Winder/Unwinder Scheduling Equations

2003 IEEE IAS Annual Meeting


Brian Thomas Boulter
Applied Industrial Control Solutions
231 Skyview Drive
Seven Hills, OH, USA 44131

Abstract- Non-recursive analytic equations describing the relationship between
translational speed, translational acceleration rates, material thickness, and roll-diameter
as a function of time are presented. These equations can be used to estimate winding &
unwinding times for scheduling product in winder and unwinder entry and exit sections
of web handling and strip processing lines. They can also be used to minimize jog time
by estimating the optimal diameter at which to begin line deceleration at core in
unwinding applications, and full roll in winding applications.
I. Introduction
A. Nomenclature
TH Strip/web thickness [m]
W Roll width [m]

R
Roll rotational speed [rad/sec]

M
Motor rotational speed [rad/sec]
V Roll surface speed [m/sec]
A
CC
Roll surface speed acceleration [m/sec^2]
D
EC
Roll surface speed deceleration [m/sec^2]
R
i
Roll radius [m]
R
EC
Empty core radius [m]
R
FR
Full roll radius [m]

M
Motor torque [Nm]
GR
M
Motor gear ratio
D 2 x Ri , Roll diameter [m]
t t
FINAL
0,

or Delta time [sec]
Roll diameter configuration definitions:

Fig. 1 Winding Applications Roll Configuration
In winding applications the diameter at which Line acceleration ends is defined as R
ACC
, and
occurs near core. The diameter at which Line deceleration starts is defined as

R
DEC
., and occurs
near full roll.

Fig. 2 Unwinding Applications Roll Configuration
In unwinding applications the diameter at which Line acceleration ends is defined as R
ACC
, and
occurs near full roll. The diameter at which Line deceleration starts is defined as

R
DEC
., and
occurs near core.
Paper Overview
The time domain equations that describe winding and unwinding of rolls are recursive and given
below.
; (1)
Where, assuming a perfect transmission system, and no clutch or roll winding slippage, the
motor and roll rotational speeds are defined as:
; (2)
; (3)
The author has derived a simple set of exact analytic equations that solve the above recursive
equations and provide the control engineer an equation set which can be used for calculating
approximate winding and unwinding times and estimating the roll diameter at any point in time
during the build-up/wind-down of the roll. This is accomplished without the need to solve (1) and
(2) with a numerical integration based equation solver.
The paper is divided into four sections. The first section is composed of this introduction and the
paper nomenclature, the second section defines the equation set, the third section provides
some useful examples. Observations and conclusions are presented in the fourth section
II. The Equation Set
The tedious derivations of the following equations are not presented in this paper, and are left
up to the interested reader as an exercise.
A. Diameter during accelerating line speed
It can be shown that for a given web/strip thickness, a given starting roll radius, and a given
accelerating line-speed the following equations (4a,b) yield R(t), the roll radius as a function of
time, and R
ACC
, the roll radius after t [sec] of acceleration. Note that the units must be
consistent. If the units described in the nomenclature are used they will be consistent.
Winding Unwinding
(4a)
(4b)
The time for acceleration can be computed with Eq. (5), assuming consistent units.
; (5)
B. Calculating the "Start deceleration" diameter
It can be shown that the diameter at which to begin deceleration is calculated as a function of
the line speed from which the deceleration begins, Eq. (6).
Winding Unwinding

(6)
Where R
DEC
is the roll radius at which to begin deceleration, and R
FR
and R
EC
are the target
ending roll radii.
C. Diameter during constant line speed
It can be shown that Eqs (7a,b) yield R(t), the roll radius as a function of time, and R
DEC
, the roll
radius after t [sec] of constant translational line speed run time.
Winding Unwinding
(7a)
(7b)
Where R
DEC
is the radius of the roll when deceleration must take place, found with Eq.
(7b). R
ACC
is the radius of the roll at the end of line acceleration, found with Eq. (4b).
The constant translational speed winding/unwinding time can be calculated as a function of
known radii, calculated with Eqs (4b) and (6):
; (8)
Note that R
DEC
obtained with Eqs (6) and (7b) is consistent.
D. Diameter during decelerating line speed
It can be shown that the equations describing the change in diameter during deceleration (9a,b)
are:
Winding Unwinding

(9a)
(9b)
The time for deceleration can be computed with (10), assuming consistent units.
; (10)
E. Rotational velocity during acceleration
It can be shown that the rotational speed of the roll during line acceleration from a stalled
condition can be calculated as a function of time (11).
Winding [rad/sec] Unwinding [rad/sec]

; (11)
In units of [rpm]
Where R
EC
and R
FR
are the radius of the roll at t=0.
F. Rotational velocity during line run
It can be shown that the rotational speed of the roll during the constant translational line speed
run time can be calculated as a function of time (12).
Winding [rad/sec] Unwinding [rad/sec]
(12)
;
G. Rotational velocity during deceleration
It can be shown that the rotational speed of the roll during line deceleration, Eq. (13), is:
Winding [rad/sec] Unwinding [rad/sec]

(13)
;
H. Maximum Rotational Velocity
The maximum rotational velocity will occur at core. For winding applications this will occur at the
end of the line acceleration. For unwinding applications this will occur at the beginning of line
deceleration. Eq. (14) computes these two values using Eqs (3,4b,6).
Winding [rad/sec] Unwinding [rad/sec]
; (14)
III. Three Examples
The following examples are for a system with the following roll and line-speed profiles. The slow
acceleration and deceleration rates are not typical, and are chosen for the purpose of
demonstration only:
Line speed 1000 [m/min]
GR 5
A
CC
5 [m/min/sec]
D
EC
5 [m/min/sec]
TH 0.0005 [m]
R
EC
0.1 [m]
R
FR
1.5 [m]
Example 1. Roll buildup from empty core to full roll
The following example demonstrates how to combine the above equations to calculate the roll
time for a roll buildup from core to full roll. Graphs of the roll build-up can be computed using the
described equations.
Step 1: Calculate T
ACC
: Eq. (5); T
ACC
= 200 [sec]
Step 2: Calculate R
ACC
: Eq. (4b); R
ACC
= 0.525 [m]
Step 3: Calculate R
DEC
: Eq. (6); R
DEC
= 1.406 [m]
Step 4: Calculate T
RUN
: Eq. (8); T
RUN
= 644 [sec]
Step 5: Calculate T
DEC
: Eq. (10); T
DEC
= 200 [sec]
Step 6: Calculate run time: T
ACC
+ T
RUN
+T
DEC
= 1044 [sec]
A graph (Fig. 3) of motor speed as a function of time for winding applications can be created
using Eqs (11,12,13).

Fig. 3. Winding Motor Speed
A graph (Fig. 4) of diameter build-up with time can also be created using Eqs (4a, 7a, 9a).

Fig. 4. Winding Roll Diameter
Example 2. Roll unwind from full roll to empty core
The following example demonstrates computations for a roll wind-down from full roll to core.
Graphs of the roll unwinding can be computed using the described equations.
Step 1: Calculate T
ACC
: Eq. (5); T
ACC
= 200 [sec]
Step 2: Calculate R
ACC
: Eq. (4b); R
ACC
= 1.406 [m]
Step 3: Calculate R
DEC
: Eq. (6); R
DEC
= 0.525 [m]
Step 4: Calculate T
RUN
: Eq. (8); T
RUN
= 644 [sec]
Step 5: Calculate T
DEC
: Eq. (10); T
DEC
= 200 [sec]
Step 6: Calculate run time: T
ACC
+ T
RUN
+T
DEC
= 1044 [sec]
A graph (Fig. 5) of motor speed as a function of time for unwinding applications can be created
using Eqs (11,12,13).

Fig. 5. Unwinding Motor Speed
A graph of diameter wind-down with time can also be created using Eqs (4a, 7a, 9a), as shown
in Fig. 6

Fig. 6. Unwinding Roll Diameter
Example 3. Sizing a Winder/Unwinder motor.
The described equations can also be useful when prescribing a winder/unwinder motor.
In applications where the ratio of R
FR
to R
EC
is greater than the ratio of the fully-weakened-field
motor speed to the motor base-speed, the motor is sized to provide enough torque to deliver
application maximum tension at R
FR
. And the motor base speed and/or gearing are adjusted to
meet the speed requirement at core. To overcome the need for increasing the motor base
speed and/or lowering the gearing, and consequently increasing the motor power and frame
size, applications that set field strength as a function of roll radius taper the line-speed reference
between R
EC
and the radius at which the field is fully weakened for the given line-speed, to
ensure that the armature voltage does not exceed the design rated value. Other applications
that use a "Maxi-torque" method, use a closed loop form of speed tapering that effectively does
the same thing.
It will be shown that, in certain applications, the motor need not be sized for maximum speed at
core, but rather for the maximum rotational speed at the end of acceleration for winding
applications, or the maximum rotational speed at the start of deceleration in unwinding
applications. The savings resulting from choosing a smaller frame size can be significant in high
power applications.
Eq (15) is used to calculate the maximum rotational speed of the motor as a function of the
acceleration rate, and material thickness, for a given line speed and empty core roll radius. This
speed will always be less than the theoretical top speed expressed in Eq (16).
Winding [rad/sec] Unwinding [rad/sec]



; (16)

M(MAX)
is calculated with the minimum strip/web thickness, which results in minimum build-up in
the roll during acceleration, and hence, maximum rotational velocity at R
ACC
. A similar argument
can be made for unwind applications.
For the system in Example 1.

M(MAX)
= 159 [rad/sec] or 1517 [rpm]

M(MAX)@REC
= 833 [rad/sec] or 7958 [rpm]
A significant difference. The observed difference is due to the use of a low acceleration rate and
a small core radius. If a more reasonable acceleration rate is used, such as 50 [m/min/sec], we
obtain:

M(MAX)
= 436 [rad/sec] or 4163 [rpm]
Still a significant difference. This shows that even with a 15:1 roll build-up ratio, a 1750 [rpm]
base speed motor could be used with only a 2.3:1 field range. This shows clearly that a motor
with a much smaller frame than the one resulting from a design using the theoretical maximum
rotational speed, can be used in this application. The larger the core, and the thinner the
material, the less this effect will be observed.
To take advantage of this observation in winding applications, an algorithm may be deployed
that weakens the field based on rotational speed reference during acceleration, then switches to
field strengthening as a function of R
i
/R
ACC
at radii greater than R
ACC
. In unwinding applications
the algorithm may weaken the field as a function of R
i
/R
DEC
at radii greater than R
DEC
and then
switch to field strengthening based on rotational speed reference during deceleration.
In some applications, the field may reach full strength at a radius less than R
FR
during run. This
implies that the motor, which must be sized with adequate torque to maintain maximum
application tension at full roll, may be significantly oversized at core, and be wasting significant
amounts of horsepower for much of its operating time. It is always best to size the motor such
that the radius at which the motor reaches full field strength is R
FR
, and adjust the
acceleration(winder)/deceleration(unwinder) rates so that maximum fully-weakened-field motor
speed is realized at R
ACC
in winding applications, and R
DEC
in unwinding applications. If this
methodology is employed in the application, and maximizing torque at core is not required, the
field may be left fully weakened from core to R
ACC
in winding applications, and from R
DEC
to core
in unwinding applications.
A full description of the methodology behind selecting a motor and specifying a speed and field
reference algorithm for a winding/unwinding application is outside the scope of this paper. It
must take into consideration such phenomena as: 1) Motor over-torqueing duty cycles and the
amount of over-torqueing that will be required of the motor while accelerating and decelerating
the system inertia at full roll 2) Torque required to overcome system friction and windage losses
3) Tension tapering profiles that minimize starring, and telescoping phenomena during winding
4) Accumulator storage, and process line speeds 5) The relationship between process thruput,
overhead costs and profit margins. It is left as the subject of discussion in a future paper.
In applications that lack a clean (digital) motor speed reference that is calculated based on a
master line speed reference and measured or estimated roll radius, the equations that model
rotational motor speed can be used to provide a feed-forward reference to the algorithm that
controls field weakening. This helps to alleviate the poor performance that is often encountered
in those applications where speed feedback is used as the reference for field weakening
algorithms in Maxi-torque schemes. This is especially true when a closed loop trim algorithm
designed to prevent the armature voltage from exceeding its rated value, is summed into the
field reference.
If the system allows for scheduling of the acceleration and deceleration rates, Eq. (17) can be
used to schedule these rates based on a given strip thickness, and a maximum rotational motor
speed.
Winding/Unwinding [m/sec^2]
(17)
IV. Conclusions
The set of equations presented in this paper provide a framework for scheduling winding and
unwinding operations in strip/web processing lines. The potential application of these equations
is broad in scope. They can be used to optimize many aspects of winding, including providing
guidance in selecting motors. It is left up to the reader to identify specific applications in which
they may be applied, based on a given set of operational requirements. The author has
employed these and other equations found in [1], [2], [3], [4], [5] in a well received proprietary
optimization program that configures recipes for winding and unwinding operations, while
specifying the least expensive motor for the given application, and the specified design
constraints.
Caveats
The equations presented in this paper are not complete in so far as the effects of applying an
"s-curve" to the speed reference are not considered. Also, the effects of air-entrainment, and
radial pressure are ignored. Given that the metals industries do not usually employ significant
"s-curved" speed references, and both air-entrainment and radial pressure phenomena are only
slightly significant in foil applications, the equations presented here-in can be deployed in those
applications with little or no error in the results.
One final caveat is that the accuracy of the equations is linearly dependant on the accuracy of
the material thickness measurement. For example, if the thickness measurement is incorrect by
1 part in 100, the calculated radius will also be incorrect by the same amount at any instant in
time.
References
[1] B. T. Boulter, "The Effect of Speed Loop Bandwidths on System Natural Frequencies in
Multi-Zone Strip Processing Lines" , Transactions of the IEEE-IAS, pp. 126 - 134 Jan/Feb.
1999,
[2] B. T. Boulter, " Improving Bridle Low-Speed Regulation Using Cascaded Current
Followers ", Transactions of the IEEE-IAS, pp. 1074-1082, Jul/Aug 2001,
[3] B. T. Boulter, " Applying Drive Performance Specifications to Systems Applications Part I,
Speed Performance ",Transactions of the IEEE-IAS, pp. 1082-1088, Jul/Aug 2001,
[4] B. T. Boulter, " Applying Drive Performance Specifications to Systems Applications Part II,
Torque/Current Regulation",Proceedings of the 36
th
IEEE IAS Conference, Chicago IL. Oct.
2001,
[5] B. T. Boulter, " Applying Drive Performance Specifications to Systems Applications Part III,
Position Regulation",Proceedings of the 37
th
IEEE IAS Conference, Pittsburgh PA. Oct. 2002,