Anda di halaman 1dari 7

PROJECT: Dualization of Hafr Albaten , Umm Aljumajim Road, Section 7 Location: ___________

TESTED BY: Designation: M.E. Date : ______ ____


CHECKED BY : E. Flores Designation: M.I. Date : _____ ______
G
H
I
W1
J
L
M
N
Hydro
meter
Reading
Temp
Correction
(Table 5/6)
Corr.
Temp. R
Sp. Gr.
Corr.
a
% Soil
Susp.
Pa
Grain
Size d1
(Table 4)
KL KG Kn Corrected
11.7 -7.3 4.4 1.000 4.47 0.0400 0.905 0.990 0.910 0.0326
11.6 -7.3 4.3 1.000 4.37 0.0260 0.907 0.990 0.915 0.0214
11.6 -7.3 4.3 1.000 4.37 0.0150 0.910 0.990 0.915 0.0124
11.4 -7.3 4.1 1.000 4.16 0.0100 0.914 0.990 0.920 0.0083
11.4 -7.3 4.1 1.000 4.16 0.0074 0.925 0.990 0.920 0.0062
11.1 -7.3 3.8 1.000 3.86 0.0036 0.927 0.990 0.926 0.0031
11 -7.3 3.7 1.000 3.76 0.0015 0.947 0.990 0.905 0.0013
A gm 127.1
B gm 125.6
C gm 1.5 mm (alt)
D gm 27.6 50.80 2" 0 7485 100
E gm 98.0 37.50 1-1/2"
F % 1.531 25.00 1" 1901.7 5583.3 75
19.05 3/4" 841.3 4742 63
4.75 No. 4 1665.8 3076 41
2.00 No. 10 606 2470 33
0.85 No. 40 65.58 22
0.075 No. 200 51.98 17.2
0.020 13.50 4.46
64.59 65.58 0.002 8.25 2.72
51.19 51.98 0.001 6.90 2.28
0.425 No. 40
Grading Washed Hydrometer
Oven Dry Mass ( H x I )
d = d1 x KL x Kn
Mass Can + Soil
Mass Can + Oven Dry Sample
For Hydrometer 152H:
Mass Water (A - B)
60
250
Temp
Reading C
18.5
18.5
18.5
18.0
18.0
7763
100/(100+F)
H x I
30
G - J
L x I
KING DOM OF SAUDI ARABIA
MATERIAL RESEARCH ND TESTING DEPARTMENT
MINISTRY OF TRANSPORT
AL HANOO - SUWAYKET COMPANY SAUDI TECH
CONTRACTOR CONSULTANT
HYDROMETER & MECHANICAL ANALYSIS OF SOIL
Dispersing Agent
J + M
100
0.9849
98.49
7763
4374
3389
3338
7712
G
Hydrometer Used
Specific Gravity
NaPO4
152H
Total Mass of Air Dried Sampled gram
Mass of Air Dried Hydrometer Sample gram
Hygroscopic Moisture Content Correction gram
Mass of Oven Dried Hydrometer Sample gram
2.65
Oven
Dry
Mass
Total
Sample
Total Mass of Air Dry Sample gram
Mass of Mat'l ret'nd on 2mm Sieve gram
Mass of Mat'l Pssng on 2mm Sieve gram
Hygroscopic correction gram
Oven Dry Mass gram
ELAPSED
TIME
MINUTES
2
Pa = (((1606(R-1)a)/100) x 100 Pa = (Ra/W1) x 100
5
15
1440
18.0
18.0
For Hydrometer 151H:
Mass Can
Total Sample
Z = 100-(% ret on 2mm sieve)/100 P = (Ra/W1) x Z
% Passing Mass
Retained
Mass
Passing
Particle Size
Hygroscopic Moisture Determination
Mass of Oven Dry soil ( B - D)
% Hygroscopic Moisture (C/E) x 100
mm (alt)
Mass Retained
Sieve Size
Contractor Material Inspector Resident Engineer
Edward Flores Engr. Mohd Badr Syed Saleh
0.075 No. 200
98.49
Checked by: Edwardo Flores Title: Material Inspector Date: 02/01/1425H
33.90
47.3
Mass
Passing
%
Passing
From Accumulation
Curve
From Grading Washed
of Hydrometer Sample
PROJECT: Dualization of Majma'ah - Hafr Albaten Road, Section 7 Location: ________________
TESTED BY: Designation: M.E. Date : ______ _____
CHECKED BY : E. Flores Designation: M.I. Date : _____ _______
0.02 0.001 0.002 4
0.02 0.001 0.002 16
Edward Flores Engr. Mohd Badr Syed Saleh
Contractor Material Inspector Resident Engineer
HYDROMETER & MECHANICAL ANALYSIS OF SOIL
KING DOM OF SAUDI ARABIA
MINISTRY OF TRANSPORT
MATERIAL RESEARCH ND TESTING DEPARTMENT
CONTRACTOR CONSULTANT
AL HANOO - SUWAYKET COMPANY SAUDI TECH
3
4
5
0.0001 0.0010 0.0100 0.1000
P
e
r
c
e
n
t

S
o
i
l

S
u
s
p
e
n
d
e
d

Grain Diameter, mm
Accumulation Curve (hydrometer sample)
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
P
e
r
c
e
n
t

P
a
s
s
i
n
g

%

Particle Size (mm)
Particle Distribution Chart (Total Sample)
PROJECT: Dualization of Hafr Albaten , Umm Aljumajim Road, Section 7 Location: ___________
TESTED BY: Designation: M.E. Date : ______ ____
CHECKED BY : E. Flores Designation: M.I. Date : _____ ______
G
H
I
W1
J
L
M
N
Hydro
meter
Reading
Temp
Correction
(Table 5/6)
Corr.
Temp. R
Sp. Gr.
Corr.
a
% Soil
Susp.
Pa
Grain
Size d1
(Table 4)
KL KG Kn Corrected
1.019 -0.00193 1.0171 0.990 1.01 0.0400 0.800 0.980 0.890 0.0279
1.018 -0.00193 1.0161 0.990 1.01 0.0260 0.850 0.980 0.890 0.0193
1.016 -0.00210 1.0139 0.990 1.01 0.0150 0.865 0.980 0.880 0.0112
1.0115 -0.00210 1.0094 0.990 1.00 0.0100 0.905 0.980 0.880 0.0078
1.0105 -0.00204 1.0085 0.990 1.00 0.0074 0.915 0.980 0.890 0.0059
1.008 -0.00342 1.0046 0.990 1.00 0.0036 0.935 0.980 0.960 0.0032
1.005 -0.00227 1.0027 0.990 0.99 0.0015 0.960 0.980 0.930 0.0013
A gm 308.2
B gm 307.9
C gm 0.3 mm (alt)
D gm 83.6 50.80 2" 0 6572 100
E gm 224.3 37.50 1-1/2"
F % 0.13 25.00 1" 2487 4085.0 62
19.05 3/4" 616.5 3469 53
4.75 No. 4 1364.5 2104 32
2.00 No. 10 350 1754 27
0.85 No. 40 66.05 18
0.075 No. 200 52.64 14.0
0.020 23.20 6.19
65.97 66.05 0.002 6.20 1.65
52.57 52.64 0.001 3.30 0.88
Edward Flores Engr. Mohd Badr Syed Saleh
Contractor Material Inspector Resident Engineer
From Accumulation
Curve
0.425 No. 40
Checked by: Edwardo Flores Title: Material Inspector Date: 02/01/1425H
33.90
0.075 No. 200 47.3
Grading Washed Hydrometer
Oven Dry Mass ( H x I ) 99.87 From Grading Washed
of Hydrometer Sample
Sieve Size
Mass Retained
Mass
Passing
%
Passing
mm (alt)
Mass of Oven Dry soil ( B - D)
Mass Can + Oven Dry Sample Particle Size Mass
Retained
Mass
Passing
% Hygroscopic Moisture (C/E) x 100
Mass Can + Soil Z = 100-(% ret on 2mm sieve)/100 P = (Ra/W1) x Z
% Passing
Mass Water (A - B)
Mass Can
Pa = (((1606(R-1)a)/100) x 100 Pa = (Ra/W1) x 100 d = d1 x KL x Kn
Hygroscopic Moisture Determination Total Sample
250 23.5
1440 26.1
For Hydrometer 151H: For Hydrometer 152H:
15 28.9
30 28.9
60 29.1
ELAPSED
TIME
MINUTES
Temp
Reading C
2 29.6
5 29.6
2.65
Hygroscopic correction gram L x I 3384
Oven Dry Mass gram J + M 7758
Mass of Mat'l Pssng on 2mm Sieve gram G - J
7763
Mass of Mat'l ret'nd on 2mm Sieve gram 4374
3389
0.9987
Hydrometer Used Mass of Oven Dried Hydrometer Sample gram H x I 99.87
152H Oven
Dry
Mass
Total
Sample
Total Mass of Air Dry Sample gram G
Specific Gravity
Dispersing Agent Total Mass of Air Dried Sampled gram 6574.5
NaPO4
Mass of Air Dried Hydrometer Sample gram 100
Hygroscopic Moisture Content Correction gram 100/(100+F)
KING DOM OF SAUDI ARABIA
MINISTRY OF TRANSPORT
MATERIAL RESEARCH ND TESTING DEPARTMENT
AL HANOO - SUWAYKET COMPANY SAUDI TECH
CONTRACTOR CONSULTANT
HYDROMETER & MECHANICAL ANALYSIS OF SOIL
PROJECT: Dualization of Majma'ah - Hafr Albaten Road, Section 7 Location: ________________
TESTED BY: Designation: M.E. Date : ______ _____
CHECKED BY : E. Flores Designation: M.I. Date : _____ _______
0.02 0.001 0.002 4
0.02 0.001 0.002 16
HYDROMETER & MECHANICAL ANALYSIS OF SOIL
Edward Flores Engr. Mohd Badr Syed Saleh
Contractor Material Inspector Resident Engineer
MINISTRY OF TRANSPORT
MATERIAL RESEARCH ND TESTING DEPARTMENT
AL HANOO - SUWAYKET COMPANY SAUDI TECH
CONTRACTOR CONSULTANT
KING DOM OF SAUDI ARABIA
3
4
5
0.0001 0.0010 0.0100 0.1000
P
e
r
c
e
n
t

S
o
i
l

S
u
s
p
e
n
d
e
d

Grain Diameter, mm
Accumulation Curve (hydrometer sample)
0
10
20
30
40
50
60
70
80
90
100
0.001 0.010 0.100 1.000 10.000 100.000
P
e
r
c
e
n
t

P
a
s
s
i
n
g

%

Particle Size (mm)
Particle Distribution Chart (Total Sample)
3

Anda mungkin juga menyukai