Diagnostic Measurements on

High Voltage Cables




Dr. Michael Krger (c) OMICRON
Commissioning of a 220kV Cable
Cable
2
Commissioning of a 220kV Cable
Overview
3
Commissioning of a 220kV Cable
Section 1
4
Cable Joint with Screen Terminals
5
Check of the PD Measurement System
6
Test Setup
7
Measurement Principle at the Link Box
8
Mounting PD Instruments at a Link Box
In the open Land during Day
9
Mounting PD Instruments at a Link Box
In the open Land during Day
10
Link Box and Optical Fibre Cable
11
Preparing the Optical Fibre Cable
12
Mounting PD Instruments at a Link Box
In the open Land during Day
13
MPD600
Optical Fibre
HFCT
Mounting PD Instruments at a Link Box
Besides the High Way during Day
14
Mounting PD Instruments at a Link Box
On the High Way during Night
15
Performance Check at a Link Box
16
Optical Fibre
HFCTs at the End Terminations
17
Outdoor termination GIS termination
High Voltage Test Source
18
High Voltage Lead to the Cable Termination
19
Diesel Generator
20
Test Voltage
21
Display of the High Voltage Source
22
PD Measurement Frequency Range
Wideband PD Measurment System
23
Noise spectrum and PD measurement bandwidth (3,5-4,5MHz)
Damping of Impulses Along the Cable
Measurement Frequency Range: 3,5 - 4,5 MHz
24
Coupling capacitor Cable termination Joint 1-2
Joint 2-3 Joint 3-4 Joint 4-5
Damping of Impulses Along the Cable
At different Frequencies
25
Switching Impulses from the HV Test Source
26
Gating off the Noise Impulses
Gating Unit connected to Antenna in the HV Test Source

27
Gating
Overview of all Channels at 180kV
28
Coupling
capacitor
Cable end
termination
Joint 1-2 Joint 2-3 Joint 3-4
Joint 6-7 Joint 7-8 Joint 8-9 Joint 4-5 Joint 5-6
Joint 11-12 Joint 12-13 Cable GIS
termination
Joint 9-10 Joint 10-11
Gating unit
On-Line PD Measurement on a Transformer-
GIS - Cable Connection (GIS Side)
29
2
1
3
Calibration with 1000pC on the GIS Side
30
Calibration with 1000pC on the GIS Side
31
Online PD Measurement at the
GIS Side with 3-Channels
32
yellow phase GIS
red phase GIS
blue phase GIS
Sensors 1, 2 and 3 at GIS the Side and
Sensor 4 at the Transformer Side
33
4
100m
Sensor 4 at the Transformer Side
34
PD Measurement at the GIS and the
Transformer Side with 4-Channels
35
blue phase GIS
blue phase Tr
yellow phase GIS
PD Measurement at GIS and TR Side
Trigger=TR Side - Delay on GIS Side
36
delayed signal
blue phase GIS
trigger = blue
phase Tr
PD Measurement at GIS and TR Side
Trigger=GIS Side - Leading Signal on TR
37
leading signal
blue phase TR
trigger = blue
phase GIS
Jumper between Oil/Oil Bushing and
Cable Termination
38
Jumper between Oil/Oil Bushing and
Cable Termination
39