Site Name Configuration 2+2+2 Infra Provider BTS Type FLEXI Sharing status Indoor/ Outdoor OUTDOOR Date 12 MAR 2014 FLM Engineer SUKANTA DASH A A.1 A.2 A.3 A.4 A.5 A.6 A.7 B B.1 B.2 B.3 B.4 B.5 B.6 B.7 B.8 B.9 B.10 B.11 B.12 B.13 Alarm no. Alarm Name OK/ Not OK Alarm No. Alarm Name 7401 Site on Battery OK 7407 DG Fail to start 7402 Rectifier Fail OK 7408 Smoke & Fire 7403 Mains Fail OK 7409 DG Fail to Stop 7404 AC Fail/High TempOK 7410 Low Fuel 7405 Low Battery OK 7411 TMA Fail 7406 Load on DG OK 7412 Door Open B.15 VSWR TRX 1 46 Antenna 1 Antenna 1 TRX 2 46 Antenna 2 Antenna 2 TRX 3 Antenna 3 Antenna 3 TRX 4 Antenna 4 Antenna 4 TRX 5 46 Antenna 5 Antenna 5 TRX 6 45 Antenna 6 Antenna 6 TRX 7 Antenna 7 Antenna 7 TRX 8 Antenna 8 Antenna 8 TRX 9 45 Antenna 9 Antenna 9 TRX 10 45 Antenna 10 Antenna 10 TRX 11 Antenna 11 Antenna 11 TRX 12 Antenna 12 Antenna 12 C INDUS Is the site clean(Shelter for indoor sites)? Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)? Preventive Maintenance Checklist BHARTI M&G5675 KHOKARLAGBT_ODF Is there any opening in hatch plate(Ensure proper sealing to close opening)? BTS Check Value for Earth resistance by earth tester( clamp meter) SHARED Site Check Is any visual alarm ON(Check from LEDs-amber/ Red)? Any hardware level alarm(Mention alarm number)? Is the IGB/ EGB connected to Earth pit? Is the alarm frame accessible? Is there any leakage of Shelter? Conduct TRX Test and mention TRX no. where TRX test failed (Replace if applicable)? Is intelligent BTS Shutdown implemented/LVLD implemented and working (Rectify if not working)? Is the BTS clean(for outdoor BTS, clean internal and external and free all air inlets/ outlets of obstructions)? Is the door lock sensor and Fan working(Outdoor BTS)? Is the BTS grounded with IGB/EGB? Is the alarm cleared during Preventive Maintenance (if not mention reason)? Any software level alarm(mention alarm no.)? Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)? Are all cables properly terminated and routed ? Is TMA/TMB installed and in working condition? Check External alarms? Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test) TX Power RSSI Value Microwave Transmission Check C.1 C.2 C.3 C.4 C.5 C.6 C.7 C.8 C.9 C.10 C.11 Link Details To Tx. Freq Rx. Freq Polarization Link 1 CHICHAL_IND_ODU 14690000 15110000 VERTICAL Link 2 Link 3 Link 4 Link 5 Link 6 Link 7 Link 8 C.12 Available Time ES SES Link 1 Link 2 Link 3 Link 4 Link 5 Link 6 Link 7 Link 8 D D.1 D.2 D.3 D.4 D.5 D.6 Sec A Sec A(OAC) Sec A(Exp.) Sec B Sec B(OAC) Tilt Mech 2 2 Tilt Elect. 0 0 Orientation 30 130 Additional Remarks 1 DG not in automation 2 PIU,BB,and Power Plant not Graunded 3 SITE NOT CLEAN 4 LA DIRECTED TO TOWER 5 RLS not as required 6 Low battery backup 7 Aviation lamp not working Is the BTS synchronized with site E1(Platform interface of the BTS)? Is there any visual alarm in MUX (if yes clear else put remark)? Are all IF cables tightened? Any alarm holding in RRI/ FIFA/ FIU/ MUX/ IDU/ (if not cleared mention alarm details)? Is the Transmission rack and FIU/ IDU/ MUX grounded? Are all IF Cables routed properly and grounded? Is there any visual alarm in FIU(if yes clear else put remark)? Is there any visual alarm in IDU(if yes clear else put remark)? Is the MUX synchronized with incoming E1/ STM (mention E1/ STM details- Slot/ Trib)? Outdoor Check Are all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)? Are all RF/ IF Cables labelled(Indoor & Outdoor)? Is the DDF labled and cables properly terminated? Statistics (Compare with Planning Data) Check and correct GSM antenna tilt and orientation (Compare with Planning data) Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied? Are GSM and microwave antennas accessible for maintenance? Check antenna clamp and support rod tightness sukanta dash Kamalesh Hatewar (Site Engineer) (Cluster Team Lead) Slave BSC Name BSC ID BSC ET Site Type Cluster Yes/ No NO NO YES NO YES NO NO YES YES YES NO NO NO NO YES YES YES YES NO YES OK/ Not OK OK OK OK OK OK OK 2 MASTER 2040 1 1 2 0 0 Yes/ No 470 Is the site clean(Shelter for indoor sites)? Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)? Preventive Maintenance Checklist BSC106TMP 206898 Is there any opening in hatch plate(Ensure proper sealing to close opening)? BTS Check Remarks Value for Earth resistance by earth tester( clamp meter) BTS Nagpur Site Check Remarks Is any visual alarm ON(Check from LEDs-amber/ Red)? Any hardware level alarm(Mention alarm number)? Is the IGB/ EGB connected to Earth pit? Is the alarm frame accessible? Is there any leakage of Shelter? Conduct TRX Test and mention TRX no. where TRX test failed (Replace if applicable)? Is intelligent BTS Shutdown implemented/LVLD implemented and working (Rectify if not working)? Is the BTS clean(for outdoor BTS, clean internal and external and free all air inlets/ outlets of obstructions)? Is the door lock sensor and Fan working(Outdoor BTS)? Is the BTS grounded with IGB/EGB? BTS GRAUNDING THEFT Is the alarm cleared during Preventive Maintenance (if not mention reason)? Any software level alarm(mention alarm no.)? Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)? Remarks Are all cables properly terminated and routed ? Is TMA/TMB installed and in working condition? Check External alarms? VSWR NOT MEASURED RSSI VALUE WITHIN LIMIT Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test) RSSI Value DAC Value Remark Microwave Transmission Check Remarks NA YES YES NO NO NO YES YES NO YES Q1 Address (Compare with Planning Data) Near End Far End Tx Power Rx Level Capacity VXRB/ FIU 12 -52 4X2E1 FIFA BBE EB YES YES YES YES YES YES Sec B (Exp.) Sec C Sec C(OAC) Sec C(Exp.) Sec D Sec D(OAC) 2 0 250 Is the BTS synchronized with site E1(Platform interface of the BTS)? Is there any visual alarm in MUX (if yes clear else put remark)? Are all IF cables tightened? Any alarm holding in RRI/ FIFA/ FIU/ MUX/ IDU/ (if not cleared mention alarm details)? Is the Transmission rack and FIU/ IDU/ MUX grounded? Are all IF Cables routed properly and grounded? Is there any visual alarm in FIU(if yes clear else put remark)? Is there any visual alarm in IDU(if yes clear else put remark)? Is the MUX synchronized with incoming E1/ STM (mention E1/ STM details- Slot/ Trib)? Outdoor Check Are all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)? Are all RF/ IF Cables labelled(Indoor & Outdoor)? Is the DDF labled and cables properly terminated? Statistics Check and correct GSM antenna tilt and orientation (Compare with Planning data) Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied? Are GSM and microwave antennas accessible for maintenance? Check antenna clamp and support rod tightness Kamalesh Hatewar (Cluster Team Lead) (FLM Manager) 470 Preventive Maintenance Checklist BSC106TMP 206898 Remarks BTS Nagpur Remarks BTS GRAUNDING THEFT Remarks VSWR NOT MEASURED RSSI VALUE WITHIN LIMIT Check transmitter power, VSWR and RSSI values( Use Site master / Laptop/ TRX Test) Remark Remarks Slot Flexbus no. 1 FB1 Sec D(Exp.) (FLM Manager) Operator Master Slave Site ID BCF ID 566 Site Name Configuration 2+2+2 Infra Provider BTS Type FLEXI Sharing status Indoor/ Outdoor OUTDOOR Date 12 MAR 2014 FLM Engineer SUKANTA DASH Sr No 1 2 3 4 5 6 7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 24 26 27 28 29 30 31 32 Pre / Post Monsoon Checklist BHARTI M&G5675 KHOKARLAGBT_ODF Pre Monsoon Checklist Is the Roxtec properly sealed: else seal with puff seal or packing material+insulation tape DC Fan working status in chiller/Shelter? BTS and Infra Check List Description Shelter Check List Is the BTS Dust Free : do proper cleaning Is the BTS Grounded as per Recommendation for Ultra/MR/Metro Power Plant LVD bypassed ? Is SA connected to RF feeder cables and grounded ? INDUS SHARED Is the door lock sensor and Fan working(Outdoor BTS)? Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)? Is any Active alarm present in BTS during the PM? (TRX test,RSSI, Active alarm, Tx Alarm in the node was checked and cleared or put remarks) BTS Dust Guard present for Ultra Cabinet? All the HW units are grounded properly for Flexi BTS( EXGA,EXDA,ESMA,ESEA units) All external Alarms are reporting and as per standard guideline. If No Mentioned in the Alarm Nos's MW Outdoor Availabilty of Check nut for Antenna clamps/support rod and tight properly Is the site clean(Shelter for indoor sites)? Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)? Is there any opening in hatch plate(Ensure proper sealing to close opening)? Are all cables properly terminated and routed ? Power Plant supports Dual LVD (critical/non-critical) Are all the connection terminals/lugs/bolts rust free and tight Txn Indoor Sealing of case Is the Transmission rack and FIU/ IDU/ MUX grounded? Antenna Radome Intact Are all IF cables tightened? Are the strut rods for m/w antennas tight? Is the Rx level as per the desired/designed level? Is the DDF labeled and cables properly terminated? Are the mounting fixtures of the m/w antennas intact? Flexi Hybrid Dust cleaning and Protection? Proper sealing cap available with Txn cable connected to System modules? Unused ports are having sealing boots in system module? Is there any visual alarm in MUX / FIU / IDU (if yes clear else put remark)? 33 34 35 36 37 38 39 40 41 42 43 43 43 1 2 3 Outdoor Cables Feeder grounding kit nut/bolt tight and properly connected to EGB In case of Outdoor BTS /IP55/IP 65 fan is working In case of Outdoor BTS /IP55/IP 65 Dust filter is clean Is ODU connector tight & water proof? In case of Outdoor BTS /IP55/IP 65 no possibility of leakage from BTS Door and Rubber glands Is ODU grounded? General Check List Access Road Will the Access Road be inaccessible due to flooding? Photograph for the site Is the IGB/ EGB connected to Earth pit? Weather proofing of GSM antenna ports are ok; else do necessary weatherproofing Is Lightning Arrestor available and connected to earth ? Take the snap shot of the site and share with the Bharti and NSN O&M head Outdoor Cage Shelters Are all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)? Is the roofing sheet intact?(If No, please get the same rectified by the vendor) Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied? Are there any holes, leakages developed through the roof?. (If yes please seal or get the sheets changed.) BSC Name BSC ID BSC ET Site Type Cluster Status Remarks NO NO NO NO NO NO YES YES YES YES YES YES YES YES YES YES YES YES NO YES NO YES NO YES YES NO NO YES YES YES YES Pre / Post Monsoon Checklist BSC106TMP Pre Monsoon Checklist Is the Roxtec properly sealed: else seal with puff seal or packing material+insulation tape DC Fan working status in chiller/Shelter? BTS and Infra Check List Description Shelter Check List Is the BTS Dust Free : do proper cleaning Is the BTS Grounded as per Recommendation for Ultra/MR/Metro 206898 Power Plant LVD bypassed ? Is SA connected to RF feeder cables and grounded ? 470 BTS Nagpur Is the door lock sensor and Fan working(Outdoor BTS)? Tighten all SMA Cables if loose(Transceiver/ Multicoupler/ Combiner)? Is any Active alarm present in BTS during the PM? (TRX test,RSSI, Active alarm, Tx Alarm in the node was checked and cleared or put remarks) BTS Dust Guard present for Ultra Cabinet? All the HW units are grounded properly for Flexi BTS( EXGA,EXDA,ESMA,ESEA units) All external Alarms are reporting and as per standard guideline. If No Mentioned in the Alarm Nos's MW Outdoor Availabilty of Check nut for Antenna clamps/support rod and tight properly Is the site clean(Shelter for indoor sites)? Is the room cool and AC working(mention room temperature wherever available from PIU/ Power Plant/ AC Display)? Is there any opening in hatch plate(Ensure proper sealing to close opening)? Are all cables properly terminated and routed ? Power Plant supports Dual LVD (critical/non-critical) Are all the connection terminals/lugs/bolts rust free and tight Txn Indoor Sealing of case Is the Transmission rack and FIU/ IDU/ MUX grounded? Antenna Radome Intact Are all IF cables tightened? Are the strut rods for m/w antennas tight? Is the Rx level as per the desired/designed level? Is the DDF labeled and cables properly terminated? Are the mounting fixtures of the m/w antennas intact? Flexi Hybrid Dust cleaning and Protection? Proper sealing cap available with Txn cable connected to System modules? Unused ports are having sealing boots in system module? Is there any visual alarm in MUX / FIU / IDU (if yes clear else put remark)? YES YES NO YES YES YES NO YES YES YES YES YES YES YES YES YES Outdoor Cables Feeder grounding kit nut/bolt tight and properly connected to EGB In case of Outdoor BTS /IP55/IP 65 fan is working In case of Outdoor BTS /IP55/IP 65 Dust filter is clean Is ODU connector tight & water proof? In case of Outdoor BTS /IP55/IP 65 no possibility of leakage from BTS Door and Rubber glands Is ODU grounded? General Check List Access Road Will the Access Road be inaccessible due to flooding? Photograph for the site Is the IGB/ EGB connected to Earth pit? Weather proofing of GSM antenna ports are ok; else do necessary weatherproofing Is Lightning Arrestor available and connected to earth ? Take the snap shot of the site and share with the Bharti and NSN O&M head Outdoor Cage Shelters Are all RF/ IF Cables properly clamped to cable tray (Indoor & Outdoor)? Is the roofing sheet intact?(If No, please get the same rectified by the vendor) Are all connectors(at feeders/jumpers/antennas) properly weather poffed and tied? Are there any holes, leakages developed through the roof?. (If yes please seal or get the sheets changed.) Circle Maharashtra and Goa Site ID M&G5675 Sl.No. Work Performed RF GIS Data 1 Configuration 2+2+2 2 Main BTS Type (Flexi/Ultra/Ultra Mini/ MR/Flexi Stck/Metro) FLEXI 3 Main BTS Type (Indoor / Out door) OUTDOOR 4 Expansion BTS type (ultra,flexi,metro,stack,MR etc) N/A 5 Exp BTS Type (Indoor / Out door) N/A 6 Number of anteena 3 7 Azumith of anteena Sec1 30 8 Azumith of anteena Sec2 120 9 Azumith of anteena Sec3 260 10 Azumith of anteena Sec4 11 Anteena Type sec1 (make and model number)-1 KATHERIN-742186 12 Anteena Type sec1 (make and model number)-2 13 Anteena Type sec2 (make and model number)-1 KATHERIN-742186 14 Anteena Type sec2 (make and model number)-2 15 Anteena Type sec3 (make and model number)-1 KATHERIN-742186 16 Anteena Type sec3 (make and model number)-2 17 Anteena Type sec4 (make and model number)-1 18 Anteena Type sec4 (make and model number)-2 19 Feeder type 7/8" 20 Feeder Length 55X6=330 sec1-1 55X2=110 sec1-2 sec2-1 55X2=110 sec2-2 sec3-1 55X2=110 sec3-2 21 Tower height 40 22 Building height 0 23 Antenna height sec1 38 24 Antenna height sec2 38 25 Antenna height sec3 38 26 Antenna height sec4 27 Tower type GBT 28 TMA sec1 NO 29 TMA sec2 NO 30 TMA sec3 NO 31 TMA sec4 32 Site Type OM 33 Operation mode (combined/uncombined) sector1 UNCOMBINED 34 Operation mode (combined/uncombined) sector2 UNCOMBINED 35 Operation mode (combined/uncombined) sector3 UNCOMBINED 36 Operation mode (combined/uncombined) sector4 RF Checksheet for GIS Accuracy PRM DATE Engg Name 37 Elect Tilt Sect1 0 38 Mech. Tilt Sect1 2 39 Elect Tilt Sect2 0 40 Mech. Tilt Sect2 2 41 Elect Tilt Sect3 0 42 Mech. Tilt Sect3 2 Site Data As per GIS Yes/No Remarks 2+2+2 YES FLEXI YES OUTDOOR YES N/A N/A 3 YES 30 YES 130 NO 250 NO ANDREW NO sr.no.not visible ANDREW NO sr.no.not visible ANDREW NO sr.no.not visible 7/8" YES 49X6=294 NO 49X2=98 NO 49X2=98 NO 40 YES 0 YES 34 NO 34 NO 34 NO GBT YES NO NO NO NO NO NO OM YES UNCOMBINED YES UNCOMBINED YES UNCOMBINED YES RF Checksheet for GIS Accuracy SUKANTA DASH 12-Mar-14 PRM DATE Engg Name 4 YES 3 YES 4 YES 2 YES 5 YES 7 YES Circle Maharashtra and Goa Site ID M&G5675 Sl.No. Work Performed GIS Data Site Data 1 Link Details (link1) CHICHAL_IND_ODU CHICHAL_IND_ODU 2 Microwave antenna Size 1.2M 1.2 3 Microwave antenna High 35M 38 4 Microwave Antenna Make and Model ANDREW ANDREW 5 Frequency band 15GHZ 15GHZ 6 Spot frequency 14690000 14690000 7 Link Configuration(1+0/1+1/2+0) 1+0 1+0 8 IDU Type Make and Model FLEXI HOPER FIFA 9 ODU Make and Model NOKIA NOKIA 10 Polarization VERTICAL VERTICAL 11 Total U space utilized (Including DDF) NA NA 12 Link Details (link2) 13 Microwave anteena Size 14 Microwave anteena Hight 15 Microwave Anteena Make and Model 16 Frequency band 17 Spot frequency 18 Link Configuration(1+0/1+1) 19 IDU Type Make and Model 20 ODU Make Make and Model 21 Link Details (link3) 22 Microwave anteena Size 23 Microwave anteena Hight 24 Microwave Anteena Make and Model 25 Frequency band 26 Spot frequency 27 Link Configuration(1+0/1+1) 28 IDU Type Make and Model 29 ODU Make Make and Model 30 Link Details (link4) 31 Microwave anteena Size 32 Microwave anteena Hight 33 Microwave Anteena Make and Model 34 Frequency band 35 Spot frequency 36 Link Configuration(1+0/1+1) 37 IDU Type Make and Model 38 ODU Make Make and Model 39 Link Details (link5) 40 Microwave anteena Size 41 Microwave anteena Hight 42 Microwave Anteena Make and Model 43 Frequency band 44 Spot frequency 45 Link Configuration(1+0/1+1) 46 IDU Type Make and Model Transmission Checksheet for GIS Accuracy Engg Name PRM DATE 47 ODU Make Make and Model 48 Link Details (link6) 49 Microwave anteena Size 50 Microwave anteena Hight 51 Microwave Anteena Make and Model 52 Frequency band 53 Spot frequency 54 Link Configuration(1+0/1+1) 55 IDU Type Make and Model 56 ODU Make Make and Model 57 Link Details (link7) 58 Microwave anteena Size 59 Microwave anteena Hight 60 Microwave Anteena Make and Model 61 Frequency band 62 Spot frequency 63 Link Configuration(1+0/1+1) 64 IDU Type Make and Model 65 ODU Make Make and Model 66 Link Details (link8) 67 Microwave anteena Size 68 Microwave anteena Hight 69 Microwave Anteena Make and Model 70 Frequency band 71 Spot frequency 72 Link Configuration(1+0/1+1) 73 IDU Type Make and Model 74 ODU Make Make and Model 75 Link Details (link9) 76 Microwave anteena Size 77 Microwave anteena Hight 78 Microwave Anteena Make and Model 79 Frequency band 80 Spot frequency 81 Link Configuration(1+0/1+1) 82 IDU Type Make and Model 83 ODU Make Make and Model 84 Link Details (link10) 85 Microwave anteena Size 86 Microwave anteena Hight 87 Microwave Anteena Make and Model 88 Frequency band 89 Spot frequency 90 Link Configuration(1+0/1+1) 91 IDU Type Make and Model 92 ODU Make Make and Model 93 Link Details (link11) 94 Microwave anteena Size 95 Microwave anteena Hight 96 Microwave Anteena Make and Model 97 Frequency band 98 Spot frequency 99 Link Configuration(1+0/1+1) 100 IDU Type Make and Model 101 ODU Make Make and Model 102 Link Details (link12) 103 Microwave anteena Size 104 Microwave anteena Hight 105 Microwave Anteena Make and Model 106 Frequency band 107 Spot frequency 108 Link Configuration(1+0/1+1) 109 IDU Type Make and Model 110 ODU Make Make and Model Name and signature of CTL with date As per GIS Yes/No Remarks YES YES NO YES YES YES YES YES YES YES Transmission Checksheet for GIS Accuracy 12-Mar-14 SUKANTA DASH Circle Maharashtra and Goa Site ID M7G5675 Sl.No. Work Performed Quantity Working Yes/No 1 FIU 2 E1T1 3 FIFA 1 YES 4 FIPA 5 RRI 6 FHY 7 FTIB 8 Mux Type 1 (STM1) 9 Mux Type 2 (STM-4) 10 Mux Type 3 (STM-16) 11 Mux Make (ECI) 12 Mux Make (Tejas) 13 Other Extra Material at site 14 Other Extra Material at site 15 Other Extra Material at site 16 Other Extra Material at site-4 17 Other Extra Material at site-5 18 Other Extra Material at site-6 19 Other Extra Material at site-7 20 Other Extra Material at site-8 Extra material Check sheet for site Engg Name PRM DATE Name and signature of CTL with date If No then SRN to be done Remarks whether to be use for O&M Purpose Extra material Check sheet for site SUKANTA DASH 12-Mar-14