Anda di halaman 1dari 2

DECK DUTIES DURING CARGO OPERATIONS.

CARGO WATCH: 0600 - 1200 / 1800 2400


ADD.2/O OFFICER - DUTY OFFICER PUMPMAN - MANIFOLD INCHARGE A/B - SAFTEY AND SECURITY INCHARGE. CDT - ASSIST DUTY OFFICER

CARGO WATCH: 0600 - 1200 / 1800 2400


2/O OFFICER A/B A/B CDT - DUTY OFFICER - MANIFOLD INCHARGE - SAFTEY AND SECURITY INCHARGE. - ASSIST DUTY OFFICER

Dutie
1. 2. 3. 4. . ". &. (.

!" #$%i"!&' i% ()$*+e

Check all valves on deck shut manifold, pumpstack, drain. Check all blanks in place as reqd for line up. Check all respective line drain valves are shut. Check all blanks are in place & all bolts are tight. Check all elbo!s in place as reqd for line up. Check all #$% are operational. 'nsure all tank openings are closed. Connect hoses.

Dutie

!"

$"et, -

e(u*it, i%()$*+e
2. +cuppers to plug 4. ',tinguishers ". -ang!a. net. (. 1 no. torch at manifold 11. )2 hose at manifold 12. +panner set at manifold 14. 3egularl. check moorings

1. )ire !ires )!d & *ft 3. )ire hoses . )ire plan &. +/#'# gear in place 0. 2 no.s !$talkies at the manifold 11. 3 no.s of )ace visors & chem. gloves 13. /aintain gang!a. !atch 1 . Check emergenc. e.e !ash & sho!er

C$'et $''iti!%$& 'utie


1. 4o ensure 1 tourch,152$4alkie & 1 ad6ustable !rench al!a.s standb. !ith them. 2. 7eck air $ 7eck steam in adequate time for line blo!ing $ steaming of tanks.

Pre arrival line up in charge


Cadet 8 #ump man must check

I"

.!

i/&e

&i%e

t!

/e

()e(0e'

0e.t

*e$',

!%e

'$,

.*i!*

$**i1$&.
1. 2. 3. 4. . ". &. (. 0. 11. 11. 12. Check all valves shut manifold, drain and pumpstack. Check all blanks 8 bolts in place. Check all elbo!s in place as reqd for line up. Check all manifolds to be used for the port are drained & read.. 9eep air hose$steam hose$f! hose read.. 9eep all spanners read. at manifold. 'nsure all butter !orth pockets are closed. 'nsure #$% valves are !orking. Check all lines to be used in port for leaks if :.9 test !ith air. 9eep 3 no.s face visors & chem -loves read.. 9eep safet. mat$drum belo! hose. Check all line drain valves shut.

C)ie" O""i(e* 2i&& .*!1i'e t)e 'ut, !""i(e* 2it) t)e "!&&!2i%+ i%"!*#$tion.
1. 2. 3. 4. . ". &. (. 0. /ake detailed cargo plan. -ive specific instructions for ullages to topup. +pecific ballasting$deballasting plan5 for trim $ list requirement. ;ose connection !ith si<e etc. *n. 6umper hose connection etc. +equence of loading$unloading for various parcels. 4ime$ullage at !hich to be called. #re loading$unloading meeting !ith dut. officer & !atch person to give specific instruction or an. change in plan. -ive specific instruction for an. e,tra precaution to be taken for ha<ardous, to,ic, solidif.ing, pol.meri<ing etc cargoes. cargoes requiring =2 blanket etc.in order prepare things in advance.

Dut, !""i(e*>
1. 2. 3. 4. . ". &. 8.

'utie :

?llages ever. hour. )ull. understand the cargo plan,sequence of loading. +hore 2$4alkie al!a.s !ith them. @nstruct 8 assist cre! !ith connection of hoses. Check specific line up to be used for loading$unloading. Aine up for loading$unloading. -ive 1 hour advance notice to!atch keeper to call e,tra hands for station,hose connection$disconnection,hose shifting. 4o give '$3 adequate notice for deck air$steam for line blo!ing,ste aming tanks.

Anda mungkin juga menyukai