Anda di halaman 1dari 5

Prepared By: Raymond A.

Monaco
Document Path
directory > directory > ...

Document History Version 1.0

Table of Contents
CATEGORIZE REQUEST OVERVIEW
Select Contacts & Meeting Point Step 1

CATEGORIZE REQUEST <Back Next> Cancel Finish

CATEGORY REQUEST NOTES


Type Section Description
Work Class: ELECTRICAL
1 Options will be {blank},
Request Category: MILE
Lead request, Next
Inspection Method: STANDARD Work Class * Electrical Filing Type * Electrical Application request.
Special Project:
Request Category * Work Milestone BIS ID *
2 This will be required if
VALIDATE FILING Inspection Method * Standard either lead or next request
Filing Type: Application is selected from a droplist.
BIS ID: Z113764
Cluster Type: 1
BIN: 1026318
Address/Location: 10 Columbus Circle
Floor/Room/Apt No: Request ID:
Location Use: CONDOMINIUMS
2
Borough: Manhattan
Filed By: CIRO LUIPO

Special Project Select...


SET SCOPE OF INSPECTION
Inspection Purpose: GENERAL
*Note Confirmation screen could
state: This is a lead cluster
--- request, please note the
Floors:
request ID for subsequent
Inspection requests.

SCHEDULE WORK ORDER


ORG Group: ELEC UNIT
Team: GEN-MH
Schedule Date: 7/22/2009

SELECT REQUESTOR AND SITE CONTACT

Requestor:
Point of Contact:
Meeting Point:

AUTHOR Select Requestor


TITLE DWG NO.
& Site Contact
Raymond Monaco 07.30.2009 5.0
CATEGORIZE REQUEST OVERVIEW
Select Contacts & Meeting Point Step 1

SCHEDULE WORK ORDER <Back Next> Cancel Finish

CATEGORY REQUEST NOTES


Type Section Description
Schedule Inspection Work Order
Work Class: ELECTRICAL
1 Available Minuets, will
Request Category: MILE
Reset Re-Check Availability
show the time remaining
Inspection Method: STANDARD
for that particular day for
Special Project:
inspections.
New Skills: Desired Date:

VALIDATE FILING New Duration:


Filing Type: Application
BIS ID: Z113764 Inspection Date Possibilities *
BIN: 1026318 1
Address/Location: 10 Columbus Circle
Floor/Room/Apt No: Scheduling Template: Date Available Min Select One
Location Use: CONDOMINIUMS Org Group: ELEC UNIT 05/06/2008 (Tue) 200 min
Borough: Manhattan
Filed By: CIRO LUIPO
Team: GEN-MH 05/08/2008 (Thr) 50 min
Special Projects: 05/09/2008 (Fri) 335 min
Inspection Duration: 150 05/12/2008 (Mon) 800 min
SET SCOPE OF INSPECTION
05/13/2009 (Tue) 550 min
Inspection Purpose: GENERAL 05/14/2009 (Wed) 720 min

--- 05/15/2009 (Thr) 860 min


Floors: 15

Building Access Form:


To:
SCHEDULE WORK ORDER
ORG Group: ELEC UNIT
Team: GEN-MH
Schedule Date: 7/22/2009

SELECT REQUESTOR AND SITE CONTACT

Requestor:
Point of Contact:
Meeting Point:

AUTHOR Select Requestor


TITLE DWG NO.
& Site Contact
Raymond Monaco 07.30.2009 5.0
Requestor: OVERVIEW
Select Contacts & Meeting Point Step 2

Select Requestor and Site Contact. 2 Cancel Finish

Select the “Select Requestor” & Site Contact. x


CATEGORY REQUEST NOTES
Confirmation Page Type Section Description
Work Class: ELECTRICAL
1 This is the confirmation
Request Category: MILE number and it is issued
Inspection Method: STANDARD once the wizard process is
1
Special Project: complete.
CONFIRMATION NUMBER : 102456
03/06/2010 Thursday 10am
VALIDATE FILING Once you reviewed the information please click the close button. 2 Cancel is disabled, due to
the fact that you cannot
Filing Type: Application
cancel at this point.
BIS ID: Z113764
BIN: 1026318
Address/Location: 10 Columbus Circle
Location Use: CONDOMINIUMS
Borough: Manhattan
Filed By: CIRO LUIPO

SET SCOPE OF INSPECTION


Inspection Purpose: GENERAL

---
Floors:

SCHEDULE WORK ORDER


ORG Group: ELEC UNIT
Team: GEN-MH
Schedule Date: 7/22/2009
Mini-Flow

SELECT REQUESTOR AND SITE CONTACT

Requestor:
Point of Contact:
Meeting Point:

AUTHOR Select Requestor


TITLE DWG NO.
& Site Contact
Raymond Monaco 07.30.2009 5.0

Anda mungkin juga menyukai