Robes Design Consultancy Pvt. Ltd. Flat 8B, Amardeep Building , !arat bose Road "ol#ata $%%%&% KIND ATTN : Mr.S.K. Madhok, Dir !"or Dear !ir, !ub Re( ' ' E# !"ro$i! % #" & i'h r. our telecon ondate

)it* re(erence to t*e above +e are enclosing our o((er t*e Belt )eig*er (or your #ind perusal. Please note t*at +e *ave supplied and installed similar Belt +eig*ers at all most all t*e ma,or plants in -ndia. )e *ope t*at our o((er s*all be inline +it* your re.uirement and you +ill able to place t*e order in (avour o( us at an early date. Please (eel (ree to get in touc* +it* us (or clari(ications i( any. Assuring you o( our best attention at all times. /*an#ing you 0ours (ait*(ully, For !c*enc# Process 1-ndia2 Ltd.

A(a)ka$" Ka$*$'o E+Mai# : a.ka$*$'o,!a#.)-i#"d.$ "

-/34 ' 1 N.. M/LTI+ IDLER %ELT 0EI12ER T3PE %MP 04


5 F.R EA62 T3PE MATERIAL 7

5eneral in(ormation according to lea(let !67 %8e 9 !67 %8e. TE62NI6AL DATA ' 4A/3R-AL
Ferro C*romium Aluminum

B:L" D3;!-/0
<.8 .=

Fulspar Co#e Ferro silicate Ferromanganese Calicinated lime Dolomite !illicomanganese CAPAC-/0 5RA-; !-A3

.> %.8 <.% <.> .% .$ <.8 ' ' ' ' ' ' ' ' &%% ? >%% /P@. /o speci(y Ambient 1Assumed2 /o speci(y .8> ? .7> mCs. 8%% mm. <= Deg. /o speci(y

4A/3R-AL /34P3RA/:R3 4B-!/:R3 CB;/3;/ B3L/ !P33D B3L/ )-D/@ /RB:5@-;5 A;5L3 B3L/ -;CL-;A/-B;

CB;D30BR L3;5/@ 1CEC2 /A"3E:PC/3;!-B; ARRA;5343;/ ACC:RAC0

' ' '

/o speci(y 5ravity /a#e up 1recommended2 %.=F o( (ull scale +it*in %F to %%F o( maG capacity.

PreEre.uisites (or accuracy and installation o( Belt +eig*er according to enclosed speci(ication /B <&7C& *as to be maintained.. A !traig*t lengt* o( =m s*ould be available a(ter last (eed point.

S6.PE .F S/PPL3 43C@A;-CAL

' '

Basic design as per speci(ication /B >%C& 9 Dra+ing 3CP5=8< enclosed. !cope includes ' E E E E mec*anics +it* one no. Loadcell. Bne no. speed pic#Eup unit +it* pulse generator. Bne 6unction BoG.

Please note t*at our system does not re.uire any test +eig*t because our o((ered microprocessor based measuring unit -;/3CB;/ PL:! *as auto Calibration (acility. -t *as calibration interval setting +it* signal out put (or selectable intervals. 3L3C/R-CAL '

Control cubicle, completely +ired, tested, o( protection class -P =8 +it* basic dimensions ==%G&=%G8=%mm 1)HDH@2 *ousing 'E 4icroprocessor based measuring unit -;/3CB;/ PL:! according to enclosed broc*ure 67 %8m +it* digital display (or (lo+ rate and totalised counts. /*e (ollo+ing signals +ill be provided. no 8 E&% mA analog signal corresponding to (eed rate (or ClientIs PLC. Bne no. pulse output to+ards t*e corresponding value .

!+itc*gear section comprising o( isolating s+itc*, (uses, trans(ormer (or incoming supply. !pecial screened cable H 1& J&J&2 G %.= s..mm (or connection (rom t*e ,unction boG to t*e controller. )e are submitting our o((er (or t*e special screened cable as Per meter basis. /*is +ill be eGtra in addition to our o((er (or t*e belt +eig*er.

ADDITI.NAL FL.0RATE INDI6AT.R 8 T.TALISER Additional one no. (lo+ rate indicator and totaliser s*all be provided in a single enclosure. /*e additional Flo+ rate indicator +ill *ave display o( digital type, 8 digit display, and c*aracter *eig*t o( & mm. /*e /otaliser +ill *ave display o( digital type, > digit display and c*aracter *eig*t o( >mm. ;B/3 ' 2 8 sets o( idlers +ill be re.uired (or our system. )e +ill use t*e eGisting idlers o( t*e conveyor. /*e mac*ining o( t*ese idlers to an outEo(Eround tolerance o( %.& mm +ill be in ClientKs scope o( +or#. /*e single piece return idlers on t*e return belt side 1& on top o( belt on eit*er side o( tac*o pic#Eup +*eel2, s*all *ave to be mac*ined to an outE o(Eround tolerance o( %.= mm by client. All cables eGcept t*e special screened cable (or loadcell H 1&J&J&2 G %.= s..mm (or connection (rom ,unction boG to our controller s*all be in ClientKs scope.

&2

<2

PRI6E S62ED/LE

!L. ;B. . &. <.

D3!CR-P/-B; Belt +eig*er B4P %8 as per !cope o( supply. !pecial screened cable Additional Remote /P@ -ndicator and totaliser

L/0.

:;-/ BA!-C PR-C3 1-; R!.2 ,7=,%%%.%% =%.%% per metre Rs.&%,%%%.%%

/B/AL 3HE)"!. PR-C3 1-; R!.2 $,==,%%%.%%

7 no. As re.ui red. set

Rs.&%,%%%.%%

6.MMER6IAL TERMS 8 6.NDITI.NS PR-C3 '

'

Prices o((ered are 3GE)or#s, Ranc*i. Freig*t +ill be c*arged at actual. /ransit -nsurance in clientIs scope. ' 3Gtra M <F.

PAC"-;5 9 FBR)ARD-;5

/AH3! 9 D:/-3! ' 3Gcise Duty 9 !ales /aG +ill be c*arged eGtra at t*e rates prevailing at t*e time o( despatc*. @o+ever, t*e present rates are ' E 3.D. ' >.<&F. C.!./. ' 8F against NCN Form. 3;/R0 /AH ' -n ;alcoIs account DAL-D-/0 D3L-D3R0 ' >% days (rom t*e date o( o((er. ' = E >mont*s (rom t*e date o( receipt o( approved dra+ings. %%F payment against despatc* documents t*roug* ban#. /*e respective ban# c*arges +ill be to respective accounts. C*arges to+ards supervision o( 3rection and commissioning are to be paid +it*in $ days o( Deputation.

PA043;/ /3R4! '

)ARRA;/0

'

& mont*s (rom t*e date o( commissioning or 8 mont*s From t*e date o( supply +*ic* ever is earlier.

TERMS F.R S/PER9ISI.N .F ERE6TI.N 8 6.MMISSI.NIN1 . Bur engineer s*all be responsible (or !upervision )or# o( 3rection 9 Commissioning only. All necessary manpo+er, tools 9 tac#les re.uired (or t*e ,ob s*all *ave to be provided by Client (ree o( cost. &. Client s*all provide (ree lodging, boarding 9 (ooding (or our engineer during *is period o( stay. Any necessary to 9 (ro conveyance (rom site to place o( stay s*all be arranged by Client (ree o( cost. <. /o and (ro Conveyance c*arges 1A.C.&/2 (or our 3ngineer (rom Ranc*i to site and t*e incidental conveyance eGpenses (or our engineer *as to be paid by Client eGtra. 8. /*e deputation c*arges to+ards carrying out t*e supervision o( erection and commissioning o( our engineer s*all be c*argeable per day basis i.e. M Rs. =,8%%CE 1Five t*ousand 3ig*t *undred only2 per day. !ervice taG M %.& F s*all be eGtra.