Anda di halaman 1dari 56

Moving Towards Zero Breakdown

Ratanmani Kukreti

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Contents
Company Profile Group Structure Outline Of Company Products Customers Process Chain Of Precision Parts Approach Towards Zero Breakdown Step to achieve Zero Failure Case Study - 1 (Electrical Break Down) Case Study 2 (Mechanical Break Down) Results

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Group Structure :
SONAGroup Group SONA
Dr. Surinder Kapur Dr. Surinder Kapur

AUTO COMPONENTS
SONA KOYO SONA KOYO STEERING STEERING SYSTEMS SYSTEMS LTD. LTD.
JSAI JSAI SFAL SFAL SONA STAMPINGS SONA STAMPINGS

SERVICE
SONA SONA eDESIGN & eDESIGN & TECH. TECH.

MOBILITY
SONA SONA MOBILITY MOBILITY SERVICES LTD SERVICES LTD (SIXT) (SIXT)

GLOBAL
SONA AUTOCOMP SONA AUTOCOMP USA USA SONA AUTOCOMP SONA AUTOCOMP EUROPE EUROPE

SONA SONA OKEGAWA OKEGAWA PRECISION PRECISION FORGING LTD. FORGING LTD. SOPL, Pune SOPL, Pune SONA BLW SONA BLW PRECISION PRECISION FORGING FORGING EUROPE & USA EUROPE & USA

MAHINDRA MAHINDRA SONA LTD. SONA LTD.

KOYO SONA KOYO SONA ELECTRONICS LTD. ELECTRONICS LTD.

FAF FAF

GROUP SHARED SERVICES


CONTROLLER CONTROLLER LEGAL LEGAL IT IT FINANCE FINANCE CORP. AFFAIRS CORP. AFFAIRS

FUJI AUTOTECH FUJI AUTOTECH EUROPE EUROPE

FAB FAB FKC FKC FAAB FAAB

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Brief History
Sona Group is currently the largest manufacturer of steering systems and forged parts for passenger cars and utility vehicle market in India. The group turnover is over `40 Billion ($ 810 Mn) with number of employees over 3800. Sona group is diversified in auto components & services. It has 17 manufacturing plants with 4 companies overseas..
Technology Tie-Ups
1990

The Beginning
1985

Extending Partnership
1995

Growth for Domain Leadership


2000

Global Footprint

Laurels
2010

2005

Technical Agreement with Koyo for Manual Steering Gear and Column Sona Steering enters a JV agreement with Maruti Udyog Ltd. Sona Steering Systems Ltd. commences production

Incorporation of Sona Somic Lemforder Components Ltd. Incorporation of Mahindra Sona Ltd. Mahindra Sona acquired the MSL Division of M & M

Incorporation of Sona e-Design Koyo increases stake in Sona Koyo to 20.5% Sona Cold Forgings commences productions Sona Okegawa commences production of bevel gears for domestic market & exports

Sona Koyo Steering Systems Ltd. receives Deming Prize

New JVs JTEKT-Sona Automotive India Ltd. Sona Fuji Kiko Automotive Ltd. Sona Okegawa, Pune started commencing Production Acquisition Sona BLW Prazisionsschmiede GmbH formed

Awards Sona Okegawa Gurgaon Plant Received TPM Excellence Award

Technical Collaboration with Sona Steering Systems Ltd., a JV with Koyo for Power Maruti, lists through an Steering Gear IPO Joint Venture company formed with MMTLSona Okegawa Precision forgings Ltd.

Acquire 21% stake in Fuji Autotech France S.A.S. Merger of Sona Somic Lemforder and Sona Cold Forging Ltd.

Certifications Sona Okegawa Certified for IMS (QMS,EMS & OHSAS)

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Sona is a Company with a Global Footprint


Sona BLW Precision Forge
North Carolina, USA 100% Subsidiary of Sona Group

Fuji Autotech Europe


Mandeure, France Sona 17%

Sona AutoComp Europe


Montbeliard, France 100% Subsidiary of Sona Group

Sona BLW Przisionsschmiede Sona AutoComp USA


South Carolina, USA 100% Subsidiary of Sona Group 3 Plants in Germany 100% Subsidiary of Sona Group

Fuji Koyo Czech (FKC)

Sona Group India Fuji Autotech Brazil


16 Plants

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Sona Group - Overview


The Sona Group it one of Indias leading companies Turnover Employees 11/12: 11/12: > ` 40 billion ( $ 810 Million) > Over 3800

The Sona Group has a strong portfolio of established businesses that includes manufacturing and IT.
Manufacturing
SONA KOYO STEERING SYSTEMS SONA OKEGAWA PRECISION FORGINGS

INFORMATION TECHNOLOGY
SONA EDESIGN AND TECHNOLOGIES

MOBILITY SERVICES

MAHINDRA SONA

SIXT RENT A CAR

Steering and Driveline Systems

Propeller Shafts, Axle & Clutches

Forgings,Differentials

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Company Profile

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Plant Layout

Hall 1

Hall 2

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Milestones

2012

OHSAS 18001Sep12
2011 2009 2008 2007

TPM Excellence in Dec 2011 TPM Re-Kickoff in Jan2009 30th Jan Acquisition of Sona BLW TPM Kickoff & Diff. Case Assembly started. New Agreement Signed with MMTL

2006

2005 2004

Commercial Production Started at Pune Plant ISO 14001:1996/EN ISO 14001in Feb ISO / TS 16949 Certified in Nov. Synchronizer Ring Production Started 20th Nov. Commercial Production & Exports to Japan Started

2003

2002

1998

1995

JV Company Promoted by Sona Koyo in Collaboration with MMC, Japan

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Products

2/26/2013

Sona Okegawa Precision Forgings Ltd.

10

Product Range

Rear axle Propeller shaft Clutch diaphragm

Differential Assembly

Bevel Gear

Speed Gear

Seat Recliner

Steering Gear Assy

Steering column

11

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Main Products
Over 250 Parts

2/26/2013

Sona Okegawa Precision Forgings Ltd.

12

Key Products
Precision Forged (net shaped) Bevel Gears, Differential Case Assemblies and Synchronizer Rings for Automotive and Other applications.

Customers
Passenger car & SUV Commercial Vehicles Tractor Off Highway Equipments Farm Equipment Construction Equipments

Fiat India (SKSSL) Mahindra & Mahindra Maruti Suzuki Spicer India Ltd. Suzuki Powertrain Tata Motors Ltd. (SKSSL)

Albion Automotive American Axle Automotive Axle Axle India Axle Tech Diamler India Force Motors HV Axle Spicer India Tata Motors Volvo Eicher

Carraro India Escorts Tractors International Tractors Ltd. John Deere Mahindra & Mahindra Mahindra Swaraj New Holland India TAFE TMTL (Eicher)

Dana India Grazziano Lombardini Mahindra & Mahindra Mahindra Swaraj New Holland india TAFE TMTL (Eicher)

Case New Holland (USA) John Deere (Iberica) Tirth Agro

JCB

2/26/2013

Sona Okegawa Precision Forgings Ltd.

13

Process Chain of Precision Parts

Die Manufacturing

Precision Hot Forging on Conventional press lines 300 t bis 1250 t

Cold Coining of the functional surface with hydraulic press lines 700 t

Machining on full automatic cutting lines

Design

Broaching of precision forged parts

Continuous quality from tooling to finished part

Flexible packaging according to customers requirements

Heat Treatment exactly matching to product requirements

Automotive World 2/26/2013

Sona Okegawa Precision Forgings Ltd.

14

Facilities
Forging Capabilities
Forging Press Capability Type
Servomotor Driven (Simplex) Friction Driven (Duplex) Friction Driven (Duplex) Servomotor Driven (Simplex) Servomotor Driven (Simplex) Servomotor Driven (Simplex)

Friction Driven (800 Ton) Wt.


10 Kg

Age

Qty. L
300 mm

1250 Ton

2 Yrs

200 mm

800 Ton

14 yrs

180 mm

220 mm

6.5 Kg

400 Ton

14 yrs

115 mm

75 mm

2 Kg

400 Ton

5 yrs & 8 yrs

Servomotor Driven (1250 Ton)


2 90 mm 70 mm 1 Kg

400 Ton

1 yrs

90 mm

70 mm

1 Kg

300 Ton

5 yrs

65 mm

30 mm

0.6 Kg

2/26/2013

Sona Okegawa Precision Forgings Ltd.

15

Facilities
Machining Capabilities
Machine
Automated CNC Turning Centre CNC Turning Center Vertical Turning Lathe Angular Head Grinder Drilling & Tapping Center Broaching Centerless Grinder Honing Hobbing CNC Gear Hobbing SPM (Case Line) Shaving

Make
Mazak Takisawa, Mazak, Ace, LMW Takishawa Micromatic AMS, Fanuc Taiga, Cranebell HMT Nagel Cooper Mitsubishi Tasa Kanzaki

Age
1yr 1 Yr. to 14 yrs 1yr 7 months to 12 yrs 1Yr to 4 yrs 6 yrs to 14 yrs 1 Yr 14 yrs 22 yrs 1 yr 10 yrs 1 yr

Qty.
6 Nos. 35 Nos. 3 No. 3 Nos. 3 Nos. 2 Nos. 1 No. 1 No. 2 Nos. 1No. 4 Nos. 1 No.

2/26/2013

Sona Okegawa Precision Forgings Ltd.

16

Facilities
Heat Treatment

Machine

Make

Age

Capacity

Qty.

5 yrs Sealed Quench Furnace Line Oriental Engg. Japan 6 yrs 12 yrs IPSEN India Nitriding Furnace IPSEN India 1 yrs 1 Yrs

1000 Kg 1000 Kg 600 Kg 1200 Kg 600 Kg

3 Nos. 3 Nos. 3 Nos. 4 Nos. 1 No.

Processes:
Case Carburizing Carbo Nitriding Hardening
2/26/2013 Sona Okegawa Precision Forgings Ltd. 17

Facilities: Design & Development Software

Solid Edge V20

Deform-Form Simulation

Unigraphics-NX7

ANSYS
2/26/2013

HYPERMILL
Sona Okegawa Precision Forgings Ltd.

Frenco Spline Software


18

Quality Assurance - Process Validation

Pyrometer For Billet Temp.

Load & Pressure Gauge For Forging Press

Pressure Gauge For Coining Press

Dial & Gauges For Inspection

Forging

Coining

Soft Machining

Sequential Pokayoke

100 % Gauging Inspection

100 % Visual Inspection

Air Gauges & Dial For Inspection

Diff. Case Assembly

Process Confirmation

Visual Inspection

Hard Machining

2/26/2013

Sona Okegawa Precision Forgings Ltd.

19

Quality Assurance- Metrology & Metallurgical Lab

Bearing Contact Tester

CMM

Gear Accuracy Tester

Metallurgical Microscope
2/26/2013

Micro Vickers Hardness Tester


Sona Okegawa Precision Forgings Ltd. 20

Sona Vision 2020

VISION

Create a Company That India is Proud of


MISSION

To Make Sona A Partner Of Choice to Global Customers


An organization of energized and involved employees.

MOTTO

Think!

Growing and achieving high profitability. Supplying to major global OEMs directly or indirectly. At least 50% of sales overseas, Be #1 in every business line

Respect for the Individual

Service to the Customer

Excellence in the pursuit of our Goals


21

2/26/2013

Sona Okegawa Precision Forgings Ltd.

Inter-relation of Companys overall Policies

2/26/2013

Sona Okegawa Precision Forgings Ltd.

22

Planned Maintenance Organisational Structure :

2/26/2013

Sona Okegawa Precision Forgings Ltd.

23

Relation Between TPM Policy And PM Pillar:

TPM Policy To enhance the operational efficiency and equipments by achieving Zero breakdowns and Zero defects Optimization of process and resources Create Visual Factory

Planned Maintenance Pillar Data collection of all the break down, break down matrix, why-why analysis and implementing PM,CBM and TBM activities Optimization of process and resources by eliminating minor stoppage and re-storing optimal condition Expose losses and problems

Trained ,Skilled and Motivated Motivations by autonomous maintenance employees for the first time right job and Implementing MP Kaizen To achieve a safe and green factory through Zero accidents and Zero Pollutions
2/26/2013

By eliminating un-safe conditions, arresting air, oil and water leakage and conservation of natural resources
24

Sona Okegawa Precision Forgings Ltd.

Methodology to achieve Zero Break Down

2/26/2013

Sona Okegawa Precision Forgings Ltd.

25

Zero Breakdown Approach

OPERATION (Operator error, Fatigue, Equipment & personnel safety)

ENHANCING RELIABILITY (Accelerated Deterioration, Restoration & Improvement of Equipment Condition)

ENHANCING DESIGN ( Uncontrolled Stresses & Insufficient Stress) Problem Discussion with DM team Problem Analysis

Problem Discussion with J-H

Problem Discussion with PM team

Problem Analysis with J-H

Problem Analysis with Electrical & Mechanical Engineers

DO FMEA

Root Cause Analysis

Root Cause Analysis

Release DCN(Design Change Note)

NO

Countermeasures

Countermeasures

Implementation of Design Changes

NO
Implementation of Countermeasures

Implementation of Countermeasures

Monitor for 3 Months Raise MP Sheet / Update Standards Horizontal Deployment

IF OK
Horizontal Deployment

Raise MP Sheet / Update Standards

IF OK
Horizontal Deployment

2/26/2013

Sona Okegawa Precision Forgings Ltd.

26

Activity :

Step Wise Activity for Zero Break Down


Step
Step-1

Activity
Maintaining Basic Condition

Step-2

Restoring or Preventing Deterioration

Step-3

Maintaining Operating Standards

Step-4

Time Based Maintenance

Step-5

Predictive Maintenance (CBM)

2/26/2013

Sona Okegawa Precision Forgings Ltd.

27

Step 1 Maintaining Basic Condition

Jishu- Hozen
Initial Cleaning

Keikaku - Hozen
Analysis of Present Status

2/26/2013

Sona Okegawa Precision Forgings Ltd.

28

Step 2 Restoring Or Preventing Deterioration

Jishu- Hozen
Counter Measure Against SOC & HTA

Keikaku - Hozen
Restoration and Improvement of the Deteriorated Equipment

2/26/2013

Sona Okegawa Precision Forgings Ltd.

29

Step 3 Maintaining Operating Standards


Jishu- Hozen
Draft Tentative Cleaning, Oiling & Inspection Standards

Keikaku - Hozen
Tentative Standard Maintenance Procedure

2/26/2013

Sona Okegawa Precision Forgings Ltd.

30

Step 4 Time Based Maintenance


Keikaku - Hozen
Time Based Maintenance Methodology Example

2/26/2013

Sona Okegawa Precision Forgings Ltd.

31

Step 5 Predictive Maintenance (Cbm)


Keikaku - Hozen
Predictive Maintenance (CBM) Methodology Example

2/26/2013

Sona Okegawa Precision Forgings Ltd.

32

CASE STUDY

2/26/2013

Sona Okegawa Precision Forgings Ltd.

33

Equipment

Induction Heater

Forging Press

Slow Cooling Conveyor

2/26/2013

Sona Okegawa Precision Forgings Ltd.

34

Failure Analysis :- Analysis by Branch wise Stratification of Mechanical & Electrical Failure ( Nos./Branch) 400 Ton press

2/26/2013

Sona Okegawa Precision Forgings Ltd.

35

Failure Analysis :- Analysis by Equipment Wise (Electrical)

Total 17 Phenomenon

2/26/2013

Sona Okegawa Precision Forgings Ltd.

36

Design Change Kaizen (Electricals)

Case Study- No. 1


1. Problem Description:- Convertor Failure Occurrence in Induction Heater Resulting in Tripping Equipment Under Study- 250 KW Induction Heater
Induction Coil Pusher Capacitor Bank Billet Loader Induction Heater
2/26/2013 Sona Okegawa Precision Forgings Ltd. 37

Design Change Kaizen (Electricals)

Case Study- No. 1


2. Kaizen Theme:- To Eliminate Induction Heater Failure 3. Data Collection:- Phenomenon wise Break Down Data for 250 Kw induction

S.NO.

Phenomenon
Induction Heater Trip Converter Failure LMD Wheel Not Working Temp Problem Starting Failure Bus Bar Clamping Problem Over Frequency Alarm

F08

F09

F10

F11

F12

F13 (Till 10 Jul' 2012)

Break Down Frequency 1 2 3 4 5 6 7 53 17 14 4 1 0 0 14 6 3 1 1 3 0 59 21 10 3 1 12 0 16 10 3 3 1 3 2 20 6 0 44 1 1 0 4 5 0 10 7 0 0

2/26/2013

Sona Okegawa Precision Forgings Ltd.

38

Case Study- No. 1 4. Root Cause Analysis


Problem:- Induction Heater Tripping
Why Phenomenon
Why -1 Converter Failure

Problem:- Induction Heater Tripping


Why Phenomenon
Why -1 Converter Failure

Answer
Dc Voltage Is Not Converted In To Ac Single Phase Inverter Circuit does Not perform Thyrister Blow off Not Known

Action
Check Inverter Section Check Protection Circuit Replace Thyrister

Answer

Action
Reset Induction Heater

Dc Voltage Is Not Converted In To AC Why-2 Single Phase Inverter Circuit does Why-3 not perform Why-4 Thyristor Blow off

Problem:- Temperature Variation


Why Phenomenon
Billet Temperature Why -1 Drops

Answer

Action
Stop Induction Heater and reset

Problem:- Induction Heater Tripping


Why Phenomenon Answer
Dc Voltage Is Not Converted In To Ac Single Phase

Action
Check Inverter Section Replace Thyrister Provide More Cooling

Why -1 Converter Failure Dc Voltage Is Not Converted In To Ac Why-2 Single Phase Thyrister Failure Why-3 Thyrister Failure

Insufficient Cooling Water Pressure (1kg/Cm2) & Flow (11 Lpm) Is Less At Heat Increase Water Why-4 Insufficient Cooling Exchanger Inlet Pr. & Flow Water Pressure (1kg/Cm2) & Flow (11 Lpm) Is Less At Increase Pump Why-5 Heat Exchanger Inlet Pump Efficiency Is Low Efficiency

Every Individual part of the induction Heater was replaced with New part including PCB cards, But Problem could not be solved

2/26/2013

Sona Okegawa Precision Forgings Ltd.

39

Case Study- No. 1


What Next When No Root Cause is found ?

Why- Induction Heater Not Working ? Why- Convertor Failure Caption Illuminate ?

Why- Over Voltage, Over Frequency & Starting Failure LED "Glow " inspite of all the parameter within range ? Why- Temperature drop in Billet when 41 & above Diameter is heated ?

4. Brain Storming

Cross Functional Team


Name Mr. Vipin Mr. Vivek Mr. Jaideep Mr. Amit Sharma Mr. Mukesh Mr. Harcharan Mr. Multan
2/26/2013

Dept. Manufacturer Manufacturer Project Design Project Design Maintenance Maintenance Maintenance
40

Sona Okegawa Precision Forgings Ltd.

Case Study- No. 1 5. Design Change for Electrical & Electronic Circuit

12 PCB cards are attached to one Mother board with interlocking to each other

2/26/2013

Sona Okegawa Precision Forgings Ltd.

41

Case Study- No. 1 6. Outcome One Single Card was developed 7. Result For Induction Heater

2/26/2013

Sona Okegawa Precision Forgings Ltd.

42

Case Study No.- 2

2/26/2013

Sona Okegawa Precision Forgings Ltd.

43

Case Study- No. 2


1. Problem Description:- Interruption Due to Die Lubricant Equipment Under Study- Die Lubricant System
Die Lubrication Tank Diaphragm Valve with solenoid coil

Stirrer
Tank
2/26/2013

Pump

Diaphragm Valve with solenoid coil


44

Sona Okegawa Precision Forgings Ltd.

Design Change Kaizen (Mechanical)

Case Study- No. 2


2. Kaizen Theme:- To Eliminate Die Lube Breakdown Phenomenon 3. Data Collection:- Phenomenon wise Break Down Data for 400Ton Forging Press
Phenomenon
DIE LUB NOT WORKING INDUCTION HEATER TRIP MIDDLE CONVEYOR NOT WORKING PRESS NOT WORKING UP & DOWN PRESS LOAD PROBLEM COIL LEAKAGE / WATER PIPE LEAKAGE CONVERTER FAILURE EJECTOR PIN NOT WORKING LMD WHEEL NOT WORKING FOOT SWITCH NOT WORKING

S.NO.

F08

F09

F10

F11

F12

Break Down Frequency 1 2 3 4 5 6 7 8 9 10 81 53 34 27 0 26 17 16 14 11 39 14 9 10 16 24 6 14 3 2 81 59 0 30 13 0 21 0 10 6 80 16 0 26 6 0 10 0 3 0 108 20 0 16 9 0 6 0 0 5

2/26/2013

Sona Okegawa Precision Forgings Ltd.

45

Case Study- No. 2


4. Root Cause Analysis
PROBLEM:- INTERRUPTION DUE TO DIE LUBE FLOWING CONTINUE FROM VALVE
WHY PHENOMENON
DIE LUBE FLOWING WHY CONTINUOSLY FROM 1 NOZZLE WHY- DIE LUBE VALVE REMAIN 2 OPEN

PROBLEM:- MTTR IS HIGH


WHY PHENOMENON ANSWER
FAULT DIAGNOSYS IS TIME CONSUMING

ANSWER
DIE LUBE VALVE REMAIN OPEN

ACTION
CLOSE DIE LUBE VALVE ALLOW DIAPHRAGM TO SETTLE PROPERLY CLEAN DIAPHRAGM OF VALVE ELIMINATE SHARP BENDS

ACTION
MAKE FAULT DIAGNOSYS EASY

WHY -1 MTTR IS HIGH

VALVE DIAPHRAGM RAISED FROM ITS SEATING

WHY-2

FAULT DIAGNOSIS IS TIME CONSUMING FIVE TIMERS , CONTACTORS AND RELAYS ARE INTER CONNECTED WITH TOO MANY WIRES

FIVE TIMERS , CONTACTORS AND RELAYS ARE INTER REDUCE THE CONNECTED WITH TOO MANY WIRE WIRES CONVERT RELAY ELECTRICAL CIRCUIT IS MADE LOGIC TO PROGRAMME WITH RELAY LOGIC LOGIC

DIE LUBE SEDIMENTS WHY- VALVE DIAPHRAGM RAISED ACCUMULATE IN DIAPHRAGM 3 FROM ITS SEATING SEAT DIE LUBE SEDIMENTS WHYSHARP BEND IN DIE LUBE ACCUMULATE IN 4 TRANSFER PIPE LINE DIAPHRAGM SEAT WHY- SHARP BEND IN DIE LUBE 5 TRANSFER PIPE LINE

WHY-3

DIE LUBE TANK TOO FAR FROM BRING TANK NEAR THE PRESS TO THE PRESS

PROBLEM:- INTERRUPTION DUE TO DIE LUBE FLOWING CONTINUE FROM VALVE


WHY PHENOMENON ANSWER ACTION
DIE LUBE FLOWING WHY - CONTINUOSLY FROM NOZZLE 1 CLOSE DIE LUBE DIE LUBE VALVE REMAIN OPEN VALVE ALLOW DIAPHRAGM TO DIE LUBE VALVE REMAIN VALVE DIAPHRAGM RAISED SETTLE OPEN FROM ITS SEATING PROPERLY CLEAN DIE LUBE SEDIMENTS VALVE DIAPHRAGM RAISED ACCUMULATE IN DIAPHRAGM DIAPHRAGM OF FROM ITS SEATING SEAT VALVE CLEAN PILOT DIE LUBE SEDIMENTS ACCUMULATE IN PILOT PRESSURE ORIFICE IS RESSURE DIAPHRAGM SEAT CLOGGED ORIFICE DIE LUBE SEDIMENTS ACCUMULATE IN PILOT INCREASE ORIFICE ORIFICE SIZE IN ONLY 1MM ORIFICE SIZE STANDARD DESIGN CHANGE DESIGN

PROBLEM:- INTERRUPTION DUE TO DIE LUBE NOT FLOWING FROM VALVE


WHY PHENOMENON ANSWER ACTION
OPEN DIE LUBE VALVE WHY - DIE LUBE STOPS FLOWING DIE LUBE VALVE DOES NOT 1 FROM NOZZLE OPEN

WHY2 WHY3 WHY4

WHY- DIE LUBE VALVE DOES NOT REMOVE 2 OPEN VALVE OUTLET GETS CLOGGED CLOGGING DIE LUBE SEDIMENTS WHY- VALVE OUTLET ORIFICE ACCUMULATE AT THE OUTLET 3 GETS CLOGGED ORIFICE OF VALVE CLEAN VALVE DIE LUBE SEDIMENTS WHY- ACCUMULATE AT THE 4 OUTLET ORIFICE OF VALVE WHY5 ORIFICE SIZE IN 1MM INCREASE ORIFICE SIZE CHANGE DESIGN

ORIFICE SIZE IN ONLY 1MM STANDARD DESIGN

WHY5 WHY6 ORIFICE SIZE IS 1MM

2/26/2013

Sona Okegawa Precision Forgings Ltd.

46

Case Study- No. 2


4. Design Change for Die lube Pump and Valve

PROBLEM:- INTERRUPTION DUE TO DIE LUBE FLOWING CONTINUE FROM VALVE

06 DIAPHRAG M VALVES ARE USED FOR SPRAYING DIE LUBE

WHY PHENOMENON

ANSWER

ACTION

1 MM ORIFICE
2/26/2013

DIE LUBE FLOWING WHY - CONTINUOSLY DIE LUBE VALVE REMAIN CLOSE DIE 1 FROM NOZZLE OPEN LUBE VALVE ALLOW DIAPHRAGM VALVE DIAPHRAGM DIE LUBE VALVE RAISED FROM ITS TO SETTLE WHY-2 REMAIN OPEN SEATING PROPERLY VALVE DIAPHRAGM DIE LUBE SEDIMENTS CLEAN RAISED FROM ITS ACCUMULATE IN DIAPHRAGM WHY-3 SEATING DIAPHRAGM SEAT OF VALVE DIE LUBE SEDIMENTS CLEAN PILOT ACCUMULATE IN PILOT PRESSURE RESSURE WHY-4 DIAPHRAGM SEAT ORIFICE IS CLOGGED ORIFICE DIE LUBE SEDIMENTS ACCUMULATE IN ORIFICE SIZE IN ONLY INCREASE WHY-5 PILOT ORIFICE 1MM ORIFICE SIZE ORIFICE SIZE IS CHANGE WHY-6 1MM STANDARD DESIGN DESIGN

Sona Okegawa Precision Forgings Ltd.

47

Case Study- No. 2


5. Design Change for Die lube Pump and Valve

02 Rotary Actuator with less bends Introduced

2/26/2013

Sona Okegawa Precision Forgings Ltd.

48

Case Study- No. 2


4. Design Change for Die lube Pump and Valve

2/26/2013

Sona Okegawa Precision Forgings Ltd.

49

Kaizens done to eliminate Breakdown Phenomenon

2/26/2013

Sona Okegawa Precision Forgings Ltd.

50

Result for Die Lubrication Problem


YEAR Phenomeno n 81 Reason F08 Die Lub. Valve Choke Timer Setting Disturb Die Lub .Pump Problem Relay Loose / Faulty Air Setting Disturb Die Lub Pipe / Line Choke Die Lub Sensor / Cable Problem DIE LUB Die Lub Stand Broken NOT Die Lub Fitting Wear / WORKING Broken Die Lub Valve Coil Faulty / Loose Die Lub Filter Choke MCB Trip / Supply Missing Air Pressure Disturb Wire Loose / Short Die Lub Cylinder Mounting Loose / Jam Die Lub Tank Empty 38 7 13 5 2 7 9 0 0 0 0 0 0 0 0 0 81 F09 28 3 0 3 0 0 0 1 4 0 0 0 0 0 0 0 39 F10 38 2 9 0 0 6 2 0 3 6 13 1 1 0 0 1 82 F11 30 2 12 1 0 2 0 0 0 6 23 0 0 4 0 0 80 39 82 80 108 50 0 52 2 Counter Measures Jan-13 0 0 0 0 0 0 0 0 0 0 0 1 0 0 1 0 2 JH step 4 & 5 implementation JH step 4 & 5 implementation JH step 4 & 5 implementation JH Step 3 Diaphragm Valve Replaced with Rotary Actuator Relay Logic with timer Changed to PLC with MMI Pump Removed & Gravity Feeding Started From a height of 6 Mtr. Relay Logic Changed to PLC JH Step 3 No. of Bends Reduced & SS pipe introduced Relay Logic Changed to PLC JH Step 3 No. of Bends Reduced Diaphragm Valve Replaced with Rotary Actuator Filtering element Removed & Stirer system Design Improved

F13 DecF12 (NOV 12 12) 32 0 23 1 0 23 1 0 4 2 19 0 1 2 0 0 108 6 0 12 0 0 19 1 0 4 0 0 0 2 2 2 0 48 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2/26/2013

Sona Okegawa Precision Forgings Ltd.

51

Distribution of Kaizen to achieve Zero Break Down

2/26/2013

Sona Okegawa Precision Forgings Ltd.

52

Counter Measure :- %age Contribution of Activities

2/26/2013

Sona Okegawa Precision Forgings Ltd.

53

Background :

2/26/2013

Sona Okegawa Precision Forgings Ltd.

54

Distribution of Kaizen to achieve Zero Break Down Zero Break Down Machine Category Criteria for Zero B/D
Zero B/D for last > 10 to 12 Month (<5 Hrs./ month) Zero B/D for last 7 to 9 Month (<5 Hrs./ month) Zero B/D for last 4 to 6 Month (<5 Hrs./ month) Zero B/D for last 2 to 3 Month (<5 Hrs./ month) Zero B/D for last 1 to 2 Month (<2 Hrs./ month)

No of Machine

Platinum

18

Diamond

16

Gold

33

Silver

51

Bronze

72

2/26/2013

Sona Okegawa Precision Forgings Ltd.

55

Thank You

2/26/2013

Sona Okegawa Precision Forgings Ltd.

56

Anda mungkin juga menyukai