SUSTENTO DE METRADO DE RESERVORIO CILINDRICO APOYADO

SECTORES:

CRUZPAMPA SECTOR I Y II, PUMARARCCO SECTOR II


V= 10.00 m3
Diametro exterior del reservorio De =
Diametro interior del reservorio Di =
H=
2.15 m
Espesor del techo
Et =
Espesor de la pared
Ep =

3.20 m
2.90 m
0.10
0.15

RESERVORIOS (03 Und.)

Parcial

Cantidad

# Reserv.

METRADO

Unidad

OBRAS PRELIMINARES
Limpieza de terreno

0.25*P*(De+0.50)^2

10.75

10.75

3.00

32.26

m2

Trazo y replanteo

0.25*P*(De+0.50)^2

10.75

10.75

3.00

32.26

m2

MOVIMIENTO DE TIERRAS
Excavacin Manual
0.25*P*(De+0.50)^2*0.6
0.25*P*(De+0.50)^2

6.45

3.00

19.35

m3

10.75

3.00

32.26

m2

8.06

3.00

24.19

m3

10.75

3.00

32.26

m2

5.73

3.00

17.18

m3

51.56

3.00

154.68

m2

568.98

3.00

1,706.94

kg

6.45

Apisonado y Compactacin
10.75

Eliminacin de material excedente


8.06

OBRAS DE CONCRETO SIMPLE


Solado de Concreto 1:4:8
0.25*P*(De+0.50)^2

10.75

OBRAS DE CONCRETO ARMADO


Concreto F'c=210 Kg/cm2., losas y muros
Losa 0.25*P*(De+0.2)^2*0.20
Techo0.25*P*(De+0.1)^2*Et
Tapa metlica
-0.6*0.6*Et
Muros0.25*P*H*(De^2-Di^2)
Encofrado y Desencofrado, reservorio
Losa
Fondo Techo
Lateral techo
Ducto insp
Muro pared interior
Muro pared exterior
Acero, reservorio

P*(De+0.50)*0.20
0.25*P*(Di^2+((De+0.1)^2-De^2))
P*(De+0.1)*Et
-0.6*0.6+0.6*4*Et
P*Di*H
P*De*H

1.82
0.86
-0.04
3.09
2.32
7.12
1.04
-0.12
19.59
21.61

SUSTENTO DE METRADO DE RESERVORIO CILINDRICO APOYADO


SECTORES:

CRUZPAMPA SECTOR I Y II, PUMARARCCO SECTOR II


V= 10.00 m3
Diametro exterior del reservorio De =
Diametro interior del reservorio Di =
H=
2.15 m
Espesor del techo
Et =
Espesor de la pared
Ep =

3.20 m
2.90 m
0.10
0.15

RESERVORIOS (03 Und.)

Parcial

REVOQUES Y ENLUCIDOS
Tarrajeo int. c/ impermeabilizante

Cantidad

# Reserv.

METRADO

Unidad

20.59

3.00

61.78

m2

11.34

3.00

34.02

m2

19.14

3.00

57.42

m2

1.00
1.00
9.58
3.00
1.00

3.00
3.00
3.00
3.00
3.00

3.00
3.00
28.75
9.00
3.00

und
und
ml
und
gbl

1.13
1.13

3.00
3.00

3.38
3.38

m2
m2

0.11

3.00

0.34

m3

1.13

3.00

3.38

m2

0.14

3.00

0.42

m3

1.13

3.00

3.38

m2

2.66

3.00

7.99

m3

7.27

3.00

21.81

m2

8.60

3.00

25.80

Kg

VALVULAS Y ACCESORIOS
Vlvulas y accesorios
valvula compuerta 1"
Niple FG de 2"x10cm
Tubera de fg de 2" (35cm)
Codo de FG DE 2"
Tuberia de entrada directa 1"
Union Universal dePVC de 1"
Canastilla de bronce de 1
''
tee de pvc de 1"x1"
Niple FG de 1"x10cm
Codo de pvc de 1"
Codo de pvc de 2"
Vlvula 2
''
tee de pvc de 2"x2"
Tuberia de salida de 2"
Cono de rebose de pvc de 2"x4"
Union universal de PVC de 2"
Vlvulas y accesorios (PUMARARCCO III)
valvula compuerta 3/4"
Tubera de fg de 2" (35cm)
Codo de FG de 2"
Tuberia de entrada directa 3/4"
Union Universal de PVC de 3/4"
Canastilla de bronce de 3/4''
tee de pvc de 3/4"x3/4"
Niple FG de 3/4"x10cm
Codo de pvc de 3/4"
Codo de pvc de 2"
Vlvula 2
''
tee de pvc de 2"x2"
Tuberia de salida de 2"
Cono de rebose de pvc de 2"x4"
Union universal de PVC de 2"

1.00
3.00
1.00
1.00
2.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
1.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

3.00
3.00
12.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

3.00
9.00
12.00
3.00
6.00
6.00
18.00
3.00
6.00
6.00
6.00
6.00
3.00
3.00
3.00
3.00
6.00
1.00
3.00
1.00
1.00
2.00
6.00
1.00
2.00
2.00
2.00
2.00
1.00
1.00
1.00
1.00
2.00

glb
Und.
Und.
Und.
Und.
Ml
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Ml
Und.
Und.
glb
Und.
Und.
Und.
Ml
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Und.
Ml
Und.
Und.

VARIOS
Tapa metlica de 0.60x0.60m

1.00

3.00

3.00

Und.

P*Di^2
P*Di*H

26.42
19.59

P*Di^2

26.42

Mortero 1:5 para dar pendiente al fondo


Tarrajeo exterior
Muro
Techo
Lateral techo
Ducto de inspeccin
VARIOS
Ventilacin FG 2"
Tapa metlica de 0.80x0.80m
Junta Wather Stop de Neoprene 6"
Llave de corona de 1/2"
Sumin. e instalacin de hipoclorador

P*De*H
0.25*P*((De+0.1)^2+Di^2+((De+0.1)^2-De^2))
P*(De+0.1)*Et
-0.6*0.6+0.6*4*Et

P*(Di+Ep)

H
1.1

21.61
15.67
1.04
-0.12

9.58

L
1.25

A
0.90

CASETA DE VALVULAS
OBRAS PRELIMINARES
Limpieza de terreno
Trazo y replanteo

1.13
1.13

MOVIMIENTO DE TIERRAS
Excavacin Manual
0.11
Apisonado y Compactacin
1.13
Eliminacin de material excedente
0.14
OBRAS DE CONCRETO SIMPLE
Solado de Concreto 1:4:8
1.13
OBRAS DE CONCRETO ARMADO
Concreto F'c=175 Kg/cm2., losas y muros
Losa
Muros
Techo
Encofrado y Desencofrado, caja
Losa
Muros
Fondo techo
Acero fy=4200 kg/cm2. caja

0.11
2.48
0.08
0.34
6.12
0.81

PLANILLA DE METRADOS
CRUZPAMPA SECTOR I Y II, PUMARARCCO SECTOR II
Item

Concepto
Und

Armadura
f"
Cant

Long.

1.00
1/4"
0.25

3/8"
0.56

1/2"
0.994

5/8"
1.6

3/4"
2.24

1"
4.04

Parcial
Kg

Total
Kg

RESERVORIO
Acero p/losa fondo-piso

182.87

182.87

Reservorio
4

3/8

20.41

182.87

182.87

Reservorio vertical

50

3/8

2.75

154.82

154.82

Reservorio horizontal

13

3/8

10.05

142.40

142.40

Reservorio

3/8

20.41

91.44

tapa de reservorio

3/8

4.55

2.55

Acero p/muros

297.22

Acero p/losa maciza

88.89

CASETA DE VALVULAS

2.55

8.60

Vertical

1 12.33

1/4

1.20

3.70

3.70

Horizontal

1/4

3.40

3.40

3.40

1/4

0.50

0.75

0.75

1 3.333

1/4

0.90

0.75

0.75

Acero losa techo

TOTAL EN kg.
TOTAL EN ML.
TOTAL VARILLAS (5% DESP.)

8.60

574.08

582.68

34.40 1,025.14

1,059.54

5.0

120.0

88.89

91.44

Acero p/muros

Caseta

297.22

8.60