PROJECT: TULJAPUR WATTER SUPPLY SCHEME

OWNER: MAHARASHATRA JEEVAN PRADHIKARAN LATUR/OSMANABAD


EPC CONTRACTOR: MEGHA ENGINEERING & INFRASTRUCTURE LTD.
CONSULTANT: SIDDHI CONSULANTING ENGINEERS.
TITLE: GTP FOR AUTO TRANSFORMER PANEL
MEIL DRG. NO.: MEIL/TUL/EQP/EO5E

QUALITY ASSURANCE PLAN

LEGENDS
A) Agency
M:- MANUFACTURER
C:- CONTRACTOR
O:- OWNER
W: - WITNESS.
R:- REVIEW OF INTERNAL TEST REPORTS/CFTS.
P:- PERFORM
B) Type Of Check
CR
MA
MI
CHP

- Critical.
- Major.
- Minor
- Check Point next stage of manufacturing to be started only after the hold point is cleared by QAD.

C) Others.
PO.
MIR
QAR
QAD
TC
DRG

- Purchase order on our vendor / Supplier.


- Material inward register.
- Internal Quality Report.
- Quality Assurance Department.
- Test Certificate submitted by Supplier / Manufacturer.
- Approved Drawings.

Page 1 of 3

PROJECT: TULJAPUR WATTER SUPPLY SCHEME


OWNER: MAHARASHATRA JEEVAN PRADHIKARAN LATUR/OSMANABAD
EPC CONTRACTOR: MEGHA ENGINEERING & INFRASTRUCTURE LTD.
CONSULTANT: SIDDHI CONSULANTING ENGINEERS.
TITLE: GTP FOR AUTO TRANSFORMER PANEL
MEIL DRG. NO.: MEIL/TUL/EQP/EO5E
1.
INPROCESS INSPECTION.
FABRICATION
Sr.
No
1

CHARACTERISTICS

Dimensional Conformity,
Alignment, Finishing
Appearance.

CLAS
S

TYPE OF
CHECK

MA

Measuremen
t / Physical
Verification

QUANTUM
OF CHECK

REFERENCE
DOCUMENTS

2.
3
4

Busbar Phase Sequence

1.

FORMAT /
RECORD

AGENCY
M C O

P
100 %

DRG

Sr.
CLAS
TYPE OF
QUANTUM
REFERENCE
CHARACTERISTICS
No
S
CHECK
OF CHECK
DOCUMENTS
ASSEBLY ( Electrical Component assembly, Layout Mounting Arrangement and Clearance )

Dimensional Conformity /
Mounting / Layout of
Busbars and components /
Rigidity
/
tightness
/
Correctness / Accessibility to
various parts, Clearance
BOQ
Wiring

ACCEPTANCE
NORMS
DRG

QAR

ACCEPTANCE
NORMS

FORMAT /
RECORD

AGENCY
M C O

P
CR

Physical
Verification

Sampling
10%

CR
CR

Visual
Visual

CR

Visual

MA

Measuremen
t

MA

Physical
Verification

R R

R R

DRG

DRG

QAR

100%
100%
Sampling
10%

DRG
DRG

DRG
DRG

QAR
QAR

DRG

DRG

QAR

P W W
P R R
P R R

Random

DRG

DRG

QAR

P W W

FINAL INSPECTION.
1.
2.

3.

Dimensional Conformity
Components,
Busbar
terminals name plates and
BOQ
Terminal Arrangement, Bus
bar
supports,
Tightness,
Clearance, Completeness of
wiring, Continuity of circuit
& earthing

P W W
100%

DRG

DRG

QAR
P W W

MA

Physical
Verification

100%

DRG

DRG

QAR

Page 2 of 3

PROJECT: TULJAPUR WATTER SUPPLY SCHEME


OWNER: MAHARASHATRA JEEVAN PRADHIKARAN LATUR/OSMANABAD
EPC CONTRACTOR: MEGHA ENGINEERING & INFRASTRUCTURE LTD.
CONSULTANT: SIDDHI CONSULANTING ENGINEERS.
TITLE: GTP FOR AUTO TRANSFORMER PANEL
MEIL DRG. NO.: MEIL/TUL/EQP/EO5E

6.

Mechanical operational tests


for Circuit breakers, Out
going feeders and Aux
devices etc.
Operational Tests / Checking
for inter locking
Meggar Test

7.

HV Test

4.

5.

P W W
MA

Physical
Verification

Sampling
10%

MA

Tests

100%

CR

Tests

100%

CR

Tests

As per
customer
demand

Std Engg Practice

Std Engg Practice

DRG / Std Engg


Practice
IS 8623

DRG Std Engg


Practice
2 M Ohms & Above
Should withstand
2.5/1.5 Kv for 1
Min

IS 8623

QAR
QAR
QAR
QAR

P W W
P W W
P W W

Page 3 of 3