Installation Requirements for HVAC Ducts Pre Requirements before the start of installation of air conditioning ducts which are already fabricated either on the site workshop or from outside the project premises and delivered to the site for installation after duct fabrication. 1. 2. Fabricated Ducts delivered from duct workshop to be stored in dry-clean and safe area to be selected on site. All materials and documentation relevant to a particular section of works will be checked by the construction manager prior to the commencement of work ensuring that these are of the correct type as reviewed by the client. Before commencement any construction works, pre-inspections will be carried out on all materials prior to them leaving the storage area i.e. quantity, physical damage and brand/make etc. Prior to the commencement of any construction works, areas and access will be inspected to confirm that they are in a suitable condition for construction works to commence, scaffolding of suitable height will be arranged. Works shall not proceed until an approved shop drawing or detail is issued. Safe Access to work areas shall be provided and shall be approved by the competent safety person prior to commencement of works. Materials shall be moved to the work area in safe manner and shall not block access /egress from/to the site. Suitable Mechanical aids shall be used where heavy loads are to be moved or lifted in to position, such equipment shall be planned for in advance of works. Where high risk works are involved then a safety clearance must be obtained from AFC safety department.
3. 4.
5. 6. 7. 8. 9.
7. 8. 9. 10.
11.
16. 17.
18.
Supervisor to check before end of work every day that: The correct type of supports are installed, supports are adequately supporting the ductwork and associated plant equipment. 19. 25mm diameter air volume test holes with tight fitting plastic plugs shall be located as required for commissioning purposes. 20. Ensure terminal equipment is installed as specified.
2.