunker Level Transmitter & Switch

3/31/2011

4/30/2011

5/20/2011

100

MHI

Bottom Ash Handling System

4/15/2011

5/15/2011

5/20/2011

103

MHI

Control Valve

4/16/2011

5/16/2011

5/20/2011

106

MHI

Safety Valves (For Boiler)

4/28/2011

5/28/2011

6/19/2011

No.

Name of EPC Contractors

Name of O&M Manual (or System)

Commissioning Completion Due


Date

Comments Deadline by KPJB Each Division, PLN,


CJP

Compiled Comments Provision to EPC


Contractors

116

MHI

Chain Conveyor

5/15/2011

6/14/2011

6/19/2011

117

MHI

Clinker Crusher

5/15/2011

6/14/2011

6/19/2011

118

MHI

Tripper Gallery Exhaust Fan

5/15/2011

6/14/2011

6/19/2011

119

MHI

Coal Pulverizer Maintenance Hoist

5/15/2011

6/14/2011

6/19/2011

120

MHI

Hoist

5/15/2011

6/14/2011

6/19/2011

121

MHI

Chain Block

5/15/2011

6/14/2011

6/19/2011

122

MHI

Boiler Elevator

5/15/2011

6/14/2011

6/19/2011

123

MHI

Boiler Maintenance Gondola

5/15/2011

6/14/2011

6/19/2011

124

MHI

Pulverizer Roll Lift Detector

5/15/2011

6/14/2011

6/19/2011

8 th Submission 19/06/2011
Name of EPC Contractors

Name of O&M Manual (or System)

Commissioning
Completion Due
Date

BVI

Instruction Manual for ESP

4/20/2011

5/20/2011

6/19/2011

TOSHIBA

Gland Steam Seal System

4/25/2011

5/25/2011

6/19/2011

MHI

Safety Valves (For Boiler)

4/28/2011

5/28/2011

6/19/2011

TOSHIBA

BFP Turbine and Auxiliaries

4/30/2011

5/30/2011

6/19/2011

TOSHIBA

Turbine Generator & Auxiliaries

5/3/2011

6/2/2011

6/19/2011

TOSHIBA

Steam Turbine Operation

5/15/2011

6/14/2011

6/19/2011

TOSHIBA

Steam Turbine Maintenance

5/15/2011

6/14/2011

6/19/2011

TOSHIBA

Turbine Control System

5/15/2011

6/14/2011

6/19/2011

TOSHIBA

Steam and Water System

5/15/2011

6/14/2011

6/19/2011

10

TOSHIBA

Valves and Specialties

5/15/2011

6/14/2011

6/19/2011

11

TOSHIBA

Motors of Steam Turbine and Generator Auxiliary

5/15/2011

6/14/2011

6/19/2011

12

TOSHIBA

Master Clock System

5/15/2011

6/14/2011

6/19/2011

13

MHI

Chain Conveyor

5/15/2011

6/14/2011

6/19/2011

14

MHI

Clinker Crusher

5/15/2011

6/14/2011

6/19/2011

15

MHI

Tripper Gallery Exhaust Fan

5/15/2011

6/14/2011

6/19/2011

16

MHI

Coal Pulverizer Maintenance Hoist

5/15/2011

6/14/2011

6/19/2011

17

MHI

Hoist

5/15/2011

6/14/2011

6/19/2011

18

MHI

Chain Block

5/15/2011

6/14/2011

6/19/2011

19

MHI

Boiler Elevator

5/15/2011

6/14/2011

6/19/2011

20

MHI

Boiler Maintenance Gondola

5/15/2011

6/14/2011

6/19/2011

21

MHI

Pulverizer Roll Lift Detector

5/15/2011

6/14/2011

6/19/2011

22

BVI

FGD system (Vol. 3 - 7)

5/15/2011

6/14/2011

6/19/2011

No.

List of Commented Expansion O&M Manuals


No.

Name of EPC Contractors

Name of O&M Manual (or System)

TOSHIBA

Large Screen Display

TOSHIBA

Digital Electro-Hydraulic Control System

TOSHIBA

Instruments

TOSHIBA

Vibration Supervisory System

TOSHIBA

Turbine Supervisory Instrument

BVI

Vibration Monitoring Equipment

TOSHIBA

DC & safe AC Systems

TOSHIBA

Distributed Control System

SANWA

10

TOSHIBA

CCTV & Communication System


Basic Interface Concept for
Controllers(DCS,PLC,LCP)

Remark

Comments Deadline by KPJB Compiled Comments Provision


Each Division, PLN, CJP
to EPC Contractors

11

TOSHIBA

Computerized Maintenance Management System

12

BVI

13

BVI

CEMS System
Instruction Manual, Maintenance Precedure, &
Troubleshooting for Panel Boards Rev.1

UP DATE : 23 December 2011


No.

Name of EPC
Contractors

MHI

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI

Name of O&M Manual (or System)


Boiler Pressure Part, Main & Reheat Steam System
(Sys des, and OM)
Air And Flue gas System (Sys des, and OM)
Soot Blowing System
Chemical Dosing System (Sys des, and OM)
Bottom Ash Handling System (Sys des, and OM)
Fuel Firing System (OM)
Boiler Maintenance
Boiler Ducts & Dampers Maintenance
Forced Darft Fan Maintenance
Primary Air Fan Maintenance
Burners (Coal, Oil and Ignator) Maintenance
Pulverizer Maintenance
Drag Chain Conveyor Maintenance
Boiler Water Circulation Pump
Regenarative Air Preheater
Soot Blower and Wall Deslagger
Coal Feeder
TV Camera Flame Deteector Cool Fan
Boiler Chemi Dosing System
DCC Chemi Dising System
DCC CW Recir Pump
DCC Sludge Pump
DCC Cooling Water Heat Exchanger
Clinker Crusher
Tripper Gallery Exhaust Fan
Fire Fighting System
Coal Pulverizer Maintenace Hoist
Hoist Elevator
Chain Block
Boiler Elevator
Boiler Maintenance Gondola
Safety Valve
Miscellaneous Valve
Drain Valve
Actuators
Hangers
Accumulator
Safety Valves (For Piping)
Batterfly Valve
Boiler Feedwater Orifice
Drum Level Indicator
Flame Detector
Pulverizer Roll Lift Detector
ECO Outlet Flue Gas Oxygen Analyzer
Furnace Monitoring Camera
Auxiliary Machine Vibration Monitor
Furnace Gas Temperature Probe
Coal Bungker Level Transmitter and Switch

System

Hand Over Status of


Soft Copy

Recieving Date

Hand Over Status of


Hard Copy

Boiler

Complete

3/10/2011

Complete

16/11/2011

Rev

Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Rev
Rev
Rev
Rev
Final
Final
Final
Final
Final
Final
Final
Final
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Rev
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011

Recieving Date Heading Cover Recieving Date

49
50
51
52
53
54
55
56
57
58
59
60
61

MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI
MHI

Electrode type Drum level Indicator


Control Valve
Control Drives
pH Meter for DCC Cooling Water
DCC Local Control Panel
Transmitter
Binary Sensors
Flow Element
Desuperheater
Thermocople
Local Gauge
Induction Motor
DC Motor

Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler
Boiler

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011
2/12/2011

62

MHI

VVVf Cubicle for Pulverizer Rotary Separator Motor

Boiler

Complete

3/10/2011

Complete

16/11/2011

Final

2/12/2011

63
64
65
66

MHI
MHI
MHI
MHI

Boiler
Boiler
Boiler
Boiler

Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011

Final
Final
Final
Final

2/12/2011
2/12/2011
2/12/2011
2/12/2011

67

MHI

DC Motor Starte Panel


Boiler Switchgear and Cast Resin Transformer
Boiler Motor Control Center
LV Distribution Board
Instruction Manual for Hyd. Power Unit of Roller
Cover

Boiler

Complete

3/10/2011

Complete

Unofficial

Final

2/12/2011

68
69
70
71
72
73
74
75

TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

As Build
As Build
As Build
As Build
As Build
As Build
Final

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

76

TOSHIBA

Complete

3/10/2011

Complete

16/11/2011

Final

16/11/2011

77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97

TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Final
Final
Final
Final
Final

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Itroduction
General
General Arrangements
General
P& ID
General
Heat Balance
General
Water Balance Sheet
General
Equipment List
General
Sigle Line Diagram
General
Hazardous Classified Locations
General
Contract Spare Parts, Contract Special Tool, Lube Oil
General
& Grrease List
Description of Steam Turbine Generator Plant Steam Turbine Generator Plant
Description of Equipment Parts of Steam TurbineSteam Turbine Generator Plant
Steam Turbine Operation
Steam Turbine Generator Plant
Steam Turbine Maintenance
Steam Turbine Generator Plant
Gland Steam Seal System
Steam Turbine Generator Plant
Turbine Control System
Steam Turbine Generator Plant
Turbine Generator and Auxiliary
Steam Turbine Generator Plant
Excitation System
Steam Turbine Generator Plant
Generator Protection System
Steam Turbine Generator Plant
Lubricating Oil System
Steam Turbine Generator Plant
Lube Oil Tranfer System
Steam Turbine Generator Plant
Electro Hydraulic Control Oil System
Steam Turbine Generator Plant
BFP Turbine and Auxiliaries
Steam Turbine Generator Plant
Steam and Water System Equipment O&M ManualSteam Turbine Generator Plant
make Up Water System Equipment O&M ManualSteam Turbine Generator Plant
Valves and Specialties O&M Manual
Steam Turbine Generator Plant
Moto of Turbine and Generator Auxiliary Steam Turbine Generator Plant
Cooling System
Balance of Plant
Water Treatment System
Balance of Plant
Compressed Air System
Balance of Plant
Auxiliary gas Supply (H2CO2)
Balance of Plant

Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final
Final

98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118

TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA
TOSHIBA

119

MES

120

MES

121

MES

122

MES

123

MES

124

MES

125

MES

126

MES

127

MES

128

MES

Fire Fighting System


Balance of Plant
Workshop Equipment
Balance of Plant
Air Conditioning and Ventilation System
Balance of Plant
Cranes and Hoists
Balance of Plant
Electrical System Design Description
Electrical and Associated Works
Generator main Connection and Circuit Breake Electrical and Associated Works
Transformer
Electrical and Associated Works
Medium Voltage Switchgear and Associated Equipment
Electrical and Associated Works
Low Voltage AC Switchgear and Associated Equipment
Electrical and Associated Works
DC and Safe AC Power Supplay System Electrical and Associated Works
EHV Substation
Electrical and Associated Works
Distributed Control System
Instrumentation and Control Systems
large Screen Display
Instrumentation and Control Systems
Digital Electro-Hydraulic Control System Instrumentation and Control Systems
Instruments
Instrumentation and Control Systems
Vibration Monitoring System
Instrumentation and Control Systems
Turbine Supervisory Intrument
Instrumentation and Control Systems
Condenser Leak Detection System
Instrumentation and Control Systems
Sampling System
Instrumentation and Control Systems
Master Clock System
Instrumentation and Control Systems
Computerized Maintenance Management Systeam
CMMS
B-00__-0-MES-M-6100-BB-SF------N_OPERATION_AND_MAINTENANCE_MANUA
L_FOR_PW
B-00__-0-MES-M-6090-AA-SF------N_OPERATION_AND_MAINTENANCE_MANUA
L_FOR_MOBILE_EQUIPMENT
B-00__-0-MES-M-6080-AA-SF-2----N_MAINTENANCE_MANUAL_FOR_SEPTIC_TA
NK
B-00__-0-MES-M-6070-CC-SF-2----N_OPERATION_AND_MAINTENANCE_MANUA
L_FOR_CHIMNEY
B-00__-0-MES-M-6060-AA-SF-2----N_OPERATION_MANUAL_FOR_SHUTTER_FOR
_POWER_HOUSE
B-00__-0-MES-M-6050-CC-SF-2----N__MAINTENANCE_MANUAL_FOR_COOLING_
WATER_INTAKE_SYSTEM
B-00__-0-MES-M-6040-BB-SF-2----N_OPERATION_AND_MAINTENANCE_MANUA
L_FOR_CAPSTAN
B-00__-0-MES-M-6030-CC-SF------N_MAINTENANCE_MANUAL_FOR_CATHODIC_
PROTECTION
B-00__-0-MES-M-6020-CC-SF------N_MAINTENANCE_MANUAL_FOR_NAVIGATIO
N
B-00__-0-MES-M-6010-CC-SF-2----N_OPERATION_AND_MAINTENANCE_MANUA
L_FOR_DRAIN_SYSTEM

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Final
Final
Final

Final
Final
Final
Final
Final
Final
Final
Final

16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011
16/11/2011

Civil

Complete

2/12/2011

Complete

11/9/2011

Final

23/12/2011

Civil

Complete

2/12/2011

Complete

11/9/2011

Final

23/12/2012

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2013

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2014

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2015

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2016

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2017

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2018

Civil

Complete

3/10/2011

Complete

11/9/2011

Final

23/12/2019

Civil

Complete

2/12/2011

Complete

11/9/2011

Final

23/12/2020

Final
Final
Final
Final
Final
Final
Final
Final

136

SANWA

CCTV AND COMMUNICATION SYSTEM CCTV & Comunication System

Complete

3/10/2011

Complete

9/11/2011

Final

2/12/2011

137

BVI

CEMS System

138
139
140
141

BVI
BVI
BVI
BVI

142

BVI

Coal Handling System (Total 23 Voulme)


Installation Manual for ID Fan Outlet Damper
DUSTHUNTER-T
Instruction Manual for Equipment Description Volume
Number
Instruction Manual for ESP

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

Balance of Plant
Balance of Plant
Balance of Plant
Balance of Plant

Complete
Complete
Complete
Complete

3/10/2011
3/10/2011
3/10/2011
3/10/2011

Complete
Complete
Complete
Complete

15/11/2011
9/11/2011
2/12/2011
9/11/2011

Revision
Revision
Revision
Revision

143

BVI

Instruction Manual for Expansion Joint

Balance of Plant

Complete

3/10/2011

Complete

3/11/2011

Revision

Balance of Plant

Complete

3/10/2011

Complete

3/11/2011

Revision

144
145

BVI
BVI

FGD system (Vol. 1 - 7)


Fire Fighting System

Balance of Plant
Balance of Plant

Complete
Complete

3/10/2011
3/10/2011

Complete
Complete

15/11/2011
11/9/2011

Revision
Revision

146

BVI

Instruction Manual for Fly Ash Handling System

Balance of Plant

Complete

3/10/2011

Complete

3/11/2011

Revision

147

BVI

Instruction Manual for Fuel Oil Filling Up Facility

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

148

BVI

Instruction Manual for Field Erected Oil Tank

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

149

BVI

Instruction Manual for General Service Pump


(Total five volume)

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

150

BVI

Hoist & Trolleys

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

151

BVI

Instruction Manual for HVAC

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

152

BVI

IDF

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

153

BVI

Instruction Manual for Instrumentation


(Control Devices & Instrumentation)

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

154

BVI

Laboratory Equipment

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

155

BVI

Limestone Handling System

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

156

BVI

Instruction Manual for Low Voltage Switchgear (Vol 1)

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

157

BVI

Mobile equipment CLG 862 Wheel Loader

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

158

BVI

Mobile equipment Volvo FM 440 truck & Manitou


ATJ160

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

159

BVI

Mobile Equipment ( CLG 355A, CLG 365, ACLG


375A)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

160

BVI

Mobile Equipment ( CLG 616/CLG 614 Vibratory


Roller)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

161

BVI

Mobile Equipment ( CLG 418 Grader)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

162

BVI

Mobile Equipment ( CLG B230 Bulldozer)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

163

BVI

Mobile Equipment (EC 460B)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

164

BVI

Mobile Equipment (FM 440)

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

165

BVI

Panel Boards

Balance of Plant

Complete

3/10/2011

Complete

15/11/2011

Revision

166

BVI

Vibration_Monitoring_Equipment

Balance of Plant

Complete

3/10/2011

Complete

9/11/2011

Revision

167

SIEMENS

Substation Automation System

Substation 500 kV

Incomplete

3/10/2011

Incomplete

Unofficial