Mark Stimson
Bosch Engineering Solutions FMA Summits May 15, 2012
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Group
Global turnover of roughly 63.4 billon USD (47.3 billion Euros) in 2010 Around 283,500 associates Innovation and highest quality standards since 1886 Each year Bosch spends more than 4.7 billion USD (3.5 billion euros) for R&D and applies for around 3,800 patents worldwide
Bosch Group
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Thermotechnology
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Thermotechnology
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Thermotechnology
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Thermotechnology
TT/SNA-EAP TT/SNA-EAP | 5/15/2012 | 5/15/2012 | 2012 | Robert 2012 Bosch RobertLLC Bosch and LLC affiliates. and affiliates. All rights All reserved. rights reserved.
Bosch Thermotechnology
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Design Support
Installation Support
9
Commissioning
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Solar Energy
(>500 kW)
No up front costs we provide the capital Stable Energy costs- long term pricing contract Risk mitigation we operate and maintain Only available in USA
10
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Solar Energy
Utility
Equipment Supplier
Host
Installer
Service Provider
Contracting Entity
Investors
11
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
Ecoplus Home Bathhurst, New Brunswick, CN Application Year of installation System Technology Net Zero 2010 Geothermal/Solar Thermal, PV, Appliances $250.00 11 years
12
| TT/SNA-EAP | 8/12/2011 | 2011 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
Riverside Correctional Facility, Philadelphia, PA Application Year of Installation System Technology Savings Payback Period Showers/laundry 2008 Solar Thermal/Boiler 20%/year 8 years
13
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
Jail Complex, Phoenix, AZ Application Year of Installation System Technology Savings Payback Period DHW/Food Processing 2011 Solar Thermal 59% 7 years
14
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
Office Building, San Francisco, CA Application Year of Installation System Technology DHW/Space Heating 2011 Gas Boiler/G615
Savings
Payback
$5000/month
5 years
15
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
64 Unit Hotel, Franconia, NH Application Year of Installation System Technology DHW 2009 Condensing Tankless
Savings
Payback
30%/year
4 years
16
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Case Study
48 Unit Condominium Complex, Van Nuys, CA Application Year of Installation System Technology DHW 2010 Condensing Tankless
Savings
Payback
30%/year
3.5 years
17
TT/SNA-EAP | 5/15/2012 | 2012 Robert Bosch LLC and affiliates. All rights reserved.
Bosch Thermotechnology
18