Anda di halaman 1dari 9

READ!

ME

Evaporation cooling

Thermocompressor design

Steady state: calculate temperature a


Transient:
calculation of time cour

Laval nozzle
Motion steam

Input parameters are in


Condenser
Evaporated
water

Cooling box

Strana 1

READ!ME

design

e: calculate temperature at the cooling box for given mass flowrate of motion steam
calculation of time course of temperature in the cooling box
blue cells

Strana 2

COOLING-STEADY STATE

Evaporation cooling

90

Thermocompressor design

80

70
Ambient temperature [C]
60
40
50
2
Area
of
cooling
box
walls
[m
]
40
T1=
157.7967
30
M [kg/s]=
0.01
100
20
Heat transfer coef. [W.m-2.K-1]
Condenser ,(the
cooling
compressor
water output)
10
0
T5[C]
40
30
20
p5[MPa]
0.007351 Antoine equation lnp=A-B/(C+T) is used
Evaporated water (the compressor suction) Kappa=
1.13 0.11504425
T2[C]
p2[MPa] Pe=p1/p2 Pk=p5/p2 fe=Me/Mp fm=Mp/Me
Me[kg/s]
30 0.00422
147
1.74
1.86
0.54 0.018609
29 0.00398
156
1.85
1.74
0.58 0.017386
28 0.00375
165
1.96
1.63
0.61 0.016324
27 0.00354
175
2.08
1.54
0.65 0.015390
26 0.00333
186
2.21
1.46
0.69 0.014562
25 0.00314
197
2.34
1.38
0.72 0.013821
24 0.00296
210
2.49
1.32
0.76 0.013153
23 0.00278
223
2.64
1.25
0.80 0.012548
22 0.00262
237
2.81
1.20
0.83 0.011995
21 0.00246
252
2.99
1.15
0.87 0.011489
20 0.00231
268
3.18
1.10
0.91 0.011024
19 0.00217
286
3.39
1.06
0.94 0.010593
18 0.00204
304
3.61
1.02
0.98 0.010194
17 0.00191
324
3.85
0.98
1.02 0.009822
16 0.00179
346
4.10
0.95
1.06 0.009476
15 0.00168
369
4.38
0.92
1.09 0.009151
14 0.00157
394
4.67
0.88
1.13 0.008847
Q-[kW]

Motion steam parameters


p1[MPa]=
0.62

Strana 3

COOLING-STEADY STATE

STEADY STATE COOLING

90
80
70
60
50

40
30
20

Qchl[kW]

10

Qztraty[kW]

0
20

22

24

26
28
T-suction [C]

30

32

Qchl[kW] Qztraty[kW]
44.662
30
41.727
33
39.178
36
36.937
39
34.949
42
33.171
45
31.568
48
30.114
51
28.789
54
27.574
57
26.457
60
25.423
63
24.465
66
23.574
69
22.742
72
21.963
75
21.233
78

Strana 4

TRANSIENT

Evaporation cooling : transient

T1[C]= 157.7967
Mp [kg/s]= 0.01
(mass flowrate)

100 [kg]
Initial temperature of water [C]=
Ambient temperature [C]
35
START UP
40
30
25
Area of cooling box walls [m2]
20
100
T [C]

Mass of water in evaporator M=


Motion steam parameters
p1[MPa]= 0.62

15

Heat transfer coef. [W.m-2.K-1]


Condenser ,(the
cooling
compressor
water output)
10
5
T5[C]= 40
5
0
p5[MPa] 0.007351 Antoine equation lnp=A-B/(C+T) is used
0
Evaporated water (the compressor suction)
Kappa= 1.13
0.115044248
Assuming, that the largest mass of water is in the evaporator tank, the analysis of transient start-up or shut-do
M.cp.dT/dt = - Me.r+S.k.(Te-T), where Me is the mass flowrate of evaporated water and r(T) is the latent heat of water

This is a ordinary differential equation which must be evaluated numerically if the heat of evaporation is not a
Nevertheless it will be interesting to compare the numerically obtained results with the analytical solution for r
The numerical solution in the column A is explicit. R
Its your bussines to find out the analytical solution.
Time step of numerical integration 100
[s]
T2[C]
p2[MPa] Pe=p1/p2 Pk=p5/p2 fe=Me/Mp
r[kJ/kg]
Me[kg/s]
30 0.00422
147
1.74
1.86
2459
0.018609
20.30 0.00235
263
3.12
1.12
2485
0.011157
16.04 0.00180
345
4.09
0.95
2496
0.009489
13.25 0.00150
414
4.91
0.86
2504
0.008631
11.29 0.00131
472
5.60
0.81
2509
0.008109
9.86 0.00119
520
6.16
0.78
2513
0.007764
8.81 0.00111
559
6.62
0.75
2515
0.007525
8.01 0.00105
590
7.00
0.74
2518
0.007354
7.41 0.00101
615
7.29
0.72
2519
0.007229
6.96 0.00098
635
7.53
0.71
2520
0.007136
6.61 0.00095
651
7.71
0.71
2521
0.007067
6.34 0.00094
663
7.86
0.70
2522
0.007015
6.14 0.00092
673
7.97
0.70
2522
0.006975
5.98 0.00091
680
8.06
0.69
2523
0.006945
5.86 0.00090
686
8.13
0.69
2523
0.006922
5.76 0.00090
690
8.19
0.69
2523
0.006904
5.69 0.00089
694
8.23
0.69
2524
0.006890
5.64 0.00089
697
8.26
0.69
2524
0.006880
5.59 0.00089
699
8.29
0.69
2524
0.006872
5.56 0.00089
700
8.30
0.69
2524
0.006865
5.53 0.00088
702
8.32
0.69
2524
0.006861
5.51 0.00088
703
8.33
0.69
2524
0.006857
5.50 0.00088
703
8.34
0.69
2524
0.006854
5.49 0.00088
704
8.35
0.69
2524
0.006852
5.48 0.00088
704
8.35
0.69
2524
0.006850
5.47 0.00088
705
8.36
0.68
2524
0.006849
5.47 0.00088
705
8.36
0.68
2524
0.006848

Strana 5

TRANSIENT
5.46
5.46
5.46

0.00088
0.00088
0.00088

705
705
706

8.36
8.36
8.37

Strana 6

0.68
0.68
0.68

2524
2524
2524

0.006847
0.006846
0.006846

TRANSIENT

cp[J/kg/K]= 4.2

START UP - COOLING

T
Q [kW]

50
40
30
20

Q [kW]

30

10

1000

2000

3000

0
4000

t [s]

analysis of transient start-up or shut-down can be restricted to the heat balance of evaporator
d water and r(T) is the latent heat of water

cally if the heat of evaporation is not a constant


results with the analytical solution for r=const.
solution in the column A is explicit. Rewrite it to the more precise implicit form.
Qcool[kW] Qlosses time [s]
T
Q [kW]
45.760
5
0
30
45.760
27.727
9.852
100 20.29519
27.727
23.689
11.980
200 16.03936
23.689
21.611
13.374
300 13.25164
21.611
20.346
14.355
400 11.29045
20.346
19.509
15.068
500 9.864078
19.509
18.928
15.597
600 8.806755
18.928
18.513
15.993
700 8.01349
18.513
18.210
16.293
800 7.413488
18.210
17.986
16.521
900 6.957082
17.986
17.817
16.696
1000 6.608489
17.817
17.690
16.829
1100 6.341444
17.690
17.594
16.932
1200 6.136417
17.594
17.521
17.011
1300 5.978744
17.521
17.464
17.071
1400 5.857336
17.464
17.421
17.118
1500 5.763762
17.421
17.388
17.154
1600 5.691589
17.388
17.363
17.182
1700 5.635892
17.363
17.343
17.204
1800 5.592891
17.343
17.328
17.220
1900 5.559681
17.328
17.316
17.233
2000 5.534027
17.316
17.307
17.243
2100 5.514205
17.307
17.300
17.251
2200 5.498887
17.300
17.295
17.256
2300 5.487049
17.295
17.291
17.261
2400 5.477899
17.291
17.288
17.265
2500 5.470826
17.288
17.285
17.267
2600 5.465359
17.285

Strana 7

TRANSIENT
17.283
17.282
17.281

17.269
17.271
17.272

2700 5.461132
2800 5.457865
2900 5.455339

Strana 8

17.283
17.282
17.281

GRAPHS
STEADY STATE COOLING

90
80

Qchl[kW]
Qztraty[kW]

70

Q-[kW]

60
50
40
30
20
10
0
20

22

24

26
T-suction [C]

28

30

35

32

50

START UP - COOLING

45

30

40
T

35

T [C]

Q [kW]

20

30
25

15

20
15

10

10
5

0
0

500

1000

1500

2000

2500

t [s]

Strana 9

3000

0
3500

Q [kW]

25