Anda di halaman 1dari 5

DETAILED SYLLABUS FOR PROJECT MANAGEMENT

DIMENSIONAL ACADEMY OF ENGINEERING

DETAILED SYLLABUS FOR PROJECT MANAGEMENT

DIMENSIONAL

3A, LITTLE MALABAR HILL, ANAND NAGAR, BEHIND CANARA BANK, NEAR CHAGAN MEETHA PETROL PUMP, CHEMBUR ( EAST) , MUMBAI 400 074 TEL NO 9867496052, 022 32153052.

ACADEMY OF ENGINEERING,

DIMENSIONAL

ACADEMY OF ENGINEERING, MUMBAI, 9867496052.

DETAILED SYLLABUS FOR PROJECT MANAGEMENT

1. Introduction. 2. Terminology. 3. Business Model. Parties, Types of contract 4. Design Build Contracts. Brief, Advantages 5. Agency CM. 6. CM at Risk. 7. Units & scales. Scales SI & British units, Conversions. 8. Method of Planning & Scheduling. Conventional Methods Gantt/Bar chart. Milestone chart. Flow chart. Network Methods Critical Path Method CPM. Program me Evolution & Review Technique PERT. 9. Advantages of PERT/CPM. 10. Elements of Network Network. Activity. Event. Dummy Activity. 11. Rules to be followed for drawing Network 12. Development of Network 13. To Estimate Project Duration Estimation of activity duration time (te) Single time estimate. Third time estimate. Estimation of earliest expected event time (TE) Estimation of latest allowable event time (TL) Calculation of event slack

DIMENSIONAL

ACADEMY OF ENGINEERING, MUMBAI, 9867496052.

DETAILED SYLLABUS FOR PROJECT MANAGEMENT

14. Identification of the Critical Path 15. Compressing the Critical path 16. Start & Finish Time of activity Earliest activity start time ( E.S.) Earliest activity finish time ( E.F.) Latest activity finish time ( L.F.) Latest activity start time ( L.S.)

17. Activity Slack or Float Total activity float. Free float. Independent float.

18. Analysis & Scheduling of Network

MICROSOFT

PROJECT MANAGEMENT

Activities, Calendars - Definitions, Sequencing & estimate duration How to develop a schedule plan and control Network analysis-CPM, PERT, PDM How to prepare Work Breakdown Structure (WBS) How to define WBS Constraints How to manage cost in a project How to do Resource Planning and Cost Estimation How to prepare Resource Sheet How to apply resource to each activity DIMENSIONAL ACADEMY OF ENGINEERING, MUMBAI, 9867496052.

DETAILED SYLLABUS FOR PROJECT MANAGEMENT


How to define Resource Pool and to allocate Resources Filters and Grouping How Material Resources are being allocated Analyzing Resources and Earned Value Analysis Method of developing different types of reports according to industrial needs Method of developing different types of reports according to industrial needs Scheduling in multiple projects Customization

PRIMEVERA
Course Description (PRIMAVERA 6) Calendars defining hourly, daily, weekly calendar Project Port folio Management Defining the Enterprise Project Structure (EPS)/td> Defining Organisation Breakdown Structure (OBS) Defining the Project Structure under the EPS Activities Definition, sequencing & Estimating duration Effectively using the four types of PDM relationship Scheduling the project Defining constraints & overcoming conflicts Defining & Assigning activity codes Defining & assigning WBS codes How to organize the activities by using activity Codes & WBS codes Filtering activities Defining and assigning Work products and Documents Changing currency setting Defining Roles Defining Resources

DIMENSIONAL

ACADEMY OF ENGINEERING, MUMBAI, 9867496052.

DETAILED SYLLABUS FOR PROJECT MANAGEMENT


Assigning by Roles Assigning by resources Estimating the cost of the project How to analyse the resource by using resource profile & resource table How to do resource leveling Defining project codes and resource codes Updating the project progress & comparing the actual progress with baseline Analysing earned value management Preparing different types of tabular reports according to the industrial needs Preparing Graphical reports Highlighting the progress in the bar chart Application of Global change Using Methodology Management Project

DIMENSIONAL

ACADEMY OF ENGINEERING, MUMBAI, 9867496052.

Anda mungkin juga menyukai