Project: HP, Chennai

Technical specification BMS, FAS, PAS

TECHNICAL SPECIFICATION
FOR

BMS,FAS & PAS

PROJECT

HP @ PRESTIGE PALLADIUM
Chennai.

CLIENT HP @ PRESTIGE PALLADIUM 4TH FLOOR Greams Road , Chennai.

ARCHITECT PLAN-A DESIGNTEC SOLUTIONS (P) LTD., - BANAGLORE

PMC

CBRE Chennai
MEP CONSULTANT AIR TREATMENT ENGG PVT LTD., Chennai

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 1

Project: HP, Chennai

Technical specification BMS, FAS, PAS

CONTENTS

1.

Building Management System

2.

Fire Alarm System

3.

Public Address System

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 2

Project: HP, Chennai 1. 1.

Technical specification BMS, FAS, PAS BUILDING MANAGEMENT SYSTEM

Building Control System General requirement These technical specifications cover the requirements for Designing,

Engineering, Supplying, Installing, Testing and Commissioning of the Building Control System. The Building Control System shall consist of the following elements: 1.1 Electronic and Electro-Mechanical Controls for all items indicated in the drawings and described in these documents including valves, motors, and other peripheral devices. 1.2 Microprocessor based Direct Digital Controllers interfacing directly with field devices like sensors, actuators, valves and Air-Conditioning Systems like Chillers, Air Handling Units (AHUs), Pumps, and Fans etc. 1.3 A Peer-to-Peer Communication Network to allow Data Exchange between the individual Station Controllers. 1.4 Communication Network interfacing the Microprocessor based Direct Digital Controllers to the Man-Machine Interface via the System Controllers. 1.5 Terminating signal / control cables from field devices installed by other contractors in to the DDC panels including suitable interfaces for protocol management. 1.6 2 Integration with the third party devices

Building Control System Topology 2.1 The Building Control System design shall be split into three hierarchical levels. Each level within the hierarchy shall be capable of functioning autonomously and independently. In case of communication failure between any of the levels, the normal functioning of the plant shall not be affected. 2.2 The Building Control System shall have the following four levels:

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 3

Project: HP, Chennai Management Level Communication Level Processing Level (Station Controllers) Field equipment level 2.3

Technical specification BMS, FAS, PAS

It shall be possible to implement these levels in a phase wise manner starting with the lowermost level.

Building Control System Management Level 3.1 The BCS Management Station shall consist of latest windows based PC together with Man Machine Interface (MMI) Software for graphic-based operation, data storage & reporting and the engineering software. 3.2 The Management Station provides the man-machine interface to the Processing Level (Station Controllers) via the Communication Level (Communication Controllers or cards). 3.3 The building and the mechanical plant shall be displayed on the PC in a graphical form, which shall be easy to understand and operate. 3.4 The Management System Hardware shall have the following specifications 3.4.1 Dual Core Processor 3.4.2 2GB RAM Minimum 3.4.3 CD / DVD, R/W 3.4.4 250 GB Hard Disk or Higher. 3.4.5 21 inch Color Flat Monitor 3.4.6 2 Parallel Port 3.4.7 Microsoft Mouse 3.4.8 Keyboard 3.5 BCS Man Machine Interface Software 3.5.1 The backdrop for layout and the plant equipments should accept the standard file types like DWG, BMP, JPEG, GIF etc 3.5.2 To display the active contents on the page the HMI should be able to interface with HTML, DOC, XLS, PPT, PDF and other standard file types.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 4

Project: HP, Chennai

Technical specification BMS, FAS, PAS

3.5.3 For navigation from page to page either buttons should be provided with proper path or the objects on the page should have the option for defining the path for navigation. 3.5.4 Graph should be defined for each analog input, which should show the previously stored values as well as current logging. 3.5.5 The graph should be displayed in the form of both Trend as well as Text. 3.5.6 The access rights for different category of users should be definable. 3.5.7 Protection against unauthorized user login. 3.5.8 Minimum of three-user license. 3.5.9 Server Client configuration. 3.5.10 3D animation representation for dynamic objects. 3.5.11 It shall be possible to create, modify and store a library of symbols to depict the various control functions. Additionally there shall be a provision to create customer specific symbols. 3.5.12 The digital object change of state should be represented either by frame change or text change. 3.5.13 Digital signals shall also be logged and viewable in report form 3.5.14 Option for displaying data browsed from third party devices. 3.5.15 Faults & Alarm statistics: When ever an alarm occurs, a popup window listing the alarm conditions having higher priority should override all the configurations and appear on the monitor. 3.5.16 SQL/Access/Oracle database for storing the alarms, dairy,

schedules, login data and data logs from the DDC. 3.5.17 Dairy / Scheduler should be configurable from the HMI depending on the user requirement. 3.5.18 The DDCs should be configurable from HMI software. 3.5.19 The reports shall be customizable as per end user requirement. 3.5.20 Explorer tree of graphic pages, which represents the plant hierarchy, should be on the left part of the HMI and should be hidden during run time.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 5

Project: HP, Chennai

Technical specification BMS, FAS, PAS

3.6

DDC Programming Software 3.6.1 The programming tool shall support higher lever programming like C or C++ or Functional block programming. 3.6.2 The programming tool shall run on the standard operating system like Windows, Linux & Sun Solaris. 3.6.3 Support offline simulation mode testing of the strategy as well as live value editing and commissioning of the direct digital controllers. 3.6.4 The programming tool shall have standard library for sensors, also the user-defined sensors shall be acceptable and stored in the library. 3.6.5 Downloading and uploading of complete strategy or part of strategy to the direct digital controllers shall be supported. 3.6.6 Shall display the tree structure of the direct digital controllers with the IO mapping. 3.6.7 Password protection against unauthorized access. 3.6.8 Shall monitor and control wide variety of third party devices like HVAC equipments, UPS, DG, Energy meters and other electrical equipments. 3.6.9 The programming tool shall support the following types of Inputs & Outputs 3.6.9.1 3.6.9.2 3.6.9.3 3.6.9.4 Constant or Variable Input Knob Soft Input On/Off module Soft Input Analog Inputs Hardwired Inputs Digital Inputs Hardwired Inputs

3.6.9.5 3.6.9.6

Analog Output Hardwired Inputs Digital Output Hardwired Inputs

3.6.10 The programming tool shall be capable of performing the following arithmetic operations, logical operations and other functions. 3.6.10.1 Arithmetic functions

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 6

Project: HP, Chennai Addition function Subtraction function Multiplication function Division function 3.6.10.2 Logic functions NOT function AND function OR function NAND function NOR function Latching function Comparator functions Greater than function Lesser than function Equal to function 3.6.10.3 Timer & Counter functions On timer function Off timer function Up counter function

Technical specification BMS, FAS, PAS

Down counter function Conversion functions Analog to Digital function Digital to Analog function PID functions Proportional function Integral function Derivative function Proportional + Integral function Proportional + Derivative function Proportional + Integral + Derivative function Delay functions

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 7

Project: HP, Chennai On delay function Off delay function Others Absolute function Enthalpy function Hysteresis function Minimum function Maximum function Average function Hours run function Alarm router function Modem function Schedules function

Technical specification BMS, FAS, PAS

Calendar / Time function 4 BCS Communication Level (Optional) 4.1 The BCS Communication Level consists of the Interface Card (Network controller) and the System Controller for processing data received from the Station Controllers and onward communication to the Management Level PC. 4.2 The Interface Card (Network Controller) shall supervise and handle the data traffic between the Station Controller and the System Controller. 4.3 The System Controller shall be an intelligent decentralized module capable of autonomous operations. 4.4 The station controller shall not depend on the system controller for its operation. 4.5 The System Controller shall be capable of Processing, Storing and Handling large volumes of data. 4.6 Optimized Network operation shall be achieved by Event and Priority based Bus Management, to ensure fast responses at all times.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 8

Project: HP, Chennai 4.7

Technical specification BMS, FAS, PAS

The System Controller shall co-ordinate flow of data in both directions and shall be responsible for the following communications:
4.7.1 4.7.2 4.7.3

System Controller to another System Controller System Controller upward to the Management Station System Controller downward to the Station Controllers

4.8

The System Controller shall be capable of storing real-time measured data received from the Station Controller. This shall be available for Statistical Analysis.

4.9

The System Controller shall have capability to classify data into categories based on programmable criteria. The data organization should be such that the same can be printed directly on a local printer.

4.10

The Interface Card shall process the Station Controller Data Points and shall convert logical System Controller addresses to Physical Station Controller Addresses.

4.11

It shall be possible to connect a Local printer to the System Controller to enable printing of the alarm messages even when the Management Level is not implemented or if the Management Station PC is switched off.

BCS Processing Level 5.1 Specification for DDCs


5.1.1

Each DDC shall be a truly standalone controller i.e. in the event of network failure the DDCs should not depend on the central control station for its operation.

5.1.2

The failure of any DDC in the network should not cause loss of communication of remainder of the network

5.1.3

DDCs shall be capable of having peer-to-peer communication with other DDCs and with the Central Operator Stations.

5.1.4

The DDCs shall be networkable using any standard protocol like BACnet over Ethernet or TCP/IP over Ethernet.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 9

Project: HP, Chennai


5.1.5

Technical specification BMS, FAS, PAS There should not be any data loss in the event of network fail and once the network is online the data should be transferred from the DDCs to the central control station without user intervention.

5.1.6

The DDCs shall be capable to do read/write data from the 3rd party devices.

5.1.7

DDCs shall be 16/32-bit microprocessor/micro controller with the memory types like EEPROM / SRAM / FLASH for storing control programs (DDC Programs) and firm wares, storing at least 1000 events for each Input (Analog & Digital) & fast processing of the data. RAM shall be used only for operating data.

5.1.8

To enable up gradation, it shall be possible to upgrade a DDC by downloading the new firmware without having to change or replace hardware.

5.1.9

The programming language shall be simple programming language like C, Functional blocks or Ladder and shall be self-explanatory. The language shall contain all the functional elements to allow all the control and interlocking functions. Besides, it shall be capable of setting up precise values for parameters, alarms and limits.

5.1.10

The DDCs shall have real time clock. All time-based controls (timescheduling, integration and other real time based controls) shall be performed with this real time resident clock.

5.1.11 5.1.12

Upon power restoration all clocks shall synchronize automatically. The DDCs shall be programmable using the functional block programming software

5.1.13

The DDCs shall be Battery backed to maintain time and store logged data with mains off for at Least 5 years.

5.1.14

Small Hand Held Operator Terminals shall be provided, capable of connecting to any of the Station Controllers. Through these terminals, it shall be possible to access and modify if required, all the Control Data, Parameters, Set-Points, Tantalizer readings, Site Descriptions and Alarm Messages.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 10

Project: HP, Chennai


5.1.15

Technical specification BMS, FAS, PAS The DDC network, Supervisory port and NDP port baud rate & address shall be selectable through dip / rotary switch or it shall be selectable through software.

5.1.16

The DDC shall have indicator lamp for indicating the status of Power, Watchdog timer & Network transmission.

5.1.17 5.1.18 5.1.19 5.1.20

A minimum of 20% spare capacity shall be provided. The protection standard shall be IP30 or higher The DDC shall be Under Writers Laboratory listed. DDC I/O Support 5.1.20.1 Analog Input: Resistance, 0 to 20 mA, 4 to 20 mA & 0 to 10 Vdc 5.1.20.2 Analog Output: 010V & 4 to 20 mA 5.1.20.3 Digital Input: Potential free 5.1.20.4 Digital Output: Potential free, TRIAC & Transistor

6 Specification for Field Equipments 6.1 Duct type temperature sensor/transmitter


6.1.1

The temperature sensing element shall be either Positive Temperature Coefficient ( RTD ) type or Negative Temperature Co-efficient ( Thermistor ) type

6.1.2 6.1.3 6.1.4

The wiring terminal shall be plug in type for easy connection of wires. Measurement range shall be 10oC to 50oC The sensor output shall be 4 to 20 mA (In case the field device is far away from the DDC) / 0 to 10 VDC or resistance (If the field devices is located near to the DDC)

6.1.5

The temperature sensor shall be suitable for the measurement range of 10oC to 55oC

6.1.6

The sensor accuracy or tolerance shall be in the range of 0.5oC

0.1oC to

6.1.7

The RTD type temperature sensor output shall be linear through out the measurement range

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 11

Project: HP, Chennai


6.1.8

Technical specification BMS, FAS, PAS

The temperature co-efficient of resistance for RTD type temperature sensor shall be less than 4 /oC

6.1.9

Drift in the temperature reading shall be less than 0.002oC/year for Thermistor type temperature sensor & less than 0.14oC/year for RTD type temperature sensor The dissipation constant for the Thermistor type temperature sensor shall be less than 3mW/oC

6.1.10 6.1.11

The protection standard shall be IP66 or higher The sensor shall be Under Writers Laboratory listed

6.2 Differential pressure switch - air


6.2.1

The differential pressure switch shall be suitable for providing filter dirty status and fan run status

6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.9

The switching set point shall be selectable for different air flow ranges The ambient operating temperature shall be 0 to 60oC The sensing range shall be 0 to 1000 Pa Maximum operating pressure shall be 5000 Pa Types of output shall be NO / NC The sensing element shall be silicon or piezoelectric diaphragm type The protection standard shall be IP55 or higher The pressure switch shall be Under Writers Laboratory listed

6.3 CO2 sensor/transmitter INDOOR / OUTDOOR


6.3.1 6.3.2

The sensor shall be of infra red technology type The output shall be 4 to 20mA (If the sensor is located far away from DDC) or 0 to 10 Vdc (If the sensor is located near to the DDC) representing 0 to 1000ppm

6.3.3 6.3.4

The sensor shall be available in duct, Room & space mounting versions The ambient operating temperature shall be 0 to 50oC and humidity shall be 0 to 100 % non-condensing

6.3.5 6.3.6 6.3.7 6.3.8

Accuracy shall be less than

1% of full scale

Response time shall be less than 1 min Drift shall be less than 2 % / 5year

The protection standard shall be IP 57 or higher

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 12

Project: HP, Chennai


6.3.9

Technical specification BMS, FAS, PAS

The sensor shall be Under Writers Laboratory listed

6.4 Duct Mount type Smoke Detector


6.4.1

The detector shall sample air currents passing through a duct and give dependable performance for management of smoke and combination fire smoke dampers.

6.4.2

Duct detectors are 6.4.2.1 6.4.2.2 6.4.2.3 system NOT a substitute for an open area smoke detector NOT a substitute for early warning detection, and NOT a replacement for a buildings regular fire detection

6.4.3 6.4.4 6.4.5 6.4.6 6.4.7

Duct detector shall be photoelectric type Shall be suitable for Air duct velocity of 100 to 4000 fpm (.5 m/s to20.3 m/s) Operating temperature shall be 0C to 70C Operating humidity range shall be 0% to 95% R.H. Sampling tubes longer than three feet must be supported on each end. Holes in duct smoke detector sampling tubes must face into the airflow.

6.4.8

Installation shall be as per NFPA Standard 90A, NFPA Standard 92A, NFPA Standard 101, NFPA Standard 72, UL Standard 268A, NBC & IS code.

6.4.9

The detector shall be Under Writers Laboratory listed

7 Third Party Integrator 7.1 Shall be a multi protocol integrator 7.2 Shall have Ethernet port 7.3 Shall support Serial RS-232, RS-485 communication protocols with optional drivers 7.4 shall support Lonworks, BACnet, MODBUS, JBUS and other industrial field-bus interfaces 7.5 Shall support DIN rail mounting or panel mounting 7.6 Shall have rechargeable internal battery backup 7.7 Shall have memory backup of 1Gb

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 13

Project: HP, Chennai

Technical specification BMS, FAS, PAS

7.8 The printer shall be connectable to the Integrator to support printing alarms in the event of failure / off mode of the management PC. 7.9 Shall have autodial option 7.10
7.10.1 7.10.2 7.10.3

Shall have following listings UL listed BTL listed EN listed

8 Specification for CABLES, CONDUITS & PANELS 8.1 Signal Cable


8.1.1

The cabling running between DDC controllers to the field devices shall be termed as signal cabling.

8.1.2 8.1.3 8.1.4 8.1.5 8.1.6 8.1.7 8.1.8

Size / No. of cores: 2 Core x 1.0 sq. mm Conductor: Stranded (32 strands) Annealed Tinned Copper Minimum no of twists / meter: 16 Laying: Twisted Pair Core Insulation: PVC Insulation (as per IS 694/1990) Standard of Construction: IS1 Standards If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation.

8.2 Communication Cable


8.2.1

The cabling running between the system integration units to the DDC controllers and between various third party integration units shall be defined as communication cable.

8.2.2 8.2.3 8.2.4 8.2.5 8.2.6

Size / No. of cores: 3 Pair x 1.0 sq. mm Conductor: Stranded (32 strands) Annealed Tinned Copper Minimum no of twists / meter: 16 Laying: Twisted Pair Core Insulation: PVC Insulation (as per IS 694/1990)

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 14

Project: HP, Chennai


8.2.7 8.2.8

Technical specification BMS, FAS, PAS

Standard of Construction: IS1 Standards If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation.

8.3 LAN Cable


8.3.1

The cabling running between the DDC controllers LAN port shall be defined as LAN cable.

8.3.2 8.3.3 8.3.4 8.3.5 8.3.6 8.3.7 8.3.8

Size / No. of cores: 4 Pair x 1.0 sq. mm Conductor: Stranded (32 strands) Annealed Tinned Copper Minimum no of twists / meter: 16 Laying: Twisted Pair Core Insulation: PVC Insulation (as per IS 694/1990) Standard of Construction: IS1 Standards If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation.

8.4 Power Cable


8.4.1 8.4.2 8.4.3 8.4.4 8.4.5

Size / No. of cores: 3 x 1.0 sq. mm / 3 x 4 sq. mm Conductor: Copper Core Insulation: PVC Insulation (as per IS 1554/Part-1/1988) Standard of Construction: ISI Standards If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation.

8.5 PVC Conduit


8.5.1 8.5.2 8.5.3 8.5.4

The PVC Conduit shall be FRLS type The thickness of PVC conduit shall be 2mm The size of conduit shall be 3/4 or 1 Standard of Construction: ISI Standards

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 15

Project: HP, Chennai 8.6 DDC Panels


8.6.1

Technical specification BMS, FAS, PAS

Vendor to design panels with appropriate space and with proper sizes of the cable and troughs. BOM and the GA shall be approved by Consultant. All cables shall enter from top of the panel and shall be provided with suitable cable glands.

8.6.2

Cables shall be unarmored shielded Belden 8760 or Equivalent for BMS signals; LAN cable (data cable) shall be CAT6. Outside overhead or underground cables shall be FRLS armoured.

8.6.3

All the cables shall run through the GI ducts or GI perforated tray before entering the panel. The cables for individual instruments to be routed locally in 25 mm PVC conduits.

8.6.4 8.6.5

Panel enclosure size shall be standard. There shall be no cable visible without proper support and appropriate dressing.

8.6.6

Proper cable glanding shall be done for entry of cable in the enclosure and at field Instrument side.

8.6.7

The cable glands shall be protected with shrouds wherever required. Cable and wire entries shall be fitted with rubber grommets and strain relief clamps to avoid any damage to the insulation. The same shall be properly sealed to prevent any ingress of dust, water, moisture, etc.

8.6.8 8.6.9

Lugging, Tagging and ferruling have to be done for each cable. The location and quantity of DDC panel shall be obtained from the BOQ and project drawings.

8.6.10

The DDC panel Assemblies: Each assembly (not each panel in an assembly) shall be provided with (2) 5 amp dedicated circuits (separate circuit breakers).

8.6.11

Enclosure shall be 7035 color coated & base plate shall be orange color coated

8.6.12 8.6.13 8.6.14

Enclosure thickness shall be 1.6mm and base plate shall be 2mm thick DDC Panel shall be mounted at 1.2 to 1.5mtr from the floor level Direct Digital Controller panel shall be IP 55 rated enclosure.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 16

Project: HP, Chennai


8.6.15

Technical specification BMS, FAS, PAS

The colour code for wiring shall be as below, the wire shall be ISI certified 8.6.15.1 Phase Red 8.6.15.2 Neutral - Black 8.6.15.3 Earth Green 8.6.15.4 Communication Yellow 8.6.15.5 Signal Cable 8.6.15.5.1 Analog Input Grey & white 8.6.15.5.2 Digital Input magenta & white 8.6.15.5.3 Analog Output Orange & white 8.6.15.5.4 Digital Output or Relay Output till Relay Brown & white 8.6.15.5.5 Relay to connector Blue & white

8.6.16 8.6.17 8.6.18

The transformers shall be UL approved MCBs shall be ISI certified like INDOCOPP, SCHNEIDER, ABB etc All DDcs & other components shall be mounted on the DIN rail, those without DIN rail mounting shall be placed on the base plate directly

8.6.19

DDC power Input & Relay Power shall be powered through connectors with fuse and shall not be connected directly from the transformers.

8.6.20 8.6.21 8.6.22

3 pin plug with switch shall be provided for 230VAC local power usage DC supply shall be provided if required Connectors numbering shall be done, this shall be same as the number given in the internal wiring drawing.

8.6.23

Simple ferrule shall be provided and IO details shall be provided in the internal wiring drawing.

8.6.24 8.6.25

Drawing file holder shall be provided on the internal side of the door Red colour indicator lamp shall be provided on the enclosure to indicate power status of the panel

8.6.26 8.6.27

Earthing stud shall be provided on the door hinges side of the enclosure Single wire connectors shall be used (double decker connectors are not allowed)

8.6.28

Relays

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 17

Project: HP, Chennai

Technical specification BMS, FAS, PAS

8.6.28.1 The AC relays shall be of min 10 Amp rating and shall be capable of withstanding continuous inductive load of more than 5 Amps at all times 8.6.28.2 The DC relays shall be heavy duty, rugged and shall be capable of continuous operation. 8.6.28.3 The provision of AC or DC relays, if required at the utility side (Electrical Panel, HVAC Panel etc.,) shall also be supplied & installed by IBMS vendor at no additional cost to avoid any integration problems while commissioning. 8.6.28.4 Relays shall be standard make like PLA, SALZER, SCHNEIDER etc
8.6.29

Rubber gasket or beading shall be provided for the door

8.7 Perforated Tray


8.7.1

DI duct or perforated cable tray shall collect the conduits from the ceiling above the wall and run till the DDC panel.

8.7.2

The tray shall be enclosed type and the conduits running inside shall not be visible

8.7.3

Size of the tray shall be considered based on the number of conduits running inside

INSPECTION & TESTING OF EQUIPMENT AND INSTALLATION SCOPE: This section covers the general requirements for Testing of installation and the contractor shall supply all the materials, instruments, labour, tools etc., for all testing work complete. INSPECTION AND TESTING SCHEDULE AT MANUFACTURERS WORKS The contractor shall offer the equipment covered in earlier section for the following inspection /tests which may be witnessed by the purchaser/purchasers Page 18

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Project: HP, Chennai

Technical specification BMS, FAS, PAS

representatives. The supplier shall be responsible for providing instruments of correct accuracy that may be required for carrying out these tests. All tests shall be carried out as per relevant Indian Standard specifications or other approved international specifications.

DDC Control Panels, Sensors, etc. Visual Inspection a. Layout of components, dimensions, mounting arrangements and bill of materials as per approved drawings. Routing of wiring and their termination etc.,

b.

c. d.

Verification of test certificates for bought out components General workmanship, identification tags etc., finish, interchangeability, compartmentalisation,

e.

Check of earthing arrangements, provision of shutters and mechanical interlock arrangements.

TESTING AT SITE General: After the completion of the work, the entire installation shall be subject to the following tests: 1. 2. 3. Wiring continuity Test Field Equipments Signal Test DDC to HMI Communication Test

Besides the above, any other test specified by the Local Authority shall also be carried out. All tested and calibrated instruments for the testing, labour, materials and incidentals necessary to conduct the above tests shall be provided by the Contractor at his own cost. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 19

Project: HP, Chennai COMMISSIONING

Technical specification BMS, FAS, PAS

This section of the specification details the requirements for the following: 1. 2. Start-up, testing and commissioning of the BMS. Coordinating of start-up and testing of the interface to any Mechanical or Electrical System interface to the BMS. 3. The BMS contractor shall take the lead responsibility for inspecting, completing and documenting the Pre-Functional Testing for the BMS to ensure the systems are fully operational and ready for Functional Testing. 4. Assist in the completion and endorsing Mechanical and Electrical checklist items of Pre-Functional Test forms for Mechanical and Electrical equipment and systems to ensure the systems are fully operational and ready for functional testing. 5. The BMS subcontractor shall take the lead responsibility for demonstrating the operations of the BMS Functional Tests. 6. Provide equipment, materials, and labor necessary to correct deficiencies found during the commissioning process, which fulfill contract and warranty requirements. 7. Coordinating and scheduling with the Mechanical and Electrical subcontractors per specification requirements. 8. Providing operation and maintenance information and record drawings to the Commissioning Authority for review, verification and organization, prior to the start of training. 9. Delivery of copies of all required engineering calculations and test

documentation as noted in the specifications. This includes, but is not limited to, manufacturers factory and field tests, subcontractor installation and start-up reports and independent testing agency reports.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 20

Project: HP, Chennai

Technical specification BMS, FAS, PAS DRAWINGS TO BE SUBMITTED BY SUCCESSFUL BIDDER

The supplier shall submit the following drawings, documents and technical manuals in four (4) sets in two (2) weeks from the date of placement of LOI for approval of purchaser / consultant.

Description: drawings & documents.

HVAC BMS Certified GA Diagram of DDC Control Panels, Control Panel Internal Wiring Drawings,

Immersion Temperature Sensor & Thermo well mounting details, Filter Switch mounting details, Room Temperature + RH Sensor mounting details, Diff Pr Sensor Mounting details, communication cable routing drawing, System Architecture & DDC Power Distribution drawings.

The bidder shall submit "as made" drawings of the above in soft copy in CDs and 6 sets of hard copies, six (6) sets of operation and maintenance manuals and six (6) sets of type and routine test certificates of major equipments.

TRAINING 1. Training course schedule, syllabus, and training materials 15 days prior to the start of training. 2. Instructor to conduct training courses for designated personnel in the maintenance and operation of the HVAC and DDC system. 3. BMS Contractor should provide the operation and maintenance training with manual. 4. Training shall be classroom, but have hands-on operation of similar digital controllers. 5. The training should be able to perform elementary operations, with guidance, and describe the general hardware architecture and functionality of the system. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 21

Project: HP, Chennai

Technical specification BMS, FAS, PAS

6. This training shall include both in BMS room as well as field, but not be limited to: a. b. c. d. e. f. g. h. i. j. k. l. Theory of operation & system of operation Hardware architecture Operator commands Control sequence programming Data base entry, Reports and logs Alarm reports & Diagnostics Physical layout of each piece of hardware Troubleshooting and diagnostics procedures Repair instructions Preventive maintenance procedures and schedules Calibration procedures. Troubleshooting, checkout and calibration of the working system shall be accomplished in a training and repeated on-site till clarify the attendees.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 22

Project: HP, Chennai

Technical specification BMS, FAS, PAS LIST OF APPROVED MAKES

SL.NO. 01 02 03 04

ITEM DESCRIPTION PC Server / PC DDC Controller HMI Software Network Controller / Gateway / Router Temperature & Humidity Transmitter, Indoor & Outdoor Differential pressure switch - air CO2 sensor Third party integrator Signal Cable Communication Cable Third Party Communication Cable PVC Conduits Control Panels

MAKE (S) OF MATERIALS IBM / HP / DELL / COMPAQ HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS HONEYWELL / TRANE / SCHNEIDER / SIEMENS / JOHNSON CONTROLS / ABB ASSOCIATED / DELTON /CCI / LAPP / FINOLEX ASSOCIATED / DELTON /CCI / LAPP / FINOLEX ASSOCIATED / DELTON /CCI / LAPP / FINOLEX VIP / AVON / NATIONAL RITTAL / STANDARD

05 06 07 08 09 10 11 12 13

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 23

Project: HP, Chennai

Technical specification BMS, FAS, PAS

2. Addressable System 1. General Description

FIRE DETECTION & ALARM SYSTEM

The fire alarm system will be of the analogue addressable type and networked with a personal computer terminal to display a graphical representation of the fire alarm system installed at IBMS Room. The graphical display terminal (s) will be located within the IBMS (BMS, FAS & SAS) Control Room. The fire alarm system shall include furnishing, installation, and connection of the Analog/Addressable Microprocessor based LCD/LED Fire Alarm Control Panel consisting of system cabinet(s), main chassis with power supply, stand-by batteries, optional city tie/reverse polarity module, optional relay modules, detection and signaling devices, and any auxiliary modules, remote annunciator assemblies, and miscellaneous peripheral devices to form a complete coordinated system ready for operation. The fire alarm system will be configured to allow sequenced (phased) evacuation of the centre following initial investigation by the centre staff. The main networked fire alarm panel will be located in IBMS ROOM with the repeater panels located at areas as required by IT FACILITY HEAD. Initiating loops and signalling circuits in each loop shall not exceed 80 percent of capacity. Layout of initiating loops shall follow the logical layout of the building by floor or section. The minimum coverage of detection devices shall include public corridors, storage rooms, electrical and telecommunications rooms. All field devices shall be labeled with loop or circuit and device number. The system and all associated equipment shall be fully approved and listed by the following agency and regulatory controls: Must comply with applicable National, State, and/or local Building code recognized at time of installation. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 24

Project: HP, Chennai

Technical specification BMS, FAS, PAS Must comply with NFPA 101 70, 72 fire alarm installation standard recognized at time of installation. Installation must comply with requirements of Local Authority Having Jurisdiction.

Auxiliary power supply systems shall meet all NFPA 72 standards, including requirements for supervision, location, and accessibility. Battery system shall be sized to provide 24 hours of supervision and then provide 10 minutes operation of all signalling devices. System shall have common keyed locks with fire alarm system control panel. The fire alarm system shall interface with the AHU, Lift, sprinkler, smoke ventilation (fire strategy), Stairwell pressurization, VESDA system, and Burglar alarm system, access control system, parking management system, gate automation and public address zones. RS-232 shall be used for connection to modems/ fiber-optic modems. Network Card: There shall be four (4) versions of the Network Card: Standard Version Port 1 RS-232 Port 2 Standard Port 1 Standard, Port 2 RS-232 RS-232 only Standard communications shall be used for direct wiring between units. Point by point graphic identification and annunciation of all initiating devices shown on floor plans shall be provided. Interface with other system: AHU/VFD through hard wired signals to shut down incase of fire signal Security system through hard wired signals to unlock the door in case of fire signal. Other Electrical system - through hard wired signals. Building Automation and Management System through hard wired. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 25

Project: HP, Chennai

Technical specification BMS, FAS, PAS

2. Fire Alarm System Components & Technical Specifications Fire Alarm System will consist of the following 2.1 2.2 2.3 2.4 2.5 Microprocessor based intelligent fire alarm control panel Graphical user interface software Analog Addressable Smoke detector Analog Addressable Manual Pull Points Analog Addressable Sounder, sounder cum strobes and directional sounder 2.6 2.7 2.8 2.9 2.10 Analog Addressable control modules/Output Modules Analog Addressable input modules/Monitor Modules Short Circuit Isolators Operator interface units Battery Standby

3. Fire alarm control panel (FACP) 3.1 The distributed Intelligent Fire Alarm Control Panel (FACP) shall function as fully stand-alone panel. FACP shall have its own microprocessor, software and memory and should be listed under UL. Each loop shall be capable of handling minimum 125 detectors and 125 modules or more. 3.2 The memory data for panel configuration and operation shall reside in non-volatile memory (EEPROM). Removal of the board shall not cause loss of memory. 3.3 FACPs shall supervise detection circuits and shall generate an alarm in case of abnormal condition. 3.4 FACPs shall provide general-purpose inputs for monitoring such functions as low battery or AC power failure. FACPs shall provide tamper protection and commandable outputs, which can operate relays or logic level devices. Output commands shall take any of, but not limited to, maintained command, Momentary Command, Alarm Follow, or Alarm latch as required. Any relay in the FACP, which is intended to be removable, shall be supervised against removal.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 26

Project: HP, Chennai 3.5

Technical specification BMS, FAS, PAS

Smoke detectors shall be powered using the FACP-based smoke detection circuits. FACPs shall provide for resetting smoke detectors, faultisolation and sensor loop operation. It shall be possible to mix different fire devices within the same FACP to optimize field wiring.

3.6

FACPs shall provide monitoring and control of one floor or area or for multiple floors or areas.

3.7

FACPs shall meet the following requirements to assure the integrity and reliability of the system. 3.7.1 The FACP shall be UL listed independently as a fire alarm control panel. 3.7.2 FACP electronics shall be contained in an enclosure made of minimum 16gauge sheet steel. Access to FACP switches and electronics shall be by key-lock. Usage of no other tools should be required. 3.7.3 All hardware and software to allow the FACP configuration and operation to be changed shall be provided. Memory data shall be contained in non-volatile memory (EEPROM). 3.7.4 Alarm verification with field-adjustable time for individual smoke detector shall be provided. During the alarm verification, the panel shall retard the alarm until the end of the period. If the alarm is only a transient smoke alarm, the panel shall automatically reset the alarm. 3.7.5 Only a verified alarm shall initiate the alarm sequence for the software zone (Logical Point Group) or point. Final time setting shall be as per approval of the fire authorities. When alarm verification is being performed on a smoke detector, the action shall be printed on the listed printer(s).

3.8

160 characters LCD display at the FACP shall be provided to indicate point in alarm or trouble. In such systems, means for manually scanning the points in trouble shall be provided and a trouble and alarm LED shall be used to indicate that there are points in alarm/trouble. The

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 27

Project: HP, Chennai

Technical specification BMS, FAS, PAS

alarm/trouble LED shall only extinguish when all alarm/troubles are cleared from the loop. 3.9 It shall be possible to command test, reset and alarm silence from the FACP. 3.10 FACP switches shall allow authorized personnel to accomplish the following, independent of the central console: 3.10.1 3.10.2 3.10.3 Initiate a general alarm condition. Silence the local audible alarm. It shall be possible to acknowledge (Silence the local FACP audible without silencing the alarm indicating devices (hooters). 3.10.4 Reset all zones (Logical Point Group) / points, after all initiating devices have returned to normal. 3.10.5 Perform a complete operational test of the microprocessor and memory with a visual indication with each board. 3.10.6 Test all panel LEDs for proper operation without causing a change in the condition of any zone (Logical Point Group) 3.10.7 3.11 Walk Test Software zones / loops shall be circuited and protected by Fault Isolation Modules which are provided along with all detector / devices. 3.12 3.13 Intelligent Smoke sensors shall report sensed levels in analog form. Monitor modules shall be provided to monitor and address contact-type input devices. 3.14 The FACP shall be able to set dual alarms threshold for occupied and unoccupied periods. During unoccupied period, the alarm threshold shall automatically be lowered to facilitate quicker response. In addition, the FACP shall further process all analog values for pre-alarm limits to 3.14.1 Any time sensor value transitions beyond the secondary and higher limit value, an alarm initiation and report shall be issued. 3.14.2 Limits and sensor values shall be displayed, modifiable, and reported in decimal values.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 28

Project: HP, Chennai 3.14.3

Technical specification BMS, FAS, PAS The FACP shall have Drift Compensation facility to compensate for environment. The FACP shall have the ability to recalibrate Pre-alarm and Alarm limits if required, after comparing each sensors operating characteristics with the set sensitivity. This should be carried out at least once in every 24 hours. FACP should annunciate trouble conditions when sensor(s) is beyond compensation range (excessively dirty sensor).

3.15

FACP shall have real-time clock to prevent loss of time and date in case of failure of power supplies.

3.16

The display on FACP shall provide indication for AC Power, System Alarm, System Trouble/Security Alarm, Display Trouble and Signal Silence.

3.17

Minimum two different password levels will be provided to prevent unauthorized System control or programming.

3.18

Operator control switches for Signal Silence, lamp Test, Reset, System Test and Acknowledge shall be provided.

3.19

The FACP should be truly field programmable. This would mean that in the event of change of any logic, detector / zone sequence alteration, the operator can initiate these by use of the alpha-numeric keys on the FACP panel to reconfigure the above parameters. Panels, which require

external programming devices to perform the above function, will not be acceptable. 3.20 3.20.1 Power supply unit of FACP shall have following characters: The main power supply shall be 230 VAC + / - 10%, 50 Hz + /-1% and shall in turn provide all necessary power of the FACP. 3.20.2 It shall provide a battery charger for 24 hours for standby power using dual-rate charging technique for fast battery recharge. 3.20.3 It shall provide a very low frequency sweep earth fault detect circuit, capable of detecting earth faults on sensitive

addressable modules. 3.20.4 It shall be power-limiting using Positive Temperature Coefficient (PTC) resistor. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 29

Project: HP, Chennai 3.20.5

Technical specification BMS, FAS, PAS It shall provide indication for battery voltage and charging current.

3.21

For ease of service, all wiring terminal blocks shall be plug-in type and shall have sufficient capacity for 18 to 12 AWG wire termination. Fixed terminal blocks shall not be acceptable.

3.22 3.22.1

Reports The system shall provide the operator with system reports that give detailed description of the status of system parameters for corrective action, or for preventative maintenance programs. The system shall provide these reports via the main LCD, and shall be capable of being printed on any system printer 3.22.2 The system shall provide a report that gives a sensitivity listing of all detectors that have less than 75% environmental

compensation remaining. The system shall provide a report that provides a sensitivity (% Obscuration per foot) listing of any particular detector. 3.22.3 The system shall provide a report that gives a listing of the sensitivity of all of the detectors on any given panel in the system, or any given analog/addressable device loop within any given panel. 3.22.4 The system shall provide a report that gives a chronological listing of up to the last 1740 system events. 3.22.5 The system shall provide a listing of all of the firmware revision listings for all of the installed network components in the system. 3.23 The FACP shall have HARDWARE compatible for BMS integration. The protocols supported by integration hardware shall be LONWORKS / BACnet / MODbus / JBUS / RS485 or any other open protocol.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 30

Project: HP, Chennai

Technical specification BMS, FAS, PAS

4. Intelligent Addressable Photoelectric Smoke Detectors 4.1 Smoke detectors shall be microprocessor based, intelligent and

addressable devices, and shall connect with two wires to one of the Fire Alarm Control Panel loops. 4.2 The detectors shall use the photoelectric (light-scattering) principal to measure smoke density. The detectors shall be ceiling mounted type and shall include a twist-lock base. 4.3 The detectors shall provide a test means whereby they will simulate an alarm condition and report that condition to the control panel. Such a test may be activated remotely on command from the control panel. 4.4 The detectors shall provide address-setting by automatic polling. Systems using binary jumpers or DIP switches to set the detector address are also acceptable. 4.5 The detectors shall also store an internal identifying code, which the control panel shall use to identify the type of detector. 4.6 The detectors shall provide dual alarm and power LEDs. Both LEDs shall flash under normal conditions, indicating that the detector is operational and in regular communication with the control panel. Both LEDs may be placed into steady illumination by the control panel, indicating that an alarm condition has been detected. An output connection shall also be provided in the base to connect an external remote alarm LED. 4.7 Using software in the FACP, the detectors shall compensate for dust accumulation and other slow environmental changes, which may affect their performance. The detectors shall be listed by. 4.8 The area covered by each smoke detector shall be as per IS-2189.

5. Addressable Manual Call Stations (Pull Station Type) 5.1 Each MCP shall transmit wiring information to the controller regarding its location with respect to other devices on the circuit.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 31

Project: HP, Chennai 5.2

Technical specification BMS, FAS, PAS

The MCP shall permanently store programmable address; Addresses are downloaded from a PC, or the Program/Service Tool. The MCPs with switches or dials for address setting is also acceptable.

5.3

All decisions shall be made at the MCP allowing lower communication speed while substantially improving control panel response time.

5.4

Manual stations shall be constructed of high impact LEXAN sheet with clearly visible operating instructions provided on the cover. The word FIRE shall appear on the front of the stations in raised letters.

5.5

Stations shall be suitable for surface mounting, or semi-flush mounting. And shall be installed not less than 3 ft (1.1 m) and not more than 4 ft (1.37 m) above floor level unless otherwise specified by applicable building codes.

6. Hooters cum Strobes 6.1 6.2 This Shall get enabled with the external control module The audio output shall be adjustable, the tones shall be temporal or continuous type, the high setting output shall be 98 dBA and Low setting output shall be 94 dBA, Sound level of each sounder shall be at least 90 dBA measured at 10 feet from the device. 6.3 Shall support Power Saver technology which lowers in-rush current and reduces operating current, significantly reducing system power supply and battery requirements. 6.4 Shall be UL 1971-listed as signaling devices for the hearing impaired and UL 1638-listed as protective visual signaling appliances. 6.5 Sound pressure level shall be at least 15 dBA above the average ambient sound level or 5 dBA above the maximum sound level having duration of at least 60 seconds, whichever is greater, measured 4 to 5 ft (1.2m to 1.5 m) above the floor in the occupiable area. 6.6 The strobe should have smooth light distribution pattern without the spikes and voids, the entire coverage area receives consistent illumination from the strobe flash.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 32

Project: HP, Chennai 6.7

Technical specification BMS, FAS, PAS

The flash rate of strobe shall not exceed two flashes per second (2 Hz) nor be less than one flash every second (1 Hz) throughout the listed voltage range of the appliance.

7. Control Module 7.1 Each module shall transmit wiring information to the controller regarding its location with respect to other devices on the circuit. 7.2 The CM shall permanently store programmable address; Addresses are downloaded from a PC, or the Program/Service Tool. The CMs with switches or dials for address setting is also acceptable. 7.3 All decisions shall be made at the module allowing lower communication speed while substantially improving control panel response time. 7.4 The Control Module shall provide supervised monitoring of wiring to load devices that require an external power supply to operate, such as horns, strobes, or bells. The CM shall also be used to integrate with PA system and transmit the fire message using PA speakers in event of fire. The CM shall also be used for overriding the access door status providing unrestricted exit path for evacuation in the event of fire. 7.5 Upon command from the control panel, the control module shall disconnect the supervision and connect the external power supply across the load device. 7.6 The disconnection of the supervision shall provide a positive indication to the panel that the control relay actually turned on. 7.7 The external power supply shall always be relay isolated from the communication loop, so that a trouble condition on the power supply shall never interfere with the rest of the system. 7.8 Full analog measurement of the supervised wiring shall be transmitted back to the panel and shall be used to detect impedance changes or other special test functions.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 33

Project: HP, Chennai 8. Relay Module 8.1

Technical specification BMS, FAS, PAS

Each module shall transmit wiring information to the controller regarding its location with respect to other devices on the circuit.

8.2

The RM shall permanently store programmable address; Addresses are downloaded from a PC, or the Program/Service Tool. The RMs with switches or dials for address setting is also acceptable.

8.3

All decisions shall be made at the module allowing lower communication speed while substantially improving control panel response time.

8.4

The relay module shall be used for tripping AHUs, run staircase pressurization fans and running ventilation fans in smoke evacuation mode.

8.5 8.6

The relay shall be energisable from voltage source of 230 VAC The relay shall have red LED, which shall illuminate when the coil is energized

8.7 8.8

The relay module shall be UL approved The relay module shall be designed for 10,00,000 mechanical operation

9. Monitor Module 9.1 Each module shall transmit wiring information to the controller regarding its location with respect to other devices on the circuit. 9.2 The MM shall permanently store programmable address; Addresses are downloaded from a PC, or the Program/Service Tool. The MMs with switches or dials for address setting is also acceptable. 9.3 All decisions shall be made at the module allowing lower communication speed while substantially improving control panel response time. 9.4 10. The monitor module shall be used for monitoring potential free contacts.

Other Devices a. Fault Isolator Fault-isolation of fire zones (Logical Point Group) / circuit modules shall be provided to enable part of a fault-tolerant loop to continue operating

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 34

Project: HP, Chennai

Technical specification BMS, FAS, PAS

when a short occurs in the loop. Detectors with built in fault isolators are also acceptable. b. Response Indicator: In addition to built-in response indicator of each detector, Secondary response indicator of LED type shall be provided outside the rooms, AFCD or wherever asked for by the Consultant, for indication of fire through detector in the room.

11. 11.1 11.2 11.3 11.4 11.5 11.6 11.7 11.8 11.9 11.10 11.11 11.12 11.13

The GUI System Hardware shall have the following specifications PC (Pentium core2 duo, 3.0GHz. or Higher Version) Windows based operating system Windows XP or Higher Version 2GB RAM Minimum CD / DVD - R/W 240 GB Hard Disk or Higher. 21 inch Color Monitor 2 Nos. RS-232 Serial Port 2 Nos. Parallel Ports 4 Nos. USB Port. Ethernet Network Card Microsoft Mouse With all required licensed software being loaded into the system. The specification provided above for the GUI hardware is minimum requirement; if vendor has any special requirement other than above then vendor specification shall be considered.

12. 12.1

Fire Detection & Alarm System GUI Software The backdrop for layout and the plant equipments should accept the standard file types like DWG, BMP, JPEG, GIF and Windows Metafile etc

12.2

To display the active contents on the page the HMI should be able to interface with HTML, DOC, XLS, PPT, PDF and other standard file types.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 35

Project: HP, Chennai 12.3

Technical specification BMS, FAS, PAS

For navigation from page to page either buttons should be provided with proper path or the objects on the page should have the option for defining the path for navigation.

12.4 12.5 12.6 12.7 12.8

The access rights for different category of users should be definable. Protection against unauthorized user login. Minimum of three-user license. Server Client configuration. It shall be possible to create, modify and store a library of the digital object change of state should be represented either by frame change or text change.

12.9

Faults & Alarm statistics: Whenever an alarm occurs, a popup window listing the alarm conditions having higher priority should override all the configurations and appear on the monitor.

12.10

SQL/Access/Oracle database for storing the alarms, dairy, schedules, login data and data logs from the FACP.

12.11 12.12 12.13

The software should be flexible to generate the customized report The software should be able to send Alarm messages via e mail and SMS. Explorer tree of graphic pages, which represents the plant hierarchy, should be on the left part of the HMI and should be hidden during run time.

13. 13.1

Sequence of Operation When a fire alarm condition is detected by one of the system initiating devices, the following shall occur: 13.1.1 All automatic programs assigned to the alarm point shall be executed and the associated indicating devices and relays activated. 13.1.2 The System Alarm on appropriate unit will indicate an alert condition. 13.1.3 13.1.4 The corresponding zone(s) in alert alarm will be indicated Second stage operation shall occur when a key is inserted into the key-operated switch of any manual pull station causing all

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 36

Project: HP, Chennai fire alarm speakers/bells

Technical specification BMS, FAS, PAS to sound the general alarm

(evacuation) at a rate of 120 strokes per minute throughout the building. 13.1.5 If the fire alarm condition is not acknowledged at the unit within five (5) minutes of the sounding of the first stage alarm, the fire alarm system shall automatically indicate a second stage alarm causing all bells in the building to sound the general alarm (evacuation) throughout the building. Activation of the second stage shall be identified at the operator's workstation. 13.1.6 13.1.7 13.1.8 Evacuation message to be relayed using public address system. Activate all control by event functions related to the alarm Send signal to U.L. Certified monitoring central station ( not applicable currently however if required in future) 13.1.9 13.1.10 13.1.11 Air-conditioning Equipment to automatically shutdown Lifts to be grounded Fan systems, i.e., shutdown, exhaust and pressurization

operations to be initiated. 13.1.12 13.1.13 Doors with hold open devices shall be signaled to release Access controlled doors, turnstiles; barriers shall be released to open. 13.2 When a trouble condition is detected by one of the system initiating or indicating circuits, the following functions shall immediately occur: 15.2.1 System Trouble will be indicated on the unit and system annunciator(s). 15.2.2 A local trouble-sounding device in the unit and annunciator shall be activated. This sound shall be distinct from the alarm sound. 15.2.3 The trouble for the corresponding initiating or indicating circuit shall be indicated on the unit. 15.2.4 The appropriate message will appear on the LCD display.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 37

Project: HP, Chennai 14. 14.1 14.1.1 14.1.2 14.1.3 Cabling Loop Cable The cable shall be ISI Certified

Technical specification BMS, FAS, PAS

The cable color shall be preferably RED The cable shall be 2Cx1.5 sq.mm (minimum), twisted shield, FRLS type, armoured double insulated copper cable of standard make.

If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation.

Note: The system should be commissioned by trained certified engineer from the system manufacturer and the certification shall be provided for the consultant / client scrutiny or inspection before the commissioning.

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 38

Project: HP, Chennai

Technical specification BMS, FAS, PAS

15.

List of Approved Makes SL.NO. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 ITEM DESCRIPTION PC SERVER / PC FACP NOTIFIER SOFTWARE NOTIFIER PHOTO ELECTRIC SMOKE DETECTOR NOTIFIER HEAT DETECTOR NOTIFIER MULTI SENSOR NOTIFIER CONTROL MODULE NOTIFIER MONITOR MODULE NOTIFIER RELAY MODULE NOTIFIER ISOLATOR MODULE NOTIFIER MANUAL CALL POINT HOOTER CUM STROBE RESPONSE INDICATOR RED COLOUR CABLES NOTIFIER NOTIFIER DEEPANJAN / VARSHA / FINECORE MAKE (S) OF MATERIALS IBM / HP / IBM / COMPAQ NOTIFIER

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 39

Project: HP, Chennai

Technical specification BMS, FAS, PAS

3.

PUBLIC ADDRESSABLE SYSTEM

1. Public address & voice evacuation system 1.1 System Specifications The Public Address System shall be designed to serve the purposes of making general announcement, playing music or to announce the fire tone under fire condition. These different signals are to be transmitted through the same set of speakers. Hence different level of priorities shall be allotted to different signals. The music shall be with the least priority and fire tone having next priority and the emergency announcement having the highest priority level. Public Addressing system shall comprise of: Ceiling ring speakers Booster Amplifiers System Controller 2. Speakers 2.1 Ceiling Mount Type Speakers 2.1.1 The loudspeaker shall have built-in protection to ensure that, in the event of a fire, damage to the loudspeaker does not result in failure of the circuit to which it is connected. 2.1.2 In this way, system integrity shall be maintained; ensuring loudspeakers in other areas can still be used to inform people of the situation. 2.1.3 The loudspeaker shall have ceramic terminal blocks, thermal fuse and heat-resistant, high temperature wiring. 2.1.4 The loudspeaker unit shall be a 6 W dual-cone loudspeaker with an integrated circular metal grille and 100 V matching transformer. The speaker cabinet shall be of neutral white color. 2.1.5 These type of speakers are used for office space, cabins, meeting rooms etc

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 40

Project: HP, Chennai 3. Booster Amplifiers 3.1 3.2

Technical specification BMS, FAS, PAS

The amplifiers shall be protected against overload and short circuits. The amplifier shall have temperature-controlled fan to ensure high reliability at high output power and low acoustic noise at lower power output.

3.3

Additionally, all booster amplifiers have an overheat protection circuit that switches off the power stage if the internal temperature reaches a critical limit due to poor ventilation or overload.

3.4

The amplifier shall have a balanced input and a loop-through connector for easy connection of multiple booster amplifiers to increase the available output power.

3.5

The amplifiers shall have 70 V and 100 V outputs for constant voltage loudspeaker systems and a low impedance output for 8 Ohm loudspeaker loads.

4. System Controller 4.1 The System Controller is the heart of the PA system. The controller shall include full system supervision, loudspeaker line impedance supervision, a supervised emergency microphone on the front panel and a supervised message manager. 4.2 The messages can be merged to allow even more flexible use of prerecorded announcements and evacuation messages. 4.3 The controller shall be used as a standalone system with up to 6 zones, or expanded to up to 60 zones using additional routers. 4.4 4.5 Up to 8 call stations shall be connected. Interconnections shall be made using standard RJ45 connectors and CAT5 cable. 4.6 4.7 All booster amplifiers connected to system controller shall be supervised. The audio output shall be of 100V, for full compatibility with the public address equipment and EVAC-compliant loudspeakers. 4.8 The controller shall have BGM source inputs and a mic/line input with configurable priority, speech filter, and phantom power. Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai Page 41

Project: HP, Chennai 4.9

Technical specification BMS, FAS, PAS

The priority levels shall be specified for microphone, call stations and trigger inputs for optimum system flexibility.

4.10

The 100 V-technique reduces line losses on longer distances and allows for easy parallel connection of multiple loudspeakers.

4.11

All zones shall be individually selected from the front panel and the BGM output level in each zone shall be individually set. The BGM output shall be connected to the 70V line, thus it shall be possible to connect a total load of 480 Watts in a two channel system combined with a 480 Watt booster.

4.12

The output of the booster shall also be available as a separate output on 100V and 70V. A separate 100 V Call Only output is provided for addressing an area where BGM is not required but where priority announcements are.

4.13

Configurable Volume Override output contacts shall be available for overriding local volume controls during priority calls.

5. Announcements 5.1 Announcements shall be made through the microphones and by selecting the required zones. Announcements shall be made in following modes: Individual mode All Call mode 5.2 In All Call mode, announcement can be made to all the speakers simultaneously. This is useful when any common message to be passed to all. Also this is more convenient and fast to address the people during emergencies. 5.3 Key Switches: The following key switches are provided for different operations Number Keys: 0 to 9 Numbers Music All Call Reset Enter

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 42

Project: HP, Chennai 6. System Interconnection 6.1

Technical specification BMS, FAS, PAS

The speakers in each zone are connected in parallel and are connected to the relay and switching unit.

6.2

The cables from each zone are separately routed and are terminated in the relay switching units

7. Cable 7.1 Speaker Cable 7.1.1 7.1.2 7.1.3 7.1.4 The cable shall be ISI certified The cable shall be 2 core 24/0.2 mm ATC twin twisted. The cable shall be FRLS type Unarmored Cable If the system manufacturer recommendation for cable is different than the above specification, then cable specification shall be considered as per system manufacturer recommendation. 7.2 PVC Conduit 7.2.1 7.2.2 7.2.3 7.2.4 The PVC Conduit shall be FRLS type The thickness of PVC conduit shall be 2mm The size of conduit shall be 3/4 or 1 Standard of Construction: ISI Standards

8. LIST OF APPROVED MAKES SL.NO. 01 02 03 04 05 06 ITEM DESCRIPTION SYSTEM CONTROLLER AMPLIFIER MAKE (S) OF MATERIALS BOSCH / SONODYNE / ATEIS / TOA BOSCH / SONODYNE / ATEIS / TOA

CEILING MOUNTED SPEAKER BOSCH / SONODYNE / ATEIS / TOA MICROPHONE 24/0.2 CABLE PVC CONDUITS BOSCH / SONODYNE / ATEIS / TOA FINECORE / VARSHA / DEEPANJAN VIP / AVON / NATIONAL

Architect: M/s.Plan-A Designtec Solution [P] Ltd., Bangalore MEP Consultant: M/s. Air treatment engineering [p] Ltd., Chennai

Page 43