A pressure drawdown test is simply a series of bottom-hole pressure
measurements made during a period of flow at constant production rate. Usually the well is closed prior to the flow test for a period of time sufficient to allow the pressure to stabilize throughout the formation, i.e., to reach static pressure. 1. PRESSURE DRAWDOWN TEST As discussed by Odeh and Nabor,1 transient flow condition prevails to a value of real time approximately equal to Semi-steady-state conditions are established at a time value of Idealized rate schedule and pressure response for drawdown testing Idealized rate schedule and pressure response for drawdown testing Three periods for analysis: Transient or early flow period is usually used to analyze flow characteristics; Late transient period is more completed; and Semi-steady-state flow period is used in reservoir limit tests. FLOW HISTORY CLASSIFICATIONS PR : Hitung Permeabilitas efektif dan skin-nya