Anda di halaman 1dari 14

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Cuadro N1
Precipitacin Mxima en 24 horas
Estacin Tingo Mara

Ao

Precipitacin

1973

(mm)
128.0

1974

110.4

1975

90.0

1976

114.0

1977

130.0

1978

79.3

1979

89.0

1980

150.0

1981

158.0

1982

99.7

1983

109.0

1984

80.0

1985

100.0

1986

111.0

1987

79.0

1988

92.0

1989

123.0

1990

78.0

1991

79.0

1992

103.0

1993

212.0

1994

108.0

1995

98.4

1996

78.0

1997

99.8

1998

156.0

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA


TINGO MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N2: Estacin Tingo Mara-Precipitacin Mxima en 24 Horas (mm)

Distribution Analysys: Pearson Type III


Point
Weibull
Actual Predicted Standard
Number Probability Value
Value
Deviation
1
0.0370
78.0
80.6
17.23
2
0.0741
78.0
81.6
12.99
3
0.1111
79.0
82.7
9.81
4
0.1481
79.0
84.0
7.31
5
0.1852
79.3
85.3
5.37
6
0.2222
80.0
86.7
4.04
7
0.2593
89.0
88.1
3.49
8
0.2963
90.0
89.7
3.76
9
0.3333
92.0
91.3
4.52
10
0.3704
98.4
93.0
5.47
11
0.4074
99.7
94.9
6.46
12
0.4444
99.8
96.8
7.42
13
0.4815
100.0
98.9
8.32
14
0.5185
103.0
101.1
9.16
15
0.5556
108.0
103.5
9.91
16
0.5926
109.0
106.2
10.59
17
0.6296
110.4
109.0
11.19
18
0.6667
111.0
112.3
11.70
19
0.7037
114.0
115.8
12.13
20
0.7407
123.0
119.9
12.48
21
0.7778
128.0
124.7
12.79
22
0.8148
130.0
130.3
13.12
23
0.8519
150.0
137.3
13.67
24
0.8889
156.0
146.3
14.92
25
0.9259
158.0
159.2
18.18
26
0.9630
212.0
181.7
27.80

Summary of Data
First Moment (mean)=
Second Moment=
Skew:
Predictions
Exceedence
Return
Probability
Period
0.995
200
0.990
100
0.980
50
0.960
25
0.900
10
0.800
5
0.667
3
0.500
2

109.792
9.92E+02
1.42E+00
Calculated
Value
249.3
225.5
202.1
179.2
149.7
127.9
112.3
100.0

Standard
Deviation
73.42
55.44
39.59
26.52
15.58
12.98
11.71
8.75

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N3: Estacin Tingo Mara.-Precipitacin Mxima en 24 Horas (mm)


Distribution Analysys: Log Pearson Type III
Point
Weibull
Actual Predicted Standard
Number Probability Value
Value
Deviation
1
0.0370
78.0
70.1
5.12
2
0.0741
78.0
74.9
4.45
3
0.1111
79.0
78.4
4.25
4
0.1481
79.0
81.3
4.24
5
0.1852
79.3
84.0
4.32
6
0.2222
80.0
86.5
4.45
7
0.2593
89.0
88.8
4.60
8
0.2963
90.0
91.1
4.77
9
0.3333
92.0
93.4
4.94
10
0.3704
98.4
95.7
5.12
11
0.4074
99.7
98.0
5.30
12
0.4444
99.8
100.3
5.49
13
0.4815
100.0
102.6
5.68
14
0.5185
103.0
105.1
5.88
15
0.5556
108.0
107.7
6.10
16
0.5926
109.0
110.4
6.33
17
0.6296
110.4
113.3
6.59
18
0.6667
111.0
116.4
6.89
19
0.7037
114.0
119.8
7.25
20
0.7407
123.0
123.5
7.70
21
0.7778
128.0
127.8
8.28
22
0.8148
130.0
132.8
9.06
23
0.8519
150.0
138.8
10.20
24
0.8889
156.0
146.4
11.95
25
0.9259
158.0
157.1
14.99
26
0.9630
212.0
175.6
21.73

Summary of Data
First Moment (mean)=
Second Moment=
Skew:
Predictions
Exceedence
Return
Probability
Period
0.995
200
0.990
100
0.980
50
0.960
25
0.900
10
0.800
5
0.667
3
0.500
2

109.792
9.92E+02
1.42E+00
Calculated
Value
232.1
211.8
192.3
173.5
149.2
130.7
116.4
103.9

Standard
Deviation
52.29
39.77
29.34
20.88
12.67
8.72
6.89
5.78

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA
AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROVIAS NACIONAL

Cuadro N4: Estacin Tingo Mara.-Precipitacin Mxima en 24 Horas (mm)


Distribution Analysis: Gumbel Extremal Type I
Point
Weibull
Actual Predicted
Standard
Number Probability Value
Value
Deviation
1
0.0370
78.0
64.6
7.37
2
0.0741
78.0
70.8
6.55
3
0.1111
79.0
75.2
6.04
4
0.1481
79.0
78.9
5.68
5
0.1852
79.3
82.1
5.42
6
0.2222
80.0
85.1
5.24
7
0.2593
89.0
88.0
5.13
8
0.2963
90.0
90.7
5.08
9
0.3333
92.0
93.4
5.09
10
0.3704
98.4
96.0
5.14
11
0.4074
99.7
98.7
5.25
12
0.4444
99.8
101.3
5.41
13
0.4815
100.0
104.1
5.61
14
0.5185
103.0
106.9
5.87
15
0.5556
108.0
109.8
6.18
16
0.5926
109.0
112.8
6.54
17
0.6296
110.4
116.1
6.95
18
0.6667
111.0
119.5
7.43
19
0.7037
114.0
123.3
7.98
20
0.7407
123.0
127.4
8.63
21
0.7778
128.0
132.1
9.38
22
0.8148
130.0
137.4
10.28
23
0.8519
150.0
143.8
11.39
24
0.8889
156.0
151.9
12.83
25
0.9259
158.0
163.1
14.86
26
0.9630
212.0
181.8
18.35

Summary of Data
First Moment (mean)=
109.792
Second Moment=
9.92E+02
Skew:
1.42E+00
Predictions
Exceedence Return Calculated
Probability Period
Value
0.995
200
234.7
0.990
100
216.5
0.980
50
198.1
0.960
25
179.7
0.900
10
154.8
0.800
5
135.2
0.667
3
119.5
0.500
2
105.5

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA AGUAYTA,
TRAMO 1.2: Km. 15+200 Km. 51+551

24 Horas (mm)

Standard
Deviation
28.47
24.96
21.46
17.96
13.36
9.90
7.44
5.74

CARRETERA TINGO MARA AGUAYTA,

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N5: Ajuste Mtodo del Error Cuadrtico Mnimo.- Estacin Tingo Mara
Precipitaciones Mximas en 24 Horas

Prob.

P(mm)

0.0370
0.0741
0.1111
0.1481
0.1852
0.2222
0.2593
0.2963
0.3333
0.3704
0.4074
0.4444
0.4815
0.5185
0.5556
0.5926
0.6296
0.6667
0.7037
0.7407
0.7778
0.8148
0.8519
0.8889
0.9259
0.9630

Po
78.0
78.0
79.0
79.0
79.3
80.0
89.0
90.0
92.0
98.4
99.7
99.8
100.0
103.0
108.0
109.0
110.4
111.0
114.0
123.0
128.0
130.0
150.0
156.0
158.0
212.0

Pearson Tipo 3
(Po-Pe)2
6.59
12.65
13.76
24.56
35.74
44.50
0.74
0.10
0.48
28.81
23.44
8.99
1.25
3.56
20.00
8.07
1.82
1.57
3.42
9.36
10.98
0.11
161.70
93.56
1.50
919.39
1,436.66

Pe
80.6
81.6
82.7
84.0
85.3
86.7
88.1
89.7
91.3
93.0
94.9
96.8
98.9
101.1
103.5
106.2
109.0
112.3
115.8
119.9
124.7
130.3
137.3
146.3
159.2
181.7

Log Pearson Tipo 3


(Po-Pe)2
Pe
70.1
62.24
74.9
9.87
78.4
0.40
81.3
5.42
84.0
22.01
86.5
41.90
88.8
0.02
91.1
1.31
93.4
2.00
95.7
7.42
98.0
3.05
100.3
0.22
102.6
6.99
105.1
4.40
107.7
0.11
110.4
1.87
113.3
8.14
116.4
28.73
119.8
33.13
123.5
0.28
127.8
0.04
132.8
7.62
138.8
126.46
146.4
92.14
157.1
0.77
175.6
1326.67
1,793.22

Pe
64.6
70.8
75.2
78.9
82.1
85.1
88.0
90.7
93.4
96.0
98.7
101.3
104.1
106.9
109.8
112.8
116.1
119.5
123.3
127.4
132.1
137.4
143.8
151.9
163.1
181.8

Gumbel
(Po-Pe)2
180.31
52.38
14.42
0.01
8.07
26.42
1.05
0.50
1.89
5.67
1.07
2.36
16.50
14.94
3.15
14.62
31.95
72.43
85.80
19.36
16.42
55.04
38.01
16.63
25.80
914.32
1,619.13

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 6: Lluvias mximas (mm) .- Km.14+800 al Km. 51+551


T
aos
200
100
50
25
10
5
3
2

P.Max
24 horas
249.3
225.5
202.1
179.2
149.7
127.9
112.3
100.0

15
79.7
72.0
64.6
57.2
47.8
40.9
35.9
31.9

30
94.7
85.7
76.8
68.1
56.9
48.6
42.7
38.0

Duracin en minutos
60
120
112.7
134.0
101.9
121.1
91.3
108.6
80.9
96.3
67.6
80.4
57.8
68.7
50.7
60.3
45.2
53.7

180
148.3
134.1
120.1
106.5
89.0
76.1
66.8
59.4

240
159.3
144.1
129.1
114.5
95.6
81.7
71.7
63.9

Cuadro N 7: Intensidades mximas (mm/hora).- Km.14+800 al Km.51+551


T
aos
200
100
50
25
10
5
3
2

P.Max
24 horas
249.3
225.5
202.1
179.2
149.7
127.9
112.3
100.0

15
318.6
288.1
258.2
228.9
191.3
163.5
143.5
127.8

30
189.5
171.3
153.5
136.1
113.7
97.2
85.3
76.0

Duracin en minutos
60
120
112.7
67.0
101.9
60.6
91.3
54.3
80.9
48.1
67.6
40.2
57.8
34.4
50.7
30.2
45.2
26.9

180
49.4
44.7
40.0
35.5
29.7
25.4
22.3
19.8

240
39.8
36.0
32.3
28.6
23.9
20.4
17.9
16.0

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA
AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 8: Parametros de intensidades mximas.-Km.14+800 al Km.51+551


N de
orden
1
2
3
4
5
6
7
8

T
aos
200
100
50
25
10
5
3
2

15
318.6
288.1
258.2
228.9
191.3
163.5
143.5
127.8

Duracin (minutos)
30
60
120
189.5
112.7 67.0
171.3
101.9 60.6
153.5
91.3
54.3
136.1
80.9
48.1
113.7
67.6
40.2
97.2
57.8
34.4
85.3
50.7
30.2
76.0
45.2
26.9

Resultado de regresin:
Constante
2.95022
Err estndar de est.Y
0.013986
R cuadrada
0.998487
Nm. de observaciones
48
Grado de libertad
45
Coeficiente(s) X
Error estndar de coef.
Log K=

2.9502

I= 891.71 T0.197
t

.0.750

Donde:
I= mm/h
T= aos
t= minutos

0.197241
-0.75
0.002947 0.0047
K= 891.71
m= 0.197
n= 0.750

180
49.4
44.7
40.0
35.5
29.7
25.4
22.3
19.8

240
39.8
36.0
32.3
28.6
23.9
20.4
17.9
16.0

Y
Log (P)
2.503246
2.459543
2.411956
2.359646
2.281715
2.213518
2.156852
2.106531
2.277609
2.233757
2.186108
2.133858
2.055760
1.987666
1.930949
1.880814
2.051924
2.008174
1.960471
1.907949
1.829947
1.761928
1.705008
1.655138
1.826075

X1
Log (T)
2.301030
2.000000
1.698970
1.397940
1.000000
0.698970
0.477121
0.301030
2.301030
2.000000
1.698970
1.397940
1.000000
0.698970
0.477121
0.301030
2.301030
2.000000
1.698970
1.397940
1.000000
0.698970
0.477121
0.301030
2.301030

X2
Log (t)
1.176091
1.176091
1.176091
1.176091
1.176091
1.176091
1.176091
1.176091
1.477121
1.477121
1.477121
1.477121
1.477121
1.477121
1.477121
1.477121
1.778151
1.778151
1.778151
1.778151
1.778151
1.778151
1.778151
1.778151
2.079181

1.782473

2.000000

2.079181

1.734800
1.682145
1.604226
1.536558
1.480007
1.429752
1.693727
1.650308
1.602060
1.550228
1.472756
1.404834
1.348305
1.296665
1.599883
1.556303
1.509203
1.456366
1.378398
1.309630
1.252853
1.204120

1.698970
1.397940
1.000000
0.698970
0.477121
0.301030
2.301030
2.000000
1.698970
1.397940
1.000000
0.698970
0.477121
0.301030
2.301030
2.000000
1.698970
1.397940
1.000000
0.698970
0.477121
0.301030

2.079181
2.079181
2.079181
2.079181
2.079181
2.079181
2.255273
2.255273
2.255273
2.255273
2.255273
2.255273
2.255273
2.255273
2.380211
2.380211
2.380211
2.380211
2.380211
2.380211
2.380211
2.380211

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA
AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 9: Intensidades mximas (mm/hora).- Km.14+800 al Km.51+551


K Tm

I=

Duracin (t)
(minutos)
5
10
15
20
30
40
50
60
70
80
90
100
110
120

K=
m=
n=

tn
891.7
0.197
0.750

5
366.32
217.82
160.70
129.52
95.56
77.01
65.14
56.82
50.61
45.79
41.92
38.73
36.06
33.78

Perodo de Retorno (T) en aos


10
419.99
249.73
184.25
148.49
109.56
88.29
74.69
65.14
58.03
52.50
48.06
44.41
41.35
38.73

25
503.19
299.20
220.75
177.91
131.26
105.78
89.48
78.05
69.53
62.90
57.58
53.21
49.54
46.41

Figura N1: Curva Intensidad-Duracin-Frecuencia


Km.14+800 al Km.51+551

550

500
450

Intensidad (mm/hora)

400

350
300

250
200
150

100
50
0

20

40

60

80

100

120

Duracin en minutos
5 aos

10 aos

25 aos

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N10: Coeficientes de escorrenta para ser usados en el Mtodo Racional

Caracterstica de la superficie

Perodo de retorno (aos)


10
25
50

Areas de Cultivos
Plano, 0-2%
0.31
0.41
0.36
0.40
0.43
Promedio, 2-7%
0.35
0.38
0.41
0.44
0.48
Pendiente superior a 7%
0.39
0.42
0.44
0.48
0.51
Pastizales
Planos, 0-2%
0.25
0.28
0.30
0.34
0.37
Promedio, 2-7%
0.33
0.36
0.38
0.42
0.45
Pendiente superior a 7%
0.37
0.40
0.42
0.46
0.49
Bosques
Planos, 0-2%
0.22
0.25
0.28
0.31
0.35
Promedio, 2-7%
0.31
0.34
0.36
0.40
0.43
Pendiente superior a 7%
0.35
0.39
0.41
0.45
0.48
Fuente: Hidrologa Aplicada, Ven Te Chow, David R. Maidment, Larry W. Mays

100

500

0.47
0.51
0.54

0.57
0.60
0.61

0.41
0.49
0.53

0.53
0.58
0.60

0.39
0.47
0.52

0.48
0.56
0.58

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA
AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N11: Caudales Mximos Mtodo Racional.


K=
m=
n=
C=
Casfalto=
Tr=

891.71
0.197
0.750
0.4
0.9
25

Sector Las Vegas

Cunetas
Laterales
Cunetas
Colectores
Rapida con
Amortiguador
Dentado
Cajas de
Recepcion
Alcantarilla

Tiempo de
concentracin Tc
horas
minutos

Area

Tipo de
Estructura

A (km2)
0.002
T
c

T
c

0
.0
1
9
5

0.08
K

0.7 7

CIA
3.6

Intensidad
mm/hora

Caudal
Mximo
(m3/s)

5.00

299.20

0.15

3
L
H

0.002

0.08

5.00

299.20

0.07

0.018

0.08

5.00

299.20

0.60

0.021

0.08

5.00

299.20

0.68

0.021

0.08

5.00

299.20

0.68

Intensidad
mm/hora

Caudal
Mximo
(m3/s)
2.66
4.99
4.65
0.17
0.13

0
.0
1
9
5

0.7 7

CIA
3.6

3
L
H

Sector El Huanuqueo
Area

Canal de
Coronacin
Quebrada 1
Quebrada 3
Quebrada 4
1
2

T
c

A (km2)
0.08
0.15
0.14
0.005
0.004

0
.0
1
9
5

0.7 7

CIA
3.6

Tiempo de
concentracin Tc
horas
minutos
0.08
5.00
0.08
5.00
0.08
5.00
0.08
5.00
0.08
5.00
K

299.20
299.20
299.20
299.20
299.20

3
L
H

Sector Deslizamiento Potencial


Tiempo de
concentracin Tc
horas
minutos
0.08
5.00

Area

Canal de
Coronacin

A (km2)
0.180

Quebrada Potencial
T
c

0
.0
1
9
5

0.7 7

CIA
3.6

Intensidad
mm/hora
299.20

Caudal
Mximo
(m3/s)
5.98

3
L
H

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 12: Valores del factor C de cobertura para cultivos,


pastos y bosques de madera
Adaptado de Weischmeier y Smith (1965) y Wischmeier (1972)
Tipo de cobertura vegetal/Tipo de uso
Barbecho continuo cultivado en el sentido de la mxima pendiente
Periodo comprendido entre la siembra y la cosecha

Factor C
1.00
0.30-0.80

Cultivos durante el perodo principal de crecimiento:


Maz

0.10-0.30

Trigo

0.05-0.15

Algodn

0.40

Soya

0.20-0.30

Pastos tipo grama

0.01-0.02

Pastos permanentes, suelos no labrados, bosques:


Cobertura vegetal entre 85% y 100%
Como gramas

0.003

Como mala yerba

0.01

Cobertura vegetal del 80%


Como gramas

0.01

Como mala yerba

0.04

Cobertura vegetal del 60%


Como gramas

0.04

Como mala yerba

0.09

Bosques de maderas comerciales:


Copa de rboles de 75% a 100%

0.001

Copa de rboles de 45% a 75%

0.002-0.004

Copa de rboles de 20% a 45%

0.003-0.010

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO MARA
AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 13: Valores del factor P para las distintas prcticas de conservacin de suelos Adaptado
de Wischmeir y Smith (1979)

Cultivo a nivel

Cultivo en fajas

Cultivo en terrazas

Pendiente
(%)

Mxima
Longitud
de ladera
(m)

Factor
P

Anchura
de faja
(m)

Mxima
longitud de
ladera
(m)

Factor
(P)

Drenaje
en canales
vegetados

Drenaje
subterraneo
en
contrapendiente

1-2

130

0.6

43

260

0.45

0.12

0.05

3-5

100

0.5

33

200

0.38

0.10

0.05

6-8

65

0.5

33

130

0.38

0.10

0.05

9-12

40

0.6

26

80

0.45

0.12

0.05

13 - 16

26

0.7

26

55

0.53

0.14

0.05

17 -20

20

0.8

20

40

0.60

0.16

0.06

21 -25

16

0.9

16

33

0.68

0.18

0.06

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROVIAS NACIONAL

Cuadro N 14: Erosionabilidad en las condiciones actuales


Parmetro
Suelo
Pendiente
Longitud (m)
R (t/ha/ao)
K
LS
C
P
AS (t/ha/ao)

Sector
Las Vegas
Crcava 1
Crcava 2
Crcava 3
Arcillas, arenas finas, medias a gruesas con gravas
38.92%
35.79%
27.50%
180
190
200
750
750
750
0.25
0.25
0.25
0.24
0.24
0.23
1
1
1
1
1
1
44.78
45.13
43.97

Cuadro N 15: Erosionabilidad recuperando la cobertura y


con prcticas de conservacin
Parmetro
Suelo
Pendiente
Longitud (m)
R (t/ha/ao)
K
LS
C
P
AS (t/ha/ao)

Sector
Las Vegas
Crcava 1
Crcava 2
Crcava 3
Arcillas, arenas finas, medias a gruesas con gravas
38.92%
35.79%
27.50%
180
190
200
750
750
750
0.25
0.25
0.25
0.24
0.24
0.23
0.09
0.09
0.09
0.18
0.18
0.18
0.73
0.73
0.71

C=Cobertura vegetal del 60%


P=terrazas con drenaje vegetado

ESTUDIO COMPLEMENTARIO DE ESTABILIDAD DE TALUDES Y ADECUACIN DEL EXPEDIENTE TCNICO DE LA CARRETERA TINGO
MARA AGUAYTA, TRAMO 1.2: Km. 15+200 Km. 51+551

Anda mungkin juga menyukai