SECTORES:
3.20 m
2.90 m
0.10
0.15
Parcial
Cantidad
# Reserv.
METRADO
Unidad
OBRAS PRELIMINARES
Limpieza de terreno
0.25*P*(De+0.50)^2
10.75
10.75
3.00
32.26
m2
Trazo y replanteo
0.25*P*(De+0.50)^2
10.75
10.75
3.00
32.26
m2
MOVIMIENTO DE TIERRAS
Excavacin Manual
0.25*P*(De+0.50)^2*0.6
0.25*P*(De+0.50)^2
6.45
3.00
19.35
m3
10.75
3.00
32.26
m2
8.06
3.00
24.19
m3
10.75
3.00
32.26
m2
5.73
3.00
17.18
m3
51.56
3.00
154.68
m2
568.98
3.00
1,706.94
kg
6.45
Apisonado y Compactacin
10.75
10.75
P*(De+0.50)*0.20
0.25*P*(Di^2+((De+0.1)^2-De^2))
P*(De+0.1)*Et
-0.6*0.6+0.6*4*Et
P*Di*H
P*De*H
1.82
0.86
-0.04
3.09
2.32
7.12
1.04
-0.12
19.59
21.61
3.20 m
2.90 m
0.10
0.15
Parcial
REVOQUES Y ENLUCIDOS
Tarrajeo int. c/ impermeabilizante
Cantidad
# Reserv.
METRADO
Unidad
20.59
3.00
61.78
m2
11.34
3.00
34.02
m2
19.14
3.00
57.42
m2
1.00
1.00
9.58
3.00
1.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
28.75
9.00
3.00
und
und
ml
und
gbl
1.13
1.13
3.00
3.00
3.38
3.38
m2
m2
0.11
3.00
0.34
m3
1.13
3.00
3.38
m2
0.14
3.00
0.42
m3
1.13
3.00
3.38
m2
2.66
3.00
7.99
m3
7.27
3.00
21.81
m2
8.60
3.00
25.80
Kg
VALVULAS Y ACCESORIOS
Vlvulas y accesorios
valvula compuerta 1"
Niple FG de 2"x10cm
Tubera de fg de 2" (35cm)
Codo de FG DE 2"
Tuberia de entrada directa 1"
Union Universal dePVC de 1"
Canastilla de bronce de 1
''
tee de pvc de 1"x1"
Niple FG de 1"x10cm
Codo de pvc de 1"
Codo de pvc de 2"
Vlvula 2
''
tee de pvc de 2"x2"
Tuberia de salida de 2"
Cono de rebose de pvc de 2"x4"
Union universal de PVC de 2"
Vlvulas y accesorios (PUMARARCCO III)
valvula compuerta 3/4"
Tubera de fg de 2" (35cm)
Codo de FG de 2"
Tuberia de entrada directa 3/4"
Union Universal de PVC de 3/4"
Canastilla de bronce de 3/4''
tee de pvc de 3/4"x3/4"
Niple FG de 3/4"x10cm
Codo de pvc de 3/4"
Codo de pvc de 2"
Vlvula 2
''
tee de pvc de 2"x2"
Tuberia de salida de 2"
Cono de rebose de pvc de 2"x4"
Union universal de PVC de 2"
1.00
3.00
1.00
1.00
2.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
1.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
3.00
3.00
12.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
9.00
12.00
3.00
6.00
6.00
18.00
3.00
6.00
6.00
6.00
6.00
3.00
3.00
3.00
3.00
6.00
1.00
3.00
1.00
1.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
glb
Und.
Und.
Und.
Und.
Ml
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Ml
Und.
Und.
glb
Und.
Und.
Und.
Ml
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Ml
Und.
Und.
VARIOS
Tapa metlica de 0.60x0.60m
1.00
3.00
3.00
Und.
P*Di^2
P*Di*H
26.42
19.59
P*Di^2
26.42
P*De*H
0.25*P*((De+0.1)^2+Di^2+((De+0.1)^2-De^2))
P*(De+0.1)*Et
-0.6*0.6+0.6*4*Et
P*(Di+Ep)
H
1.1
21.61
15.67
1.04
-0.12
9.58
L
1.25
A
0.90
CASETA DE VALVULAS
OBRAS PRELIMINARES
Limpieza de terreno
Trazo y replanteo
1.13
1.13
MOVIMIENTO DE TIERRAS
Excavacin Manual
0.11
Apisonado y Compactacin
1.13
Eliminacin de material excedente
0.14
OBRAS DE CONCRETO SIMPLE
Solado de Concreto 1:4:8
1.13
OBRAS DE CONCRETO ARMADO
Concreto F'c=175 Kg/cm2., losas y muros
Losa
Muros
Techo
Encofrado y Desencofrado, caja
Losa
Muros
Fondo techo
Acero fy=4200 kg/cm2. caja
0.11
2.48
0.08
0.34
6.12
0.81
PLANILLA DE METRADOS
CRUZPAMPA SECTOR I Y II, PUMARARCCO SECTOR II
Item
Concepto
Und
Armadura
f"
Cant
Long.
1.00
1/4"
0.25
3/8"
0.56
1/2"
0.994
5/8"
1.6
3/4"
2.24
1"
4.04
Parcial
Kg
Total
Kg
RESERVORIO
Acero p/losa fondo-piso
182.87
182.87
Reservorio
4
3/8
20.41
182.87
182.87
Reservorio vertical
50
3/8
2.75
154.82
154.82
Reservorio horizontal
13
3/8
10.05
142.40
142.40
Reservorio
3/8
20.41
91.44
tapa de reservorio
3/8
4.55
2.55
Acero p/muros
297.22
88.89
CASETA DE VALVULAS
2.55
8.60
Vertical
1 12.33
1/4
1.20
3.70
3.70
Horizontal
1/4
3.40
3.40
3.40
1/4
0.50
0.75
0.75
1 3.333
1/4
0.90
0.75
0.75
TOTAL EN kg.
TOTAL EN ML.
TOTAL VARILLAS (5% DESP.)
8.60
574.08
582.68
34.40 1,025.14
1,059.54
5.0
120.0
88.89
91.44
Acero p/muros
Caseta
297.22
8.60