Beasly Street Hotel

Introduction
We have recently completed the construction of a 125 bedroom hotel in Beasly St, Cor and!successfully carried out the 2 storey basement phase of these "or s# !$he basement construction posed a number of en%ineerin% and lo%istical challen%es #

$he Challen%es
$he city centre site is located some 5&m from the river 'ee and sub(ect to a hi%h tidal "ater table# $he site is bounded by several listed buildin%s # $he buildin%s are founded on poor %round and sensitive to vibration# $he site is confined and access is restricted

$he )e*uirements
$he site needed to be de"atered for the duration of the basement construction +,cessive "ater table dra"do"n needed to be avoided underneath nei%hbourin% properties -round movement and vibration needed to be ept belo" set limits#

$he .ethod
Installation of perimeter secant pile "all to roc level /appro, 25 m deep0 1esi%n and installation of a perimeter de"aterin% system dischar%in% to the river# 2 rechar%e system to maintain the "ater table tables underneath the ad(oinin% buildin%s# 3 day "or in% durin% the critical e,cavation phase $emporary proppin% to minimise deflection of piles durin% e,cavation

$he )esult
$he e,cavation phase "as completed in a 4 "ee period# $he reinforced concrete "or s includin% basement, me55anine and %round floors "ere completed in 12 "ee s .onitorin% of vibrations ,"ater levels inside and outside the site, deflection of piles and possible movement of ad(oinin% buildin%s "ere all carried out durin% the construction 2ll measurements "ere maintained "ithin set limits