ST41992 FG 2285 MP 25-31-59 04 A MM P8R189M A330-340 REQUEST NO : 2285 WITH EFFECTIVITY **ON A/C ALL TOPIC : 253159 04

E TO : elena.dulgheru@aerotec.ro FORMATTED CONTENT FROM : REQUESTED EDITION NUMBER : 2. 9.2013

LAA01 EDITION EFFECTIVITY

EDITION CRITERIA

GALLEY (6489ML) - REMOVAL/INSTALLATION TASK 25-31-59-000-80100 Removal of the Forward Galley Unit (6489ML) 1. Reason for the Job This component is heavy. For the correct component weight, refer to the galley manufacturer's Component Maintenance Manual (CMM). More than one person is necessary for this procedure. 2. Job Set-up Information Not Applicable 3. Job Set-up Subtask 25-31-59-865-05000-001 TOP END-UD : Y DATE : 2010 07 12 MPM 40021S10000

A. Get access to the avionics compartment and to the applicable 5000VEseries panel(s). Then open, safety and tag this (these) circuit breaker(s) : ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39 4. Procedure Subtask 25-31-59-010-05200-003 TOP END-UD : DATE : MPM 200734D57957

Page 1

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

TASK 25-31-59-400-80100 Installation of the Forward Galley Unit (6489ML) WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : - FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 TO 15 MINUTES. - GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS. WARNING : BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS. 1. Reason for the Job This component is heavy. For the correct component weight, refer to the galley manufacturer's Component Maintenance Manual (CMM). More than one person is necessary for this procedure. 2. Job Set-up Information Not Applicable 3. Job Set-up Subtask 25-31-59-865-05100-001 TOP END-UD : Y DATE : 2010 07 12 MPM 40021S10000

A. Get access to the avionics compartment and to the applicable 5000VEseries panel(s). Then make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged: ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39

Page 2

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY 4. Procedure Subtask 25-31-59-865-06100-001 TOP END-UD : Y DATE : 2010 07 12 MPM 40021S10000 LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

A. Get access to the avionics compartment and to the applicable 5000VEseries panel(s). Then remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39 5. Close-up

Page 3

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

TASK 25-31-59-000-80200 Removal of the Forward Galley Unit (6489ML) 1. Reason for the Job This component is heavy. For the correct component weight, refer to the manufacturer's Component Maintenance Manual (CMM). More than one person is necessary for this procedure. 2. Job Set-up Information A. Fixtures, Tools, Test and Support Equipment ------------------------------------------------------------------------------|REFERENCE |QTY DESIGNATION | ------------------------------------------------------------------------------No specific * CAP - BLANKING No specific * PLUG - BLANKING No specific AR SAFETY CLIP - CIRCUIT BREAKER No specific * WARNING NOTICE(S) B. Referenced Information ------------------------------------------------------------------------------|REFERENCE | DESIGNATION | ------------------------------------------------------------------------------12-24-38-680-80100 Draining of the Potable Water System (with Electrical Power) 23-73-11-000-80100 Removal of the Area Call Panel 23-73-22-000-80100 Removal of the Attendant Indication Panel 24-42-00-861-80100 Energize the Ground Service Network 25-23-42-000-80100 Removal of the Forward and Aft Exit Ceiling Panels 25-23-45-000-80100 Removal of the Door Frame Linings of the Forward Passenger/Crew Door 25-26-41-000-80100 Removal of the Curtains and the Curtain Rails 25-26-41-000-80200 Removal of the Curtain Rails and the Curtain Header Zone 220 25-35-15-000-80200 Removal of the Espresso-Maker 25-35-19-000-80300 Removal of an Oven (all Types) 25-35-34-000-80100 Removal of the Galley Control-Panel 38-10-00-614-80300 Release of the Pressure from the Potable Water System CMM 253913 K6162 25-31-59-991-00900-006 Fig. 401 25-31-59-991-01000-005 Fig. 402 25-31-59-991-01100-001 Fig. 403 25-31-59-991-01200-006 Fig. 404 Page 4

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

------------------------------------------------------------------------------|REFERENCE | DESIGNATION | ------------------------------------------------------------------------------25-31-59-991-01400-002 Fig. 405 25-31-59-991-01500-005 Fig. 406 25-31-59-991-01700-002 Fig. 407 3. Job Set-up Subtask 25-31-59-861-05100-001 TOP END-UD : Y DATE : 2012 07 16 MPM 200734D57957

A. Energize the ground service network (Ref. TASK 24-42-00-861-80100). Subtask 25-31-59-860-05200-001 TOP END-UD : Y DATE : 2012 07 16 MPM 200734D57957

B. Aircraft Maintenance Configuration (1) Release the pressure from the potable water system (Ref. TASK 38-10-00-614-80300). (2) Drain the potable water system (Ref. TASK 12-24-38-680-80100). Subtask 25-31-59-941-05100-001 C. Safety Precautions (1) On the air control-panel 225VU: (a) Make sure that the APU BLEED, all the ENG BLEED and the PACK 1(2) pushbutton-switches are released. NOTE : For the APU BLEED, the ON legend is off. For all the ENG BLEED, the OFF legends are on. For the PACK 1(2), the OFF legends are on. (b) Put a WARNING NOTICE(S) in position to tell persons not to operate these pushbutton-switches. (2) Put a WARNING NOTICE(S) in position to tell persons not to connect the ground air supply: - On the HP ground air-connector - On the LP ground air-connector. Page 5 TOP END-UD : Y DATE : 2012 07 16 MPM 200734D57957

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(3) Put a WARNING NOTICE(S) in position on the water service-panel to tell persons not to fill the potable-water system. Subtask 25-31-59-865-06300-001 TOP END-UD : Y DATE : 2012 07 16 MPM 40021S10000

D. Get access to the avionics compartment. Then open, safety and tag this(these) circuit breaker(s): ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39 Subtask 25-31-59-010-05300-011 E. Get Access (1) Open all necessary doors to get access to the parts that you must remove/disconnect. (a) Remove the doors, if necessary. (2) Make sure that all the galley compartments are empty. (3) Remove this galley equipment: (a) Remove the espresso makers (Ref. TASK 25-35-15-000-80200). (b) Remove the ovens (Ref. TASK 25-35-19-000-80300). (4) Remove the curtains and the curtain rails (Ref. TASK 25-26-41-000-80100) and (Ref. TASK 25-26-41-000-80200). (5) Remove the necessary ceiling panels (Ref. TASK 25-23-42-000-80100). (6) Remove the linings of the forward door-frame, if necessary (Ref. TASK 25-23-45-000-80100). (7) Remove the area call panel, if necessary (Ref. TASK 23-73-11-000-80100). Page 6 TOP END-UD : DATE : MPM 200734D57957

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(8) Remove the attendant indication panel (Ref. TASK 23-73-22-000-80100). (9) Remove the galley control-panel (Ref. TASK 25-35-34-000-80100). 4. Procedure Subtask 25-31-59-020-05200-003 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

A. Removal of the Galley - Pelmets (Ref. Fig. 401/TASK 25-31-59-991-00900006) (1) Remove the bolt (7) and the washer (6) and disconnect the bonding strap (5). (2) Remove and discard the tie wraps (8). (3) Safety the bonding strap (5) to the galley. (4) Remove the screws (3) and the pelmet (2). (5) Remove the screws (4) and the pelmet (1). Subtask 25-31-59-020-05300-005 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

B. Removal of the Galley - Electrical Connections (Ref. Fig. 402/TASK 25-3159-991-01000-005) (1) Disconnection of the electrical wires: WARNING : WEAR PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE DURING THE TASK, REMOVE AND DISCARD IT. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND. CAUTION : MAKE MATCH MARKS ON ALL THE ELECTRICAL WIRES BEFORE YOU DISCONNECT THEM. INCORRECT CONNECTION OF WIRES WILL CAUSE DAMAGE TO EQUIPMENT. (a) Remove and discard the lockwire from the screws (9). (b) Loosen the screws (9) and remove the cover (10). Page 7

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Pelmet Figure 401/TASK 25-31-59-991-00900-006 EFF : ALL Page 8

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Electrical Connections Figure 402/TASK 25-31-59-991-01000-005 EFF : ALL Page 9

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(c) Remove the nuts (8) and disconnect the electrical wires (7). (d) Remove and discard the lockwire from the screws (13). (e) Loosen the screws (13) and remove the cover (14). (f) Remove the nuts (12) and disconnect the electrical wires (11). (g) Record the position and the number of the clamps (18) and the spacers (15) for the installation procedure. (h) Remove the bolts (20), the washers (19), the spacers (15), the clamps (18), the washers (16) and the nuts (17). (i) Safety the electrical wires (7) and (11) to the galley. (2) Disconnection of the electrical connectors: (a) Disconnect the electrical connectors 10ML-A (5) and 6003VC-A (6). (b) Put a CAP - BLANKING on each disconnected electrical connector. (c) Remove and discard the tie wraps (4). (d) Safety the electrical connector 10ML-A (5) to the galley. (e) Safety the electrical connector 6003VC-A (6) to the aircraft structure. (3) Disconnection of the bonding straps: CAUTION : MAKE SURE THAT THE ELECTRICAL WIRE(S) IS(ARE) DISCONNECTED BEFORE YOU DISCONNECT THE BONDING STRAP(S). CAUTION : MAKE SURE THAT THE ELECTRICAL CONNECTOR(S) IS(ARE) DISCONNECTED BEFORE YOU DISCONNECT THE BONDING STRAP(S). (a) Remove the bolts (1) and the washers (2) and disconnect the bonding straps (3). (b) Remove and discard the tie wraps (4). (c) Safety the bonding straps (3) to the galley.

Page 10

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Subtask 25-31-59-020-05400-001

TOP END-UD : Y DATE : 2012 07 24 MPM 200734D57957

C. Removal of the Galley - Air Connections (Ref. Fig. 403/TASK 25-31-59-99101100-001) (1) Remove the clamp (2) and disconnect the fresh-air hose (3) from the pipe (1). (2) Remove the clamps (5) and disconnect the exhaust-air hose (4) from the pipe (6). (3) Put a PLUG - BLANKING on the disconnected line ends. Subtask 25-31-59-020-05500-002 TOP END-UD : Y DATE : 2013 02 01 MPM 200734D57957

D. Removal of the Galley - Cooling Connections (Ref. Fig. 404/TASK 25-31-59991-01200-006) (1) Removal of the access cover: (a) Remove the screws (2) and the access cover (1). (2) Disconnection of the cooling connection: WARNING : MAKE SURE THAT THE GALLEY COOLING SYSTEM IS DEPRESSURIZED. A PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT. (a) Remove the bolts (3) and the washers (4) and disconnect the air-chiller duct adapter (5). (b) Put a PLUG - BLANKING on the disconnected line ends. Subtask 25-31-59-020-05700-002 TOP END-UD : Y DATE : 2013 02 01 MPM 200734D57957

E. Removal of the Galley - Water Connections (Ref. Fig. 405/TASK 25-31-59991-01400-002) (1) Removal of the access cover: (a) Remove the screws (2) and the access cover (1). (2) Disconnection of the water connections:

Page 11

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Air Connections Figure 403/TASK 25-31-59-991-01100-001 EFF : ALL Page 12

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Cooling Connections Figure 404/TASK 25-31-59-991-01200-006 EFF : ALL Page 13

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Water Connections Figure 405/TASK 25-31-59-991-01400-002 EFF : ALL Page 14

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

WARNING : DO NOT DO WORK ON THE WASTE WATER SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH. (a) Disconnect the potable water connection: WARNING : MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT. WARNING : MAKE SURE THAT THE EQUIPMENT YOU USE FOR THIS PROCEDURE IS CLEAN AND APPROVED FOR THE POTABLE WATER SYSTEM. IF NOT IT CAN CAUSE CONTAMINATION OF THE POTABLE WATER SYSTEM. WARNING : BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH SOAP AND WATER. THESE WILL PREVENT INFECTION. CONTAMINATION FROM GALLEY WASTE IS DANGEROUS TO HEALTH. 1 2 3 4 Push back the insulation hose (3). Remove the clamps (4) and push back the protective hose (5). Loosen the nut (7) and disconnect the potable water line (6) from the fitting (8). Put a PLUG - BLANKING on the disconnected line ends.

(b) Disconnect the waste water connection: WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK: - ON THE WASTE WATER SYSTEM, OR - ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE WATER SYSTEM. WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (WASTE WATER IS DANGEROUS FOR HEALTH). 1 2 3 Push back the insulation hose (12). Remove the clamp (11) and disconnect the waste water hose (10) from the pipe (9). Put a PLUG - BLANKING on the disconnected line ends. Page 15

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Subtask 25-31-59-020-05800-005

TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

F. Removal of the Galley - Upper Attachments (Ref. Fig. 406/TASK 25-31-59991-01500-005) (1) Removal of the access panels: (a) Release the fasteners (2) and remove the access panel (1). (b) Remove the screws (4) and the access panel (3). (2) Removal of the upper attachments: (a) Remove the bolt (22), the washer (21) and disconnect the bonding strap (20). (b) Remove and discard the tie wraps (23). (c) Safety the bonding strap (20) to the galley. (d) Hold the tie rod (10) and remove the bolt (7), the nut (5) and the washer (6). (e) Remove the screws (13), the washers (12) and the attachment assembly (11) with the tie rod (10). (f) Hold the tie rod (14) and remove the bolt (19), the nut (16) and the washer (18). (g) Safety the tie rod (14) to the galley. Subtask 25-31-59-020-06100-002 TOP END-UD : DATE : MPM 200734D57957

G. Removal of the Galley - Floor Seals (Ref. Fig. 407/TASK 25-31-59-99101700-002) (1) Remove the screws (2) and the wheel guides (3). (2) Remove the screws (4), the sealing profiles (5) and the seals (1). Subtask 25-31-59-020-05900-011 TOP END-UD : DATE : MPM 200734D57957

Page 16

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Upper Attachments Figure 406/TASK 25-31-59-991-01500-005 EFF : ALL Page 17

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Floor Seals Figure 407/TASK 25-31-59-991-01700-002 EFF : ALL Page 18

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Subtask 25-31-59-020-06000-011

TOP END-UD : DATE : MPM 200734D57957

H. Removal of the Galley - Splitline (1) For the disassembly of the galley refer to the manufacturer's Component Maintenance Manual CMM 253913 K6162.

Page 19

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

TASK 25-31-59-400-80200 Installation of the Forward Galley Unit (6489ML) WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : - FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 TO 15 MINUTES. - GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS. WARNING : BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS. 1. Reason for the Job This component is heavy. For the correct component weight, refer to the manufacturer's Component Maintenance Manual (CMM). More than one person is necessary for this procedure. 2. Job Set-up Information A. Fixtures, Tools, Test and Support Equipment ------------------------------------------------------------------------------|REFERENCE |QTY DESIGNATION | ------------------------------------------------------------------------------No specific * TIE WRAP No specific 1 TORQUE WRENCH : range 0.00 to 1.20 m.daN (0.00 to 9.00 lbf.ft) No specific 1 TORQUE WRENCH : range 0.20 to 3.60 m.daN (2.00 to 26.00 lbf.ft)

Page 20

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

B. Consumable Materials ------------------------------------------------------------------------------|REFERENCE | DESIGNATION | ------------------------------------------------------------------------------04-022 SYNTH. HYDROCARBON GREASE HIGH PRESSURE 08-057 PRIMER 09-054 SILICONE SEALANT (1 PART) FOR NTF 15-008 CORROSION PREVENTIVE COMPOUND, TEMPORARY 19-009 LOCKWIRE STAINLSS STL OR NICKEL ALLOY 19-018 LOCKWIRE STAINLSS STL OR NICKEL ALLOY C. Referenced Information ------------------------------------------------------------------------------|REFERENCE | DESIGNATION | ------------------------------------------------------------------------------12-24-38-680-80100 Draining of the Potable Water System (with Electrical Power) 12-33-21-618-80100 Pre-conditioning through the Low-Pressure Ground Connection 12-33-21-618-80101 Pre-conditioning through the High-Pressure Ground Connection 12-33-21-618-80102 Pre-conditioning with the APU 12-33-21-618-80103 Pre-conditioning with a Low-Pressure SUBFREEZING PCA ground-air supply unit 12-33-21-618-80104 Pre-conditioning through the Low-Pressure Ground Connection with A/C power off 20-28-00-720-80500 Check of the Electrical Bonding of the Different Components (but not the Fluid Systems and the Components Installed on Composite Materials) 20-28-00-912-80200 Electrical Bonding of Components with Conductive Screws and Bolts and Bonding Straps 23-73-11-000-80100 Removal of the Area Call Panel 23-73-11-400-80100 Installation of the Area Call Panel 23-73-22-000-80100 Removal of the Attendant Indication Panel 23-73-22-400-80100 Installation of the Attendant Indication Panel 24-41-00-861-80100 Energize the Aircraft Electrical Circuits from the External Power A 24-41-00-861-80101 Energize the Aircraft Electrical Circuits from the APU (APU Started with APU BAT) 24-41-00-861-80103 Energize the Aircraft Electrical Circuits from the External Power A and B 24-41-00-861-80104 Energize the Aircraft Electrical Circuits from the APU (APU started with External power A) 24-41-00-861-80105 Energize the Aircraft Electrical Circuits from the External Power B Page 21

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

------------------------------------------------------------------------------|REFERENCE | DESIGNATION | ------------------------------------------------------------------------------24-41-00-862-80100 De-energize the Aircraft Electrical Circuits from the External Power A 24-41-00-862-80101 De-energize the Aircraft Electrical Circuits from the APU 24-41-00-862-80103 De-energize the Aircraft Electrical Circuits from the External Power A and B 24-41-00-862-80104 De-energize the Aircraft Electrical Circuits from the External Power B 24-42-00-861-80100 Energize the Ground Service Network 24-56-00-710-80100 Operational Test of the Galley Supply 25-23-42-000-80100 Removal of the Forward and Aft Exit Ceiling Panels 25-23-42-400-80100 Installation of the Forward and Aft Exit Ceiling-Panels 25-23-45-000-80100 Removal of the Door Frame Linings of the Forward Passenger/Crew Door 25-23-45-400-80100 Installation of the Door Frame Linings of the Forward Passenger/Crew Door 25-26-41-000-80100 Removal of the Curtains and the Curtain Rails 25-26-41-000-80200 Removal of the Curtain Rails and the Curtain Header Zone 220 25-26-41-400-80100 Installation of the Curtains and the Curtain Rails 25-26-41-400-80200 Installation of the Curtain Rails and the Curtain Header Zone 220 25-31-59-000-80200 Removal of the Forward Galley Unit 25-34-00-710-80100 Operational Test of the Galley Cooling 25-35-15-000-80200 Removal of the Espresso-Maker 25-35-15-400-80200 Installation of the Espresso-Maker 25-35-19-000-80300 Removal of an Oven (all Types) 25-35-19-400-80300 Installation of an Oven (all Types) 25-35-34-000-80100 Removal of the Galley Control-Panel 25-35-34-400-80100 Installation of the Galley Control-Panel 38-10-00-614-80100 Pressurization of the Potable Water System 38-10-00-614-80300 Release of the Pressure from the Potable Water System CMM 253913 K6162 ESPM 204452 25-31-59-991-00900-006 Fig. 401 25-31-59-991-01000-005 Fig. 402 25-31-59-991-01100-001 Fig. 403 25-31-59-991-01200-006 Fig. 404 25-31-59-991-01400-002 Fig. 405 25-31-59-991-01500-005 Fig. 406 25-31-59-991-01700-002 Fig. 407 25-31-59-991-01600-008 Fig. 408

Page 22

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY 3. Job Set-up Subtask 25-31-59-860-05300-011 TOP END-UD : DATE : MPM 200734D57957 LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

A. Aircraft Maintenance Configuration (1) Make sure that the ground service network is energized (Ref. TASK 24-42-00-861-80100). (2) Make sure that the pressure is released from the potable water system (Ref. TASK 38-10-00-614-80300). (3) Make sure that the potable water system is drained (Ref. TASK 12-24-38-680-80100). (4) Make sure that on the air control-panel 225VU: The APU BLEED, all the ENG BLEED and the PACK 1(2) pushbutton-switches are released. NOTE : For the APU BLEED, the ON legend is off. For all the ENG BLEED, the OFF legends are on. For the PACK 1(2), the OFF legends are on. (5) Make - On - On - On - On sure that the warning notices are in position: the HP ground air-connector the LP ground air-connector the air control-panel 225VU the water service-panel.

(6) Make sure that all necessary doors to the parts that you install/connect are open. (a) Make sure that the doors are removed, if necessary. (7) Make sure that the galley compartments are empty. (8) Make sure that this galley equipment is removed: (a) Make sure that the ovens are removed (Ref. TASK 25-35-19-000-80300). (b) Make sure that the espresso makers are removed (Ref. TASK 25-35-15-000-80200). (9) Make sure that the curtains and the curtain rails are removed (Ref. TASK 25-26-41-000-80100) and Page 23

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(Ref. TASK 25-26-41-000-80200). (10) Make sure that the forward door-frame linings are removed, if necessary (Ref. TASK 25-23-45-000-80100). (11) Make sure that the necessary ceiling panels are removed (Ref. TASK 25-23-42-000-80100). (12) Make sure that the area call panel is removed, if necessary (Ref. TASK 23-73-11-000-80100). (13) Make sure that the attendant indication panel is removed (Ref. TASK 23-73-22-000-80100). (14) Make sure that the galley control-panel is removed (Ref. TASK 25-35-34-000-80100). Subtask 25-31-59-865-06400-001 TOP END-UD : Y DATE : 2012 07 16 MPM 40021S10000

B. Get access to the avionics compartment. Then make sure that this(these) circuit breaker(s) is (are) open, safetied and tagged: ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39 4. Procedure Subtask 25-31-59-210-05200-001 A. Preparation for Installation (1) Clean the component interface and/or the adjacent area. (2) Do a visual inspection of the component interface and/or the adjacent area. (3) Make sure that the parts retained from the removed component are clean and in the correct condition. (4) Make sure that the interface of the floor panel and the Mylar/Non-textile Floor (NTF) at the galley position is sealed. Page 24 TOP END-UD : Y DATE : 2012 08 16 MPM 200734D57957

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(5) If it is not sealed: (a) Apply SEALANTS (Material No. 09-054) to the interface. Subtask 25-31-59-420-05300-011 TOP END-UD : DATE : MPM 200734D57957

B. Installation of the Galley - Splitline (1) For the assembly of the galley refer to the manufacturer's Component Maintenance Manual CMM 253913 K6162. Subtask 25-31-59-420-05400-008 TOP END-UD : DATE : MPM 200734D57957

C. Installation of the Galley - Lower Attachments (Ref. Fig. 408/TASK 25-3159-991-01600-008) WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : - FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 TO 15 MINUTES. - GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS. (1) Apply - The - The - The COMMON GREASES (Material No. 04-022) to: bolts (1) and (11) fittings (9) eccentric bushings (13) and (14).

(2) Install the bushings (8) and the round seals (7). (3) Install the fittings (9), the washers (10) and the bolts (11). (4) TORQUE the bolts (11) to between 1.81 and 2.71 m.daN (13.35 and 19.99 lbf.ft). (5) If necessary, install the shim plates (12) as recorded during the removal procedure.

Page 25

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

MPM 200734D57957

Galley - Lower Attachments Figure 408/TASK 25-31-59-991-01600-008 EFF : ALL Page 26

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(6) Move the galley: WARNING : SUPPORT THE UNIT/ASSEMBLY CAREFULLY TO PREVENT INJURY TO PERSONS AND DAMAGE. THE UNIT/ASSEMBLY IS HEAVY. CAUTION : DO NOT PUT THE LOWER EDGE ON THE CABIN FLOOR OR LET IT RUB AGAINST THE FLOOR DURING THIS PROCEDURE. IF YOU DO, YOU CAN CAUSE DAMAGE TO THE CABIN FLOOR AND/OR THE COMPONENT. (a) Put the galley in position on the fittings (9) . (7) Install the eccentric bushings (13) and (14). (8) If necessary, install the shim plates (4) as recorded during the removal procedure. (9) Install the plates (3), the washers (2) and the bolts (1). (a) If necessary, turn the eccentric bushings (13) and (14) until it is possible to install the bolts (1). (10) TORQUE the bolts (1) to between 1.13 and 1.69 m.daN (100.00 and 149.56 lbf.in). (11) Do the preservation of the lower attachments: (a) Apply STORAGE PRESERVATION (Material No. 15-008) to the heads of the bolts (1) and the adjacent area. (12) Put the covers (6) in position and install the screws (5). (13) TORQUE the screws (5) to between 0.135 and 0.170 m.daN (11.95 and 15.04 lbf.in). Subtask 25-31-59-420-06200-002 TOP END-UD : DATE : MPM 200734D57957

D. Installation of the Galley - Floor Seals (Ref. Fig. 407/TASK 25-31-59991-01700-002) WARNING : MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA WHEN YOU USE SPECIAL MATERIALS. IF YOU GET ONE OF THESE MATERIALS ON YOUR SKIN, IN YOUR MOUTH OR IN YOUR EYES : - FLUSH IT AWAY WITH A FLOW OF CLEAN WATER FOR BETWEEN 10 TO 15 MINUTES. Page 27

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

- GET IMMEDIATE MEDICAL AID IF IRRITATION OCCURS. DO NOT BREATHE THE FUMES FROM THE MATERIAL. DO NOT SMOKE WHEN YOU USE THE MATERIAL. DO NOT USE THE MATERIAL NEAR A FLAME, SPARKS OR SOURCES OF HEAT. THESE MATERIALS ARE DANGEROUS : THEY ARE POISONOUS, FLAMMABLE AND SKIN IRRITANTS. (1) Install the seals (1), the sealing profiles (5) and the screws (4) . (2) TORQUE the screws (4) to between 0.135 and 0.170 m.daN (11.95 and 15.04 lbf.in). (3) Install the wheel guides (3) with the screws (2). (4) TORQUE the screws (2) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in). (5) Seal the galley/floor interface: (a) Apply BONDING AND ADHESIVE COMPOUNDS (Material No. 08-057) and SEALANTS (Material No. 09-054) to the seals (1) and the floor interface. Subtask 25-31-59-420-05500-005 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

E. Installation of the Galley - Upper Attachments (Ref. Fig. 406/TASK 25-3159-991-01500-005) (1) Put the tie rod (14) in position and install the washer (18), the bolt (19) and the nut (16). NOTE : The bolt (19) must be easy to install. (2) If necessary, adjust the tie rod: WARNING : WEAR PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE DURING THE TASK, REMOVE AND DISCARD IT. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND. (a) Cut, remove and discard the lockwire from the locknut (15). (b) Loosen the locknut (15).

Page 28

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(c) Turn the eye-end (17) clockwise or counterclockwise until you can install the bolt (19) easily. (d) Make sure that the eye-end (17) of the tie rod (14) is in safety. NOTE : If you cannot push a needle or equivalent through the inspection hole, the eye-end (17) is in safety. (e) Tighten the locknut (15). (f) Safety the locknut (15) with MISCELLANEOUS (Material No. 19-018). (3) TORQUE the bolt (19) to between 1.38 and 1.79 m.daN (10.18 and 13.20 lbf.ft). (4) Put the attachment assembly (11) with the tie rod (10) in position and install the washers (12) and the screws (13). (5) TORQUE the screws (13) to between 0.565 and 0.904 m.daN (50.00 and 80.00 lbf.in). (6) Put the tie rod (10) in position and install the bolt (7), the washer (6) and the nut (5). NOTE : The bolt (7) must be easy to install. (7) If necessary, adjust the tie rod: WARNING : WEAR PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE DURING THE TASK, REMOVE AND DISCARD IT. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND. (a) Cut, remove and discard the lockwire from the locknut (9). (b) Loosen the locknut (9). (c) Turn the eye-end (8) clockwise or counterclockwise until you can install the bolt (7) easily. (d) Make sure that the eye-end (8) of the tie rod (10) is in safety. NOTE : If you cannot push a needle or equivalent through the inspection hole, the eye-end (8) is in safety. (e) Tighten the locknut (9). Page 29

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(f) Safety the locknut (9) with MISCELLANEOUS (Material No. 19-018). (8) TORQUE the bolt (7) to between 1.38 and 1.79 m.daN (10.18 and 13.20 lbf.ft). (9) Connect the bonding strap (20) and install the washer (21) and the bolt (22) (Ref. TASK 20-28-00-912-80200). (10) Safety the bonding strap (20) with new TIE WRAP (23). (11) Installation of the access panels: (a) Put the access panel (3) in position and install the screws (4). (b) TORQUE the screws (4) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in). (c) Put the access panel (1) in position and engage the fasteners (2). Subtask 25-31-59-420-05600-006 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

F. Installation of the Galley - Water Connections (Ref. Fig. 405/TASK 25-3159-991-01400-002) WARNING : DO NOT DO WORK ON THE WASTE WATER SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH. (1) Connection of the potable water connection: WARNING : MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT. WARNING : MAKE SURE THAT THE EQUIPMENT YOU USE FOR THIS PROCEDURE IS CLEAN AND APPROVED FOR THE POTABLE WATER SYSTEM. IF NOT IT CAN CAUSE CONTAMINATION OF THE POTABLE WATER SYSTEM. WARNING : BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH SOAP AND WATER. THESE WILL PREVENT INFECTION. CONTAMINATION FROM GALLEY WASTE IS DANGEROUS TO HEALTH. (a) Remove the blanking plugs from the disconnected line ends. Page 30

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(b) Connect the potable water line (6) to the fitting (8) and install the nut (7). (c) TORQUE the nut (7) to between 1.69 and 2.82 m.daN (12.46 and 20.80 lbf.ft). (2) Connection of the waste water connection: WARNING : ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK: - ON THE WASTE WATER SYSTEM, OR - ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE WATER SYSTEM. WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (WASTE WATER IS DANGEROUS FOR HEALTH). (a) Remove the blanking plugs from the disconnected line ends. (b) Connect the waste water hose (10) to the pipe (9) and install the clamp (11). (c) Tighten the clamp (11). Subtask 25-31-59-420-05800-001 TOP END-UD : Y DATE : 2012 07 24 MPM 200734D57957

G. Installation of the Galley - Cooling Connections (Ref. Fig. 404/TASK 2531-59-991-01200-006) WARNING : MAKE SURE THAT THE GALLEY COOLING SYSTEM IS DEPRESSURIZED. A PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT. (1) Remove the blanking plugs from the disconnected line ends. (2) Put the air-chiller duct adapter (5) in position and install the washers (4) and the bolts (3). (3) TORQUE the bolts (3) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in).

Page 31

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Subtask 25-31-59-420-05900-001

TOP END-UD : Y DATE : 2012 07 16 MPM 200734D57957

H. Installation of the Galley - Air Connections (Ref. Fig. 403/TASK 25-3159-991-01100-001) (1) Remove the blanking plugs from the disconnected line ends. (2) Connect the exhaust-air hose (4) to the pipe (6) and install the clamps (5). (3) Tighten the clamps (5). (4) Connect the fresh-air hose (3) to the pipe (1) and install the clamp (2). (5) Tighten the clamp (2). Subtask 25-31-59-420-06000-005 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

J. Installation of the Galley - Electrical Connections (Ref. Fig. 402/TASK 25-31-59-991-01000-005) (1) Connection of the bonding straps: (a) Connect the bonding straps (3) and install the washers (2) and the bolts (1) (Ref. TASK 20-28-00-912-80200). (b) Safety the bonding straps (3) with new TIE WRAP (4). (2) Connection of the electrical connectors: CAUTION : MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL CONNECTOR(S). (a) Remove the blanking caps from the electrical connectors. (b) Make sure that the electrical connectors are clean and in the correct condition. (c) Connect the electrical connectors 10ML-A (5) and 6003VC-A (6). (d) Safety the electrical connectors (5) and (6) with new TIE WRAP (4).

Page 32

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(3) Connection of the electrical wires, ref. ESPM 204452: WARNING : WEAR PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE DURING THE TASK, REMOVE AND DISCARD IT. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND. CAUTION : MAKE SURE THAT THE BONDING STRAP(S) IS(ARE) CONNECTED BEFORE YOU CONNECT THE ELECTRICAL WIRE(S). CAUTION : REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU CONNECT THE ELECTRICAL WIRES. INCORRECT CONNECTION OF THE WIRES WILL CAUSE DAMAGE TO EQUIPMENT. (a) Connect the electrical wires (7) and install the nuts (8). (b) TORQUE the nuts (8) to between 0.30 and 0.35 m.daN (26.55 and 30.97 lbf.in). (c) Put the cover (10) in position and install the screws (9). (d) TORQUE the screws (9) to between 0.08 and 0.10 m.daN (7.08 and 8.85 lbf.in). (e) Connect the electrical wires (11) and install the nuts (12). (f) TORQUE the nuts (12) to between 0.30 and 0.35 m.daN (26.55 and 30.97 lbf.in). (g) Put the cover (14) in position and install the screws (13). (h) TORQUE the screws (13) to between 0.08 and 0.10 m.daN (7.08 and 8.85 lbf.in). (i) Safety the screws (9) and (13) with MISCELLANEOUS (Material No. 19-009). (j) Install the clamps (18), the spacers (15), the washers (16) and (19), the bolts (20) and the nuts (17) as recorded during the removal procedure (Ref. TASK 25-31-59-000-80200). (k) Tighten the bolts (20).

Page 33

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Subtask 25-31-59-720-05100-001 K. Bonding Test

TOP END-UD : Y DATE : 2012 07 16 MPM 200734D57957

(1) Do the test of the electrical bonding of the galley (Ref. TASK 20-28-00-720-80500). Subtask 25-31-59-865-06500-001 TOP END-UD : Y DATE : 2012 07 16 MPM 40021S10000

L. Get access to the avionics compartment. Then remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): ------------------------------------------------------------------------------PANEL DESIGNATION FIN LOCATION ------------------------------------------------------------------------------721VU GALLEY SYS 1 1MC T10 722VU GALLEY SYS 2 2MC S39 Subtask 25-31-59-942-05100-001 M. Safety Precautions (1) Remove the warning notices from: - The HP ground air-connector - The LP ground air-connector - The air control-panel 225VU - The water service-panel. Subtask 25-31-59-710-05200-003 TOP END-UD : Y DATE : 2013 06 05 MPM 200734D57957 TOP END-UD : Y DATE : 2012 07 24 MPM 200734D57957

N. Operational Test of the Galley Systems (1) Operate the galley ventilation system (Ref. TASK 12-33-21-618-80100) (Ref. TASK 12-33-21-618-80101) (Ref. TASK 12-33-21-618-80102) (Ref. TASK 12-33-21-618-80103) (Ref. TASK 12-33-21-618-80104). (a) Examine the ventilation hoses for leaks. 1 If you find leaks, repair them.

(2) Do a check of the potable water and waste water systems:

Page 34

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

(a) Pressurize the potable water system (Ref. TASK 38-10-00-614-80100). (b) Examine all the potable water lines in the galley for leaks. 1 If you find leaks, repair them.

(c) Open all the faucets on all the galley equipment that supplies water and let it flow until it is clean. (d) Examine all the waste water lines in the galley for leaks. 1 If you find leaks, repair them.

(e) Close all the water faucets. (3) Do an operational test of the galley cooling system (Ref. TASK 25-34-00-710-80100). (a) Examine the cooling lines in the galley for leaks. 1 If you find leaks, repair them.

(4) Do an operational test of the galley power supply (Ref. TASK 24-56-00-710-80100). (5) Do a test of the electrical systems: (a) Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-80100) (Ref. TASK 24-41-00-861-80101) (Ref. TASK 24-41-00-861-80103) (Ref. TASK 24-41-00-861-80104) (Ref. TASK 24-41-00-861-80105). (b) On the galley electrical panel, make sure that all the circuit breakers are closed. ------------------------------------------------------------------------------| ACTION | RESULT | ------------------------------------------------------------------------------1. On the overhead panel 235VU: - Push the pushbutton-switches GALLEY and COMMERCIAL. 2. At the galley: - Operate each unit/component of the electrical equipment for a On the galley electrical panel: - The POWER indicator light comes on. At the galley: - Each unit/component is serviceable.

Page 35

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

------------------------------------------------------------------------------| ACTION | RESULT | ------------------------------------------------------------------------------short time. 3. On the galley control-panel: On the galley electrical panel: - Set the AIR CHILLER ON/OFF switch - The SYSTEM OPERATE light comes on. to ON. 4. At the galley: At the galley: - Examine the air-chiller ducts for - If you find leaks, repair them. leaks. 5. On the galley control-panel: On the galley control-panel: - Set the AIR CHILLER ON/OFF switch - The SYSTEM OPERATE light goes off. to OFF. 6. At the galley: - Operate the lights for a short time. 7. On the overhead panel 235VU: - Push the pushbutton-switches GALLEY and COMMERCIAL. At the galley: - The lights come on and go off. On the galley electrical panel: - Make sure that the POWER indicator light goes off.

(c) De-energize the aircraft electrical circuits (Ref. TASK 24-41-00-862-80100) (Ref. TASK 24-41-00-862-80101) (Ref. TASK 24-41-00-862-80103) (Ref. TASK 24-41-00-862-80104). Subtask 25-31-59-420-06100-005 TOP END-UD : Y DATE : 2013 06 28 MPM 200734D57957

P. Installation of Components after the Test Procedure (1) Installation of the components of the water connections: (Ref. Fig. 405/TASK 25-31-59-991-01400-002) (a) Connect the potable water connection: 1 2 3 Put the protective hose (5) in position and install the clamps (4). Tighten the clamps (4). Put the insulation hose (3) in position.

(b) Connect the waste water connection: Page 36

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY 1 LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA

Put the insulation hose (12) in position.

(c) Install the access cover: 1 2 Put the access cover (1) in position and install the screws (2). TORQUE the screws (2) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in).

(2) Installation of the pelmets: (Ref. Fig. 401/TASK 25-31-59-991-00900006) (a) Put the pelmet (1) in position and install the screws (4). (b) TORQUE the screws (4) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in). (c) Put the pelmet (2) in position and install the screws (3). (d) TORQUE the screws (3) to between 0.282 and 0.395 m.daN (24.96 and 34.96 lbf.in). (e) Connect the bonding strap (5) and install the washer (6) and the bolt (7) (Ref. TASK 20-28-00-912-80200). (f) Safety the bonding strap (5) with new TIE WRAP (8). (3) Installation of the access cover of the cooling connection: (Ref. Fig. 404/TASK 25-31-59-991-01200-006) (a) Put the access cover (1) in position and install the screws (2). (b) TORQUE the screws (2) to between 0.170 and 0.226 m.daN (15.04 and 20.00 lbf.in).

Page 37

ST41992 FG 2285 MP 25-31-59 04 A MM E TO : elena.dulgheru@aerotec.ro REQUEST NO : 2285 TOPIC : 253159 04 REQUESTED : 2. 9.2013 WITH EFFECTIVITY 5. Close-up Subtask 25-31-59-410-05300-003 Subtask 25-31-59-410-05200-011 A. Close Access (1) Install the removed ceiling panels (Ref. TASK 25-23-42-400-80100). (2) Install the linings of the forward door frame as necessary (Ref. TASK 25-23-45-400-80100). (3) Install the curtains and the curtain rails (Ref. TASK 25-26-41-400-80100) and (Ref. TASK 25-26-41-400-80200). (4) Install the area call panel, if necessary (Ref. TASK 23-73-11-400-80100). (5) Install the attendant indication panel (Ref. TASK 23-73-22-400-80100). (6) Install all the removed galley equipment: (a) Install the espresso makers (Ref. TASK 25-35-15-400-80200). (b) Install the ovens (Ref. TASK 25-35-19-400-80300). (7) Install the galley control-panel (Ref. TASK 25-35-34-400-80100). (8) Close all necessary doors. (a) Install the doors, if necessary. (9) Make sure that the work area is clean and clear of tools and other items. TOP END-UD : DATE : MPM 200734D57957 TOP END-UD : DATE : MPM 200734D57957 LAA01 EDITION EFFECTIVITY EDITION NUMBER EDITION CRITERIA