Project-M/s Garden Silk Mills Ltd Capacity-18MW

Turbine heat rate=

(((Steam flow TG inlet*Enthalpy )- (F.W Flow*Enthalpy)) -(Process flow*Enthalpy))+

T.G Load -18 MW Guarantee parameters HMBD Steam flow Steam enthalpy F.w flow F.w Enthalpy Process flow process enthalpy make up water flow makeup water enthalpy process return flow process return enthalpy Power generation Turbine heat rate Plant heat rate 25.04.11 Remarks

87580 79400 819 815 88000 83100 215 209 22000 14070 670 670 1176 14070 35 35 20900 0 75 0 18000 16870 2204.26 2276.743 2655.735 2743.064

Customer has not given return condensate as per HMBD .In this time there were not ready to give return condensate .Yet not ready to give return condensate as per HMBD from GSML

T.G Load -18 MW with 10 tph process flow


T.G Load-18MW Steam flow Steam enthalpy F.w flow F.w Enthalpy Process flow process enthalpy make up water flow makeup water enthalpy process return flow process return enthalpy Power generation Turbine heat rate Plant heat rate HMBD 10.10.11 80640 81900 819 819 81070 84100 213.5 216 10000 5400 670 670 10800 5000 35 35 0 2000 75 35 18000 17250 2356.318 2639.86 2772.138 3180.55 11.10.11 84500 819 88300 212 11400 670 7400 35 4000 35 17400 2485.45 2994.52 24.06.11 81900 824 85300 208 11017 670 8000 35 3000 35 18000 2374.823 2861.232

T.G Load -18 MW without process flow


T.G Load-16.38 Steam flow Steam enthalpy HMBD 67580 819.6 04.07.11 69017 819.6 09.09.11 74000 819

F.w flow F.w Enthalpy Process flow process enthalpy make up water flow makeup water enthalpy process return flow process return enthalpy Power generation Turbine heat rate Plant heat rate

68010 210 0 0 7.9 35 0 0 18000 2283.708 2686.715

72018 205 0 0 1026 35 0 0 16300 2566.78 3019.74

77000 212 0 0 1026 35 0 0 16300 2718.89 3198.69

(Process flow*Enthalpy))+(Makeup flow*Enthalpy)+(Process return flow*Enthalpy))/Turbine load

ow
Remarks

Flow measurement is not provided at makeup water flow which is calculated from DM water generation and DM tank level and process return flow meter is not our scope but customer has provided the flow meter at their process end and furnish the same daily basis .

Remarks

Steam flow is increased upto 5TPH compare to 04.07.11 reading