Anda di halaman 1dari 5

CURRICULUM VITAE

Adrian Thabiso Mogotsi


Page 1 of 5

(Please note: this is an EXAMPLE PERSONAL DETAILS:


Nationalit : ID no: Dat( o) *irth: ,o-( Lo+ation: 1or2 Lo+ation: C(ll n4-b(r: 1or2 n4-b(r: E7-ail: 1or2 (7-ail: Marital Stat4s: Dri:(rs Li+(ns(: Lang4ag(s: A:ailabilit : C4rr(nt Salar :

CV- All information herein is non existent)

Mots!ana "1#$%"5&' 15 O+tob(r 1$#1 1' A..l( Str((t/ 0aboron( 3ran+isto!n ''%"5 5656 5555 ''%"5 #&1 #&1# AdrianTM8 ahoo9+oAdrian8botsbas(9b! Marri(d/ % d(.(ndants Class * English/ S(ts!ana and ;alanga &' Da s *1P 6"' ''' .(r ann4- CTC <(=+l9 grat4it >

Make sure the dates are always chronological from most recent to past achievements.

3ORMAL EDUCATION:
?(ar +o-.l(t(d %''# %''' Instit4tion Uni:(rsit o) *ots!ana Mat(r S.(i Coll(g( @4ali)i+ation *S+/ 0(olog and En:iron-(ntal S+i(n+( *0CSE

COMPUTER S;ILLS:
Gemcom Surpac - Advanced Sirovision - Advanced Datamine - Advanced Geomos monitoring system - Advanced Rocscience Suite (Dips, Phase2D, Slide, SW DG ! - "ntermediate #ine #apper- "ntermediate G$is (Data$ase! - "ntermediate #icromine- "ntermediate

Use proper dates from most recently. Be specific. For example - 2007 to resent is too vague. !nclude the months as "ell.

EMPLO?MENT ,ISTOR?:
A4n %''5 B C4rr(nt <S(. %'11 B C4rr(nt> Position:

*OTS*ASE MININ0 COMPAN?


0(ot(+hni+al Engin((r

Slope #onitoring #onitoring scaling and e%cavation of final &alls after $lasting for safety purposes and performs face inspections as per set procedures and standards Developing and implementing monitoring procedures and protocols for slope monitoring programme Analysing and interpreting slope sta$ility data using G '#'S monitoring system and reporting in accordance &ith set protocols for ha(ard &arning

#ive a specific $racketed $reakdo"n in dates of your career progression and promotions in order to sho" the client the length of experience acting in each particular %o$ function.

CURRICULUM VITAE
Adrian Thabiso Mogotsi
Page % of 5 Geotechnical and Geological data collection Planning and coordination of geological and geotechnical data collection according to set standards and procedures Analysing and interpreting of geotechnical and geological data from core logging Scan line mapping Geotechnical data collection and analysis using Sirovision and Siro)oint soft&are Data management #anaging and manipulation of geotechnical and geological data *alidating and capturing geotechnical and geological mapping data efficiently and accurately to ensure +uality at entry point Data security control Slope ,ailure #odelling and Analysis Performing geotechnical analysis and slope failure modelling using Dips, Slide, S&edge and Surpac Defining geotechnical and hydrogeological domains (areas of similar characteristics! "dentifying potential failure modes and addressing them accordingly Pit de&atering Determining ground &ater inflo& volumes $y mapping seepages, measuring flo& rates and assessing ground&ater levels from monitoring pie(ometers -last optimi(ation Assessing roc. mass response to mining and response of significant structures during mining, and ma.ing appropriate recommendations to #ining and Planning Section Defining $last domains from roc. mechanics data and calculates fragmentation targets that can $e achieved from the $last design and su$mit to -lasting Section for effective $lasting
&ith more than one position at a company' detail your career progression in chronologically' expanding on the duties and responsi$ilities. (his candidate "as promoted from )ssistant Mine #eol. to #eotechical *ngineer.

<No: %''# B S(. %'11> Position:

Assistant Min( 0(ologist 7 0(ot(+hni+al

Slope #onitoring #onitoring scaling and e%cavation of final &alls after $lasting for safety purposes and performs face inspections as per set procedures and standards implementing and monitoring procedures and protocols for slope monitoring programme Geotechnical and Geological data collection Geotechnical data collection and analysis using Sirovision and Siro)oint Geotechnical and geological data from core logging Scanline and face mapping Pit de&atering Determining ground &ater inflo& volumes $y mapping seepages, measuring flo& rates and assessing ground&ater levels from monitoring pie(ometers -last optimi(ation /alculating $lasting inde% and su$mit to -lasting Section for effective $lasting

CURRICULUM VITAE
Adrian Thabiso Mogotsi
Page & of 5 #onitoring of pre-split drilling for improvement of high&all conditions <S(. %''# B O+t %''#> Position: 0rad4at( 0(ologist 7 E=.loration S(+tion

Data #anagement - nsuring that data captured is stored in the correct place in the system &ith correct file name, daily0 1ithological, structural and minerali(ation mapping of the grid2cut line Soil sampling - Adhere to Soil sampling procedures daily Drilling #onitoring Drill /ore logging and sampling o 1ithology and minerali(ation logging daily o Adherence to sampling methodology o Adherence to 3/23A standard procedure #easuring and determining Specific Gravities of minerali(ed (ones <A.r %''# B A4g %''#> Position: 0rad4at( 0(ologist 7 R(so4r+( E:al4ation S(+tion

Data collection and management o Perform R/ samples geological logging for drilled holes o Perform R/ data entry from field reports 4 drilling production, assays, 1ogs, collars data Data validation - /hec.ing the R/ sample results to ensure assays are reported for consigned samples at set turnaround times /ommitment to ensure adherence to 3A23/ protocols and sampling protocols for Grade /ontrol and Dynamic Resource #odel inputs #onitor drill rig recoveries for R/ sampling <A4n %''5 B Mar %''#> Position: Prod4+tion 0(ologist <A+ting> 7 0(olog Prod4+tion S(+tion

-ench #apping #apping pit floors to delineate &aste and ore contacts &ith help of survey coordinates for orientation purposes *isual estimation of minerali(ation in $last hole chip samples (logging! Data capturing and validation -lasthole sampling and sampling 3A23/ nsuring adherence to 3A23/ protocols and sampling protocols for Grade /ontrol #odel inputs nsuring availa$ility, "ntegrity and accuracy of data Grade /ontrol #odelling #odelling of geological units (1ithology and minerali(ation! using Datamine to distinguish ore from &aste &ithin the ore $ody0 Geological "nterpretation of occurrence units and minerali(ation trends 're 1oading /ontrols Direct supervision of $last hole sampling, ore loading and ore stoc.piling0 "nterpretation of modelled grade distri$ution to guide in demarcation of ore and &aste areas0 /ompiling the geology production report sho&ing actual &ee.ly, monthly ore figures against $udgets Reason for leaving: Looking for career growth. After being with the company for 5 yrs, I would like greater challenges and more responsibility, coupled with more e posure.
)l"ays put reasons for leaving each company. (his helps clients to assess your motives' intentions and preferences. (his prevents +uestions and can potentially fast track the recruitment process for you. ,easons for promotion "ithin the same company are not re+uired.

CURRICULUM VITAE
Adrian Thabiso Mogotsi
Page 6 of 5

A.r %''5 B Ma %''5 Position:

STS ENER0?/ 3UNECA COAL ENER0? PROAECT


ProD(+t 0(ologist

Drilling #onitoring and supervision /ore logging o Detailed and provisional drill core logging and sampling o Geotechnical core logging to assess competency of roc. mass o Point load tests on roc. specimen Reason for leaving: !ffered an opportunity to "oin #otsbase $ining %ompany as a &raduate trainee in &eology, and took the opportunity to develop his career and gain e perience in mining environment since he had e perience in e ploration already. 3(b %''5 B Mar %''5 Position:

INSTITUTION O3 0EOLO0ICAL SURVE?


Assistant 0(ologist <Atta+h(d to 0ro4nd L(:(l Mining in Ma4n>

Detailed geological and geotechnical drill core logging Drill core orientation Data capture and validation #easuring and determining Specific Gravities of minerali(ed (ones

Reason for leaving: 'o gain e perience in e ploration pro"ects

;E? ACCOMPLIS,MENTS:

Successful implementation of the G '#'S monitoring system for the ,rancisto&n pit at -ots$ase #ining company Successful setup and implementation of Sirovision data collection tool at -ots$ase #ining /ompany /omplete roc. fall studies to com$at the roc. fall pro$lems at ,rancisto&n pit (this &as done in con)unction &ith the consultant roc. engineer! /ompleting a t&o-year training programme at -ots$ase #ining /ompany in one year

RE3ERENCE B ONL? TO *E CONTACTED 1IT, PERMISSION5


-ots$ase #ining /ompany 6ha$iso 6em$e.ani /hief Geologist 6el (&!5 77289 28: 9;<9 -mail5 t0tem$e.ani=$ots$ase0co0$&

-astly' remem$er that a reference that the client "ould re+uire is someone "ho you have directly reported to in the past. utting on "ork colleagues can $e used in the event "here someone may $e $attling to get in contact "ith you' $ut are generally not accepted as they "ould not have $een a direct report.

CURRICULUM VITAE
Adrian Thabiso Mogotsi
Page 5 of 5

3OR MORE VALUA*LE CV 1RITIN0 TIPS/ PLEASE 3OLLO1 T,IS LIN;:


http522adogreen0com2candidates2cv-e%ample-and-&riting-tips-africa2

Anda mungkin juga menyukai