Introduction

A waterflooding model for West Sak reservoir has been developed using a vertical injector and a horizontal well. The horizontal well has 2 laterals one in sand B and other in sand D. Data has been taken from AOGCC website, one petro papers, DOE website and MS thesis of UAF students. Table: Crude oil composition Component CO2 N2 C1 C2 C3 NC4 NC5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20 C21+ (MW = 455, SG = 0.875) Mol% 0.02 0.03 38.25 0.86 0.36 0.18 0.06 0.2 0.02 0.01 0.82 1.5 1.72 1.35 1.50 1.8 1.94 1.8 1.57 1.8 2.46 2.83 38.95

Fig: PT Diagram

Total size of reservoir: 1000*1000*213.1 Grids: 20*50 , 20*50

Table: Layer properties Layer number 1 2 3 4 5 6 7 8 9 10 11 12 13 Thickness, ft 13 35 18 24.8 25.2 34.5 7 12.6 7.9 4 10 12 9.1 Avg. porosity 0.31 0.23 0.33 0.27 0.28 0.26 0.31 0.28 0.31 0.23 0.3 0.23 0.3 Initial water saturation % 42.2 46.2 47.7 38.3 35.6 35.6 35.6 35.6 35.6 45.6 35.6 42 42 Sand Package D D B B A A A A A A A A A

Reservoir top: 3500 ft Kx = Ky = 150 md Kz = 0 Table: Rock and Fluid properties Sw 0.35 0.365625 0.38125 0.396875 0.4125 0.428125 0.44375 0.459375 0.475 0.490625 0.50625 0.521875 0.5375 0.553125 0.56875 0.584375 0.6 Krw 0 0.003945 0.009713 0.016454 0.023916 0.031965 0.040514 0.049504 0.058888 0.068632 0.078707 0.089089 0.099758 0.110698 0.121893 0.133331 0.145 Krow 1 0.878906 0.765625 0.660156 0.5625 0.472656 0.390625 0.316406 0.25 0.191406 0.140625 0.097656 0.0625 0.035156 0.015625 0.003906 0

Wells: 1 injector @ BHP 2500 psia 1 producer @ BHP 600 psia, 2 horizontal laterals in layer 2 and layer 4. Reference: 1600 psia at 3500 ft Water Compressibility: 4*10^-6 psi inv Production started on 1/1/2003 (original date 1989)

Fig: Production Profile for producer

Fig: Gas rate monthly of the producer

The lowest rate is 12850 ft3/day. Fig: Bottom hole fluid rate for producer

The lowest rate is 1340 bbl/d

Fig: Liquid rate monthly for Injector

Conclusion:
The work done until now concurs with the fact that this project was not economical. The oil production starts to decrease after just one year and declines to almost 1 bbl/d in a span of 2 years. The production profile also matches with the original production profile; it can be observed that during the initial stages a very high oil rate is obtained. Once a peak is achieved, the oil rate starts to decrease and falls to zero. Next step would be to do a CO2 injection in the field. Once CO2 model is developed, geomechanics can be coupled with the model to predict the sand behavior. And based on the difference in production a completion strategy can be defined.