Desert Learning Centre, Al Ain,
United Arab Emirates
Page 8
Jaber al Ahmad Hospital, Kuwait City,
Kuwait
Page 12
Sky Gate, Beirut,
Lebanon
Page 14
Ofce Tower at KAFD, Riyadh,
Saudi Arabia
Page 15
Formwork Scaffolding Engineering
Issue 1 | 2012 Middle East
Successful construction with PERI
SKYDECK the light-weight slab formwork
for large-scale projects on fast-track
Conference Center on Parcel A01, Riyadh, Saudi Arabia
Daniel Keogh,
Senior Construction Manager:
The project involves multiple work
fronts that require multiple solu-
tions. The PERI range of systems,
especially for formwork, enabled the
construction team to address each
differing situation with a system to
suit. Where individual work areas
incurred varying conditions, the
exibility of the PERI systems al-
lowed for adaption of the formwork
to the requirements. Each PERI
system offers its own efciency,
whether through plant, resources or
rotation of material, which can be
imparted into the programming of
works.
The conference center is part of the
King Abdullah Financial District (KAFD)
in North Riyadh, which is one of the
most prestigious developments in Saudi
Arabia. The construction of the confer-
ence center commenced in August
2011 and is expected for nalization mid
high speed erection with minimum
cycle timings as well as optimizing the
cost of material by using economical
systems. All of the above objectives
have been met by PERI. For the large
number of columns the LICO column
formwork was selected. Due to the
easy handling and few components
needed, a one day cycle was achieved
with 11 sets of shutters. The contractor
was able to cast the core walls in a 3 to
4 days cycle by using the VARIO GT 24
wall formwork. One major concern was
the huge slab area, which needed to
be casted in a very short time. PERI
provided the light-weight slab form-
work SKYDECK with its dropheads,
MULTIPROP MP 480 and MP350.
The 24,400m of easy-to-use decking
system and the 36,000m propping
were utilized in a most efcient way.
Furthermore, SB-2 Brace Frames have
been used for the single-sided retaining
walls with heights up to 4.80m. All in
all, PERI is able to provide the perfect
formwork solution for any fast-track
project requirement.
The large-scale footprint and fast-track program of
the project required the delivery of a huge form-
work volume in a short time, which was success-
fully executed by PERI in Saudi Arabia, Germany
and several other subsidaries worldwide.
The SKYDECK slab formwork allows a systematic
and fast erection by using its few components.
Three PERI systems (VARIO GT 24, LICO Column
Formwork and SKYDECK) work hand-in-hand
on several oors.
Contractor
El Seif Engineering
Contracting Company
Field Service
PERI Engineering,
Saudi Arabia
2012. This fast-track project comprises
a carpark in four basement levels and
will provide space for more than
1,500 cars over a total built-up area of
29,000 m. Some of the main objectives
from the contractor were to create an
extremely safe working environment,
The illustration featured in this brochure are photographs
taken at a particular time on a construction site. This is
why the safety details shown cannot be considered as final.
PERI GmbH
Formwork
Scaffolding
Engineering
300
150
75
75
150
75
75
3 2
Maximum exibility
for a wide range of applications
PERI UP Rosett Flex
Dear Customers
and Dear Readers,
We are extremely pleased to present you with
a new issue of the PERI Scope Middle East
magazine. The selected projects feature an
interesting cross-section of our formwork,
scaffolding and engineering solutions. Apart
from large-scale projects such as the Jaber Al
Ahmad Hospital in Kuwait City on page 8, or
the Conference Center in Riyadh on page 16,
we also highlight some impressive multi-
storey buildings and infrastructure develop-
ments in the whole Middle East region.
With all our company activities, we attach
great importance on capabilities for the future
and ecological sustainability. Our product
development is aimed at achieving the best
utilization of materials and, at the same time,
minimum material use. Regarding the selec-
tion of raw materials and material procure-
ment, we take into account ecological consid-
erations while precise and efcient production
processes ensure the highest product qual-
ity. As a result, our customers prot among
other things from the high number of uses
and longevity of our system equipment. In
the process, the safety of site personnel has
always had the highest priority for us because
only the provision of safe working conditions
guarantees effective construction progress.
In connection with a wide range of customer-
oriented services, we provide economical
solutions for all construction tasks.
We have already been able to prove this during
the numerous projects we have been involved
in throughout the region. For the future, we ex-
pect to be involved in much more of the same
in the Near and Middle East. We are particu-
larly looking forward to the FIFA World Cup in
Qatar which will also include a lot of stadium
and infrastructure constructions. The rst
architectural designs of the new arenas are
very impressive indeed and we can therefore
expect to be participating in a range of inter-
esting construction tasks over the next few
years. We will be pleased to meet these excit-
ing challenges which we would like to tackle in
partnership with our customers.
Regards,
Ulrich Rottler
General Manager Near and Middle East
PERI UP Rosett Flex successfully provided
working platforms and access stairs throughout
the complex industrial building structure Edicio
gora in Valencia (Spain).
Cover photo
Etihad Towers in Abu Dhabi is being
built with the help of PERI climbing
formwork. PERI also delivered form-
work and scaffolding for the buildings
on the left and on the right side of this
new high-rise building.
PERI UP Rosett Flex comes with
a grid of 250 mm ensuring optimal
adaption to the structure. Intermedi-
ate decks and handrails can be xed
to the standard PERI UP Rosett Flex
node every 500 mm.
PERI UP Rosett Flex supporting the
complex structure of Saadiyat Bridge in
Abu Dhabi. Using only a few individual
components, all loads were safely trans-
ferred into the ground.
PERI UP Rosett Flex is extremely exible and meets the highest safety standards. One example for the
use in an industrial facility is the scaffolding for the Kralupynad Vltavou Oil Renery in the Czech Republic.
PERI UP Rosett Flex access stairs.
Every entry or exit level can be achieved.
PERI UP Rosett Flex providing safe
access to all reinforcement and
concrete works for this 18 m high
shear wall. Formwork as well as
scaffold can be lifted by crane.
The Horizontal Ledger (UH) with
gravity lock: secure connection also
under vibrations.
The metal decking design combines
high permissible loads (up to 10 kN/m)
with low weight and a slip resistant
surface.
PERI UP Rosett Flex scaffold can be
used for various applications such as
access stairs, access scaffold, faade
scaffold, industrial scaffold and shoring.
Its standard grid of 250 mm was devel-
oped to ensure maximum exibility in
any direction and has proven to be highly
adaptable to any structure or height.
PERI UP Rosett Flex main components
are vertical standards (UV), horizontal
ledgers (UH), braces (UB) and decks
(UD). The horizontal ledgers are xed to
the vertical standards through
PERI UP Rosett Flex gravity lock. Once
a ledger is hinged into the rosett node it
is immediately secured and cant come
off. The gravity lock uses vibrations on
the scaffold to further tighten the
connection.
All metal decks are perforated and self-
locking, ensuring a high slip resistance
and always safe connection to horizon-
tal ledgers. All decks are hot dip galva-
nized. Oil, chemicals or salt water can
therefore easily be removed.
Metal decks are available in widths of
250 mm and lengths from 500 mm to
3,000 mm. Any decking surface can be
closed completely by using available
system components. The result is a gap
free and safe working area.
5 4
Economical formwork solutions
for a project leading towards an eco-friendly future
TRIO panel formwork the best solution
for any project requirement
Masdar Institute of Science and Technology, MIST 1B, Abu Dhabi, United Arab Emirates
Nilona Tower, Dubai, United Arab Emirates
The expansion of Masdar Institute
of Science and Technology covers
the construction of a student accom-
modation, seven open laboratories, a
multi-use hall facility, swimming pool
and a gym. It will incorporate similar
energy efcient design elements such
as shaded streets, natural ventilation
and heat reecting facades that makes
the facility and architecture unique.
The total built up area is 82,000 m
and is expected to be completed over
the course of 18-months, with approxi-
mately 35% size increase to the current
campus.
PERI has been awarded the contract
to supply formwork for columns, core
walls and slabs. In order to be able to
realize such project, PERI has de-
signed customized solutions to satisfy
the needs of the client.To achieve
Nilona Tower is located in Dubai
Healthcare City Phase II, and will house
24 storeys, ground oor and 3 base-
ment oors for parking. The tower will
feature 352 elegant and luxurious guest
rooms, 128 luxury serviced apartments,
comprehensive health and tness
facilities. Guests and residents will also
have an array of nutritious gourmet din-
ing and be surrounded by spectacular
sceneries.
The differently dimensioned reinforced
concrete columns were formed with
TRIO, CB 240, MULTIFLEX and PD 8
shoring support, according to the re-
quirements using the optimal system
in each case. By using the CB 240, the
oor cycle can easily be achieved, while
PD 8 Shoring Towers provided optimal support for
the typical slabs.
The Masdar Institute was established in coopera-
tion with Massachusetts Institute of Technology
(MIT); it focuses on research, technological
development and human capital development in
renewable energy and clean technologies.
With a customized solution for cantilever, PD 8
shoring, with a legload capacity of up to 70 kN,
has been the ideal product choice.
With PERIs table modules and props the amount
of single components could be reduced drastically.
The high exural stiffness of VARIOs girders and
matching steel walers can often be used to speed
up shuttering, by optimizing the formwork panels
and minimizing the number of tie points. In many
cases the VARIO system yields the most cost-
effective solution. The components of the VARIO
system were used to provide individual, movable
beam side shutters which fullled the requirement
of preassembling and reusing of all beam shutters.
Due to the exibility of PERIs TRIO
panel formwork, it was possible to
cover the large variety of different
vertical elements in our project. With
their MULTIFLEX system, we tackled
the challenges of non-typical struc-
tures, covering immense construc-
tion areas. For our typical slabs
we used PERIs table forms, which
allowed us to reach a short construc-
tion cycle. Throughout the project
we were satised with PERIs sup-
port and their technical experience
and solutions.
Wolfgang Kopf,
Construction
Manager
Formwork:
Kahtan al-Tikriti and
Safwan S Boumorra,
Construction Managers:
Despite the fast track nature of
MIST-1B project and the continuity
of the superstructure works 24/7,
for a duration of 7 months, PERI
proved their capability to present
the site required technical sup-
port and on site solutions for the
complicated cases, backed up with
the calculation and the praticality
of the said solutions.
Contractor
Al Rostamani Pegel
Field Service
PERI Dubai, UAE
Contractor
Arabian Construction Company (ACC)
Field Service
PERI Abu Dhabi, UAE
keeping a safe working environment
and being in need of less manpower.
For forming, reinforcing and concreting
the shear oors, TRIO resources were
used. Swivel Head Table form served
for the slab edge formwork.
The broad PERI product range and opti-
mized logistical operations through only
one formwork partner simplied and
accelerated the construction progress.
This meant, for example, that the TRIO
with CB 240 wall formwork system
could be used extremely versatile:
for forming the core walls as well as
constructing the shear walls. In addi-
tion, MULTIFLEX and PD 8 slabs tables
ensured that formworking was carried
out very efciently.
minimum cycle times, the client used
VARIO GT 24 girder formwork system
for thewalls and columns. It is a fast,
easy to use system that adapts to any
required wall shape or height. One of
the main advantages for this system is
the exibility in use, by pre-assembled
panels tting exact design require-
ments.
In order to meet the slab heights up
to 4.97 m, PERI offered MULTIFLEX
system with GT 24 and VT 20 gird-
ers and a tailor-made slab and beam
support solution, with a combination of
MULTIPROPs and PD 8 towers. As a
result the client got an adaptable slab
formwork, with individual system com-
ponents consisting of props, tripods,
crossheads, PD 8 towers, primary and
secondary girders.
7 6
Iconic landmark at Abu Dhabi Corniche
risen with PERIs climbing solution
Etihad Towers, Abu Dhabi, United Arab Emirates
The tower is located on the most desirable and
exclusive beachside Al Ras Al Akhdar district of Abu
Dhabi on an area of over half a million square meters.
Mohsin Khater,
Contracts Manager:
The PERI formwork system
contributed greatly to the
success of Etihad Towers. Not
only did it provide an excellent
structural solution for the com-
plex project, but also provided
an economical way for sav-
ing manpower. I would highly
recommend PERI in the future
projects.
Contractor
Arabian Construction Company (ACC)
Field Service
PERI Abu Dhabi, UAE
Occupying the built-up area of the pro-
ject approximately 5.1 million square
metres, Etihad Tower project is a pres-
tigious mixed-use development com-
posed of ve towers, a large multi-level
podium and a four level underground
parking for more than 3,000 cars.
With the use of PERI system on site,
inclusive of PD 8 for supporting and
concreting PT beams in the podium
area, it was easy and safe to erect
despite the heavy and high structure.
PERIs climbing formwork was used
for concreting corewalls from B4 to
P5 in Towers 1, 2, 3. This created a
cost-effective solution for the client,
in comparison to the hydraulic sys-
tem. Additionally, as safety on site is
and has been a main concern in such
heights, the unobstructed platform
made the work for labor and staff safe
and fast. For all typical oors in the
towers UNIPORTAL table form has
been used: it was customized for each
towers shape which made it ideal for
the high-rise building.
Smart technical formwork solutions
for complicated structures
Emergency Baghdad Water Supply and Sanitation Project, Baghdad, Iraq
Emergency Baghdad Water
Supply and Sanitation Project
is located at Baghdad-Rasafah
and includes four clarioc-
culators, one TW Reservoir
and 20 other buildings. The
project foundation consists of
Dr. Kamal Yas,
Project Director:
Reliability and efciency
are the two main reasons
for choosing PERI as form-
work solution for our huge
and complicated project.
With PERI formwork we are
saving time and labour
costs. Furthermore, their
excellent eld service which
no other competitor can
provide in Iraq.
Contractor
Al Ghadak Construction & Eng. Co,
Baghdad
Field Service
PERI Amman, Jordan
1,800 piles, the total concrete
quantity cast in the project
around 18,000m with 3,000t
of steel. The complicated
conical shape were formed
by VARIO wall formwork,
carried on heavy duty spindles
which reliably transfers loads
to horizontal steel walers.
RUNDFLEX has been used
for the upper part of the cir-
cular tank. TW Reservoir with
7m inclined wall was formed
by VARIO with climbing
brackets, plus MULTIFLEX
for 6.80m slab height with
ST100 as shoring towers.
Ranging from 54 to 75 oors, the tower soar some
300 m above the city, opening to pristine vistas of
the Arabian Gulf. The emulsion of PD 8, climbing
formwork, UNIPORTAL Table Form, MULTIFLEX
and VARIO GT 24 has been a supporting tool to
complete the project.
High quality formwork solutions
with easy-to-use SKYDECK systems
QP District, Qatar
The QP District is one of
the largest real estate pro-
jects currently in Qatar. The
project includes: 3 basement
oors, parking and technical,
podium retail and technical,
9 towers-ofce, shell and
core, 1 hotel and convention
center, a Prayer hall and an
energy center. The towers are
positioned as such to form 2
The early striking feature allowed
very fast cycles and a minimum of
equipment to transport between
levels, independently of the crane.
Contractor
Bouygues Batiment International
MIDMAC Contracting WLL
Al Jaber Engineering LLC J.V., Qatar
Field Service
PERI Doha, Qatar
spiral shapes, consisting of an
inner and outer ring of towers.
The 2 nautilus forms spiral in
height in opposing directions,
with a pinnacle at the south-
east corner of the site visible
from the West Bay Area as
well as the main road arteries
west of the site. This project
should be completed in 2013.
With a very tight construction
Hisham Fahmy,
Deputy Project Director:
For a project of this mag-
nitude, the choice of form-
work is crucial. We decided
in favor of PERI because of
the light-weight system, the
crane-independent factor
and the adjustable capacity
benet. All the PERI systems
were perfectly adapted and
responded to the needs of
our project and site. The
continuous follow-up of PERI
engineers has made us very
happy and satised with our
decision.
schedule for the basement
works and the towers, the
contractor was looking for
the fastest, most efcient
and adaptable systems.
The SKYDECK light-weight
aluminum panel slab system
offered the possibility to pour
slabs to varying thickness
and geometry in a system-
atic, efcient and safe way.
4
.9
8
9
.6
5
3
.1
2
0.43
3
.2
9
9 8
Sheikh Zayed Desert Learning Center
(SZDLC), one of the most prestigious
projects within the region of Al Ain, is
a tribute to the late Sheikh Zayed Bin
Sultan Al Nahyan and part of the Al Ain
Wildlife Park Resort development of
Al Ain Zoo. The Education through the
exhibition building is not only an out-
standing landmark project, but rather
an architectural sculpture, which blends
with its surrounding environment and
reaches into the future by incorporating
sustainability as well as preservation
of nature into the building concept.
Consequently SZDLC has turned into a
pioneer project to acquire LEED Plati-
num and Estidama 5 Pearls certicate
for Green Buildings in the UAE.
Among the features of the building are
the cross section between a museum
and a science centre, containing inter-
active displays about the UAEs wildlife
One of numerous assembly drawings: VARIO
formwork and PD 8 structure for the theatre wall
above level 6.15 m.
PERIs SB-1 Brace Frame was the ideal solution
for single-faced concreting walls.
Al Ain Desert Learning Center, located near Al
Ain Zoo, will develop into an iconic landmark for
culture and heritage within the region.
A variety of different angles required a precise
shuttering solution, which was achieved with
PERIs exible VARIO system.
Pre-assembled VARIO panel formworks reduced
manpower needed at site.
No inclination, curvature, and arching featured in
the components is repeated, thus every formwork
element is unique.
Dirk Leitzig,
Assistant Project Director:
The choice of using PERI formwork for this project has been due to the
capabilities of PERIs dealing and expertise, with the extremely complex ge-
ometry of the concrete structure of the building. Furthermore, their custom-
er support and the fast provided on-site solutions by their technical team
have been highly appreciated and proven PERIs commitment to the job.
ED. Zublin AG
Al Ain
Field Service
PERI L.L.C., UAE
German Engineering and customized formwork solutions
for three-dimensional shapes and angles
Desert Learning Centre, Al Ain, United Arab Emirates
and culture. Most impressively is the
structure of the 200-seat auditorium, an
educational library and a cafeteria with
an open terrace overlooking the safari
park. The roof steps down to an area
that can be used for special events.
Located in the middle of the vast Al
Ain Wildlife Park & Resort (AWPR),
the building seems to grow out of the
ground like a giant mushroom. This
effect will be accentuated further once
the grey concrete is fully concealed
by the sand-coloured cladding, which
is made up of 4 cm diamond-shaped
marble panels.
As this project has been extremely
challenging, both technically as well as
for products to be used at site, PERI
was chosen to deliver the mix of the
formwork solutions for the different
areas within this project. Among the
perfect shoring solution with their PD 8
supporting tower system. As it can be
errected vertically or horizontally and is
easy to assemble combined with the
advantage that entire units can be lifted
via crane into their preferred location.
PD 8 was the most economical for the
high lift oor and roof slabs.
The fully assembled VARIO panels are
assembled from tried and tested VARIO
system components. The panels are
supplied complete with lifting eyes and
rubbing board. VARIO GT 24 standard
panels are designed for a permissible
fresh concrete pressure of 60 kN/m to
DIN 18202.
various challenges were angles and
degrees of intertwining walls, thus a
very exible formwork solution had to
be provided. With the VARIO GT 24
formwork system, which is designed
for a fresh concrete pressure of
100 kN/m any cross-section or height
could be covered. For guarantee frames
which can be connected quickly, PERI
provided SB-1 Brace Frame on a single-
face concreting system, suitable up
to a height of 3.60 m and a fresh con-
crete pressure of 30 kN/m.
The horizontal structure formwork
was covered with PERIs exible as
MULTIFLEX (GT 24/GT 24) plus PEP20
props, providing adaptable girder for
the slabs suitable for the required
layout and height. For the slabs of this
project a variety of shoring solutions
were provided. To secure the high load
bearing of the slab, PERI offered the
One of the Estimada requirements is
lots of windows to maximize on day-
light. It will also give the building its
architectural shape with double glazing
to reduce heat loss.
Despite the heavy-weight construc-
tion, PERIs formwork and concrete
result, met the building challenges and
concept to achieve a highly complicat-
ed concrete nish, however, providing
a lled with light gratitute, with large
diamond-shaped window openings
within the entire building.
4
.0
0
4
.0
0
4
.0
0
4
.0
0
4
.0
0
12.30
4.30 4.30 1.70
0.20 0.20
0.80 0.80
11 10
Comprehensive bridge formwork
and shoring solution
PERIs know-how and formwork quality
a clear choice for this contractor
Khalifa Port and Industrial Zone, Abu Dhabi, United Arab Emirates
RA-188 Interchange No. 6, Kuwait City, Kuwait
The Khalifa Port and Indus-
trial Zone tis a multi-purpose
facility located in Taweelah.
The project includes a world-
class container and industrial
port and logistics, commercial,
educational and residential
The cross-section of the bridge
structure was supported by ST 100
shoring towers.
VARIO double-sided wall formwork.
Amar Mangat and Kim Hock,
Construction Managers:
With PERI formwork solu-
tion we could maintain our
schedule and full the high
quality requirements of this
challenging project. The
outstanding performance
of site supervision as well
as quality of the formwork
products helped us to
achieve our goals ahead of
time. We would be happy
to continue to work with
PERI.
Eng. Mahmoud Haggag
and Eng. Reda Amin,
Project and Construction
Managers:
We already knew that,
while talking about our
project objectives, such as
workability, time saving
and quality of formwork,
our clear choice of form-
work supplier could only
be PERI.
Contractor
Al Habtoor Leighton Group,
Abu Dhabi, UAE
Field Service
PERI L.L.C., UAE
Contractor
Combined Group Contracting Co,
Kuwait City, Kuwait
Field Service
PERI Kuwait
special economic and free
trade zones. A mixture of
VARIO Wall Formwork and
MULTIFLEX Slab Formwork
has been used for the large-
area formwork. These
guarantee simple handling,
fast concreting cycles and
problem-free adjustment to
different wall and slab con-
gurations. By utilizing the
heavy duty PD 8 HD, high
load bearing capacities have
been reached.
RA-188 interchange, a project
on the 30th ring road near
Fahaheel area, consists of
two identical bridges of 38 m
span and a tunnel of 900 m,
with 1.800 m of through walls.
With heights varying between
2.5 to 12.0 m, eight sets of
VARIO wall were provided to
cover the large variation of
wall heights. For the cross-
ing bridges VARIOKIT with
ST 100 shoring towers were
utilized.
Sky Gate tower rising quickly
with RCS climbing system
Contractor
MAN Enterprise, Ashraeh
Field Service
PERI Lebanon
The core is shuttered with 620 m of
VARIO, one ACS P platform to carry
the placing boom, eleven RCS plat-
forms and two BR shaft platforms,
allowing the core to climb two oors
in advance to the slab.
Located on a hilly promon-
tory of Ashraeh, Sky Gate
provocatively completes what
appears as an urban wall
rising in this central area of
Beirut. Introducing the project
is a convivial piazza, which
lead the way to a 10 m high
entrance lobby. Exceptional
apartments stacked above are
informed by distinctive indoor/
outdoor environments ranging
from 300 m to 1,500 m.
These villas in the sky offer
4 m high living spaces behind
bathed with light and over the
look of Lebanese mountains
and Mediterranean Sea.
The VARIO and Self Climbing
Systems provided the right
solution for core 620 m of
VARIO, one ACS P platform
to hold the placing boom,
eleven RCS C platforms, and
two BR shaft platforms. For
shear walls 185.60 m TRIO
is used in narrow spaces,
because of its width where
VARIO cant be used. With
the system, VARIO for
double-sided walls and col-
umns 312 m for its exibil-
ity, it covers the varied types
of columns and double-sided
walls along all the oors.
MULTIFLEX method is used
for the basement slabs. It cov-
ers the different slabs thick-
ness and differenct heights
by using PEP 20 (300 and
350) props. The typical slab,
1,120 m of tableform with
TKHead is used, and 450m
of MULTIFLEX under the
edge drop beams. In addition,
two trolley and one lifting fork
are also supplied and 177m
of VARIO Formwork and 36
pieces of SB-1 are supplied
for single-sided walls.
Sky Gate, Beirut, Lebanon
13 12
Mega Project in Kuwait
formed with PERI ahead of time
Mastering narrow
spaces with ACS P
climbing solution
Jaber Al Ahmad Hospital, Kuwait City, Kuwait
Four Points Sheraton Hotel,
Kuwait City, Kuwait
A 42 oor tower with different oor
heights as an extension for the existing
old Sheraton. It rises over the old one
by 22 oors with a space in between
of 1.50 m only for the lower oors. A
self compacted concrete is required
for casting the tower main core, which
will be casted ahead of slab. Situated
in the heart of Kuwait City, Four Points
by Sheraton Kuwait is in the center
of Kuwaits commercial and industrial
TRIO with its six different panel widths reduced
on-site material, by increasing the utilisation rates.
LICO the lightweight column formwork. Clear passageways and working environment due
to few props needed for the slab support.
Four Points Sheraton is already known as one
of the upcoming landmarks in Kuwait.
Crane-independent and ergonomic working due
to mobile climbing hydraulics, ideal for narrow
spaces. Reliable lifting power of 100 kN raises the
climbing unit to the next pour without the need of
intermediate anchors.
RCS Climbing Brackets are the ideal
solution for external walls in great
heights.
Contractor
Arab Contractor Os-
man Ahmed
Osman & Company
Field Service
PERI Kuwait City,
Kuwait
Contractor
Al Bahar Construction
Company
Field Service
PERI Kuwait / Kuwait
Serry Sulayman,
Assistant to Chairman |
Project Director:
Taking care of ne details, giving
full 24/7 technical support and after
sales service by taking care to the
fullest extend possible for any site
problem or challenges. Having very
close respectable, friendly relations
with our team and also suitable
material prices. All of the above,
show how PERI is dealing with Arab
Contractors especially in the Jaber
Al Ahmad Al Jaber Hospital Project
in Kuwait, one of the greatest Mega
projects in the Middle East.
Eng. Mohamad Al-Zouman,
Deputy General Manager:
Four Points Sheraton Expansion
is a very challenging project and
due to PERIs help these challenges
were simplied. The working space
in the project area was very nar-
row and the distance between our
wall and neighboring site was only
40 cm. But with PERIs ACS P with
Gallow system, it allowed us to lift
the panels from the top without any
side support - and this was exactly
what we needed considering the
narrow space. In my opinion, with-
out PERI ACS P this scope of work
would have been impossible.
As one of the biggest hospital in gulf
area, Jaber al Ahmad Hospital is located
in South Surra Area. A seven oors main
building with an area of 47,000m, sur-
rounded by 5 towers of 14 oor height
with a oor area of 4,500 m per tower,
a multi storey car park on the outer peri-
meter. The hospital is 1,168 beds with
total built up area of 270,000 m. The
hospital provides a comprehensive range
of medical services comprising diag-
nostic and treatment services, trauma
center and casualty services, outpatient
services, dental services, obstetrics and
gynecology services, inpatient care ser-
vices, VIP suites for the visiting heads
of states and another waiting wing for
VIP suites.
Five years of construction requires
easy and quick formwork solutions.
PERI TRIO panels formwork for cores
and internal walls, VARIO formwork for
peripheral curved walls, table formwork
for slabs and TRIO and LICO systems
for columns.
Sheikh Jaber Al Ahmad Al-Sabah hos-
pital is targeted to be the largest, stand
alone hospital building in terms of beds
and facilities. Impressive achievements
have been accomplished, while building
the Jaber Hospital, with estimated time
of completion within the next two years
despite its tremendous size.
areas. Thus, the Hotel provides useful
business conveniences to accommo-
date both, business and leisure needs.
A combination of different types of
wall formworks with climbing systems
is used to achieve the construction
requirements, showing also exibility
and high productivity. VARIO has been
used for core and efcient straight
walls. PERI RCS for the walls on the
slab edge and for the shaft and gallows
of the walls ACS P has been provided.
15 14
Safety especially in great heights
is important for better productivity
Ofce Tower at KAFD, Riyadh, Saudi Arabia
The cantilevered SLT main beams of SKYDECK
provide a convenient working space of 1.30 m.
Extended slab edges at sloping structures can be
constructed with SKYDECK and MULTIPROP due
to the high load-bearing capacity of both aluminium
systems.
Contractor
El Seif Engineering
Contracting
Field Area
PERI Engineering,
Saudi Arabia
Khaled Katma,
Senior Construction Manager:
PERI systems are durable and
exible. The light-weight SKYDECK
panels mean minimum engage-
ment of the tower crane and easy
usage for the workers. It is very
easy when MULTIPROP towers at
double height are used. We are
very pleased with the level of
service and technical support
provided to the site.
The King Abdullah Financial District
is designed as a state-of-the-art and
fully self-contained development for
doing business and facilitating invest-
ment and enterprise in the Kingdom of
Saudi Arabia and, in due course, in the
wider Middle East region. This project
is located in the heart of the KAFD
and required high safety at each level.
The two irregular shaped core walls
climbed ahead by using a combination
of ACS and RCS, both self-climbing
systems with high standards of safety,
which was a key factor for the achieved
3 to 4 days cycle. VARIO GT 24 wall
formwork was the versatile solution
for the cores as well as the retain-
ing wall. The SKYDECK light-weight
slab formwork in conjunction with the
MULTIPROP MP 480 and MP 250 is
used for the typical oors but also for
the assembly of towers by the means
of MRK frames. Supporting heights
of up to 20 m were safely designed
and built. The site team achieved an
outstanding safety record by adapt-
ing the benets of all PERI systems.
70 m tower structure
in Muscat Oman
Savings in manpower and time
with LICO Column Formwork and exible VARIO system
Bank of Oman, Muscat, Oman
Central Bank of Oman
expansion and renovation
project involved the de-
sign and construction of a
large new facility as well as
complete reorganizaiton and
renovation of the existing
building. This refurbishment
Clear surface nishing with PERIs
formwork for columns and slabs.
Contractor
Al Adrak Trading and
Contracting LLC
Field Service
PERI Muscat, Oman
Contractor
Carillion Alawi LLC, Muscat, Oman
Field Service
PERI Muscat, Oman
Baljinder Pal,
Site Manager:
I am extremely satised
with PERI they provide us
with a large product range,
construction-compliant
solutions and competent
on site and after sales
service.
Binu Thomas,
Site in Charge:
By utilizing PERI systems
such as LICO for columns,
VARIO for lift and retain-
ing walls, we experienced
great benets and profes-
sional solutions for our
sites. With PERI formwork
we reduced manpower,
wastages on site and were
impressed by the easy
handling of their systems.
In future projects we de-
nitely will continue to use
PERI.
The concrete structure that
forms the 70 m tower con-
sists of an outer perimeter
wall and an inner lift shaft core
of approximately 50 m.
This was constructed using
a traditional PERI climbing
system around the outside
perimeter, with the gravity BR
platform used to great effect
between the outer and inner
core and the centre of the lift
shaft. This provided a very
safe and effective platform for
all activities and ensured mini-
mum work to lift and adjust
for the next pour.
The top 20 m of the four cor-
ner wall, was completed with
the traditional PERI climbing
system.
work included modica-
tion of the facades to be
compatible with the new
building. PERI LICO, the
light-weight column form-
work, for cost-effective
forming without a crane,
was chosen due to low
individual weights of the
elements, which allow as-
sembly and dismantling by
hand. This means that the
formwork crew is still in a
position to effectively use
the newly gained crane avail-
ability in a productive way.
Parliament Building, Muscat, Oman