Aung Kyaw Htoo Deputy Director Energy Planning Department Ministry of Energy
Content
(1) Milestones of Myanmar Oil and Gas Industry (2) Ministry of Energy and Movements (3) Plan and Prospect (4) Perception, Challenges and Recognition (5) Conclusion
Ministry of Energy
Organizations and Respective Responsibilities
Ministry of Energy
Myanma Oil and Gas Enterprise (MOGE) Exploration Drilling Production Onland Oil and Gas Pipeline Network CNG
Refineries & Process Marketing Distribution Fertilizer Plants Methanol Plant CO2 and LPG Plants Waxing & Tar
* Ministry of Energy is Focal Point for Myanmar Energy Sector Cooperation with International and Regional organizations.
Onshore
Daily Production Discovered Producing Fields Tested/Suspended Fields Appraisal Unconventional Project IPR Onshore Blocks Total Demarcated
Domestic Crude Pipeline Network Domestic Gas Pipeline Network
- Crude Oil 7600 bbl & Natural Gas 55 mmcf - 28 oil and gas fields - 18 oil fields and 5 gas fields (Total 23) - 1 tested and 4 suspended oil fields - 1 in Southern Chindwin Basin - Shale Gas Projects under Study Period - 1 field by Horizontal Drilling - 53 (Operating 16, awarded 16 blocks in 2013 Bidding, Open 21)
- 535 km
- 741 km - 736 km
Offshore Producing Fields Daily Production Yadana Yetagun Shwe Export Ongoing Plan Offshore Blocks - Yadana,Yetagun and Shwe - Crude Oil 10,000 bbl & Natural Gas1400 mmcf - 750 mmcfd (722 BTU) - 10,000 bbl/day + 450 mmcfd (1010 BTU) - 200 mmcfd (1012 BUT) - 1100 mmcfd (Thailand) and 200 mmcfd (China) - Zawtika Project M-9 (year 2014) - A Project for domestic supply, Block M-3 - Demarcated Total 51 (Shallow 26 & Deep 25)
Export Gas Pipeline to Thailand (PTTEPI) Yadana to Metering Station (36) - 410 km Yetagun to Metering Station (24) - 274 km Zawtika Project is undergoing in progress and Fist Gas be soon!
9
7 19 26 16 9 25 51 104
3 10 13 4 2 6 19 35
3 8 11 12 7 19 30 48
3 7 10 6 5 11 21 37
1 2 3 6 2 8 11 32
(Deep)
AD MD Arakan Offhsore Area (Deep) Mottama/ Taninthayi (Deep) Deep Water Block Total TOTAL OFFSHORE BLOCKS Block Total
Status of Blocks
Demarcated 53 onshore and 51 offshore blocks, Total 104 blocks. 16 onshore blocks and 19 offshore blocks are operating by multi companies in present 2nd Onshore Bidding Round, 16 Onshore Blocks are awarded to 10 companies. 1st Offshore Bidding Round, out of 30 blocks, 21 blocks are interested only in, 10 evaluated proposals and announcement will be soon!
Fertilizer Plant (Urea) - 5 (Ammonia 1340 MTD & Urea 2012MTD) Methanol Plant - 1 (450 MT/day, under rehabilitation)
CO2 Recovery Plant - 1 (Liquid 24 Ton & Dry ice 6 Ton/day) Others - Waxing and Bitumen (548 MT/day)
11
12
Plan !
1. Main Concern-> Domestic Orientation 2. Secure for long-term sufficient 3. Priority: Upstream E&P in Onshore and Offshore Area
Exploration and Associated Services Drilling and Related Services Engineering, Infrastructure and Supporting Services
4. JV System:
Midstream and Downstream Area Fabrication Yards! Marine Supply Base! Laboratories Training Centers! New Infrastructures!
5. Privatization (Marketing in Petroleum Products) 6. Unconventional Sources of Hydrocarbon! 7. Next Bidding Rounds!
13
Prospect!
1. Government Assessment of potential reserves country-wide Upstream E&P monitoring and State participation Revenue and generated skilled-environments JV with International companies: Capital, Technology, Associated Infrastructure, Supply base and Services etc. 2. JV System in Downstream Area Encouraging JV to existing refineries and following plan! 3. JV System in Service and Supply Base Marine Supply Base! 4. JV System in Laboratories and Training Centers! 5. JV System in New Infrastructures 6. New Refinery (2 mil. MT per Ann.) 7. Privatization Scheme: LPG, Petroleum Products, !!! 8. The lack of an adequate infrastructure-> Opportunities 9. No information-> Expect huge reserves!
14
15
Seismic Survey
Drilling Campaign
Year 2014-2015
EIA/SIA 6 months Signing PSC
Year 2018-2019
Seismic Survey
Seismic Survey & Drilling
Year 2020
Drilling Campaign
Offshore Blocks
Time Schedule ->Working Program in Onshore and Offshore blocks within Exploration Periods Seismic and Drilling Campaign-> Survey Teams & No. of drilling rigs! Favourable Seasons: Logistic, Survey Parties and Drilling Rigs ?
20
Recognition
Terms, Conditions and Expression of Model PSC As a Standard for Bidding 2013 Same level for all bidders Revisit and amendment are engaged EIA, SIA and EMP Reserves-> Unitization Project-> Abandonment & Decommission Additional Contracts Negotiation between National Company and IOCs Gas Sale Agreement, Crude Sale Agreement Infrastructure: Pipeline and related communications Tariff etc
21
Conclusion
High Geologic Risk in Deep Water Main theatre of deep water activities-> Last frontier basin! Priority is Upstream E&P, Onshore and Offshore Area Required New Infrastructures, Downstream and Value-Change