QATAR PROJECTS
Package name Owner $ million* Status Consultant Principal contractor Start date End date
AT A GLANCE
*List includes projects worth over $137 million only. **ITB = invitation to bid; EPC = engineering, procurement and construction; FEED = Front-end engineering design
Al Khor Highway Public Works Authority (Ashghal ) 300 Design Parsons Not yet appointed 2013 2017
Al Khor Stadium - Qatar 2022 Fifa World Cup Qatar Football Association (QFA) 251 Design Albert Speer & Partner (AS&P) Not yet appointed 2015 2019
Al Shamal Stadium - Qatar 2022 Fifa World Cup QFA 285 Design AS&P Not yet appointed 2015 2019
Al Thumama Sports Hall Qatar Olympic Committee (QOC) 250 EPC Dar Al Handasah Consolidated Contracting Company (CCC) 2013 2015
Al Wakrah Stadium - Qatar 2022 Fifa World Cup QFA 286 Design AS&P Not yet appointed 2015 2019
Bin Samikh Tower Tanmiyat Real Estate Investment 137 Construction Harinsa Contracting Company Qatar 2007 2013
Burj Al Marina Qatari Diar Real Estate Investment Company (QDREIC) 360 Construction Erga Group-Real Estate Investment & Services Company (Reisco) Redco International Company 2010 2013
Doha Convention Tower QDREIC 1,500 EPC ITB Hyder Consulting Middle East Not yet appointed 2013 2018
Doha Dukhan Highway - Al Mael Roundabout to Bani Hajer Roundabout Ashghal 1,000 Construction WS Atkins QD-SBG Construction Company 2011 2014
Doha Expressway - Phase Six - East Industrial Road Upgrade Ashghal 200 Construction Parsons Sinohydro Corporation 2011 2014
Doha Expressway - Phase XII (F Ring Road) Ashghal 230 Construction Parsons CCC-Teyseer Trading and Contracting Company 2011 2017
Doha Expressway - Phase XIII (Al Muntazah Highway) Ashghal 500 Construction Parsons Al Jaber & Partners Construction & Energy 2012 2015
Doha Festival City Bawabat Al Shamal 1,600 EPC ITB Arab Engineering Bureau (AEB)-DP Architects Arabian Construction Company (ACC)-Amana Steel Buildings Contracting 2013 2015
Doha Metro Network - Golden Line Qatar Railways Development Company (QRDC) 3,000 EPC ITB Turner & Townsend Not yet appointed 2013 2016
Doha Metro Network - Green Line QRDC 3,000 EPC ITB Turner & Townsend Not yet appointed 2013 2016
Doha Metro Network - Red Line QRDC 3,000 EPC ITB Turner & Townsend Not yet appointed 2013 2016
Doha Metro Network (Overview) QRDC 37,000 Design Louis Berger Group-Hill International-Punj Lloyd-Jacobs Engineering Not yet appointed 2013 2020
Group- Egis Rail-DB International-Turner & Townsend
Doha Port Stadium Qatar 2022 Fifa World Cup QFA 200 Design AS&P Not yet appointed 2015 2019
Education City People Mover QRDC 224 Construction Deutsche Bahn (Die Bahn)-Turner & Townsend Siemens Transportation Systems-Al Habtoor Leighton Group 2012 2015
Education City South East Underground Car Park Qatar Foundation 250 EPC ITB Atkins Not yet appointed 2013 2014
Education City Stadium - Qatar 2022 Fifa World Cup QFA 287 Design Arup Not yet appointed 2013 2019
Education City West Car Park Qatar Foundation 225 Construction WS Atkins & Partners Overseas MAN Enterprise 2012 2014
El Gharafa Stadium Expansion - Qatar 2022 Fifa World Cup QFA 202 Design AS&P Not yet appointed 2015 2019
Export Gas Compression Facilities Upgrade Dolphin Energy 250 EPC JGC Corporation L & T - Larsen & Toubro 2012 2015
Faculty of Islamic Studies Qatar Foundation 212 Construction KEO International Consultants CCC 2011 2013
Hamad Bin Khalifa Medical City Ashghal 534 EPC EC Harris Hyundai Engineering & Construction 2010 2013
Lusail Development - CP4 Marafeq Qatar-LREDC 300 EPC Marafeq Qatar- Cowi- Halcrow-Hyder Consulting Yuksel Construction-Midmac Contracting Company 2012 2014
Lusail Iconic Stadium - Qatar 2022 Fifa World Cup QFA 660 Design Davis Langdon-Mace International-Foster + Partners-Hyder Consulting Not yet appointed 2015 2019
Lusail Light Rail Transit Network QRDC 1,800 EPC ITB Turner & Townsend Qatari Diar Vinci Construction (QDVC) 2013 2016
Lusail Marina Iconic Development Katara Hospitality 467 Design Not yet appointed Not yet appointed 2014 2016
Mesaieed Steel Plant Expansion Qatar Steel Company (Qasco) 1,250 EPC Inteco Siemens 2012 2013
Msheireb - Phase 1B Msheireb Properties 650 Construction Arup-Bauer-Aecom-Burns & McDonnell Bauer-Al Futtaim Carillion-Qatar Building Company-Medgulf Construction 2011 2014
Msheireb - Phase 1C Msheireb Properties 500 Construction Arup-Aecom-Burns & McDonnell Multiple-Medgulf Construction 2012 2014
Msheireb - Phase Two Msheireb Properties 1,000 EPC Arup-Aecom-Burns & McDonnell-Gensler-Allies and Morrison Arabtec Construction 2012 2015
New Doha Port - Container Terminal and Infrastructure Package Ministry of Economy and Finance 275 EPC ITB WorleyParsons Not yet appointed 2013 2015
New Doha Port - Phase One Ministry of Economy and Finance 4,000 EPC Royal Haskoning-Cowi-WorleyParsons-Scott Wilson Kirkpatrick China Harbour Engineering Company 2011 2015
Northgate Mall Shopping Al Afaq Real Estate-Equinox 412 EPC Callison Al Habtoor Leighton Group 2011 2014
Qatar Power Transmission System Expansion - Phase 11, Stage One - Substations General Electricity & Water Corporation (Kahramaa) 1,000 Feasibility Study Lahmeyer-Mott MacDonald Unknown 2014 2015
Qatar Power Transmission System Expansion - Phase Nine Kahramaa 2,000 EPC Energoprojekt National Contracting Company (NCC)-Hyosung Corporation- 2009 2013
Mitsubishi Electric-Areva-Siemens
Qatar University Stadium - Qatar 2022 Fifa World Cup QFA 300 Design AS&P 2015 2019
Ras Laffan Condensate Refnery Expansion Laffan Refnery Company 1,000 EPC ITB JGC Corporation-APS Engineering Company Not yet appointed 2013 2015
Ras Laffan Dry Dock - Phase Six Qatar Gas Transport Company (Nakilat) 175 Feasibility Study Unknown Not yet appointed 2014 2016
Ras Laffan Independent Water & Power Project Expansion Kahramaa 3,000 EPC ITB Kahramaa Not yet appointed 2013 2016
Shemoukh Twin Towers Project Real Estate Services Group (RESG) 165 Construction EHAF Consulting Engineers SEG - Societe dEntreprise & de Gestion 2010 2013
Sheraton Hotel Park QDREIC 340 Construction Qatar Design Consortium QDVC 2010 2014
Solar Power Plant (Overview) Kahramaa-Qatar Solar Technologies 660 Feasibility Study Iberdrola Not yet appointed 2013 2015