Gravity Sewers Spreadsheet

Project Name: Main or Line Main A Unknown Sewer Project Manhole Stations From To Ex MH A1 Length of Pipe (ft) 107.31 Check for Length 400 ft OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Review Engineer: ETC Date: Check for Slope* 0.004 OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK 2/21/12 Slope (%) 7.10 Slope Invert Elevation In (ft) Elevation (ft) 450.15 7.62

Elevation Out (ft) 457.77

Slope (ft/ft) 0.0710

Gravity Sewers Spreadsheet


Project Name: Unknown Sewer Project Review Engineer: ETC Date: 2/21/12

Mannings formula:

k 3 2 R S n

A P

Where: V = velocity (ft/s) k = 1.486 n = Manning's coefficient (0.013) R = hydraulic radius (ft) S = slope (ft/ft) A = cross sectional area of flow (ft2) P = wetted perimeter (ft)

10 CSR 20-8.120(5)(D)1. -- All sewers shall be designed and constructed to give mean velocities, when flowing full, of not less than 2 ft/s. 10 CSR 20-8.120(5)(D)5. -- High velocity protection. Where velocities greater than 15 ft/s are attained, special provision shall be made to protect against displacement by erosion and impact.

Main or Line Main A

Unit Variable 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486 1.486

n 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013 0.013

Diameter (in) 8.0

Area (ft2) 0.3491

P (ft) 2.0944

R2/3 (ft) 0.3029

S1/2 (ft/ft) 0.2665

V (ft/s) 9.22

Check for Velocity 2 ft/s OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK

Check if Support is Needed > 15 ft/s NO YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES YES

Gravity Sewers Spreadsheet


Project Name: Unknown Sewer Project Review Engineer: ETC Date: 2/21/12

New Collection Systems: Present Population: Predicted Population (20-year planning period): Design average flow: Peaking factor: Design peak hourly flow: 200 1,000 100,000.00 gpd 1.39 139,300.70 gph 10 CSR 20-8.110(4)(C )3. = Predicted Population x 100 gpd/capita 10 CSR 20-8.110(4)(C )4.C.(I) = (18 + Predicted Population) / (4 + Predicted Population) 10 CSR 20-8.110(4)(C )4.C.(II) - Figure 1. = Peaking factor x Design average flow gpd 10 CSR 20-8.110(4)(C )4.C.(II) = Predicted Population x 0.17 lbs BOD5/day/capita 10 CSR 20-8.110(4)(C )5.C.(I) = Predicted Population x 0.20 lbs SS/day/capita 10 CSR 20-8.110(4)(C )5.C.(I)

Design average BOD5: Design average SS:

170.00 lbs BOD5/day 200.00 lbs SS/day

Existing Collection Systems:

*Slope 10 CSR 20-8.120(5)(D)1.: Nominal Sewer Size (in) Minimum Slope (ft/100 ft) 8 0.40 10 0.28 12 0.22 14 0.17 15 0.15 16 0.14 18 0.12 21 0.10 24 0.08 27 0.067 30 0.058 33 0.052 36 0.046 39 0.041 42 0.037

Instructions for Spreadsheet: Font in blue denotes input from the plans and specifications. "Check for Slope*" column in the Slope tab is set for an 8" pipe with a minimum slope of 0.004 ft/ft. The equation can be changed to reflect the appropriate pipe size according to the chart located on this page. Citations from the proposed amendment to 10 CSR 20-8.120 will be effective February 29, 2012. To add more rows to the tables developed, highlight the last row in the table. Place the cursor on the right, bottom corner of the last highlighted cell, click on this position and drag down to create more rows. This will maintain the formatting and equations embedded in the cells.