(***) Please do not merge cells. Incident Incident Title ID (Date) 2-Jan Tool EBO 012 tripped 2-Jan Tool SEM's RCBO 20A tripped at FA Lab Incident of Branch line 110kV Thuc Duc Dong
Equipment
EBO 012
SEM 04
6-Jan
6-Jan
Tripped CB of ACL022
ACL022 tool
7-Jan
Tripped CB of GSC00005
CAM003
7-Jan
Tool SEM's RCBO 20A tripped at FA Lab Water leakage on PCWR pipe of EBO004 The wire burnt at socket out let at WC#1 Tripped MCCB 100A of Domestic and Diesel pump
SEM 04
11-Jan
GSC 00002
12-Jan
EBO002
14-Jan
PLC # 8
14-Jan 15-Jan
Power sagged Control panel of primary and high level pump of deflux#1 lost power Tool GSC0008 tripped
NA DFX001
15-Jan
GSC 00008
16-Jan
Tripped CB of ACL024
ACL024 tool
20-Jan
Power sagged
NA
22-Jan 23-Jan
Elevator #2 in GPB fault There was a leakage NaOH on coupler of hand valve (HV261-1-MP9) for 2nd adjustment tanks
Window glass was damaged at locker E SMS system was down Tripped MCCB NS6D1C02A 250A
NA NA NA
29-Jan
GSC 00006
29-Jan
Cooling Tower#4
30-Jan
While R&R, One operator detected water leak ont PCW tool EBO007 & 008
31-Jan
Pizza oven
OFA regulator valve supply was broken water leakage on PCWR pipe of EBO008 Tool GSC0004 tripped
20-Feb 21-Feb 21-Feb 21-Feb 22-Feb 22-Feb 25-Feb 27-Feb 27-Feb 28-Feb 1-Mar 5-Mar 5-Mar 6-Mar 7-Mar 8-Mar 12-Mar 13-Mar
Water leak from pipe LSS system at D20-21 walkable celling. Tool ICO013 tripping STH 10 socket outlet loose primary pump doesn't work properly Open insulation on EBO Feezer 1 power loss Power sag Abnormal vibration lift pump of tool FTS0001 doesnot work Tripped CB of ACL018 instant noodle smell infront of Break room Support tool owner checked electrical Lost power supply for intel LOGO in GPB power loss MFG tool GSC00002 of the module CAM001 loose connection of OFA pipe to tool CMT025 module CXT025 Tool ICO010 tripping Road Lighting 3RYB on panel ES6L1A02A Tool EOT 001tripping
Pipe of LSS system ICO013 STH 10 DFX0002 EBO Feezer 1 External power GPB elevator 2 FTS0001 ACL018 tool NA CHB001 LOGO Intel at GPB CAM001 CMT025 ICO010 Road lighting 3RYB EOT001
20-Mar
DESPATCH freezer
24-Mar
External power
28-Mar
Power sag of Incoming A 88.24% duration 0,080s, Incoming B 87.38%, duration 0.080s
External power
28-Mar
Power sag of Incoming A 85.71% duration 0,049s, Incoming B 83.29%, duration 0.050s
External power
29-Mar Cracked AWN piping 30-Mar CHB001 loss power 1-Apr Power sag 1-Apr Server system in south mezzanine was problem 2-Apr No power supply for tool BTU of module training CAM 2-Apr One small snake at Lobby GPB
AWN pipe CHB001 External power WIN911 system Tool training CAM NA
Tool TH#1 tripping Flexible water pipe was broken " Security Guidelines" board was loosen ICOS# 03,08,09,011 was problem"Auto machine off" The elevator in ATM was problem Two CB outgoing of battery ES6D1D08A in HT room CUB were tripped Dock lift #6 got problem Back guard house lost power almost equipment The temperature in south clean room is unstable
12-Apr Out let workstation tripped 22-Apr Power sag 22-Apr LPG detector MB-1-SS3-025 actived 23-Apr Power sag
Jockey pump
compressor 1 in the kitchen fault auto paging was hung Underground domestic pipe leak detected ATM flooding The freezer #1 lost power in the kitchen
freezer 1 NA Domestic water supply line Domestic water supply line Freezer#1
DFX001
2-May
CAM005
Oven of Bam002 tripped Water leak service duct tool dock 1 ATM Freezer #6 lost power in the kitchen
6-May
NA
7-May
Service light NA NA
13-May Tripping MCCB 100A on panel ES6D1C02A serving power for Diesel pump 13-May Main gate of front guard house couldn't open 15-May DX #6 fault 15-May Cooling Tower Fan 4D was fault
NA
EBO010
20-May Tripped MCB Ckt#14B 220V 16A 1P onpanel TS1D2H27A 20-May Tripping RCCB 40A, NS3D1F02A/28RYB
22-May Power supply loss 24-May TIR004 modole EPX004 link004 lost power
NA
TIR004 modole EPX004 link004 24-May Wet chemical fire suppression system kitchen accidentially triggered by NA CSC
PBM005
28-May Water leakage at flange in suction of 1st RO feed pump 6-Jun OFA gauge of RLM006 did not work 7-Jun abnormal corona was found while UDT scanning at HV switchgear South ATM 7-Jun CT #3 cell A was tripped the thermal relay
10-Jun Valve pneumatic discharge of CT#2 cell C was fault 10-Jun OFA Lateral pressure low alarm
CT#2 Compressor
12-Jun Tool BPM0002 belong BAM 002 link 2 Lost power 12-Jun PCWS water leak at EBO007 15-Jun MCCB 100A at panel NS3L2G07A tripped
BPM0002 EBO007 NA
18-Jun RCCB 63A(0.3A) ES7L1P03Aon panel ES7D2Q01A .It supply for lighting and socket in IW tripped 23-Jun 24-Jun 24-Jun 25-Jun
The finger of an employee Intel was injury Tool HAST#2 was tripped in Street LAB and Tool under PM and testing Win 911 was hang
7 street ligh did not work Locker '' 3732'' Tool HAST #2 WIN911 system
Note: Classify
A1 : Faults by equipment B1 : Faults by operation C1 : Faults by maintenance, sanitary D1 : Faults by other E1 : Fault by PCII shut down (Equipment or system is not stopped) Area Time of Incident Building Information ATM 08:30hrs ATM 09:00hrs
System
Electrical
Electrical
All Building
Electrical
MFG 18:16hrs
ATM
Electrical
MFG 11:18hrs
ATM
Electrical
FA Lab 12:00hrs
ATM
0:05hrs 13:30hrs
11:30hrs
Electrical
MFG
10:20hrs
ATM
PCW
MFG
22:10hrs
ATM
I&C
ATM Mezzanine
11:00hrs
ATM
Electrical Electrical
External MFG
20:24hrs 15:52hrs
NA ATM
Electrical
MFG
19:01
ATM
Electrical
MFG
09:45hrs
ATM
Electrical
External
06:12hrs
NA
Elevator AWN
17:04hrs 0:30hrs
GPB CUB
NA BMS Electrical
Electrical
MFG
10:10hrs
ATM
Mechanical
CUB roof
16:00hrs
CUB
Mechanical
Walkable ceiling
10:00hrs
ATM
Electrical
Kitchen
21:25hrs
GPB
LSS Electrical Electrical Process Mechanical Electrical Electrical Mechanical Process Electrical NA Electrical Electrical Electrical Mechanical Electrical Electrical Electrical
Walkable celling D20-21 MFG MFG MFG MFG Kitchen Whole site GPB Elevator L15 MFG MFG MFG GPB MFG MFG MFG Street light MFG
8:10 7:48 10:50 22:10 9:00 11:59 6:16 15:57 14:46 5:00 16:00 13:35 19:40 13:21 8:30 10:15 22:54 9:40
ATM ATM ATM ATM ATM GPB ALL Bldg GPB ATM ATM ATM ATM GPB ATM ATM ATM GPB ATM
Electrical Electrical
MFG Kitchen
9:30 0:31
ATM GPB
Electrical
IW
11:41
IW
Electrical
ATM
14:06
MIS
Electrical
ATM
0:40
MIS
Electrical
ATM
17:55
MIS
IW HC07 SS1
9:55 5:25
8:45
LSS
HC04
11:15
HC04
Process
MFG
8:11
ATM
Electrical
MFG
8:00
ATM
NA
Clean room
18:39
ATM
Electrical NA Electrical
NA
GPB
23:06
GPB
Mechanical
Clean room
4:45
ATM
Electrical Electrical
1:30 11:30
ATM GPB
NA Electrical LSS
Electrical
Clean room
12:50
ATM
RO train A/ RODI/ CUB Mechanical Electrical Electrical ATM South ATM CUB
Electrical Mechanical
CUB CUB
7:05 PM 7:50 PM
CUB CUB
Electrical
IW
15:07
IW
4:18 9:45 NA
Problem Description
Tool tripped while start-up after holiday Tool tripped while start-up after holiday Power interruption on line 110kV
Tool tripped while start-up after recovered facility system Tool tripped while start-up after updating software for tool Tool tripped while start-up after repair tool. water dripped possile due to condensation. Need to replace insulation layer The electrical wiring of the vacuum cleaner was burnt Tripping MCCB 100A EH4D1A06A at panel ES6D1C02A, causing power interruption for domestic pumps (one power source) and battery charger for diesel fire pump Tool GSC0002 tripped while restarting after PM about 2hrs (Module Cam001, link#1) DBTS1D2F27B/CKT#3, 16A 3P 380V type C
PLC # 8 lost signal can't monitor status of MAH#11, 3temperature sensors , 4 dry coils and temperature SCR#11 Incoming A 82.74% duration 0,06s, Incoming B 82.42%, duration 0.06s. Tripping MCCB serving power for panel ES1L2C19A
Tool GSC0008 tripped while starting after was hung tool.(Module Cam004, link#4) DBTS1D2F25B/CKT#12, 20A 3P 380V type C Tool tripped while start-up after recovered facility system There was in power sag issue with magnitude 87.96% duration 0.06s Elevator#2 out of service The supply valve coupling of 2nd Adjustment tank NaOH dosing pump#1 was damaged
window glass was damaged at locker E Cannot receive all alarm by SMS Tripping MCCB NS6D1C02A supply power for Compressor#3 control panel, Normal power of PLC#1,2,3,4), Rodi PLC amd Battery charger at HV room Tool GSC0006 tripped while starting after PM about 2hrs (Module Cam003, link#3) DBTS1D2F25B/CKT#7, 20A 3P 380V type C Appear a hole on IW pipe and causing water dripping along the pipe
Tripped MCCB NS3C1F02A supply power to Pizza oven in the Kitchen OFA regulator valve supply was broken Water leak at ball valve of PCWR pipe Tool GSC0004 tripped while starting after PM about 2hrs (Module Cam002, link#2) DBTS1D2F27B/CKT#7, 20A 3P 380V type C Water leak from pipe (D150) LSS system at D20-21 walkable celling. Tool ICO013 tripping CB on panel TS1D2H27A CKT#4R Socket outlet cable is loosely connected primary lift pump sometimes has no water flow. PCW cooling insulation is missing fan of compressor was burn in the rotor fan Power sag of the incoming power supply Abnormal vibration on carriage out going valve was closed Tool tripping after PM finished Instant noodle smell infront of Break room at D9 when breaking time. MCB of tool CHB001 was failure inside tool panel. Tripped Overload MCCB( 100A, Ir 0.8)Of intel LOGO at panel NS3D3C07A There was touch issue between a phase and cover point drop loose connection of OFA pipe to tool CMT025 module CXT025 Tool ICO010 tripping CB on panel TS1D2H25A CKT#11Y RCCB 40A tripping RCBO 32A 30mA on panel US1D1A28A tripping
Tool DESPATCH tripping RCBO 32A 30mA on panel NS1D1A28A Freezer 7 does not work
Cracked AWN piping - double containment MCB of tool CHB001 was failure inside tool panel. Power sag of the incoming power supply Server system in south mezzanine was problem General contrator not yet turn on CB on Bus-duct (TS1B2F05A) SCC informed One small Snake in Lobby GPB we called Pest Control for help Then It was caught by them Tripped RCCB, Ckt#3B/NS1D1A28A supply power to tool TH#1 flexible water pipe supply water to cold down the gas stove in the kitchen was broken. " Security Guidelines" board was loosen. ICOS# 03,08,09,011 was problem"Auto machine off" the elevator was problem with error is 9 KB fault Two CB outgoing 110v battery ES6D1D08A supply power to all Sepam in panel NS6S1E02A in HT room CUB were tripped Dock lift out of function Back guard house lost power almost equipment dueto RCCB on panel DB-HC07 tripped Temperature control main valve of the south DCC lost control and create water condensation on piping in the main South. Plug of workstation PCK Power sag of the incoming power supply Gas detector activated and shut off gas supply valve Power sag of the incoming power supply
freezer 1 fault auto paging was hung Underground domestic pipe leak detected Water flooding casued by Deflux #1 open valve RCCB 40A 0.03 A on panel NS3D1F02A serving power for freezer#1 was tripped . Water leak at tool DFX001
There was no power supply for Mfg tool GSC00009 of the module CAM005 (belong to link5) in DB Tool TS1D2F25C/CKT#2RYB, MCB D16 3P 380v type D. After holiday, tool started and there was no power Coupling was loosen When doing round and reading we found that the freezer #6 was lost power in the kitchen.
Customer detected Strange smell at G23 column in clean room The cable of Led lights below fruit tray was damaged Dead frog stuck in insect killer Power supply loss
Tripping MCCB 100A on panel ES6D1C02A Main gate of front guard house couldn't open DX supply cool air to CCR#1 in GPB wasnt running Cooling Tower Fan 4D was fault
Employee finger was injuried at cafeteria. Incident happen when he stand up holding the edge of the table
ICO#4 was lost power supply Power supply for coca-cola dispenser was tripped
Power supply loss Power supply loss Wet chemical fire suppression system kitchen accidentially triggered by CSC
Water leakage at flange in suction of 1st RO feed pump OFA gauge of RLM006 did not work abnormal corona was found while UDT scanning at HV switchgear ATM The thermal of Cell #3 A relay was tripped
Pneumatic discharge valve of CT#2 cell C was fault Three compressor was fault due to the CWP pressure was unstable, air penertration happned in condenser piping system. That led the air into the pump and made the CWP pressure changed Tool BPM0002 belong BAM 002 link 2 Lost power PCWS water leak at EBO007 on pipe connection MCCB 100A at panel NS3L2G07A
Lighting at IW was lost power .we checked and detected RCCB 63A(0.3A) ES7L1P03Aon panel ES7D2Q01A The door was hurt her finger. RCBO 32A 30mA on panel NS1D1A28A, ckt #7b supply for tool HAST#2 was tripped the SMS alarm didnt trigger.due to Win 911 was hang
INTEL VN From-To :, Dec 2013 A1 : Faults by equipment B1 : Faults by operation C1 : Faults by maintenance, sanitary D1 : Faults by other E1 : Fault by PCII shut down (Equipment or system is stopped) Interim Corrective Action Initiated by Date Implemented 2-Jan
Check and coordinate with tool owner to reset breaker Coordinate with tool owner to hook up power analyzer and reset breaker Coordinate with EVN to investigate
Bao
Bao
2-Jan
Kha
6-Jan
Check and coordinate with tool owner to reset breaker Check and coordinate with tool owner to reset breaker Check and coordinate with tool owner to reset breaker Replace insulation layer and keep monitoring Remove the wiring and replace new cover of socket outlet Reset MCCB to restore the power and coordinate with electrical team for further investigation
Kha
6-Jan
A.Tuan
7-Jan
A.Tuan
7-Jan
Bao
11-Jan
Tu
12-Jan
Coordinate with BMS and IT teams to restore the system Site check all facilities equipment and production tools none is affected Check and coordinate with tool owner to reset breaker Check and coordinate with tool owner to reset breaker Check and coordinate with tool owner to reset breaker Site check all facilities equipment and production tools - none affected Check and Barricade then call hotline Schindler for investigate
Tuan
14-Jan
A.Tuan Canh
14-Jan 15-Jan
A.Tuan
15-Jan
Tu
16-Jan
N.Tuan
20-Jan
N.Tuan A.Tuan
22-Jan 23-Jan
Closed NaOH main valve of supply piping then replace new coupler Barricade that area and then escalate to next level Close monitor the system on BMS and contact with third party to restore the SMS system Stop the project, and then reset the CB to restore the power. Escalate to management team for further investigation Check and coordinate with tool owner to reset breaker * Isolate the IDW pipe. Plan to Replace the damaged IDW pipe - cooling tower #4 on WW06.3. * Take the sample to analyze the damaged IDW pipe - cooling tower #4 on WW09.3
A.Tuan
29-Jan
Bao
29-Jan
Bao
30-Jan
Conduct tripping investigation and restore the power for Pizza oven LOTO valve supply and barricade Check and fixed Conducted investigation and reset breaker
Tu
31-Jan
Check and containing water by bucket and barricade area. Check physical condition of panel and reset CB Get get from CSC for the correction adjust regulator valve Return back insulation check and escalate to Mechanical team fix it Restore affected equipment due power sag (CUB equipment) Shutdown, barricade and call OEM Re-open out valave Reset CB Re-balance aircon supply at break room Check and measure power supply Check ,Reset MCCB and measure current 10.2A Fixed issue of socket outlet and restore power supply Seek Atea's help to fix it Check physical condition of panel and reset CB Replaced faulty ballast and restore lighting Check power panel and tool condition and measured leak current
N.Tuan Tu Tu Bao Bao Tu Tu Bao Bao Tu Bao A.Tuan N.Tuan A.Tuan Bao Bao Tu Tuan
20-Feb 21-Feb 22-Feb 21-Feb 27-Feb 27-Feb 25-Feb 28-Feb 27-Feb 28-Feb 1-Mar 5-Mar 5-Mar 6-Mar 7-Mar 8-Mar 13-Mar 13-Mar
Check physical condition of panel and reset RCBO Checked and release emergency button
Tuan Bao
20-Mar 21-Mar
De-activated Rudolf earth leakage relay which is suspected to be faulty and reset the 200amp main circuit breaker
Tu
21-Mar
Restore affected equipment due power sag -Tool CHB001 was hang. - Tool CMT on module CXT#16 was tripped Site validation for impacted tools - No impact tools
A.Tuan
24-Mar
Tu
28-Mar
Tu
28-Mar
Seal crack and close monitoring as temporary containment Check and measure power supply Impact to CXT#016,021 power lost Checked and re-start server system Checked and turn on CB on Bus-Duct Call pest Control
Check physical condition of panel and reset RCCB Close valve and replace new flexible. " Security Guidelines" board was loosen. Now we put caution this area and remove it Check power and OFA pressure supply recuse the person inside the elevator and call Schindler for troubleshoot check and reset CB
check and barricade Check and reset RCCB we changed the temperature control main valve form auto mode to manual mode to adjust the temperature in spec control Check and reset CB Restore affected equipment due power sag Measure possible gas leak but not registered on measuring tool. Gas sensor was then reset Impact tool handler module CXT022 was hung
cover the leaking point with tape and contain water. Requently check and make plan to repair.
Bao
24-Apr
Tu reset win 911 system Bao Close main supply line from SHTP Anh Tuan Close pole drop isolation DI supply main supply lineAnh from Tuan SHTP Tuan Lock out freezer and pass down to Electrical and Mechanical to investigate and correct fault. VTI also inform to transfer food to other freezers Bao Temporarily isolated the valve supply DI water for DFX001 and coordinated with Panpa to clean water on floor Reset CB Bao
2-May
2-May
Coordinated with elect. Team and Atea to fix issue (wrong phase connection) Installed pipe support and tighten coupling Lock out freezer and pass down to Electrical to investigate earth leakage fault and correct problem. VTI also inform to transfer food to other freezers Responded to the call on starnge smell at G23G27 but could not indentify. Strange smell just disappear and back to normal. After checking carefully and put caution, barricade this area. Contact with pest control to handle it Recover system and support for tool
Bao Tu Tuan
A.Tuan
6-May
MCCB earth leakage protection relay temporary disable function Temprorary fix Apply loto CB pass to CM team fix checked and reset already
checked and get information, we have already remove and change one new table
A.Tuan
15-May
Defective seal was replaced and funded findings to other similar tools Reset MCB Perform investigation and was found cuased by ongoing ketchen expansion. Coordiante for repair to CSC Recover system and support for tool Reset CB MCB 63A at TS1D2E25B Clean up affected area and recommision fire suppression using Ansulex chemical from less utilized area. Affected of pizza oven currently repair by ATEA Check and investigate the issue and identify to a loose spliced inside cable tray. Cable connection was temporarily restored using electrical terminal block
Bao
19-May
N.Tuan A.Tuan
20-May 20-May
N.Tuan
28-May
Replaced damage parts and recommission the system Planning o replace the new one. It was replaced on WW25.5 at warm down shift coordinate with electrical team to fix it Checked the current setting was 70A range. It was difference with others. We adjusted the setting up to 80A. Re-measured the inrush current, working current. Changed over for CT other. Replaced new actuator 26 June 2013 Change three compressors to manual mode are operated and open air vent on CWP, OFA pump.
A.Tuan A.Tuan
10-Jun 10-Jun
Tool BPM0002 belong BAM 002 link 2 Lost power co-ordinate with CM team to fix The yellow cable was damaged. We replaced new one
N.Tuan
18-Jun
Check and temporary change a locker for her Check and reset RCBO Restart system
Rev01
Root Cause
Detected high inrush current while start-up value 260A There was a temporary ground fault incident on 110KV transmission Line 1 from CAT LAI THU DUC DONG. Tool tripped due to in-rush current
11:00hrs
11:00hrs
18:40hrs
11:30hrs
12:20hrs
Possible the adhesive is getting aged Due to short circuirt Under investigation by Electrical team
10:50hrs
Water leak at Y-Strainer because the teflon was not wrapped properly Error of IT switch
22:30hrs
12:15hrs
17:00hrs
19:26hrs
10:10hrs
19:00hrs 03:30hrs
Under investigation Viettel server was down JLL contractor installed new CB for exhaust fan in CS store ( on panel NS6C1D01A ). And caused tripping the MCCB 250A Possible: high inrush current while tool starting
NA 17:04hrs 18:15hrs
10:30hrs
NA
10:30hrs
23:00hrs
Tool owner moved workstation up and bump regulator Failure of piping Possible: high inrush current while tool starting
14:35
Failure of Fire piping coupling Possible: high inrush current while tool starting Workmanship issue on the tool install Possible: no water in the tank. Related to leak tracing on PCW Rotor of fan burn Eternal fault at EVN side Under testing under investigation Maybe high inrush current while start-up Differential room pressure between break room and mfg is marginal MCB of tool CHB001 was fault in tool panel. Circuit breaker protection was activated and was reset normally Socket outlet wire fastener screw grounded to the pole drop OFA leak on fittings - Fixed issue of loose connection and tool run back to normal Possible: high inrush current while tool starting Leak current on a ballast of street light due to failed ballast The 2 tools were used same neutral line. They had cause leak current on facility CB - Ask tool owner used 2 plugs of these tools on single source (used one double holes socket) Maybe high inrush current while start-up VTI staff had open freezer door and unintentionally triggered emergency button to shutdown the system. Under investigation since fault recorded was far below the operating limits. Suspect earth leakage relay faulty
16:00 8:22 15:35 23:50 16:00 12:00 7:00 13:48 17:36 5:15 23:10 16:30 20:20 18:30 9:30 10:45 10:00 11:00
10:00 1:15
11:55
External fault at EVN line - Load of line 47724kV-Long Buu at Thu Duc Dong station was decrease suddently. It was impact to power quality at Intel station External fault at EVN line- At Cat Lai station 220/110kV, MC 880 of line 15kV-My Hoa was open due to the distance protection relay was actived External fault at EVN line - At Phu Lam station 500/220/110kV, MC of line 220kV-Binh tan was open due to the distance protection relay was actived long-used material MCB of tool CHB001 was fault in tool panel. Under investigate Server system in south mezzanine was problem General contrator not yet turn on CB on Busduct (A-380-BD17,TS1B2F05A) NA
14:06
0:55
17:55
Under investigate NA " Security Guidelines" board was loosen may be problem inside the tools.under investigate root caue by tool owner the elevator was overload(9 KB fault) Under investigation by electrical team
Swat team will fix it tomorrow The contactor was painting with their equipment plug-in the socket outlet plug-out wrong the temperature sensor control main valve of DCC
Screw loose in the plug make wire cable short current 10:24 External fault at EVN side 5:25 Under investigation 13:20 Under investigation 8:45
Under investigation
Under investigation ???? Under investigation Under investigation Open deflux #1 internal valve Motor fan condenser damaged (Fan motor is run to fail due to size is very small) DI water overlow through the mounting screw hole of the level switch of of the deflux equipment NA
15:30
NA
NA
8:30
ATEA contrator connected wrong phases and neutral Lacking support on of the HDPE water supply line Lamp inside freezer has high leakaged current causing tripping
19:10
Detected the cable of fruit lights was damaged and lights still under warranty NA Main 110KV redundancy power cable from Thu Duc supply along SHTP main gate was hit by mobile crane Under observation due to the need for full power shutdown which is not accepatble The limit control swicth fautly Thermal relay was tripped. Changed the set point The coupling was broken and root cause is under investigation by the team Table was removed from use while incident will be investigated
23:20
Strainer drain plug has expanded rubber seal that caused misalignment and does not properly seal water from going out Tool related problem ATEA cutting the floor had damage underground cable supplying coca cola dispenser 500KV main power supply for southern Vietnam was external interrupted Tool related problem Wet chemical fire suppression system kitchen accidentially triggered by ATEA
19:00
1:50 NA
8:53
Cracked flange with contributing factors of life, material and workmanship Long time using, so material was in bad condition arc between PT Wrong current setting
NA NA 3:00 NA
Actuator was loosen due to the O-ring was broken. Under investigation
NA 21:12
possibility: high inrush current Long time using Keep following but no more leak. The yellow cable was damaged. We replaced new one
9:50
15:25
Classification
Remarks
CSC issue on CB
Non-JLL Control
Mfg issue on CB
Non-JLL Control
Non-JLL Control
Non-JLL Control
CSC issue on CB
Non-JLL Control
Mfg issue on CB
Non-JLL Control
Mfg issue ( Complaint) ITS nearmiss (JLL Sub con) ITS nearmiss
CSC issue on CB
Non-JLL Control
Non-JLL Control
Non-JLL Control
CSC issue on CB
CSC issue on CB
Non-JLL Control
Non-JLL Control
ITS nearmiss (Component Failure) ITS nearmiss (Componet failure not under PM plan)
Safety Incident Complaint (External services) ITS nearmiss (Attributed by JLL Subcon)
CSC issue on CB
Non-JLL Control
ITS nearmiss
Non-JLL Control
ITS nearmiss
Non-JLL Control
ITS nearmiss (Attributed by JLL Subcon - under investigation) MFG issue Non-maintenance issue by Norfolk Mfg issue on CB
JLL
Non-maintenance issue by Norfolk Mfg issue on CB CSC issue Complaint Complaint Non-maintenance issue by Norfolk External fault Maintenance issue Complaint (Norfolk out of control) Mfg issue on tool Complaint Mfg issue on tool Under investigation CSC issue CSC issue Mfg issue on tool Component failure Mfg issue on CB Non-JLL Control JLL under control
Component failure
Non-JLL Control
Component failure Mfg issue on tool External fault IT issue CSC issue - complaint Safety issue - complaint
Mfg issue Maintenance issue Complaint Mfg issue Maintenance issue Non-maintenance issue by Norfolk JLL/Norfolk under control JLL/Norfolk under control
Non-maintenance issue by Norfolk ????? IT issue Non-maintenance issue by Norfolk Mfg issue ITS near miss
MFG issue
Complaint
ATEA related issue Base built issue Base built issue - All freezer is under investigation due to recurring tripping of freezers
CSC related
Customer complaint
ITS near miss ITS near miss Complaint ITS near miss - no speed entry due to availablity of n+1 however all AR's is currently addressed Complaint/ Safety issue
Complaint.
MFG issue ITS near miss - no speed entry due to fault was originally a complaint. Load is not original base built equipment - CSC related External ITP MFG issue CSC relelated ITS
None maintenance issue by Norkfolk Complaint None maintenance issue by Norkfolk None maintenance issue by Norfolk