NO.

URAIAN PEKERJAAN

Rincian

A. SEWA PERALATAN & PERLENGKAPAN 1 Rigging Stage,Sound Screen 2 Soundsystem + 2 Set Alat Band 3 Lighting 4 Multimedia Proffesional Animator Computer Production Laptop Highend Production (Macbook Pro) Profesional VJ (Visual Jockey) Media Server VJ Controller Equipment Cameramen Camera Video Jimmy Jib & Operator Video Mixer & Operator Multimedia Projector 6000 AL Computer Production Datation Computer Display Datation Datation System Transportasi Engineer Akomodasi Cargo 5 Generator Set 85 KVA 6 Generator Set 250 KVA 7 Pagar Barikade 8 Rigging VIP 9 Level VIP 10 Tenda Sarnafil Artis & Pengisi Acara 11 Kursi Futura & Cover 12 Meja VIP 13 AC Outdoor (Ruang Tunggu Artis) 14 Property & Design Stage Mobilisasi pekerja Listrik Kerja Akomodasi Pekerja Dinding Plywood Pekerjaan Pasangan Rangka Kasau 5/7 Pekerjaan Pasangan Kayu 5/9 Pekerjaan Pasangan Kayu 6/12

24x16 80000 watt 200000 watt

Sby-Kdi-Sby

250m x 5 12x10 250x5 5x2 300 Bh x 5

Paku 3" Untuk Kayu Paku 10" Paku 7" Paku Plywood Printing Backdroop

B. JASA PROFESI

C. TRANSPORTASI

D. PAMERAN SULTRA EXPO 2014

E. PUBLIKASI DAN DOKUMENTASI

F. BELANJA NON OPERASIONAL

VOLUME

HARGA SATUAN SATUAN Rp

JUMLAH HARGA (Rp)

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari Hari

21,000,000 45,000,000 35,000,000

1 5 5 1250 5 1250 10 1500 5 5

Ton Hari Hari Hari Hari m2 Hari Bh Hari Hari

25,000,000 5,500,000 10,000,000 35,000 7,500,000 30,000 550,000 22,500 250,000 1,250,000

105,000,000 225,000,000 175,000,000 25,000,000 27,500,000 50,000,000 43,750,000 37,500,000 37,500,000 5,500,000 33,750,000 1,250,000 6,250,000 -

1 14 9 8

Paket m2 m3 m3 m3

20,000,000 1,650,000

20,000,000